03.02.2021 Views

Montour Run Watershed Assessment & Implementation Plan

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

and Streambank Restoration

Priority 4 1,6

Miles

NORTH FAYETTE

FINDLAY

5,

focused on stream bank restoration locations based on directed into bioretention swales that could be built on

CORAOPOLIS

Tree Can opy in in th the e Riparian Bu Bu ffer ffer (%) (%) ≤ 21 ≤7

21 7

1 - Ban k Stabil ization 1 - Ban k Stabil ization

the visual assessment and publicly accessible parcels (Figure

3.4.3). ≤ 434

2 - Debris Jam Rem oval

existing grassy areas (estimated cost for 3,000 linear feet

2-C Findlay Priority Township 3 Public

Priority 4

20 5 8 5 2

≤ 20

≤ 434

2 - Debris Jam Rem oval

MOON

2 5

Works Department Bioretention

1,5

2

1

1,3 5

approximately $150,000).

P

40

≤ 868

3 - H om eown er Ou treach

Priority 5

≤ 40

3 - H om eown er Ou treach

2-E Riparian Buffer and

5 5

≤ 868

Priority 5

4

5

601

Priority 1 ≤ 1 303

4 - I m prove BMP 4 - I m prove BMP

Streambank Restoration

≤ 60

3A: Reinforce ≤ 1 303 the riparian 5 buffer - Mu n icipal through ity

≤ 80

5 Mainten - Mu tree n icipal plantings

ceity Mainten an ce3C: Wilson Elementary School grounds rain gardens and

≤ 21 72

Priority 2

≤ 80

and stream ≤ 21 72 restoration efforts 6 - Riparian on both Bu ffer sides I m provem of the en stream. t

bioswales. Grassy parking islands and landscaping Priority 4pro-

vides opportunities to detain, infiltrate, and filter storm-

≤ 1 00

NORTH FAYETTE

6 - Riparian Bu ffer I m provem en t

0 0.35 0.7 1.4

≤ 24545

≤ 1 00

Priority NORTH FAYETTE 2 These 7 - Fu rth er Assessm en t

≤riparian 24545 areas are owned by Allegheny 7 - Fu rthCounty. er Assessm A en t

Miles

NORTH FAYETTE

Esri, HERE

Model ed Sedim en t (l bs/yr)

≤ 55390

FIN

visual assessment of this stretch identified 20 individual

areas of streambank with visible erosion, no riparian on this site would also provide tremendous educational

water runoff from the buildings and parking lots. Projects

2-A Stream and Model ed Sedim en t (l bs/yr)

≤ 55390

≤ 0.05

2-B Findlay Township Building

Bank Restoration

NORTH FAYETTE ≤ 0.05

buffer, or was in some way compromised. Reinforcing the opportunities for biology/environmental studies/gardening

classes or clubs.

Stormwater Detention

Tree Can opy MOON in th e Riparian Bu ffer INDEPENDENCE (%)

≤ 21 7

1

buffer

- Ban k Stabil

in this

ization

Demonstration Project

area would help to decrease erosion and

≤ 20

≤ 434

2 - Debris Jam Rem oval

increase resilience. To address 2,000 linear feet of riparian

≤ 40 1,6

INDEPENDENCE

FINDLAY

Priority ≤ 868

Priority 3

3 - H om eown er Ou treach

3

area will cost approximately $200,000.

3D: Roadside parcels/park along the South Fork of Montour

Run between North Star Road. and Santiago Road.

4 - I m prove BMP

≤ 60

≤ 1 303

5 - Mu n icipal ity Mainten an ce

MOON

FINDLAY

≤ 80

≤ 21 72

6 3B: - Riparian West Allegheny Bu ffer I m provem Middle en School t and High School

These parcels are designated as a public park according

2-D Riparian Buffer

0 0.23 0.45 ≤0.9

1 00

2-C Findlay Township Campuses. This hilltop complex contains ample grassy to County data. Augmenting the riparian buffer, and

≤ 24545

Public

7 - Fu rth er Assessm en t

and Streambank Restoration ROBINSON

Miles

Esri, HERE

Works Dept. Bioretention

parking islands and school property that could be used repairing MOON deeply incised streambanks could help increase

1,6

Model ed Sedim en t (l bs/yr)

≤ 55390

to detain, infiltrate and filter stormwater runoff from the resiliency Priority along 1 this stream corridor.

Modeled Sediment ≤ 0.05 (lbs/yr)

buildings and parking lots. Projects on this site would

≤1 99

1 - Bank Stabilization

Priority 2

also provide tremendous educational opportunities for 3E: Findlay Township Community Building Green Infrastructure

Demonstration Project. The municipality owned

2 - Debris Jam Removal

≤397

biology/environmental studies/gardening classes or Priority 4

3 - Homeowner Outreach

2-E Riparian Buffer andINDEPENDENCE

≤794

clubs. Three basins could be explored for retrofitting Priority 1 to Activity FINDLAY Center serves the surrounding area, not 5, just

Priority 1

Priority 1

4 - Improve BMP

Streambank Restoration ≤1190

5 - Municipality Maintenance

increase bioretention and potential habitat (estimated the township of Imperial. A rain garden at this location

5 8 5 2

cost, $240,000). Similarly, parking lot runoff could 2-A be Stream and Bank would be a highly visible example of Green Infrastructure

2 5

≤2976

6 - Riparian Buffer Improvement

2

0 0.23

1

1,3 5

NORTH FAYETTE

1,5

0 0.35 0.7 1.4

NORTH FAYETTE 2-B Findlay 7 - Further Township Assessment Building

Restoration

0.45 5 0.9

ROBINSON 5

5 5

Miles

NORTH 2-C ≤5555 Findlay FAYETTE Township Public

Esri, HERE

Stormwater Detention

4

Miles

Works

FINDLAY

≤8530 Dept. Bioretention

MOON

Demonstration Project

1,6

Figure 3.4.2-Priority recommendation sites for ≤50585 Subwatershed Area 2-North Fork and West Enlow. Sites based on

