St Mary Redcliffe Church - A Year at Redcliffe

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Priority Item<br />

Next Financial <strong>Year</strong> 2017/18<br />

Cost<br />

estim<strong>at</strong>e<br />

Faculty <strong>St</strong><strong>at</strong>us D<strong>at</strong>e<br />

/priority Comments<br />

17/1 Quinquennial Inspection and £6,000 not required Sep-17 Last quinquennial was in l<strong>at</strong>e 2012.<br />

Report<br />

17/4 Electrical system testing £2,500 not required Jul-17 In support of Qq<br />

15/14a Bellframe and wall mounting £20,000 List B<br />

refurbishment and painting<br />

Approved<br />

15/5b Replacement of rainw<strong>at</strong>er sump<br />

guards on LC & South lower roofs<br />

14/18 Repairs to Textiles - copes, frontals £5,000 Faculty<br />

etc. and siverware maintenance.<br />

received<br />

13/11b Welcome - Interpret<strong>at</strong>ive Signage £6,000 Faculty<br />

received<br />

2016/17 Quote from Taylors accepted.<br />

Order sent to Taylors. Will start in<br />

August. 16<br />

£3,000 not required Sep-17 As on High roof & north lower roof.<br />

LC first & S when lead has been<br />

replaced.<br />

2015-18 The textiles project has been<br />

authorised to continue for <strong>at</strong> least<br />

the next year.<br />

When<br />

???<br />

Text has been produced and edited<br />

- artwork and sign production in<br />

hand?<br />

14/7a Lighting System - Side Aisles £33,000 required Sep-17 Proposal expected in March from<br />

downlighters & Emergency<br />

Paul Albone of Brunel Industries.<br />

Lighting<br />

13<br />

14/7b New Lighting control panel in vestry £10,000 required Oct-17 Allowing better more flexible control<br />

of new lighting. Included in P Albone<br />

proposal.<br />

13<br />

14/7c Lighting System Upd<strong>at</strong>ing - to<br />

reduce energy usage<br />

£50,000 required 2017/18 3rd phase of program. High level<br />

nave and chancel lights.<br />

13<br />

Ref.s Funding<br />

10<br />

<strong>Church</strong> Lands<br />

<strong>Church</strong> Lands<br />

<strong>Church</strong> Lands<br />

<strong>Church</strong> Lands<br />

&<br />

Ist Lord D<br />

<strong>Church</strong> Lands<br />

Canynges 2013<br />

& <strong>Church</strong><br />

Lands<br />

<strong>Church</strong> Lands<br />

Canynges<br />

agreed<br />

Feb 16<br />

<strong>Church</strong> Lands<br />

17/2 Decor<strong>at</strong>ive Repairs to ceilings £10,000 not required 2017/18 After South lower roof re-leading <strong>Church</strong> Lands<br />

& Canynges<br />

17/3 Handrail for lectern steps. £2,500 not required 2017/18 Iron and brass to m<strong>at</strong>ch pulpit steps<br />

handrail - <strong>at</strong>tached to wooden<br />

pl<strong>at</strong>form.<br />

15/6 Ongoing Masonry repairs £20,000 May be<br />

required<br />

16/4 New chest of drawers for textiles £6,000 Faculty<br />

Rejected<br />

2017/18 To include highest priority items<br />

identified in the quinquennial.<br />

2017/18 To replace the rejected modified<br />

altar<br />

<strong>Church</strong> Lands<br />

<strong>Church</strong> Lands<br />

&<br />

Ist Lord D<br />

<strong>Church</strong> Lands<br />

16/2 Replacement and repair of rest of £10,000 required 2017/18 Replacement of doors in oak, as<br />

high level external doors.<br />

and when necessary (as per spec<br />

from architect in 4<br />

£184,000 May 2009)<br />

<strong>Church</strong> Lands<br />

Priority Item<br />

Awaiting HLF bid l<strong>at</strong>er in 2017/18 ??<br />

ROM Cost Faculty <strong>St</strong><strong>at</strong>us D<strong>at</strong>e Comments<br />

estim<strong>at</strong>e<br />

/priority<br />

17/2 Facilities fit for the future / north £5,000,000 required 2015<br />

side redevelopment ????<br />

onwards<br />

If and when City external<br />

redevelopment plans progress<br />

01<br />

16/3a Cleaning of North and East faces of £100,000 required 2017/18 If there are north side<br />

the <strong>Church</strong> - 1st yr of 2 year<br />

redevelopment plans this work<br />

project?<br />

would follow<br />

15/12 West end G<strong>at</strong>e, Paving and steps £5,000 not required 2015/16 Preliminary <strong>St</strong>udy of possible West<br />

end remodelling (leads into HLF<br />

bid)<br />

12/7 Toilet for Disabled - planning, £5,000 not required 2015/16 Detailed designs will be drawn up<br />

(&11/9) design and spec. for 2017 build?<br />

when loc<strong>at</strong>ion is identified & funding<br />

agreed.<br />

12/7<br />

(&11/9)<br />

Toilet for Disabled £20,000 required 2015/16 Assuming detailed designs are<br />

drawn up in previous year.<br />

Ref.s Funding<br />

Major Appeal<br />

<strong>Church</strong> Lands<br />

<strong>Church</strong> Lands<br />

&<br />

Ist Lord D<br />

Canynges &<br />

<strong>Church</strong> Lands<br />

Canynges &<br />

<strong>Church</strong> Lands<br />

27