Contracting
guidebook_intracting_web
guidebook_intracting_web
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
6.2/ Agreement model<br />
Agreement<br />
No.<br />
between the following parties:<br />
the Energy department<br />
and<br />
the “client” department, namely<br />
regarding<br />
the provision of financial resources<br />
for energy saving measures<br />
1/ Preamble<br />
The Energy department has been endowed with a municipal budget line to finance energy saving measures<br />
in municipal buildings. The objective is to achieve rapid implementation of these measures.<br />
2/ Location and description of the measures<br />
Location:<br />
Description:<br />
3/ Funding<br />
Total cost of the energy measure: € including VAT<br />
(as determined by the Buildings department)<br />
Full or partial funding of % is necessary.<br />
Release of funding from the Energy department of € is therefore required.<br />
The funding requirement is justified by the appended calculations.<br />
The “client” department is responsible for checking whether funding is required.<br />
This funding can only be granted in financial year .<br />
As a general rule, funding cannot be carried over to the next financial year.<br />
The financial resources to implement the measure shall be transferred from the “energy saving measures in<br />
municipal buildings” project’s budget item to the client department’s budget.<br />
The “client” customer must submit a budget transfer request to the energy department for acceptance. Once<br />
accepted, the request is sent by the energy department to the finance department and entered into the<br />
accounts.<br />
4/ Cost-efficiency and payback period<br />
The energy department estimates that the energy efficiency measures will deliver the following annual<br />
savings:<br />
kWh Heating (Gas, district heating, fuel oil)<br />
kW Power (Gas, district heating)<br />
kWh Electricity<br />
kW Electric power<br />
m³ Water<br />
kg CO 2<br />
emissions<br />
A breakdown of the calculation is appended.<br />
In total, annual energy cost savings are estimated at:<br />
€ (Heat)<br />
€ (Water)<br />
€ (Electricity) i.e., total savings of:<br />
––––––––––––––––––––––––––<br />
€<br />
Based on these total annual savings, payback is years<br />
Infinite Solutions Guidebook – Internal <strong>Contracting</strong>