Construction-Contracting<br />
of Harran Plain Fourth Section Irrigation Project in 1996. Besides the<br />
Harran Plain Sixth Section Irrigation Project and Mardin – Ceylanpınar<br />
Main Line one of the biggest irrigation channel of Turkey; <strong>Kolin</strong><br />
Construction also completed the Şanlıurfa Tunnel Projects which is<br />
among the most important tunnels of the world. Construction of the<br />
Şanlıurfa Tunnel and Facilities was completed in April 2007.<br />
• The 301 km of the Kabul – Herat Road project, funded by<br />
USAID, and 115 km of road construction, funded by Saudi Fund,<br />
were completed in Afghanistan by <strong>Kolin</strong> Construction. <strong>Kolin</strong><br />
Construction which mobilized quickly in very severe conditions<br />
of Afghanistan, completed the works on time and proved its<br />
construction and organization skills in the international arena.<br />
<strong>Kolin</strong> is the only Turkish construction company which finalized<br />
the most road construction projects in Afghanistan. <strong>Kolin</strong><br />
Construction completed five transportation, one hospital, and one<br />
girls’ dormitory projects in Afghanistan up to 2007.<br />
• <strong>Kolin</strong> Construction carried out the Jordan Valley Irrigation Project<br />
on behalf of the Hashemite Kingdom of Jordan Ministry of Water<br />
and Irrigation.<br />
•Work undertaken for the U.S. Secretary of Defense stand out in<br />
terms of both quantity and technical qualities. Included in the list of<br />
U.S. Corps of Engineers for over 15 years, <strong>Kolin</strong> Construction has<br />
completed 10 projects requiring many advanced equipment and<br />
systems. Adana Central Security Control Facility included in the<br />
said projects and designed to be used as the supreme headquarter<br />
during wartime was completed and handed over in 2003.<br />
• <strong>Kolin</strong> Group purchased 50%of the shares of Sefine Maritime Inc.<br />
• The first highway underpass project of Baku was completed in<br />
2007 in Azerbaijan and inaugurated by the President Ilham Aliyev.<br />
• The Al-Khadra Ranch Irrigation Project was completed.<br />
•The construction of TCDD High-Speed Train Railway infrastructure<br />
between Yerköy, Yozgat and Sivas still continues.<br />
• Construction of the first balanced cantilever viaducts was<br />
executed.<br />
What did we do in 2010?<br />
Projects completed by <strong>Kolin</strong> Construction in 2010 are as follows:<br />
• Within the scope of the privatization of Electricity Distribution Inc<br />
by the Privatization Administration; tender of Çamlıbel Electricity<br />
Distribution Inc. which covers Sivas, Yozgat and Tokat and tender of<br />
Uludağ Electricity Distribution Inc. which includes Balıkesir, Bursa,<br />
Çanakkale and Yalova were awarded to the Limgaz - <strong>Kolin</strong> - Cengiz<br />
Consortium. To this aim, the company of Çamlı and Uuğ Electricity<br />
Distribution and Retail Sale Service was established.<br />
• The Kayseri Northern Passage Diversion (infrastructure,<br />
superstructure, and signaling) project, awarded by the General<br />
Directorate of Turkish State Railways (TCDD) continued. The project<br />
covers the construction of a 23-kilometer double lane railway<br />
<strong>Kolin</strong> Group of Companies which<br />
represents a brand identified with<br />
ethical values, righteousness<br />
and reliability has also shaped<br />
its business strategies around<br />
these concepts. Based on these<br />
strategies, the Group has adopted<br />
it as principle to establish long-term<br />
business partnerships.<br />
parallel to the Kayseri Northern Ring Road to replace the current<br />
railway passing through Kayseri. Earth works of all directions,<br />
drainage structures, under and over passes, bridge constructions as<br />
well as rail, sleeper, ballast, switch procurement and installment and<br />
signaling and telecommunication works of all routes are also being<br />
carried out. The initial contract value is TL 65.000.000.<br />
• Construction of the new U.S. Embassy Facility continued in<br />
2010. The security design and specialized construction technique<br />
of the project, which has a contract value of 121 million Dollars, is<br />
