Final Feasibility Study Report<br />
BoRit Asbestos Superfund Site, Operable Unit 1, Ambler, PA<br />
November 18, 2016<br />
Does not contain any numeric indicator of risk for remedial worker and includes qualitative<br />
statements like:<br />
This disturbance of contaminated waste, soil, and Reservoir sediment could also pose short-term<br />
risks to workers from inhalation of asbestos fibers during implementation of the remedy. Safety<br />
measures such as dust suppression, personal protective equipment (PPE), and establishment of<br />
work zones would protect workers during implementation. Other potential impacts to workers<br />
would be mitigated through adherence to safety plans and standard operating procedures.<br />
Feasibility Study Report (Revison 01)<br />
Donna Reservoir and Canal System<br />
Donna , Hidalgo County, Texas<br />
July 2016<br />
Does not contain any numeric indicator of risk for remedial workers and includes qualitative<br />
statements like:<br />
Short term risks are elevated in Alternative 3. The community is affected by an increase in<br />
traffic caused by the transportation of equipment and material. Additionally, dust may be<br />
produced during construction and transportation activities, but can be mitigated through<br />
standard construction practices.<br />
Revised Draft Feasibility Study<br />
Peterson/Puritan, Inc. Superfund Site – Operable<br />
Unit 2<br />
Cumberland and Lincoln, Rhode Island<br />
July 2014<br />
Does not contain any numeric indicator of risk for remedial workers and includes qualitative<br />
statements like:<br />
Implementation of this alternative would potentially result in short-term exposure risks to the<br />
community, workers, or the environment during soil removal and installation of the RCRA<br />
Subtitle C cap; these potential risks would be managed with engineering controls, access<br />
restrictions, and worker training.<br />
FINAL RADIOLOGICAL <strong>ADDENDUM</strong> TO THE <strong>REVISED</strong> FEASIBILITY STUDY<br />
REPORT FOR PARCEL C<br />
PARCEL C, HUNTERS POINT SHIPYARD<br />
SAN FRANCISCO, CALIFORNIA<br />
June 20, 2008<br />
Does not contain any numeric indicator of risk for remedial workers and includes tables with<br />
indicators of short-term risk as “good” or “very good.” It also has tables with circles partially<br />
blacked out to indicate levels of short-term risk. The FS also includes qualitative statements like:<br />
Workers would be protected during ROC remediation from Parcel C radiologically-impacted<br />
sites by implementing containment controls such as dust suppression and following health and<br />
safety protocols, including personal protective equipment and decontamination procedures.<br />
Page 26