2. February 2014
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
VIEWS<br />
A road towards Manang after Chamay, the rock boulder was 100s of feet high. The construction was<br />
done without using any explosives to blast the rocks, considering the damage that might be caused<br />
towards the wildlife in that area. The stone boulder was cut through after softening using chemicals<br />
to pave the road ahead.<br />
FEBRUARY <strong>2014</strong> / 61