03.02.2021 Views

Montour Run Watershed Assessment & Implementation Plan

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fish_Sites

Montour_Run

30

TSS (Fall vs. Spring)

25

20

15

10

5

Hassam

Road Site

Hassam

Road Site

0

MR08-North ForkMR07-South Fork MR06-DS Enlow MR05-Enlow MR04-McClaren MR03-DS

McClaren

MR02-Meeks

MR01-Mouth

Lab Fall

Lab Spring

Figure 2.2.12-Laboratory results of Total Suspended Solids (TSS) in ppm at eight sample sites in Montour Run

Watershed for Fall of 2017 and Spring of 2018.

Cliff Mine

Road Site

Cliff Mine

Road Site

400

Chloride (Fall vs. Spring)

0 1.5

3

Miles

Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community

350

300

336

0 2.5

5

Miles

Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community

250

200

150

100

50

93.3

89.4

76.9

63.4

192

151

178

147

216

199

178

190 186

118

216

MontourRunStreams

Fish_Sites

Montour_Run

0

MR08-NORTH

FORK

MR07-SOUTH

FORK

MR06-DS

ENLOW

MR05-ENLOW

MR04-

MCCLAREN

MR03-DS

MCCLAREN

MR02-MEEKS

MR01-MOUTH

Figure 2.2.14-Fish survey sites along Montour Run.

Lab Fall

Lab Spring

Figure 2.2.13-Laboratory results of Chloride in ppm at eight sample sites in Montour Run Watershed for Fall of 2017

and Spring of 2018.

70 | Montour Run Watershed Assessment & Implementation Plan

Montour Run Watershed Assessment & Implementation Plan | 71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!