Views
1 week ago

hoist pdf bind

Hoist Cabling schedule

Hoist Cabling schedule Cable 1 – JB1 – Top of hoist Core no Term - I/O number Desc 1 24vdc + 2 24vdc - 3 I13 Top ramp prox 4 I 5 Mid ramp prox Not used on 2 level 5 I 11 Bottom pos prox 6 Stopper safety ch1 From JB1 to JB2 7 Stopper safety ch2 From JB1 to JB2 8 O 0 Top rail/hoist vlv ½ + 9 O 0- Top rail/hoist vlv ½ - 10 O 1 Mid rail sol 3 + Not used on 2 level 11 O 1- Mid rail sol 3 - Not used on 2 level 12 Earth Cable 2 – JB2 – On moving hoist Core no Term – I/O no Desc 1 24vdc + 2 24vdc - 3 I 6 Top acc prox 4 I 4 Mid acc prox Not used on 2 level 5 I 17 Bottom O/C switch 6 Stopper safety ch1 From JB1 to JB2 7 Stopper safety ch2 From JB1 to JB2 8 I 0 Stopper safety ch1 9 I 1 Stopper safety ch2 10 0 2 Bottom sol vlv 11 O1 Mid hoist sol vlv+ Not used on 2 level 12 O1- Mid hoist sol vlv- Not used on 2 level Cable 3 – JB1 to Control panel via upper and lower limit switches. Core no. JB1 Limit switches Control panel 1 1 – 24vdc + Through limit switch I14 2 1 – 24vdc + contacts. I15

Download PDF - Harrington Hoists and Cranes
THAT BIND
BIND
Download Complete Acco Wire Rope Hoist Catalogue (PDF
SERIES 2200 AIR HOIST - Hoists Direct
Cranes, Hoists & Lifts - IEWC
Mast climbers and hoists Mast climbers and hoists - Vertikal.net
Shaft-Hoisting Installation
Hoisting the sails - PwC
LoadMate Electric Chain Hoists
Shaft-Hoisting System
Air Hoist Line Failure - Drillsafe.org.au
SICOP Contactors for Hoisting Duty Brochure
Ties that Bind
Detroit Hoist Brochure - CraneWerks.com