12.12.2012 Views

Chlorine Monitoring and Dechlorination Techniques Handbook

Chlorine Monitoring and Dechlorination Techniques Handbook

Chlorine Monitoring and Dechlorination Techniques Handbook

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Chlorine</strong> <strong>Monitoring</strong> <strong>and</strong> Dechlorinating <strong>Techniques</strong> H<strong>and</strong>book<br />

higher than 1 m so that the dechlorinating agent does not have to be lifted by the operator<br />

during the process. A chemical metering pump can be fitted to the top of the injection point<br />

to allow the operator to control the flow rate of dechlorinating chemicals into the injection<br />

point.<br />

4.6 Constructed Ponds<br />

Large constructed ponds are not likely to be used for short term or emergency response<br />

situations. However, they may be appropriate for long term or permanent discharges. Details<br />

of holding ponds are provided in Section 5.0.<br />

Page 32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!