25.02.2019 Views

FIS-483 Consolidated Engineering Study Report

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Marathon Petroleum Company, Catlettsburg Refinery, KY<br />

Capacity Improvement <strong>Study</strong> of LPCCR Platformer Heater (1-44-B-1/2/3/4)<br />

Figure 12: Charge Heater Tube Metal Temperature<br />

Figure 13: Flue Gas Temperature Leaving Charge Heater<br />

Furnace Improvements<br />

Low Cost Solutions for Fired Heaters 46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!