GE94-02: Repair Flow Testing and Calibration Procedures for ...
GE94-02: Repair Flow Testing and Calibration Procedures for ...
GE94-02: Repair Flow Testing and Calibration Procedures for ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
This report describes some of the important features of the specification <strong>and</strong> provides some<br />
guidance <strong>for</strong> its use.<br />
As part of the preparation of the specification, analyses were conducted on combustion<br />
components from an MS7001FA turbine <strong>and</strong> on samples provided by several after‐market<br />
coating vendors. The results of those analyses are also presented in this report.<br />
GE96‐10B1. Specification <strong>for</strong> <strong>Repair</strong> of MS7001 EA, F, FA First Stage Buckets. July<br />
1998.<br />
This specification identifies the requirements <strong>for</strong> repair of MS7001EA F <strong>and</strong> FA first stage<br />
buckets, which are made from GTD 111 nickel‐base alloy in equiaxed <strong>and</strong> directionally solidified<br />
<strong>for</strong>ms. It includes provisions <strong>for</strong> repair by re‐coating <strong>and</strong> optionally weld repair <strong>and</strong>/or HIP<br />
rejuvenation, as specified in the purchase order. The life extension achieved by repair will<br />
depend on the condition of the buckets as removed from service <strong>and</strong> the extent of repairs<br />
per<strong>for</strong>med.<br />
GE96‐10B2. Specification <strong>for</strong> <strong>Repair</strong> of MS7001 EA, F, FA Second Stage Buckets.<br />
July 1998.<br />
This specification identifies the requirements <strong>for</strong> repair of MS7001EA, F <strong>and</strong> FA second stage<br />
buckets that are made from IN 738 or GTD111 nickel‐base alloy with optional provisions <strong>for</strong> the<br />
removal <strong>and</strong> re‐application of protective coatings. The repaired bucket life should approach<br />
service life of the new buckets.<br />
GE96‐10B3. Specification <strong>for</strong> <strong>Repair</strong> of MS7001 EA, F, FA Third Stage Buckets.<br />
July 1998.<br />
This specification identifies the requirements <strong>for</strong> repair of MS7001EA, F <strong>and</strong> FA third stage buckets that<br />
are made from Udimet 500 or equiaxed GTD111 nickel‐base alloy with optional provisions <strong>for</strong> the<br />
removal <strong>and</strong> re‐application of protective coatings. The repaired bucket life should approach service life<br />
of the new buckets.