16.12.2017 Views

Metro Rail News December 2016

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Delhi <strong>Metro</strong> to run new generation UTO<br />

(driverless) trains in phase-III corridors<br />

- By <strong>Metro</strong> <strong>Rail</strong> <strong>News</strong><br />

Though the concept of driverless train is not new in the developed countries, it is<br />

still a novel idea in India. On one side, driverless trains are being championed as a<br />

way of avoiding human error and reaching new levels of efficiency at a time when<br />

many metro systems are operating at the very limits of their capacity. On the<br />

other, critics are concerned about entrusting public safety to a driverless system,<br />

as well as the specter of mass job losses. In this context, the announcement of<br />

Delhi <strong>Metro</strong>’s first driverless train was a proud moment for India. On 4 June 2015,<br />

the first driverless trains arrived in Delhi. These trains will run on the Phase III<br />

corridors covering 58-km long Majlish Park-Shiv Vihar (Line 7) and the over 38-<br />

km long Janakpuri (West)- Botanical Garden (Line 8). The trains will be fully<br />

operational by the April of 2017.<br />

<strong>Metro</strong> <strong>Rail</strong> <strong>News</strong> | <strong>December</strong> <strong>2016</strong> | www.metrorailnews.in 43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!