Construction-Contracting<br />

of Harran Plain Fourth Section Irrigation Project in 1996. Besides the<br />

Harran Plain Sixth Section Irrigation Project and Mardin – Ceylanpınar<br />

Main Line one of the biggest irrigation channel of Turkey; <strong>Kolin</strong><br />

Construction also completed the Şanlıurfa Tunnel Projects which is<br />

among the most important tunnels of the world. Construction of the<br />

Şanlıurfa Tunnel and Facilities was completed in April 2007.<br />

• The 301 km of the Kabul – Herat Road project, funded by<br />

USAID, and 115 km of road construction, funded by Saudi Fund,<br />

were completed in Afghanistan by <strong>Kolin</strong> Construction. <strong>Kolin</strong><br />

Construction which mobilized quickly in very severe conditions<br />

of Afghanistan, completed the works on time and proved its<br />

construction and organization skills in the international arena.<br />

<strong>Kolin</strong> is the only Turkish construction company which finalized<br />

the most road construction projects in Afghanistan. <strong>Kolin</strong><br />

Construction completed five transportation, one hospital, and one<br />

girls’ dormitory projects in Afghanistan up to 2007.<br />

• <strong>Kolin</strong> Construction carried out the Jordan Valley Irrigation Project<br />

on behalf of the Hashemite Kingdom of Jordan Ministry of Water<br />

and Irrigation.<br />

•Work undertaken for the U.S. Secretary of Defense stand out in<br />

terms of both quantity and technical qualities. Included in the list of<br />

U.S. Corps of Engineers for over 15 years, <strong>Kolin</strong> Construction has<br />

completed 10 projects requiring many advanced equipment and<br />

systems. Adana Central Security Control Facility included in the<br />

said projects and designed to be used as the supreme headquarter<br />

during wartime was completed and handed over in 2003.<br />

• <strong>Kolin</strong> Group purchased 50%of the shares of Sefine Maritime Inc.<br />

• The first highway underpass project of Baku was completed in<br />

2007 in Azerbaijan and inaugurated by the President Ilham Aliyev.<br />

• The Al-Khadra Ranch Irrigation Project was completed.<br />

•The construction of TCDD High-Speed Train Railway infrastructure<br />

between Yerköy, Yozgat and Sivas still continues.<br />

• Construction of the first balanced cantilever viaducts was<br />

executed.<br />

What did we do in 2010?<br />

Projects completed by <strong>Kolin</strong> Construction in 2010 are as follows:<br />

• Within the scope of the privatization of Electricity Distribution Inc<br />

by the Privatization Administration; tender of Çamlıbel Electricity<br />

Distribution Inc. which covers Sivas, Yozgat and Tokat and tender of<br />

Uludağ Electricity Distribution Inc. which includes Balıkesir, Bursa,<br />

Çanakkale and Yalova were awarded to the Limgaz - <strong>Kolin</strong> - Cengiz<br />

Consortium. To this aim, the company of Çamlı and Uuğ Electricity<br />

Distribution and Retail Sale Service was established.<br />

• The Kayseri Northern Passage Diversion (infrastructure,<br />

superstructure, and signaling) project, awarded by the General<br />

Directorate of Turkish State Railways (TCDD) continued. The project<br />

covers the construction of a 23-kilometer double lane railway<br />

<strong>Kolin</strong> Group of Companies which<br />

represents a brand identified with<br />

ethical values, righteousness<br />

and reliability has also shaped<br />

its business strategies around<br />

these concepts. Based on these<br />

strategies, the Group has adopted<br />

it as principle to establish long-term<br />

business partnerships.<br />

parallel to the Kayseri Northern Ring Road to replace the current<br />

railway passing through Kayseri. Earth works of all directions,<br />

drainage structures, under and over passes, bridge constructions as<br />

well as rail, sleeper, ballast, switch procurement and installment and<br />

signaling and telecommunication works of all routes are also being<br />

carried out. The initial contract value is TL 65.000.000.<br />

• Construction of the new U.S. Embassy Facility continued in<br />

2010. The security design and specialized construction technique<br />

of the project, which has a contract value of 121 million Dollars, is<br />

different from other ordinary projects and it will further raise <strong>Kolin</strong><br />

