water for placement and for the hydration<br />

and curing process. As the concrete cures<br />

and excess water leaves the slab, the concrete<br />

actually will shrink in size. When this<br />

happens, concrete with its great compressive<br />

strength won’t just shrink in itself - it’s too<br />

strong for that. It will actually curl up on the<br />

ends - also called concrete curling. When<br />

several large slabs are poured next to each<br />

other, this can create a peak in floor flatness.<br />

In typical construction this will happen over<br />

several months as the concrete cures. So,<br />

you could actually polish the floor and have<br />

a nice, smooth surface. Wait a few months,<br />

and you could have a joint that opens back<br />

up to create a lip or bump that may catch<br />

on wheels or be felt when walking over the<br />

surface.<br />

PATIENCE<br />

Smith Brothers, being part of several large<br />

expansions in their business life, had seen<br />

this happen and put together a construction<br />

schedule to accomodate this process. Instead<br />

of rushing to get us in the space to polish -<br />

there was a full 6-month cure time allowed<br />

before we even started our processes. This<br />

meant that the concrete had completed its<br />

shrinkage and curling, allowing us to grind<br />

this out of the floor and provide a smoother<br />

and flatter floor than in other projects - and<br />

with less or no additional work later on.<br />

THE JOB<br />

<strong>The</strong> project as a whole was a two-story construction<br />

facility with 60,000 SF of floor on<br />

the first floor and a Second Story that housed<br />

an additional 40,000 SF.<br />

DETAILS<br />

<strong>The</strong> entire building’s details were thought out and<br />

created an aura of ‘well-done’ and quality. <strong>The</strong><br />

lighting, paint, and floor blended well to create an<br />

open, spacious feeling. In a facility that prides itself<br />

on quality of work - it was equally as important<br />

to follow that in their own construction, and<br />

create that environment for their team members.<br />

“Smith Brothers set<br />

out intentionally<br />

to execute on good<br />

design and good<br />

craftsmanship”<br />