CU1811
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CASEstudy<br />
amount of time that saves!", he remarked.<br />
He also explained that a lot of time was<br />
saved on picking up and recording<br />
defects and building errors. Now, people<br />
working on-site can easily report<br />
building errors on the go, take a picture<br />
and add a comment and share them<br />
with the team, prompting speedier<br />
remediation. There was no further need<br />
to return to the office, log onto your<br />
workstation and fill in paperwork away<br />
from the site. That entails the possibility<br />
of transcription errors, leading to timeconsuming<br />
and expensive construction<br />
problems and the possibility of even<br />
more expensive litigation if the problem<br />
ends up in a courtroom.<br />
PLANNING MAINTENANCE DURING<br />
CONSTRUCTION<br />
StreamBIM has been designed to be<br />
accessible to all project members,<br />
irrespective of their different levels and<br />
areas of expertise or involvement. As<br />
Kristian explained, "An open BIM makes it<br />
easy to involve people with different<br />
knowledge and responsibilities. By using<br />
StreamBIM in the planning phase as well<br />
as throughout the production, we can<br />
create a digital twin documenting all the<br />
work which has been carried out,<br />
allowing traceability on all building<br />
components. This is amazing compared<br />
to the previous way we completed a<br />
handover. In the past we received thick<br />
paper document folders from the main<br />
contractors, which we never used<br />
because the information we needed was<br />
so difficult to find." StreamBIM provides<br />
highly visual 3D models of a building<br />
which can be navigated in real-time,<br />
whether you are using a laptop or<br />
smartphone. Clicking on components<br />
enables you to access all relevant<br />
information regarding that component -<br />
from technical support for maintenance<br />
to replacement acquisition and financials.<br />
INVOLVING END USERS<br />
"For large public hospitals, it is vital that<br />
we involve the end user in the planning<br />
phase. As end users in a highly<br />
complex environment, they understand<br />
much better than the engineers the<br />
idiosyncrasies and practical usage of<br />
the building. They can give feedback<br />
allowing us to avoid any costly<br />
corrections we would have to make<br />
after they have moved into the building.<br />
"We estimate we will save millions of<br />
Norwegian kroner by involving up to 170<br />
nurses, cleaning personnel, office<br />
managers, and even patient groups, in<br />
the planning of the hospital by giving<br />
them access to this user-friendly 3D<br />
BIM model.<br />
"By accessing this user-friendly 3D BIM<br />
model available on their smartphones<br />
and tablets, streamed from the single<br />
model on the central cloud server, they<br />
can browse the model when they have<br />
time to study the new building, and make<br />
comments on areas that cause them<br />
concern, or where they think<br />
improvements or changes need to made.<br />
"Overall, it has been a smooth and<br />
productive process. If a user needed to<br />
report an idea, she or he could just tag<br />
the room and propose the change. We<br />
could not have done this with 200 paper<br />
drawings."<br />
"Above all," Kristian concluded, "we<br />
focus on building without errors the first<br />
time, so before we began construction,<br />
we had a digital tour of BUS 2 with our VR<br />
glasses supported by StreamBIM on the<br />
tablets, so that everyone involved in the<br />
project could visualise every aspect of<br />
the building and what the end product<br />
was going to look like. You can't put a<br />
value on being able to see what you are<br />
working towards, and to accomplish that<br />
using such user-friendly software. I only<br />
know for sure that no one wants to go<br />
back to the way we did this before."<br />
www.streambim.com<br />
November/December 2018 25