30.06.2017 Views

2. February 2014

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

VIEWS<br />

A road towards Manang after Chamay, the rock boulder was 100s of feet high. The construction was<br />

done without using any explosives to blast the rocks, considering the damage that might be caused<br />

towards the wildlife in that area. The stone boulder was cut through after softening using chemicals<br />

to pave the road ahead.<br />

FEBRUARY <strong>2014</strong> / 61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!