Montour Run Watershed Assessment & Implementation Plan
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
≤50209
≤81 589
≤185145
≤354600
Quantifiable Goals & Objectives
≤800203
Recommended BMPs by Subwatershed Area
1-C - Detention Basin
Assessment and Renovation
FINDLAY
1-F RIDC Park Stormwater Master Plan
1-F RIDC Park Stormwater Master Plan
Development and Implementation
NORTH FAYETTE
NORTH NORTH
FAYETTE FAYETTE
4 - Improve BMP
5 - Municipality Maintenance
6 - Riparian Buffer Improvement
7 - Further Assessment
1-D Moon Middle and High School
Green Infrastructure
MOON
1-E Bioretention Retrofit
4
5
3
Esri, HERE
2 1
NORTH FAYETTE
CORAOPOLIS
1-C - Detention Basin
1-D Moon Middle and High School CORAOPOLIS
Priority 3 Priority 4
1-B Moon Township Rain
Assessment and Renovation
Green Infrastructure
Garden Capacity Expansion
FINDLAY
0 0.35 0.7 1.4
Miles
0 0.2 0.4 0.8 1.2 1.6
Miles
TSS (lbs Per Year) Maximum Export (Modeled)
≤31 38
≤1 2552
≤1 8828
≤50209
≤81 589
≤185145
≤354600
≤800203
MOON
Priority 1-E Bioretention 5 Retrofit
1-B Moon Township Rain
Garden Capacity Expansion
4
5
1A - Streambank
and Buffer
Restoration
3
2 1
NORTH FAYETTE
1 - Bank Stabilization
2 - Debris Jam Removal
3 - Homeowner Outreach
4 - Improve BMP
5 - Municipality Maintenance
6 - Riparian Buffer Improvement
7 - Further Assessment
1A - Streambank
and Buffer
Restoration
Figure 3.4.1-Priority recommendation sites for Subwatershed Area 1-Airport Area. Sites based on pollution accumulation
modeling (TSS shown) and accessibility.
INDEPENDENCE
1-D Moon Middle and High School
1-C - Detention Basin
Green Infrastructure
124 | Montour Assessment Run Watershed and Renovation Assessment & Implementation Plan
NORTH
Esri, HERE
FAYETTE
INDEPENDENCE
≤ 60
≤ 80
≤ 1 00
Model ed Sedim en t (l bs/yr)
≤ 0.05
2-B Findlay Township Building
Stormwater Detention
Stormwater Detention
Demonstration Demonstration Project Project
2-B Findlay Township Building
Stormwater Detention FINDLAY
Demonstration Project
FINDLAY
2-D Riparian Buffer 2-D Riparian Buffer
and Streambank and Restoration Streambank Restoration
1,6 FINDLAY1,6
2-D Riparian Buffer
and Streambank Restoration
1,6
FINDLAY 2-D Riparian Buffer and
FINDLAY
Streambank Restoration
2-E Riparian Buffer and ≤ 40
2-E Riparian Buffer and
Streambank Priority Restoration ≤ 60
1
MilesStreambank Miles Restoration NORTH FAYETTE NORTH FAYETTE
≤ 80
0 0.2 0.4 0.8 1.2 1.6
ROBINSON
Miles
NORTH FAYETTE
≤ 1 00
0 0.35 0.70 0.351.40.7 1.4
≤ 1 303
5 - Mu n icipal ity Mainten an ce
≤ 21 72
6 - Riparian Bu ffer I m provem en t
≤ 24545
7 - Fu rth er Assessm en t
2-C Findlay Priority ≤Township 55390 3 Public
Priority 4
Works Department Bioretention
CORAOPOLIS
2-C Findlay Priority Township 2-C 3Findlay Public Priority Township 3 Public
