27.04.2017 Views

OCL_Group_Capability_Profile_27.4.17_LR

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CiviL DiviSiON<br />

CiviL DiviSiON<br />

The <strong>OCL</strong> Civils team have and continue to operate at the forefront when delivering some of the largest civil projects in<br />

the domestic, commercial and rail sectors including London Underground and Network Rail infrastructures.<br />

PROJECT<br />

Manningtree Station Lift Shafts<br />

CLiENT<br />

Cleshar – aGa<br />

We have gained a reputation for providing a consistent level of high quality work, driven by a loyal and experienced<br />

workforce.<br />

Our experienced management and project teams are able to work and overcome technical obstacles presented to them<br />

in a professional adaptable manner whilst at all times promoting synergy and commercial collaboration with our clients<br />

to provide immediate solutions and ensuring projects are delivered on time and within budget. We have gained vast<br />

experience from working on major infrastructure projects, such as Cross Rail and many other large Network Rail power<br />

and station upgrades Projects, London Underground upgrades, Thames Link, HS2, D<strong>LR</strong> and many other<br />

commercial and domestic civil engineering development projects.<br />

all our <strong>OCL</strong> civil site managers hold SMSTS certification as a minimum, with the vast majority are also trained within HSE to<br />

NEBOSH, iOSH level as standard. This provides confidence to both client and <strong>OCL</strong> that the implementation of our clear and<br />

concise policies, programmes and systems are being adhered to at all times aiding full compliance and installation standards.<br />

Regular internal site quality checks are carried out by our site inspectors , maintaining robust compliance and assurance<br />

measures.<br />

When choosing <strong>OCL</strong> for your Civil project requirements, you can be sure we have not only the ability to carry out the<br />

works competently and safely, but we will provide you with the confidence to come back time and time again...<br />

EXaMPLE CiviL CaSE STUDiES<br />

<strong>OCL</strong> were contracted to provide and manage a skilled shaft team at Manningtree rail station. The works are<br />

part of the aGa step free station modifications. 2 new lift shafts and passageways will be installed.<br />

Due to the complex nature of the works, a design was created to install and pre cast the permanent shaft<br />

sections, these are then hydraulically driven into position. all works are carried out during the day due to the<br />

system and methods developed.<br />

The <strong>OCL</strong> <strong>Group</strong> were able to offer experienced managers and operatives to deliver the project<br />

BREakDOWN OF WORkS UNDERTakEN ON PROJECT TO DaTE;<br />

• Carry out all pre surveys, ground surveys, and cat scans of areas<br />

• install 400mtr access road through adjacent field<br />

• Embankment access to platforms<br />

• Excavate and install RC jacking beam<br />

• Hand excavate and cast Lift sections<br />

• install waterproof system to shafts<br />

• Hand excavate and install new RC passageway<br />

• Break through and cast modifications to existing subway<br />

• Completion and submission of all required documentation for iTP<br />

• Completion of all other required site documentation<br />

iNSTaLLaTiON TEaM<br />

• Project Manager x 1<br />

• Site Managers x 1<br />

• Foreman x 3<br />

• Operatives : x 8 – 10<br />

• Compliance Manager-HSE auditorx1<br />

PROJECT<br />

Edgware Station SER<br />

CLiENT<br />

Giffen – LU<br />

PROJECT<br />

Upminster Depot UTX<br />

CLiENT<br />

Giffen <strong>Group</strong> – LUL Depots<br />

<strong>OCL</strong> <strong>Group</strong> are contracted to install new SER buildings for the Giffen <strong>Group</strong>. These sites included a complex<br />

mass concrete underpin sub base at Edgware Road.<br />

This was to ensure stability of the existing LU retaining wall at Edgware Road. On completion of the permanent<br />

“underpin”, <strong>OCL</strong> cast a new RC base slab for the SER superstructure. Brick and block walls were erected both<br />

internal and external. New suspended Comflor installation and penetrations through the Mezzanine and Roof<br />

RC slabs. New sub surface drainage diversion inclusive of Manhole chambers and 6m deep soakaway units.<br />

BREakDOWN OF WORkS UNDERTakEN ON EDGEWaRE SER PROJECTS TO DaTE;<br />

• Carry out all pre surveys, ground surveys , and cat scans of areas<br />

• Excavate and install new retaining wall foundation supports<br />

• install Sub surface and sub platform foundations and supports in confined space<br />

• install new RC base slab<br />

• install new steel superstructure<br />

• install new brick and block façade<br />

• install visqueen membranes<br />

• Excavate and install a new 150dia drainage route including 6m deep soakaway and EWS<br />

• install new RC footpaths<br />

• install new RC base slabs (aldgate, Hammersmith, Edgware)<br />

• install Comflor RC mezzanine and roof slabs at Edgware<br />

• Completion and submission of all required documentation for MaiD<br />

iNSTaLLaTiON TEaM<br />

• Project Manager x 1<br />

• Site Managers x 1<br />

• SPCs x 1<br />

• Operatives : x 8 – 10<br />

• Compliance Manager-HSE auditor x 1<br />

<strong>OCL</strong> were contracted to install a UTX within Upminster Depot for The Giffen <strong>Group</strong>. The UTX route was under<br />

4 roads with associated Driver walkways for 70 meters, over a weekend possession.<br />

The <strong>OCL</strong> <strong>Group</strong> were able to offer experienced managers and skilled operatives to deliver the works;<br />

BREakDOWN OF WORkS UNDERTakEN ON PROJECT TO DaTE;<br />

• install complete CRMS route throughout Upminster Depot for new power containment<br />

• install new power supply from sub station to depot shed<br />

• install new drivers walkways with troughing routes for cable containment<br />

• Carry out all pre surveys, ground surveys and cat scans of areas<br />

• install undertrack crossing for power supply<br />

• Excavate between roads<br />

• install progressive EWS<br />

• install ducting<br />

• Pin duct route<br />

• install concrete surround<br />

• install RC capping with core warning tape<br />

• Reinstate track ballast<br />

• kango pack the route<br />

iNSTaLLaTiON TEaM<br />

• Site Managers x 1<br />

• SPC x 2<br />

• Operatives x 12<br />

• Compliance Manager-HSE auditor x 1<br />

Page 16<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!