04.04.2017 Views

KING THE CORPORATION OF THE TOWNSHIP OF KING

2oCLS1i

2oCLS1i

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Planning Department Report P-2017-15<br />

Page 10<br />

Technical Updates<br />

> Preamble: A preamble section is included in the Urban Areas ZBL to explain how<br />

to use the document, and how certain sections and provisions function in relation<br />

to others.<br />

> Definitions: The Urban Areas ZBL includes over 200 definitions that have been<br />

reviewed, updated and modified to incorporate contemporary standards and<br />

terminology. All uses permitted are defined in the ZBL, and all defined terms are<br />

italicized.<br />

> Structure, Format and Appearance: The structure and appearance of the Urban<br />

Areas ZBL text and mapping has been modernized and updated to enable easier<br />

interpretation and readability.<br />

> Illustrations: Illustrations have been added alongside certain definitions to provide<br />

additional clarity with respect to interpretation.<br />

The changes proposed in the new Urban Areas ZBL highlighted above are those that<br />

are most notable. Those having interest in the ZBL are encouraged to review the<br />

document (attached as Appendix B) to understand how the proposed changes may<br />

affect certain properties.<br />

Next Steps and Considerations<br />

The presentation of the final draft of the Urban Areas ZBL represents a significant<br />

milestone in the Review process. Comments and input received on the first draft of the<br />

Urban Areas ZBL (November 2016) has been considered in the preparation of the final<br />

draft presented to Council at this statutory Public Meeting. The final draft has been<br />

circulated to relevant agencies and departments and has been published on King's<br />

website for public review and comment.<br />

Planning staff acknowledges the comments received by the public on the final draft of<br />

the Urban Areas ZBL to date. Planning staff, in cooperation with the Township's planning<br />

consultants MMM Group, will consider all comments provided on the final draft and will<br />

undertake any necessary revisions in preparation the final Urban Areas ZBL to be<br />

brought forward for Council's consideration at a subsequent meeting in May 2017. It is<br />

respectfully requested that comments on the final draft (dated March 2017) be provided<br />

to the Township by April 13, 2017.<br />

The primary focus of the King City and Schomberg phase of the ZBL Review has been<br />

to implement the policies of the King City and Schomberg Community Plans. The<br />

Township is in the process of an Official Plan Review. While the final draft of the Urban<br />

Areas ZBL has taken into consideration the ongoing Official Plan Review to date, it is<br />

anticipated that further refinements and/or amendments will be required upon the<br />

approval of the new King Township Official Plan to implement new policy directions<br />

through zoning. The Urban Areas Zoning By-law Review has provided the opportunity<br />

implement existing direction from the King City and Schomberg, Community Plans, and<br />

modernize the zoning with the goal of simplifying and streamlining a future zoning<br />

conformity exercise.<br />

8. INTEGRATED SUSTAINABILITY PLAN LINKAGE:<br />

The King City and Schomberg ZBL Review contributes to the implementation of a broad<br />

range of appropriate action items for all four of the environmental, economic, socio-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!