OCL_Group_Capability_Profile_27.4.17_LR
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CiviL DiviSiON<br />
CiviL DiviSiON<br />
The <strong>OCL</strong> Civils team have and continue to operate at the forefront when delivering some of the largest civil projects in<br />
the domestic, commercial and rail sectors including London Underground and Network Rail infrastructures.<br />
PROJECT<br />
Manningtree Station Lift Shafts<br />
CLiENT<br />
Cleshar – aGa<br />
We have gained a reputation for providing a consistent level of high quality work, driven by a loyal and experienced<br />
workforce.<br />
Our experienced management and project teams are able to work and overcome technical obstacles presented to them<br />
in a professional adaptable manner whilst at all times promoting synergy and commercial collaboration with our clients<br />
to provide immediate solutions and ensuring projects are delivered on time and within budget. We have gained vast<br />
experience from working on major infrastructure projects, such as Cross Rail and many other large Network Rail power<br />
and station upgrades Projects, London Underground upgrades, Thames Link, HS2, D<strong>LR</strong> and many other<br />
commercial and domestic civil engineering development projects.<br />
all our <strong>OCL</strong> civil site managers hold SMSTS certification as a minimum, with the vast majority are also trained within HSE to<br />
NEBOSH, iOSH level as standard. This provides confidence to both client and <strong>OCL</strong> that the implementation of our clear and<br />
concise policies, programmes and systems are being adhered to at all times aiding full compliance and installation standards.<br />
Regular internal site quality checks are carried out by our site inspectors , maintaining robust compliance and assurance<br />
measures.<br />
When choosing <strong>OCL</strong> for your Civil project requirements, you can be sure we have not only the ability to carry out the<br />
works competently and safely, but we will provide you with the confidence to come back time and time again...<br />
EXaMPLE CiviL CaSE STUDiES<br />
<strong>OCL</strong> were contracted to provide and manage a skilled shaft team at Manningtree rail station. The works are<br />
part of the aGa step free station modifications. 2 new lift shafts and passageways will be installed.<br />
Due to the complex nature of the works, a design was created to install and pre cast the permanent shaft<br />
sections, these are then hydraulically driven into position. all works are carried out during the day due to the<br />
system and methods developed.<br />
The <strong>OCL</strong> <strong>Group</strong> were able to offer experienced managers and operatives to deliver the project<br />
BREakDOWN OF WORkS UNDERTakEN ON PROJECT TO DaTE;<br />
• Carry out all pre surveys, ground surveys, and cat scans of areas<br />
• install 400mtr access road through adjacent field<br />
• Embankment access to platforms<br />
• Excavate and install RC jacking beam<br />
• Hand excavate and cast Lift sections<br />
• install waterproof system to shafts<br />
• Hand excavate and install new RC passageway<br />
• Break through and cast modifications to existing subway<br />
• Completion and submission of all required documentation for iTP<br />
• Completion of all other required site documentation<br />
iNSTaLLaTiON TEaM<br />
• Project Manager x 1<br />
• Site Managers x 1<br />
• Foreman x 3<br />
• Operatives : x 8 – 10<br />
• Compliance Manager-HSE auditorx1<br />
PROJECT<br />
Edgware Station SER<br />
CLiENT<br />
Giffen – LU<br />
PROJECT<br />
Upminster Depot UTX<br />
CLiENT<br />
Giffen <strong>Group</strong> – LUL Depots<br />
<strong>OCL</strong> <strong>Group</strong> are contracted to install new SER buildings for the Giffen <strong>Group</strong>. These sites included a complex<br />
mass concrete underpin sub base at Edgware Road.<br />
This was to ensure stability of the existing LU retaining wall at Edgware Road. On completion of the permanent<br />
“underpin”, <strong>OCL</strong> cast a new RC base slab for the SER superstructure. Brick and block walls were erected both<br />
internal and external. New suspended Comflor installation and penetrations through the Mezzanine and Roof<br />
RC slabs. New sub surface drainage diversion inclusive of Manhole chambers and 6m deep soakaway units.<br />
BREakDOWN OF WORkS UNDERTakEN ON EDGEWaRE SER PROJECTS TO DaTE;<br />
• Carry out all pre surveys, ground surveys , and cat scans of areas<br />
• Excavate and install new retaining wall foundation supports<br />
• install Sub surface and sub platform foundations and supports in confined space<br />
• install new RC base slab<br />
• install new steel superstructure<br />
• install new brick and block façade<br />
• install visqueen membranes<br />
• Excavate and install a new 150dia drainage route including 6m deep soakaway and EWS<br />
• install new RC footpaths<br />
• install new RC base slabs (aldgate, Hammersmith, Edgware)<br />
• install Comflor RC mezzanine and roof slabs at Edgware<br />
• Completion and submission of all required documentation for MaiD<br />
iNSTaLLaTiON TEaM<br />
• Project Manager x 1<br />
• Site Managers x 1<br />
• SPCs x 1<br />
• Operatives : x 8 – 10<br />
• Compliance Manager-HSE auditor x 1<br />
<strong>OCL</strong> were contracted to install a UTX within Upminster Depot for The Giffen <strong>Group</strong>. The UTX route was under<br />
4 roads with associated Driver walkways for 70 meters, over a weekend possession.<br />
The <strong>OCL</strong> <strong>Group</strong> were able to offer experienced managers and skilled operatives to deliver the works;<br />
BREakDOWN OF WORkS UNDERTakEN ON PROJECT TO DaTE;<br />
• install complete CRMS route throughout Upminster Depot for new power containment<br />
• install new power supply from sub station to depot shed<br />
• install new drivers walkways with troughing routes for cable containment<br />
• Carry out all pre surveys, ground surveys and cat scans of areas<br />
• install undertrack crossing for power supply<br />
• Excavate between roads<br />
• install progressive EWS<br />
• install ducting<br />
• Pin duct route<br />
• install concrete surround<br />
• install RC capping with core warning tape<br />
• Reinstate track ballast<br />
• kango pack the route<br />
iNSTaLLaTiON TEaM<br />
• Site Managers x 1<br />
• SPC x 2<br />
• Operatives x 12<br />
• Compliance Manager-HSE auditor x 1<br />
Page 16<br />
RaiSiNG THE STaNDaRDS • 01702 479 091<br />
ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />
Page 17