Priority 4 Priority 4
2-C Findlay Township Public
MOON
Works Department Works Bioretention
Works
Department
Dept. Bioretention
Bioretention 2-B Findlay Township Building
Priority 5 Priority 5
Stormwater Detention
2-C Findlay Priority Township 3 Public
Demonstration Project Priority 4
Works Department Bioretention
Priority 2 Priority 2
Priority 5
2-B Findlay Township 2-B Findlay Building Township Building
Stormwater Detention
Demonstration Project
FINDLAY Priority 2
2-D Riparian Buffer
and Streambank MOON Restoration MOON
1,6
FINDLAY
2-E Riparian Buffer 2-E and Riparian Buffer and
Priority 1
Streambank Restoration Streambank Restoration
MOON
FINDLAY 1,6
Tree Can opy in th e Riparian Bu ffer (%)
Priority 1 Priority 1 Priority 1
≤ 20
0 0.35 0.7 1.4
Miles
Tree Can opy in Tree th e Riparian Can opy Bu in ffer th e (%) Riparian Bu ffer (%) ≤ 21 7Model ed Sedim ≤ 21 7en t (l bs/yr)
≤ 20
≤ 40
≤ 60
≤ 20
Tree Can opy ≤ 40in th e Riparian Bu ffer (%)
≤ 20≤ 60
≤ 434
≤ 868
≤ 1 303
≤ 0.05≤ 434
≤ 21 7≤ 868
≤ 434≤ 1 303
≤ 80
≤ 40
≤ 80
INDEPENDENCE
≤ 21 72
≤ 868
≤ 21 72
≤ 1 00
≤ 60
≤ 1 00
≤ 24545
≤ 1 303
≤ 24545
≤ 80
≤ 21 72
Model ed SedimModel en t (l bs/yr) ed Sedim en t (l bs/yr) ≤ 55390 ≤ 55390
≤ 1 00
2-C Findlay Township ≤ 24545 Public
≤ 0.05 ≤ 0.05
Works Dept. Bioretention
Model ed Sedim en t (l bs/yr)
≤ 55390
≤ 0.05
CORAOPOLIS
Figure 3.4.2-Priority recommendation sites for Subwatershed Area 2-North Fork and West Enlow. Sites based on pollution
accumulation modeling (TSS and Riparian Buffer shown) and accessibility.
INDEPENDENCE
CORAOPOLIS
INDEPENDENCE
2-C Findlay Township 2-C Findlay PublicTownship
Public
1,6
1,6
0 0.35 0.7 1.4
Miles
FINDLAY
MOON
2-A Stream and 2-A Stream and
Bank Restoration Bank Restoration
1,6
2-E Riparian Buffer and
Streambank Restoration
CORAOPOLIS
MOON
2-A Stream and
Bank Restoration
MOON
MOON
2-A Stream and Bank
Restoration
Priority 1
NORTH FAYETTE
≤ 21 7
≤ 434
≤ 868
NORTH FAYETTE NORTH FAYETTE
NORTH FAYETTE NORTH Priority FAYETTE 1
NORTH FAYETTE
Esri, HERE
Esri,
≤ HERE
1 303
NORTH FAYETTE
NORTH FAYETTE
Esri, HERE
≤ 21 72
≤ 24545
Priority 5
Priority 2
Esri, HERE
NOR
NORTH
1 - Ban k Stabil ization 1 - ≤Ban 55390 k Stabil ization
2 - Debris Jam Rem 2 - Debris oval Jam Rem oval
3 - H om eown 1 - Ban er 3 k Ou - Stabil Htreach
omization
eown er Ou treach
4 - I m prove 2 - BMP Debris 4 - I Jam m prove RemBMP
oval
5 - Mu n icipal 3 - Hity om5 Mainten eown - Mu ner icipal an Ouce
treach ity Mainten an c
6 - Riparian 4 - Bu I mffer prove 6 - IRiparian mBMP
provemBu en ffer t I m provem
7 - Fu rth er 5 - Assessm Mu n7 icipal - Fu enrth ity t er Mainten Assessm anen cet
6 - Riparian Bu ffer I m provem en t
7 - Fu rth er Assessm en t
Montour Run Watershed Assessment & Implementation Plan | 125
1,6
2-A Str
Bank R