Marathon Petroleum Company, Catlettsburg Refinery, KY<br />
Capacity Improvement <strong>Study</strong> of LPCCR Platformer Heater (1-44-B-1/2/3/4)<br />
This revamped design of the heater with new convection section will increase the<br />
charge rate capacity of the heater to 24.5 MBPD. We have sized the heater for<br />
the permitted firing rate of 280 MMBtu/hr (LHV). The total absorbed heat duty is<br />
246.5 MMBtu/hr. The total process duty is 191.7 MMBtu/hr. Debutanizer heat<br />
duty is 5.12 MMBtu/hr and Waste heat duty is 49.63 MMBtu/hr.<br />
The table below shows the comparison of existing design, maximum charge case<br />
and proposed design heat duties and the percentage flow through split flow coils:<br />
Heater<br />
Section<br />
No. 1<br />
Interheater<br />
Charge<br />
Heater<br />
No. 2 Inter<br />
Heater<br />
No. 3 Inter<br />
Heater<br />
Existing<br />
Design<br />
Case<br />
Maximum<br />
Charge case<br />
Proposed<br />
Design<br />
Case<br />
Extra Heat<br />
Duty<br />
Flow<br />
through<br />
split flow<br />
coils<br />
Heat Duty, MMBtu/hr %<br />
37.46 42.97 66.13 23.16 26.46<br />
26.12 36.20 50.08 13.88 22.41<br />
28.70 35.56 49.20 13.64 22.93<br />
13.98 19.99 26.32 6.33 24.70<br />
Total Duty 106.3 134.7 191.7 57.0<br />
The process heat duty is being increased by almost 85.4 MMBtu/hr from the<br />
existing design heat duty and about 57 MMBtu/hr from the current operating levels<br />
of 134.7 MMBtu/hr.<br />
1.5 Cost Estimation<br />
<strong>FIS</strong> has developed ±30% cost estimates for Platformer Heater(1-44-B-1/2/3/4)<br />
revamp. The estimated cost for the proposed recommendation is $ 9.99 Million.<br />
The cost includes design engineering supply and erection of the new convection<br />
section. It also includes split flow piping and instrumentation.<br />
We hope you find our report helpful and informative. We will provide you all the help<br />
you need in implementing these changes. We will be happy to provide you with<br />
follow up support, should you need further information or clarifications.<br />
Furnace Improvements<br />
Low Cost Solutions for Fired Heaters 12