Opa-locka 2021
Cityof
State
The
Governmental Funds
Roadway Resurfacing $300,000
Cairo Lane 800,000
Sidewalks 260,000
Total Governmental $1,360,000
Water-Sewer Funds
Cairo Lane $ 2,900,000
Water-Sewer Project Design Criteria 500,000
Total Water-Sewer Projects $ 3,400,000
Stormwater Fund
Stormwater Master Plan $ 300,000
Stormwater Project Design Criteria 500,000
NW 30th Avenue 160,000
Zone 6 850,000
Cairo Lane 300,000
Project To Be Identified From Master Plan 600,000
Total Stormwater Projects $ 2,710,000
• Increased focus on City appearance.
• Funding for a park masterplan to provide long-range guidance to the restoration of this
vital community asset.
• Funding for a CRA masterplan to provide additional long range guidance for CRA
development.
• Citywide process improvement led by significant IT Department investment.
• Five-Year Plan submitted on schedule and accepted by the State without modification
required. Highlights include:
• Continued historic property tax base growth after FY 22 pause. (Current anecdotal
information indicates a stronger real estate market than had been assumed for FY
22.)
15 City of Opa-Locka State of the City