23.12.2012 Views

GE94-02: Repair Flow Testing and Calibration Procedures for ...

GE94-02: Repair Flow Testing and Calibration Procedures for ...

GE94-02: Repair Flow Testing and Calibration Procedures for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This report describes some of the important features of the specification <strong>and</strong> provides some<br />

guidance <strong>for</strong> its use.<br />

As part of the preparation of the specification, analyses were conducted on combustion<br />

components from an MS7001FA turbine <strong>and</strong> on samples provided by several after‐market<br />

coating vendors. The results of those analyses are also presented in this report.<br />

GE96‐10B1. Specification <strong>for</strong> <strong>Repair</strong> of MS7001 EA, F, FA First Stage Buckets. July<br />

1998.<br />

This specification identifies the requirements <strong>for</strong> repair of MS7001EA F <strong>and</strong> FA first stage<br />

buckets, which are made from GTD 111 nickel‐base alloy in equiaxed <strong>and</strong> directionally solidified<br />

<strong>for</strong>ms. It includes provisions <strong>for</strong> repair by re‐coating <strong>and</strong> optionally weld repair <strong>and</strong>/or HIP<br />

rejuvenation, as specified in the purchase order. The life extension achieved by repair will<br />

depend on the condition of the buckets as removed from service <strong>and</strong> the extent of repairs<br />

per<strong>for</strong>med.<br />

GE96‐10B2. Specification <strong>for</strong> <strong>Repair</strong> of MS7001 EA, F, FA Second Stage Buckets.<br />

July 1998.<br />

This specification identifies the requirements <strong>for</strong> repair of MS7001EA, F <strong>and</strong> FA second stage<br />

buckets that are made from IN 738 or GTD111 nickel‐base alloy with optional provisions <strong>for</strong> the<br />

removal <strong>and</strong> re‐application of protective coatings. The repaired bucket life should approach<br />

service life of the new buckets.<br />

GE96‐10B3. Specification <strong>for</strong> <strong>Repair</strong> of MS7001 EA, F, FA Third Stage Buckets.<br />

July 1998.<br />

This specification identifies the requirements <strong>for</strong> repair of MS7001EA, F <strong>and</strong> FA third stage buckets that<br />

are made from Udimet 500 or equiaxed GTD111 nickel‐base alloy with optional provisions <strong>for</strong> the<br />

removal <strong>and</strong> re‐application of protective coatings. The repaired bucket life should approach service life<br />

of the new buckets.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!