20.02.2018 Views

Rio Descoberto Dam - International Congress of Large Dams-Montreál

RIO DESCOBERTO DAM: WATER SUPLLY SYSTEM FOR BRASÍLIA CITY- BRAZILREHABILITATION AND PERFORMANCE - Soares A., Viana M., Corrêa, Nelson LA, Corrêa Mariane, Sabino Freitas Correa, Francisco Andriolo Ito

RIO DESCOBERTO DAM:
WATER SUPLLY SYSTEM FOR BRASÍLIA CITY- BRAZILREHABILITATION
AND PERFORMANCE - Soares A., Viana M., Corrêa, Nelson LA, Corrêa Mariane, Sabino Freitas Correa, Francisco Andriolo Ito

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

14<br />

6.2.4- Mortar Drilled Cores Tests<br />

Cores were drilled from the mortar placed in the diaphragm and tested. The<br />

following statistical data were obtained:<br />

Property<br />

Mortar<br />

(diaphragm)<br />

Interface<br />

Concrete<br />

(dam)-<br />

Mortar<br />

(diaphragm)<br />

Concrete<br />

(dam)<br />

Absorption (%) 1.22<br />

Specific Weight (t/m3) 1.97 – 2.08 2.52<br />

Permeability (m/s) 10 -11 – 10 -10<br />

Compressive Strength (MPa) 12.7 – 31.1 25.7<br />

Splitting Tensile Strength (MPa) 1.87 1.14 4.51<br />

Direct Tensile Strength (MPa) 1.07 – 1.80 2.32<br />

Shear Strength (MPa) under Normal<br />

Pressure: 2.0 MPa<br />

Shear Strength (MPa) under Normal<br />

Pressure: 4.0 MPa<br />

Shear Strength (MPa) under Normal<br />

Pressure: 6.0 MPa<br />

Figure 21- Statistical data from drilled cores<br />

Image 21- Données statistiques des noyaux perforés<br />

2.77 – 5.57 2.05 – 3.77 5.03 – 5.14<br />

3.92 – 6.63 3.10 – 3.66 6.43 – 6.76<br />

5.57 – 8.38 4.50 – 6.10 12.42<br />

Figure 21- Drilled cores from<br />

diaphragm mortar<br />

Image 21- Noyaux perforés du<br />

mortier du diaphragme<br />

Figure 22- Drilled cores from<br />

diaphragm mortar, interface, and<br />

from the old concrete from the dam<br />

Image 22- Noyaux perforés du<br />

mortier du diaphragme, contact<br />

entre couches et du vieux béton du<br />

barrage<br />

7- CONSTRUCTION CHRONOLOGY<br />

The drilling works started in September <strong>of</strong> 2000 at the block “Q”, this was<br />

the first block finished in January 2001. The average drilling rate was 5000 meter<br />

per month, and the peak drilling month rate was reached in June 2001 with 8000<br />

meters drilled in 30 days, working with five drilling equipments.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!