different from other ordinary projects and it will further raise <strong>Kolin</strong><br />
Construction’s profile both internationally and nationally about the<br />
superstructure works and enable the participation in the future<br />
U.S. Embassy projects in other countries as well.<br />
• The infrastructure projects of 10.680 houses continued<br />
in Tripoli, Libya. Contract of this project which has value of<br />
531,517,374.77 Libyan dinars and tendered by Libya’s Housing<br />
and Infrastructure Board (HIB) was signed on February 27, 2010.<br />
The project covers earthwork of a 830-hectare collective housing<br />
area, 40-km road construction work, a 200-km storm drainage<br />
system, a 50-km sewage system, a 140-km water supply system,<br />
a 40-km irrigation system, bridge construction, electricity and<br />
telecommunication distribution lines, construction of pumping<br />
stations, chlorination facilities, lighting and landscaping works.<br />
• Construction works of Gökova – Marmaris Road, Menemen –<br />
Manisa Road, İzmir – Çeşme intersection and Balıklıova – Mordoğan<br />
– Karaburun Road was undertaken.<br />
• Construction of Izmir Ring Road Harmandalı Intersection –<br />
Koyundere Intersection was undertaken.<br />
• Construction work of Ankara Potable Water 2nd Phase Project<br />
Gerede System was undertaken. Funded by the Japanese<br />
International Cooperation Agency, the project aims to supply<br />
potable water to Ankara, capital of Turkey, via a 31.6-km tunnel.<br />
The project will be one of the longest water transfer lines of<br />
the world. Three tunnel-boring machines will be used for the<br />
construction of the tunnel.<br />
• Artvin-Erzurum State Road 2nd Section Construction Project<br />
and the Ortaköy Viaduct and Ortaköy Road Construction Project<br />
were undertaken. Two balanced overhang viaducts with a total<br />
length of 503 meters will be built over three elevated sections of<br />
average height of 80 meters under the scope of this project.<br />
2011 projects<br />
New projects of <strong>Kolin</strong> Construction started in 2011 are as follows:<br />
• Since the capacity of İzmir Port is not sufficient, Çandarlı Port<br />
Project was launched in order to carry out the requirements<br />
about the container loads and establish a port complex which can<br />
serve on the main container transport lines passing through the<br />
Mediterranean.<br />
• Rehabilitation and Reconstruction Work of Köseköy-Gebze<br />
Section of the Ankara-İstanbul High-Speed Train Project was<br />
undertaken.<br />
<strong>Kolin</strong> Group of Companies 2011 / Annual Report 33<br />
• Construction of Water Supply and Waste Water Systems and<br />
Waste Water Treatment Plant for İsmayilli Rayon in Azerbaijan<br />
was started. This project aims not only to supply clean, easily<br />
accessible and continuous water to İsmailli Rayon but also<br />
remove and recycle the waste water in a manner not to damage<br />
the environment and human health.<br />
• Rehabilitation of Hajiqabul-Horadiz Road in Azerbaijan (M6),<br />
Parcel 1 Hajiqabul Bulagli Section Km: 00+000-40+500 and<br />
Rehabilitation of Hajiqabul-Horadiz Road (M6), Parcel 2, Bulagli-<br />
Bahramtepe Section, Km: 40+500-112+550 were started.<br />
• Upgrading of Hoima-Kaiso–Tonya Road (92 km) to paved<br />
(bituminous) standard, which is a preferential project for Uganda<br />
since it is a main route ensuring access to petrol reserves, was<br />
undertaken.<br />
<strong>Kolin</strong> Construction Projects USD<br />
Total Completed Projects 96 2.178.041.762<br />
Total Ongoing Projects 37 3.067.823.741<br />
Total Completed Transportation and Infrastructure Projects 42 1.382.170.195<br />
Total Completed Agriculture and Energy Projects 21 589.928.958<br />
Total Completed Building-Housing-Industrial Facility Projects 33 205.942.609<br />
Total Ongoing Transportation and Infrastructure Projects 23 1.944.324.174<br />
Total Ongoing Agriculture and Energy Projects 13 1.062.099.548<br />
Total Ongoing Building-Housing-Industrial Facility Projects 1 61.400.019<br />
Backlog 1.569.888.903<br />
Total Ongoing Transportation and Infrastructure Projects 23 1.078.358.844<br />
Total Ongoing Agriculture and Energy Projects 13 455.195.101<br />
Total Ongoing Building-Housing-Industrial Facility Projects 1 36.334.958