higher than 1 m so that the dechlorinating agent does not have to be lifted by the operator<br />
during the process. A chemical metering pump can be fitted to the top of the injection point<br />
to allow the operator to control the flow rate of dechlorinating chemicals into the injection<br />
point.<br />
4.6 Constructed Ponds<br />
Large constructed ponds are not likely to be used for short term or emergency response<br />
situations. However, they may be appropriate for long term or permanent discharges. Details<br />
of holding ponds are provided in Section 5.0.<br />
Page 32