Montour Run Watershed Assessment & Implementation Plan
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Fish_Sites
Montour_Run
30
TSS (Fall vs. Spring)
25
20
15
10
5
Hassam
Road Site
Hassam
Road Site
0
MR08-North ForkMR07-South Fork MR06-DS Enlow MR05-Enlow MR04-McClaren MR03-DS
McClaren
MR02-Meeks
MR01-Mouth
Lab Fall
Lab Spring
Figure 2.2.12-Laboratory results of Total Suspended Solids (TSS) in ppm at eight sample sites in Montour Run
Watershed for Fall of 2017 and Spring of 2018.
Cliff Mine
Road Site
Cliff Mine
Road Site
400
Chloride (Fall vs. Spring)
0 1.5
3
Miles
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community
350
300
336
0 2.5
5
Miles
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community
250
200
150
100
50
93.3
89.4
76.9
63.4
192
151
178
147
216
199
178
190 186
118
216
MontourRunStreams
Fish_Sites
Montour_Run
0
MR08-NORTH
FORK
MR07-SOUTH
FORK
MR06-DS
ENLOW
MR05-ENLOW
MR04-
MCCLAREN
MR03-DS
MCCLAREN
MR02-MEEKS
MR01-MOUTH
Figure 2.2.14-Fish survey sites along Montour Run.
Lab Fall
Lab Spring
Figure 2.2.13-Laboratory results of Chloride in ppm at eight sample sites in Montour Run Watershed for Fall of 2017
and Spring of 2018.
70 | Montour Run Watershed Assessment & Implementation Plan
Montour Run Watershed Assessment & Implementation Plan | 71