Construction at

Indiana and Main

The summer closure of Indiana Avenue from 18th Street to Main

Street was a collaboration with FP&C and the Operations Division to

accommodate two separate projects.

1.26 1.19

2019

2020

At the Dustin R. Womble Basketball Center, FP&C installed two

raised crosswalks that go across Indiana Avenue from the Womble

Center to the United Supermarket Arena.

North of Main Street, the Operations Division expanded the C-10

parking lot. This also included connecting the loop road from

Knoxville Avenue to the loop road behind the Physical Plant. The

south entrance to the parking lot can be accessed from the new

roundabout constructed at the intersection of Indiana Avenue and

Main Street.

* 1 being the best

Custodial Survey for

Professionalism of Staff

1.75

with one being the best

193.67

Total Parking Lot Acres

on Texas Tech Main

Campus

Custodial Survey for

Services Provided

1.97

with one being the best

C-10 expansion added 206 more parking spaces