Project Ozona Economic & Technical Review[8167]
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Top of Greyburg<br />
<strong>Project</strong> <strong>Ozona</strong>: Single Well <strong>Economic</strong>s<br />
Greyburg through San Andres Cross Section (southern portion of property (Sec. 82 & 88)<br />
Pearson #4, Sec. 88 Bean #3, Sec. 88 Bean #2E, Sec. 88 Vaughn #40S, Sec. 82 Vaughn #44S, Sec. 82 Vaughn #43S, Sec. 82<br />
Well No. IP (BOPD) Comp date<br />
Section 81<br />
3 13 Aug-54<br />
1C 51 Apr-53<br />
1 62 May-65<br />
2 55 Nov-64<br />
Initial Individual Well Results<br />
Well No. IP (BOPD) Comp date<br />
Section 82<br />
40-S 120 Feb-55<br />
39 105 Nov-54<br />
44-S 88 Aug-55<br />
43-S 0 Jul-55<br />
39 105 Nov-54<br />
18 43 Jul-65<br />
17 33 Apr-65<br />
16 61 Mar-55<br />
15 77 Apr-55<br />
14 47 Mar-55<br />
11 70 Mar-55<br />
13 195 Feb-55<br />
12 45 Apr-55<br />
10 135 Feb-55<br />
9 77 Feb-55<br />
8 50 Jan-55<br />
7 208 Dec-54<br />
5 179 Dec-54<br />
4 184 Dec-54<br />
3 67 Nov-54<br />
2 112 Jan-55<br />
1 0 Sep-53<br />
41 44 Mar-55<br />
Well No. IP (BOPD) Comp date<br />
Section 88<br />
B4 30 Nov-12<br />
4 8 Nov-54<br />
3 168 Jun-54<br />
13-88 30 Jan-67<br />
14-88 9 Aug-87<br />
12 20 Jan-87<br />
11 35 Jul-81<br />
9 30 Nov-77<br />
2 29 Sep-75<br />
3 8 Sep-76<br />
4 40 Jul-76<br />
5 9 Dec-76<br />
6 9 Apr-77<br />
1 8 Nov-72<br />
2 140 Oct-54<br />
2 73 Nov-54<br />
3 142 Dec-54<br />
1 120 Jan-55<br />
3 D&A Jan-55<br />
Well No. IP (BOPD) Comp date<br />
Section 89<br />
4 15 Feb-17<br />
1 D&A Jun-78<br />
7 13 May-77<br />
8 35 Nov-77<br />
10 9 Feb-78<br />
Cross Section Locations<br />
Average Initial Rates of Production Far Exceed the 20 bopd IP Assumption Used in <strong>Economic</strong> <strong>Project</strong>ions<br />
18