Quantifiable Goals & Objectives

≤800203

Recommended BMPs by Subwatershed Area

1-C - Detention Basin

Assessment and Renovation

FINDLAY

1-F RIDC Park Stormwater Master Plan

1-F RIDC Park Stormwater Master Plan

Development and Implementation

NORTH FAYETTE

NORTH NORTH

FAYETTE FAYETTE

4 - Improve BMP

5 - Municipality Maintenance

6 - Riparian Buffer Improvement

7 - Further Assessment

1-D Moon Middle and High School

Green Infrastructure

MOON

1-E Bioretention Retrofit

4

5

3

Esri, HERE

2 1

NORTH FAYETTE

CORAOPOLIS

1-C - Detention Basin

1-D Moon Middle and High School CORAOPOLIS

Priority 3 Priority 4

1-B Moon Township Rain

Assessment and Renovation

Green Infrastructure

Garden Capacity Expansion

FINDLAY

0 0.35 0.7 1.4

Miles

0 0.2 0.4 0.8 1.2 1.6

Miles

TSS (lbs Per Year) Maximum Export (Modeled)

≤31 38

≤1 2552

≤1 8828

≤50209

≤81 589

≤185145

≤354600

≤800203

MOON

Priority 1-E Bioretention 5 Retrofit

1-B Moon Township Rain

Garden Capacity Expansion

4

5

1A - Streambank

and Buffer

Restoration

3

2 1

NORTH FAYETTE

1 - Bank Stabilization

2 - Debris Jam Removal

3 - Homeowner Outreach

4 - Improve BMP

5 - Municipality Maintenance

6 - Riparian Buffer Improvement

7 - Further Assessment

1A - Streambank

and Buffer

Restoration

Figure 3.4.1-Priority recommendation sites for Subwatershed Area 1-Airport Area. Sites based on pollution accumulation

modeling (TSS shown) and accessibility.

INDEPENDENCE

1-D Moon Middle and High School

1-C - Detention Basin

Green Infrastructure

124 | Montour Assessment Run Watershed and Renovation Assessment & Implementation Plan

NORTH

Esri, HERE

FAYETTE

INDEPENDENCE

≤ 60

≤ 80

≤ 1 00

Model ed Sedim en t (l bs/yr)

≤ 0.05

2-B Findlay Township Building

Stormwater Detention

Stormwater Detention

Demonstration Demonstration Project Project

2-B Findlay Township Building

Stormwater Detention FINDLAY

Demonstration Project

FINDLAY

2-D Riparian Buffer 2-D Riparian Buffer

and Streambank and Restoration Streambank Restoration

1,6 FINDLAY1,6

2-D Riparian Buffer

and Streambank Restoration

1,6

FINDLAY 2-D Riparian Buffer and

FINDLAY

Streambank Restoration

2-E Riparian Buffer and ≤ 40

2-E Riparian Buffer and

Streambank Priority Restoration ≤ 60

1

MilesStreambank Miles Restoration NORTH FAYETTE NORTH FAYETTE

≤ 80

0 0.2 0.4 0.8 1.2 1.6

ROBINSON

Miles

NORTH FAYETTE

≤ 1 00

0 0.35 0.70 0.351.40.7 1.4

≤ 1 303

5 - Mu n icipal ity Mainten an ce

≤ 21 72

6 - Riparian Bu ffer I m provem en t

≤ 24545

7 - Fu rth er Assessm en t

2-C Findlay Priority ≤Township 55390 3 Public

Priority 4

Works Department Bioretention

CORAOPOLIS

2-C Findlay Priority Township 2-C 3Findlay Public Priority Township 3 Public

Priority 4 Priority 4

2-C Findlay Township Public

MOON

Works Department Works Bioretention

Works

Department

Dept. Bioretention

Bioretention 2-B Findlay Township Building

Priority 5 Priority 5

Stormwater Detention

2-C Findlay Priority Township 3 Public

Demonstration Project Priority 4

Works Department Bioretention

Priority 2 Priority 2

Priority 5

2-B Findlay Township 2-B Findlay Building Township Building

Stormwater Detention

Demonstration Project

FINDLAY Priority 2

2-D Riparian Buffer

and Streambank MOON Restoration MOON

1,6

FINDLAY

2-E Riparian Buffer 2-E and Riparian Buffer and

Priority 1

Streambank Restoration Streambank Restoration

MOON

FINDLAY 1,6

Tree Can opy in th e Riparian Bu ffer (%)

