You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>PVOD</strong>04201 - 600mm DIAMETER MONITORING CHAMBER<br />
APPLICATION 1 - MAXIMUM RECOMMENDED CHAMBER DEPTH (APPROX 1200mm)<br />
LANDSCAPING TO ARCHITECT SPECIFICATION<br />
150mm THICK CONCRETE TO STRUCTURAL ENGINEERS SPECIFICATION<br />
CLASS B ENGINEERING BRICKWORK - MAX 2 COURSES<br />
COVER & FRAME TO ARCHITECT / ENGINEER SPECIFICATION<br />
FINISHES / SURFACING EXAMPLES (TO ARCHITECT / ENGINEER SPECIFICATION)<br />
MAX DEPTH<br />
FROM COVER LEVEL<br />
TO INVERT LEVEL<br />
APPROX 900mm<br />
SYNTHETIC TURF<br />
NATURAL TURF<br />
EQUESTRIAN<br />
SURFACING<br />
PERVIOUS<br />
PAVING<br />
85mm PERMAVOID LAYER<br />
SUMP DEPTH<br />
300mm<br />
<strong>PVOD</strong>04201 - 600mm DIAMETER MONITORING CHAMBER<br />
<strong>PVOD</strong>06101 -160mm DIAMETER PIPE CONECTION KIT<br />
<strong>PVOD</strong> TANK CONNECTION COMPONENT<br />
NOTE: IN ACCORDANCE WITH BUILDING REGULATIONS H1, CLEARANCE OF BLOCKAGES, TABLE 11.<br />
SHOULD THE DEPTH OF THE CHAMBER FROM INVERT LEVEL, TO THE<br />
TOP OF THE SPECIFIED COVER EXCEED 1.2 METRES, A RESTRICTED ACCESS<br />
COVER NO GREATER THAN 350mm MUST BE USED FOR HEATH AND SAFETY REASONS TO DETER ENTRY.<br />
Version 1.1 - May 16