12.12.2012 Views

Chlorine Monitoring and Dechlorination Techniques Handbook

Chlorine Monitoring and Dechlorination Techniques Handbook

Chlorine Monitoring and Dechlorination Techniques Handbook

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Construct the injection point<br />

<strong>Chlorine</strong> <strong>Monitoring</strong> <strong>and</strong> Dechlorinating <strong>Techniques</strong> H<strong>and</strong>book<br />

The injection point should be constructed to intercept the inlet pipe to the pond. This allows<br />

mixing prior to the water entering the pond.<br />

A chemical metering pump 6 can be fitted to the top of the injection point to allow the<br />

operator to control the flow rate of dechlorinating chemicals into the injection point. Some<br />

specifications for pumps are attached in Appendix C. To calculate the dosing rate of<br />

dechlorinating agent in solution, refer to Section 3.0. Routine monitoring of the water for<br />

chlorine residuals should occur to ensure proper dechlorination.<br />

In the case of a pond, the structure is likely to be permanent. In this case it is recommended<br />

that a shed be constructed to house the dechlorinating chemicals, <strong>and</strong> the chemical metering<br />

pump. Power would need to be provided to the site. The shed should be kept locked to<br />

prevent tampering. The shed will also ensure that the chemical metering pump is protected<br />

from the elements.<br />

It is also recommended that some rip-rap be placed at the base of where the inlet pipe will<br />

discharge water into the pond. This will prevent erosion of sediments on the base of the pond<br />

<strong>and</strong> discourage sediments from being churned up by the energy of the incoming water.<br />

5.2 In-line Injection<br />

The in-line injection method involves mechanically injecting dechlorinating agent into some<br />

type of piping system. As the type of systems that may require this approach varies greatly,<br />

only general concepts can be provided in this h<strong>and</strong>book.<br />

Injection Point<br />

The injection point should be constructed to intercept the existing piping a minimum of 10<br />

m from the point of discharge to a receiving water body. The system must ensure sufficient<br />

mixing of the chlorinated water with the dechlorinating agent while the water is still inside<br />

the pipe. The method of injection should also ensure throughout mixing of the water with the<br />

dechlorinating agent.<br />

Flow Measurement<br />

In a pipe with relatively constant flow, a metering system can be set at one specific addition<br />

rate. No monitoring of the flow in the pipe would be required. However, if large variations<br />

6<br />

Chemical metering pumps are available from local suppliers.<br />

Page 36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!