Opa-locka 2021

Cityof

State

The

Governmental Funds

Roadway Resurfacing $300,000

Cairo Lane 800,000

Sidewalks 260,000

Total Governmental $1,360,000

Water-Sewer Funds

Cairo Lane $ 2,900,000

Water-Sewer Project Design Criteria 500,000

Total Water-Sewer Projects $ 3,400,000

Stormwater Fund

Stormwater Master Plan $ 300,000

Stormwater Project Design Criteria 500,000

NW 30th Avenue 160,000

Zone 6 850,000

Cairo Lane 300,000

Project To Be Identified From Master Plan 600,000

Total Stormwater Projects $ 2,710,000

• Increased focus on City appearance.

• Funding for a park masterplan to provide long-range guidance to the restoration of this

vital community asset.

• Funding for a CRA masterplan to provide additional long range guidance for CRA

development.

• Citywide process improvement led by significant IT Department investment.

• Five-Year Plan submitted on schedule and accepted by the State without modification

required. Highlights include:

• Continued historic property tax base growth after FY 22 pause. (Current anecdotal

information indicates a stronger real estate market than had been assumed for FY

22.)

15 City of Opa-Locka State of the City