Health - NEDA-RDC VI
Health - NEDA-RDC VI
Health - NEDA-RDC VI
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Major Infrastructure Programs and Projects<br />
Programs and Projects<br />
Bridge for Prosperity Acceleration<br />
Project<br />
Location: Talagpun-ay, Sipalay City<br />
Source: <strong>NEDA</strong> 6, PMED<br />
Infrastructure Development<br />
Map 10 Major Inter-Regional<br />
Bridges Reconstruction<br />
Project<br />
Location: Bacolod South-<br />
Kabankalan Road,<br />
Negros Occidental<br />
Project Cost: P 188.8M<br />
44<br />
Bridge for Prosperity Acceleration<br />
Project<br />
Location: Binucuil, Kabankalan City<br />
Project Cost: P 60 M<br />
President’s Bridge Program Phase II<br />
Location: Sta. Isabel Bridge, Kabankalan<br />
City<br />
Project Cost: P 17.9 M