Modeled Sediment (lbs/yr) Priority 2

pollution accumulation Tree Can opy in thmodeling e Riparian Bu (TSS ffer and (%) Riparian Buffer ≤ 21 7 shown) and accessibility. 1 - Ban k Stabil ization

Priority 4

FINDLAY ≤1 99

≤ 20

≤ 434

2 - Debris Jam Rem oval

1,6

3-A Streambank and

≤397

be detained. Located ≤ 40

3 - H om eown er Ou treach

in the headwaters of the watershed, ≤ 868 space between stream and road is scrubby grass. Establishing

a more robust riparian buffer along this corridor is

3-D Stream Riparian Buffer

≤794

4 - I m prove BMP 2-D Riparian Buffer and

Riparian Restoration

NORTH FAYETTE

valuable benefits ≤would 60 be derived in the form of public

education. and ≤improving 80 the adjacent area. A 3,000 ≤ 21 72 estimated to cost $260,000. 6 - Riparian Bu ffer I m provem en t

≤ 1 303

5 - Mu n icipal ity Mainten an Streambank ce Restoration

and Streambank Restoration

≤1190

2-A Stream and Bank

square foot rain garden ≤ 1 00 on this site will cost an estimated ≤ 24545

7 - Fu rth er Assessm en t

FINDLAY

5,

≤2976 Priority 3

2-B Findlay Township Building

Restoration

$174,000.

Area 3: South Fork Montour Run: The South Fork of

5 8 5

Model ed Sedim en t (l bs/yr)

Stormwater ≤ 55390 Detention

2

Montour Run did not undergo Priority visual 1 assessment because

2

≤5555

2 5

1,5 1

1,3 5

2C: The Township ≤of 0.05

Demonstration Project

Findlay Public Works Department on of access issues. Prioritized areas in this sub-watershed

5 5

5 4

5

≤8530

Clinton Road includes a large parcel with gravel parking group were identified by spatial analysis of the pollution

0 0.23 0.45 0.9

ROBINSON

Miles

≤50585

lots, expanses of roof, and an existing detention basin. accumulation modeling and examination FINDLAY within publicly Priority 51,6

NORTH FAYETTE

The INDEPENDENCE detention basin should be evaluated for retrofitting

to retain water and nutrients. Estimated costs are

0 0.2 0.4 0.8 1.2 1.6

3-B West Allegheny

Priority 4 accessible parcels.

FINDLAY

Modeled Sediment (lbs/yr)

2-D Riparian Buffer and

Esri, HERE

$80,000.

This sub-watershed ROBINSON group does contain several large Miles

≤1 99

1 - Bank Stabilization

School Grounds

Streambank Restoration

2-E Riparian Buffer and

industrial properties where GI could help to reduce stormwater

runoff. Potential focus partners include:

3-C Wilson Elementary

≤397 NORTH FAYETTE

Green Infrastructure 2 - Debris Jam Removal

2-C Findlay Township Public

Streambank Restoration

NORTH FAYETTE

3 - Homeowner Outreach

2D: Restore riparian buffer and stream banks along

Works Dept. Bioretention

MOON

2

1, 5,8 2 5 ≤794

4 - Improve BMP

School Grounds Green

stream in conjunction with the Airport Authority. The

1. Amazon 0 0.2 0.4 0.8 1.2 1.6 5 5

3 5

Infrastructure

≤1190

5 - Municipality Maintenance

Esri, HERE

streambanks and near-stream regions would benefit from 2. Imperial Parking ROBINSON Lot retrofits, Findlay Community 1,5 5

Miles 3,4,6,7

5 1

≤2976 3-E Findlay Township Community

5 5 1,

6 - Riparian Buffer Improvement

increased tree cover and natural bank armoring from willow

plantings, in particular. Approximately 400 linear feet 3. Lenox Court retention pond retrofit

Demonstration Project

Center and Agway

4 3

Building Green Infrastructure

7 - Further Assessment

≤5555

of riparian buffer plantings along this stretch is estimated 4. Birchwood Land Pond retrofit

0 0.23 0.45 0.9

≤8530

Esri, HERE

ROBINSON

Miles

to cost $80,000.

5. West Allegheny School District

≤50585

Modeled Sediment (lbs/yr)

2-A Stream and Bank

≤1 98

2E: Restore riparian buffer and stream banks along Imperial

/ Burgettstown Road. In particular, the road introduc-

and South Fork, and continued along the main stem.

Visual assessments began at the confluence of the North

Figure 3.4.3-Priority recommendation sites for Subwatershed Area 3-South Fork Montour Run. Sites based on

2-B Findlay Township Building

Restoration

1 - Bank Stabilization

2-E Riparian Buffer and

≤396

pollution accumulation modeling (Sediment shown) and accessibility.

Priority 4

Stormwater Detention

2 - Debris Jam Removal

Streambank Restoration

es stormwater runoff directly to the stream. Currently the Prioritized project areas in this sub-watershed group are

≤793 NORTH FAYETTE

3 - Homeowner Outreach

Demonstration Project

≤991 Priority 2

4 - Improve BMP

52 | Future Goals & Recommendations0 0.2 0.4 0.8 1.2 1.6

≤1190

Montour 5 - Municipality Run Watershed Maintenance Assessment & Implementation Plan | 53

Esri, HERE

ROBINSON

Miles

NORTH FAYETTE

≤1 587

6 - Riparian Buffer Improvement

FINDLAY 1,6

7 - Further Assessment

≤2975

Esri, HERE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!