14.04.2018 Views

hoist pdf bind

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Hoist Cabling schedule<br />

Cable 1 – JB1 – Top of <strong>hoist</strong><br />

Core no Term - I/O number Desc<br />

1 24vdc +<br />

2 24vdc -<br />

3 I13 Top ramp prox<br />

4 I 5 Mid ramp prox Not used on 2 level<br />

5 I 11 Bottom pos prox<br />

6 Stopper safety ch1 From JB1 to JB2<br />

7 Stopper safety ch2 From JB1 to JB2<br />

8 O 0 Top rail/<strong>hoist</strong> vlv ½ +<br />

9 O 0- Top rail/<strong>hoist</strong> vlv ½ -<br />

10 O 1 Mid rail sol 3 + Not used on 2 level<br />

11 O 1- Mid rail sol 3 - Not used on 2 level<br />

12 Earth<br />

Cable 2 – JB2 – On moving <strong>hoist</strong><br />

Core no Term – I/O no Desc<br />

1 24vdc +<br />

2 24vdc -<br />

3 I 6 Top acc prox<br />

4 I 4 Mid acc prox Not used on 2 level<br />

5 I 17 Bottom O/C switch<br />

6 Stopper safety ch1 From JB1 to JB2<br />

7 Stopper safety ch2 From JB1 to JB2<br />

8 I 0 Stopper safety ch1<br />

9 I 1 Stopper safety ch2<br />

10 0 2 Bottom sol vlv<br />

11 O1 Mid <strong>hoist</strong> sol vlv+ Not used on 2 level<br />

12 O1- Mid <strong>hoist</strong> sol vlv- Not used on 2 level<br />

Cable 3 – JB1 to Control panel via upper and lower limit switches.<br />

Core no. JB1 Limit switches Control panel<br />

1 1 – 24vdc + Through limit switch I14<br />

2 1 – 24vdc + contacts. I15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!