Priority 1 Priority 1 Priority 1

≤ 20

0 0.35 0.7 1.4

Miles

Tree Can opy in Tree th e Riparian Can opy Bu in ffer th e (%) Riparian Bu ffer (%) ≤ 21 7Model ed Sedim ≤ 21 7en t (l bs/yr)

≤ 20

≤ 40

≤ 60

≤ 20

Tree Can opy ≤ 40in th e Riparian Bu ffer (%)

≤ 20≤ 60

≤ 434

≤ 868

≤ 1 303

≤ 0.05≤ 434

≤ 21 7≤ 868

≤ 434≤ 1 303

≤ 80

≤ 40

≤ 80

INDEPENDENCE

≤ 21 72

≤ 868

≤ 21 72

≤ 1 00

≤ 60

≤ 1 00

≤ 24545

≤ 1 303

≤ 24545

≤ 80

≤ 21 72

Model ed SedimModel en t (l bs/yr) ed Sedim en t (l bs/yr) ≤ 55390 ≤ 55390

≤ 1 00

2-C Findlay Township ≤ 24545 Public

≤ 0.05 ≤ 0.05

Works Dept. Bioretention

Model ed Sedim en t (l bs/yr)

≤ 55390

≤ 0.05

CORAOPOLIS

Figure 3.4.2-Priority recommendation sites for Subwatershed Area 2-North Fork and West Enlow. Sites based on pollution

accumulation modeling (TSS and Riparian Buffer shown) and accessibility.

INDEPENDENCE

CORAOPOLIS

INDEPENDENCE

2-C Findlay Township 2-C Findlay PublicTownship

Public

1,6

1,6

0 0.35 0.7 1.4

Miles

FINDLAY

MOON

2-A Stream and 2-A Stream and

Bank Restoration Bank Restoration

1,6

2-E Riparian Buffer and

Streambank Restoration

CORAOPOLIS

MOON

2-A Stream and

Bank Restoration

MOON

MOON

2-A Stream and Bank

Restoration

Priority 1

NORTH FAYETTE

≤ 21 7

≤ 434

≤ 868

NORTH FAYETTE NORTH FAYETTE

NORTH FAYETTE NORTH Priority FAYETTE 1

NORTH FAYETTE

Esri, HERE

Esri,

≤ HERE

1 303

NORTH FAYETTE

NORTH FAYETTE

Esri, HERE

≤ 21 72

≤ 24545

Priority 5

Priority 2

Esri, HERE

NOR

NORTH

1 - Ban k Stabil ization 1 - ≤Ban 55390 k Stabil ization

2 - Debris Jam Rem 2 - Debris oval Jam Rem oval

3 - H om eown 1 - Ban er 3 k Ou - Stabil Htreach

omization

eown er Ou treach

4 - I m prove 2 - BMP Debris 4 - I Jam m prove RemBMP

oval

5 - Mu n icipal 3 - Hity om5 Mainten eown - Mu ner icipal an Ouce

treach ity Mainten an c

6 - Riparian 4 - Bu I mffer prove 6 - IRiparian mBMP

provemBu en ffer t I m provem

7 - Fu rth er 5 - Assessm Mu n7 icipal - Fu enrth ity t er Mainten Assessm anen cet

6 - Riparian Bu ffer I m provem en t

7 - Fu rth er Assessm en t