Marathon Petroleum Company, Catlettsburg Refinery, KY<br />

Capacity Improvement <strong>Study</strong> of LPCCR Platformer Heater (1-44-B-1/2/3/4)<br />

This revamped design of the heater with new convection section will increase the<br />

charge rate capacity of the heater to 24.5 MBPD. We have sized the heater for<br />

the permitted firing rate of 280 MMBtu/hr (LHV). The total absorbed heat duty is<br />

246.5 MMBtu/hr. The total process duty is 191.7 MMBtu/hr. Debutanizer heat<br />

duty is 5.12 MMBtu/hr and Waste heat duty is 49.63 MMBtu/hr.<br />

The table below shows the comparison of existing design, maximum charge case<br />

and proposed design heat duties and the percentage flow through split flow coils:<br />

Heater<br />

Section<br />

No. 1<br />

Interheater<br />

Charge<br />

Heater<br />

No. 2 Inter<br />

Heater<br />

No. 3 Inter<br />

Heater<br />

Existing<br />

Design<br />

Case<br />

Maximum<br />

Charge case<br />

Proposed<br />

Design<br />

Case<br />

Extra Heat<br />

Duty<br />

Flow<br />

through<br />

split flow<br />

coils<br />

Heat Duty, MMBtu/hr %<br />

37.46 42.97 66.13 23.16 26.46<br />

26.12 36.20 50.08 13.88 22.41<br />

28.70 35.56 49.20 13.64 22.93<br />

13.98 19.99 26.32 6.33 24.70<br />

Total Duty 106.3 134.7 191.7 57.0<br />

The process heat duty is being increased by almost 85.4 MMBtu/hr from the<br />

existing design heat duty and about 57 MMBtu/hr from the current operating levels<br />

of 134.7 MMBtu/hr.<br />

1.5 Cost Estimation<br />

<strong>FIS</strong> has developed ±30% cost estimates for Platformer Heater(1-44-B-1/2/3/4)<br />

revamp. The estimated cost for the proposed recommendation is $ 9.99 Million.<br />

The cost includes design engineering supply and erection of the new convection<br />

section. It also includes split flow piping and instrumentation.<br />

We hope you find our report helpful and informative. We will provide you all the help<br />

you need in implementing these changes. We will be happy to provide you with<br />

follow up support, should you need further information or clarifications.<br />

Furnace Improvements<br />

Low Cost Solutions for Fired Heaters 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!