EX8000 is powered by dual <strong>Cummins</strong> QSK60<br />
engines pumping out close to 4000 hp.<br />
Meandu Mine was bought from Rio Tinto in<br />
2008 to secure a long-term fuel source for<br />
the two adjacent Tarong power stations.<br />
Construction of the mine began in 1981<br />
after the Queensland Government made<br />
the decision to build the first Tarong<br />
power station. In 1984, the mine began<br />
regular supply of coal to the 1400 MW<br />
power station – supply that increased<br />
with the construction of the second<br />
Tarong power station (443 MW) in 2003.<br />
to do much walking,” says Jim Young.<br />
Other machines in the excavator fleet<br />
include a 518-tonne EX5500-5 which had<br />
run 43,250 hours near the end of 2013<br />
(it has dual <strong>Cummins</strong> QSK45 engines<br />
rated at 1350 hp), and a 359-tonne<br />
EX3600-6 which had worked 23,000 hours<br />
(it is powered by a single Tier II <strong>Cummins</strong><br />
QSK60 MCRS engine rated at 1944 hp).<br />
The QSK60 with its modular common<br />
rail fuel system (MCRS) achieved<br />
18,850 hours in the EX3600-6 before<br />
rebuild, and <strong>Cummins</strong> mining business<br />
manager Stewart McKeddie expects<br />
a similar life to overhaul with the dual<br />
Tier II QSK60 engines in the EX8000.<br />
The 19-strong dump truck fleet at Meandu<br />
is spearheaded by Komatsu 830E AC<br />
The mine is currently producing 4.8<br />
Mtpa but has reached as high as 7.2<br />
Mtpa. Downer EDI is providing the<br />
mining services at Meandu although<br />
Stanwell owns most of the plant.<br />
Hitachi is the preferred excavator<br />
brand at Meandu, the oldest machine<br />
on site – an EX3500 with dual 880<br />
hp <strong>Cummins</strong> K38 engines – having<br />
clocked up around 84,000 hours since<br />
its commissioning in 1992. “It’s on easy<br />
work these days where it doesn’t have<br />
06 07<br />
Meandu Mine has five active pits…pictured are the west and central pits.