St Mary Redcliffe Church - A Year at Redcliffe
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Priority Item<br />
Next Financial <strong>Year</strong> 2017/18<br />
Cost<br />
estim<strong>at</strong>e<br />
Faculty <strong>St</strong><strong>at</strong>us D<strong>at</strong>e<br />
/priority Comments<br />
17/1 Quinquennial Inspection and £6,000 not required Sep-17 Last quinquennial was in l<strong>at</strong>e 2012.<br />
Report<br />
17/4 Electrical system testing £2,500 not required Jul-17 In support of Qq<br />
15/14a Bellframe and wall mounting £20,000 List B<br />
refurbishment and painting<br />
Approved<br />
15/5b Replacement of rainw<strong>at</strong>er sump<br />
guards on LC & South lower roofs<br />
14/18 Repairs to Textiles - copes, frontals £5,000 Faculty<br />
etc. and siverware maintenance.<br />
received<br />
13/11b Welcome - Interpret<strong>at</strong>ive Signage £6,000 Faculty<br />
received<br />
2016/17 Quote from Taylors accepted.<br />
Order sent to Taylors. Will start in<br />
August. 16<br />
£3,000 not required Sep-17 As on High roof & north lower roof.<br />
LC first & S when lead has been<br />
replaced.<br />
2015-18 The textiles project has been<br />
authorised to continue for <strong>at</strong> least<br />
the next year.<br />
When<br />
???<br />
Text has been produced and edited<br />
- artwork and sign production in<br />
hand?<br />
14/7a Lighting System - Side Aisles £33,000 required Sep-17 Proposal expected in March from<br />
downlighters & Emergency<br />
Paul Albone of Brunel Industries.<br />
Lighting<br />
13<br />
14/7b New Lighting control panel in vestry £10,000 required Oct-17 Allowing better more flexible control<br />
of new lighting. Included in P Albone<br />
proposal.<br />
13<br />
14/7c Lighting System Upd<strong>at</strong>ing - to<br />
reduce energy usage<br />
£50,000 required 2017/18 3rd phase of program. High level<br />
nave and chancel lights.<br />
13<br />
Ref.s Funding<br />
10<br />
<strong>Church</strong> Lands<br />
<strong>Church</strong> Lands<br />
<strong>Church</strong> Lands<br />
<strong>Church</strong> Lands<br />
&<br />
Ist Lord D<br />
<strong>Church</strong> Lands<br />
Canynges 2013<br />
& <strong>Church</strong><br />
Lands<br />
<strong>Church</strong> Lands<br />
Canynges<br />
agreed<br />
Feb 16<br />
<strong>Church</strong> Lands<br />
17/2 Decor<strong>at</strong>ive Repairs to ceilings £10,000 not required 2017/18 After South lower roof re-leading <strong>Church</strong> Lands<br />
& Canynges<br />
17/3 Handrail for lectern steps. £2,500 not required 2017/18 Iron and brass to m<strong>at</strong>ch pulpit steps<br />
handrail - <strong>at</strong>tached to wooden<br />
pl<strong>at</strong>form.<br />
15/6 Ongoing Masonry repairs £20,000 May be<br />
required<br />
16/4 New chest of drawers for textiles £6,000 Faculty<br />
Rejected<br />
2017/18 To include highest priority items<br />
identified in the quinquennial.<br />
2017/18 To replace the rejected modified<br />
altar<br />
<strong>Church</strong> Lands<br />
<strong>Church</strong> Lands<br />
&<br />
Ist Lord D<br />
<strong>Church</strong> Lands<br />
16/2 Replacement and repair of rest of £10,000 required 2017/18 Replacement of doors in oak, as<br />
high level external doors.<br />
and when necessary (as per spec<br />
from architect in 4<br />
£184,000 May 2009)<br />
<strong>Church</strong> Lands<br />
Priority Item<br />
Awaiting HLF bid l<strong>at</strong>er in 2017/18 ??<br />
ROM Cost Faculty <strong>St</strong><strong>at</strong>us D<strong>at</strong>e Comments<br />
estim<strong>at</strong>e<br />
/priority<br />
17/2 Facilities fit for the future / north £5,000,000 required 2015<br />
side redevelopment ????<br />
onwards<br />
If and when City external<br />
redevelopment plans progress<br />
01<br />
16/3a Cleaning of North and East faces of £100,000 required 2017/18 If there are north side<br />
the <strong>Church</strong> - 1st yr of 2 year<br />
redevelopment plans this work<br />
project?<br />
would follow<br />
15/12 West end G<strong>at</strong>e, Paving and steps £5,000 not required 2015/16 Preliminary <strong>St</strong>udy of possible West<br />
end remodelling (leads into HLF<br />
bid)<br />
12/7 Toilet for Disabled - planning, £5,000 not required 2015/16 Detailed designs will be drawn up<br />
(&11/9) design and spec. for 2017 build?<br />
when loc<strong>at</strong>ion is identified & funding<br />
agreed.<br />
12/7<br />
(&11/9)<br />
Toilet for Disabled £20,000 required 2015/16 Assuming detailed designs are<br />
drawn up in previous year.<br />
Ref.s Funding<br />
Major Appeal<br />
<strong>Church</strong> Lands<br />
<strong>Church</strong> Lands<br />
&<br />
Ist Lord D<br />
Canynges &<br />
<strong>Church</strong> Lands<br />
Canynges &<br />
<strong>Church</strong> Lands<br />
27