Membranes<br />

Step 3: Insulation<br />

same depth, and more importantly to stop the fixings being<br />

over or under tightened.<br />

Mechanical attachment or adhering are the two<br />

routes available.<br />

To adhere SarnaTherm G insulation to an adhered vapour<br />

barrier Sarnacol 2162 is poured from a 5kg tin into beads<br />

SarnaTherm G PIR insulation boards can be<br />

which should be 10mm-20mm in width, alternatively the<br />

installed by either method. When a polyethylene<br />

VCL is installed, the insulation boards are then Step 3: SarnaTherm G insulation adhered to the air Sika C-250 spray applied insulation adhesive can be used<br />

vapour barrier using Sika C-250 spray applied to speed up the installation.<br />

loose laid and mechanically fixed by means of insulation adhesive.<br />

Sarnafil fixings, insulation pressure plates and<br />

The distance between each bead is in the Sarnafil<br />

thermally broken tube fasteners. Using the nylon tubes - which prevent cold specification depending on the wind uplift calculations. After an hour the<br />

bridging - means that the insulation boards can be kept as thin as possible adhesive should have cured enough to stop the board lifting but we advise<br />

thus reducing the cost of the insulation.<br />

that the boards are trafficked as little as possible.<br />

The tubes are installed using a TP 19 fixing tool. This tooling acts as a<br />

depth gauge or torque adjuster to ensure all fasteners are installed to the<br />

If a board is tilted on an uneven deck, once it comes out of the semi cured<br />

adhesive it will not adhere back in and so should be taken up and re-stuck.<br />

Step 4: SarnaTherm HD<br />

The Sarnafil HD system is made even tougher by<br />

installing a high density PIR insulation board<br />

underneath the Sarnafil membrane. This<br />

SarnaTherm HD insulation can withstand impact and<br />

high weight loadings. The boards should be adhered<br />

to the surface of the preceding SarnaTherm G<br />

The SarnaTherm HD boards are adhered to the<br />

surface of the preceding SarnaTherm G insulation<br />

using the C-250 insulation board adhesive.<br />

insulation, bonded board to board by means of Sarnacol<br />

2162 or adhered using the C-250 spray applied<br />

insulation board adhesive.<br />

If mechanically fixing the HD insulation, the first layer of<br />

SarnaTherm G should be pinned into position and then<br />

the fixation of the SarnaTherm HD carried out to the<br />

Sarnafil specified fixing pattern and fastener density.<br />

Step 5: Sarnafil HD Membrane<br />

spray tip nozzle clean. If and when work is interrupted,<br />

immerse the spray tip in cleaner and spray the end of<br />

Now for the membrane itself. The installation of the<br />

the applicator gun with a solvent flushing spray to<br />

2mm thick G410-20EL Sarnafil HD membrane to the<br />

remove excessive adhesive that could cure and block it.<br />

SarnaTherm HD insulation is by method of adhering<br />

the membrane using either Sarnacol 2170 roller<br />

By keeping the canister turned fully on and controlling<br />

applied contact adhesive, or by using the new Installation of the 2mm thick G410-20EL Sarnafil HD the adhesive by the control on the applicator gun,<br />

membrane to the SarnaTherm HD insulation boards<br />

Sarnacol 2172 spray applied contact adhesive. The using Sarnacol 2170 roller applied contact adhesive. pressure is kept throughout the hose and gun which will<br />

spray applied version delivers quicker installation<br />

keep the adhesive from curing inside it.<br />

times, less stress on the applicator and less waste of product.<br />

The application is a thin covering as a primer coat and then another<br />

Sarnacol 2172 comes in an 18kg canister to which a hose and applicator adhering coat to the back of the membrane. The two are put together and<br />

gun is connected. At the end of the applicator gun a small spray tip nozzle rolled over with a water filler roller to expel air bubbles and wrinkles and<br />

is screwed on. This makes the adhesive spray out in what is called a ‘spray achieve an intimate contact. Finally, to seal the overlaps seams should be<br />

fan’, which is a more controllable pattern than just delivering it like an heat welded either by a Sarnamatic automatic welding machine or hand<br />

aerosol spray. The important factor for the spray products is to keep the welded using a Leister triac hot air gun.<br />

“Attention to detail and following these<br />

procedures will deliver a roof to be proud of and<br />

one that withstands the pressures of modern<br />

construction methods”<br />

Contact Sika Sarnafil<br />

01707 394444<br />

gbr.sarnafil.sika.com<br />

@SikaSarnafilUK<br />

44 TC JUNE <strong>2018</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!