Construction’s profile both internationally and nationally about the<br />

superstructure works and enable the participation in the future<br />

U.S. Embassy projects in other countries as well.<br />

• The infrastructure projects of 10.680 houses continued<br />

in Tripoli, Libya. Contract of this project which has value of<br />

531,517,374.77 Libyan dinars and tendered by Libya’s Housing<br />

and Infrastructure Board (HIB) was signed on February 27, 2010.<br />

The project covers earthwork of a 830-hectare collective housing<br />

area, 40-km road construction work, a 200-km storm drainage<br />

system, a 50-km sewage system, a 140-km water supply system,<br />

a 40-km irrigation system, bridge construction, electricity and<br />

telecommunication distribution lines, construction of pumping<br />

stations, chlorination facilities, lighting and landscaping works.<br />

• Construction works of Gökova – Marmaris Road, Menemen –<br />

Manisa Road, İzmir – Çeşme intersection and Balıklıova – Mordoğan<br />

– Karaburun Road was undertaken.<br />

• Construction of Izmir Ring Road Harmandalı Intersection –<br />

Koyundere Intersection was undertaken.<br />

• Construction work of Ankara Potable Water 2nd Phase Project<br />

Gerede System was undertaken. Funded by the Japanese<br />

International Cooperation Agency, the project aims to supply<br />

potable water to Ankara, capital of Turkey, via a 31.6-km tunnel.<br />

The project will be one of the longest water transfer lines of<br />

the world. Three tunnel-boring machines will be used for the<br />

construction of the tunnel.<br />

• Artvin-Erzurum State Road 2nd Section Construction Project<br />

and the Ortaköy Viaduct and Ortaköy Road Construction Project<br />

were undertaken. Two balanced overhang viaducts with a total<br />

length of 503 meters will be built over three elevated sections of<br />

average height of 80 meters under the scope of this project.<br />

2011 projects<br />

New projects of <strong>Kolin</strong> Construction started in 2011 are as follows:<br />

• Since the capacity of İzmir Port is not sufficient, Çandarlı Port<br />

Project was launched in order to carry out the requirements<br />

about the container loads and establish a port complex which can<br />

serve on the main container transport lines passing through the<br />

Mediterranean.<br />

• Rehabilitation and Reconstruction Work of Köseköy-Gebze<br />

Section of the Ankara-İstanbul High-Speed Train Project was<br />

undertaken.<br />

<strong>Kolin</strong> Group of Companies 2011 / Annual Report 33<br />

• Construction of Water Supply and Waste Water Systems and<br />

Waste Water Treatment Plant for İsmayilli Rayon in Azerbaijan<br />

was started. This project aims not only to supply clean, easily<br />

accessible and continuous water to İsmailli Rayon but also<br />

remove and recycle the waste water in a manner not to damage<br />

the environment and human health.<br />

• Rehabilitation of Hajiqabul-Horadiz Road in Azerbaijan (M6),<br />

Parcel 1 Hajiqabul Bulagli Section Km: 00+000-40+500 and<br />

Rehabilitation of Hajiqabul-Horadiz Road (M6), Parcel 2, Bulagli-<br />

Bahramtepe Section, Km: 40+500-112+550 were started.<br />

• Upgrading of Hoima-Kaiso–Tonya Road (92 km) to paved<br />

(bituminous) standard, which is a preferential project for Uganda<br />

since it is a main route ensuring access to petrol reserves, was<br />

undertaken.<br />

<strong>Kolin</strong> Construction Projects USD<br />

Total Completed Projects 96 2.178.041.762<br />

Total Ongoing Projects 37 3.067.823.741<br />

Total Completed Transportation and Infrastructure Projects 42 1.382.170.195<br />

Total Completed Agriculture and Energy Projects 21 589.928.958<br />

Total Completed Building-Housing-Industrial Facility Projects 33 205.942.609<br />

Total Ongoing Transportation and Infrastructure Projects 23 1.944.324.174<br />

Total Ongoing Agriculture and Energy Projects 13 1.062.099.548<br />

Total Ongoing Building-Housing-Industrial Facility Projects 1 61.400.019<br />

Backlog 1.569.888.903<br />

Total Ongoing Transportation and Infrastructure Projects 23 1.078.358.844<br />

Total Ongoing Agriculture and Energy Projects 13 455.195.101<br />

Total Ongoing Building-Housing-Industrial Facility Projects 1 36.334.958