29.05.2019 Views

Wealden Times | WT208 | June 2019 | Kitchen & Bathroom supplement inside

Wealden Times - The lifestyle magazine for the Weald

Wealden Times - The lifestyle magazine for the Weald

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sponsored by<br />

majority of the cabinetry to<br />

be ready for the work surface<br />

template. The work surface was<br />

fitted seven working days later,<br />

with two further days to complete<br />

the kitchen cabinet installation.<br />

Were any special features<br />

included? A dropped ceiling was<br />

created to house a large flush<br />

ceiling mounted extractor. This<br />

was not only functional, but<br />

formed an interesting feature –<br />

the horizontal LED strip lighting<br />

incorporated reflects the LED<br />

lighting installed to the underside<br />

of the worktop above the cabinet<br />

doors. A cabinet was also adapted<br />

to conceal the main manifold for<br />

the underfloor heating system,<br />

with storage space above.<br />

We worked with the architect<br />

to ensure that the worktop ran in<br />

line with the top of the window<br />

frame, to conceal it, as one of<br />

the main features of the dwelling<br />

are the ‘frameless’ windows. <br />

OUR NEW WEBSITE<br />

IS NOW LIVE!<br />

01732 350911 | showroom@townsbathrooms.co.uk | townsbathrooms.co.uk<br />

Unit 5, Sanderson Way, Tonbridge TN9 1QG | Mon to Fri: 9am - 5pm Sat: 9am - 4pm<br />

On display:<br />

17 wealdentimes.co.uk<br />

Towns<strong>Bathroom</strong>s<strong>WT208</strong>a.indd 1 09/05/<strong>2019</strong> 11:07

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!