11.09.2018 Views

Urban Design Portfolio

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Urban</strong> <strong>Design</strong><br />

53


37<br />

«Living around the Tramway» is a work of reflection on Rimouski City’s transportation system and<br />

their impact on citizens’ lifestyle. It was a work in two phases:<br />

In the first phase, we decides to implement a tram-train on the existing train rail crossing the city in<br />

order to create a link between villages, reduce car dependency, and increase density around the future<br />

tram stations. We chose to increase density by creating polar points around tram stations by using<br />

tactical urbanism. In provinding services through the mobile tram wagons, we could achieve this<br />

goal. Moreover, using the train rail crossing the city was the very unique element that could a give<br />

a visual and physical link to the citizen to the St-Lawrence river and improve their daily lives. This<br />

phase was done in team of 4 people.<br />

In the second phase, we split our team in two. Our team decided to plan an intervention in the city<br />

center while the other planned something in the rural area of the city. Our project involves the restructstuction<br />

and reorganization of the fabric around the shopping center «Carrefour Rimouski»<br />

located in Rimouski-East. This project meant to be a “standard model” of best practice for future interventions<br />

on the urban fabric of the city center. The restructution aim to create a polar points in the<br />

city centered on the tram stations. Around those, it would be possible to live, work and live within 5<br />

minutes of walk.


0 1 2,5<br />

5km<br />

38


Procuring<br />

various services to<br />

citizens through daily<br />

moving wagons<br />

2<br />

The temporary services schedule<br />

Tactical urbanism<br />

<strong>Urban</strong>isme tactique<br />

39<br />

Day 1<br />

Day 2<br />

Day 3<br />

1<br />

The actual traffic flow


40<br />

In this proposition, we wanted to transform the shopping center,<br />

currently acting as a barrier, as an element articulating the<br />

different areas of use (industrial, residential, commercial and<br />

river (see diagram p.30)) found in the chosen sample.a<br />

The re-weaving the urban fabric was, among others, the result<br />

of the extension and the creation of some streets, but also, it<br />

was the result of the diversion of traffic delivery trucks from the<br />

Industrial Boulevard to the rue du Havre, which was extended<br />

to the port. These roads changes have made 2 things possible:<br />

First, the movement of the main industrial delivery road in the<br />

industrial zone, made it possible to implement new office buildings<br />

and services for industrial use of both sides of Industrial<br />

Boulevard to create a better transition interface between commercial<br />

and industrial areas. This road has a new function and<br />

is now pedestrian friendly.<br />

Secondly, the diversion of the industrial traffic lanes reasulted in<br />

the reduction of the traffic in the lanes at the north of the mall.<br />

They are now disproportionately wide. This allowed a reduction<br />

and a reorganization of the routes. This action resulted the<br />

creation of a public place facing the river and linked to the mall.<br />

The Mall:<br />

A consolidation taking into account the normal lifetime of a<br />

mall (50 years) was made at the north of it. In other words, if<br />

at the end of its life the mall is going to be destroy, the consolidation<br />

has been done to transform the land where the mall<br />

is located in 3 new blocks. In case where it would be rebuilt or<br />

renovated, the new shopping center passages will ensure permeability<br />

between the areas of use of this long-term tissue. In<br />

the short term, this permeability is ensured by the introduction<br />

of a new main entrance on the front side of Industrial Boulevard<br />

and with the implementation of a new tram station on this road.<br />

In the long term, it will be ensured by the new consolidation.<br />

In this new consolidation, the parking has been moved at the<br />

back of the shopping. A park and a newly built neighbourhood<br />

replaced the old parking. The roof of the new shopping center<br />

acts like a physical link between the industrial and the new<br />

neighbourhood.<br />

0 1 2,5<br />

5km<br />

3<br />

Adding and removing streets to redirect<br />

traffic onto alternative routes<br />

The deviated traffic flow results<br />

in giving a new public access<br />

point to the river


41<br />

4<br />

5 6<br />

The new roads<br />

Adding doors and hallwaays to create<br />

pedestrian connections to the surroundings<br />

8<br />

Reconstructing a mall connected to its surroundings


42<br />

7<br />

Implantation of the tram system and<br />

construction of a new plaza providing an<br />

access point to the river<br />

Demolition<br />

The Typologies<br />

Commercial - Industry<br />

Low density housing -Mixed use - Office<br />

The new access point to the river<br />

The North Public Place<br />

The public place at the north of the shopping center<br />

seats the tram station and mobile wagon services.<br />

This new public square serves as an articulatory element<br />

between different use zones and allows easy<br />

access to the river. The consolidation made around<br />

this public place has been done in order to create<br />

visual and physical links to the river and to surrounding<br />

streets. It also ensures legibility and permeability<br />

of the urban fabric.


43<br />

1<br />

2<br />

Monday<br />

The skate rental mobile wagon can be found on the northern public place<br />

The mall


44<br />

Section 1 - The new link between the residential. the commercial and the industrial zone<br />

Section 2 - The new link to the river created by the construction of the plaza<br />

Tuesday<br />

The Christmas Market mobile wagon can be found on the northern public Place<br />

The mall

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!