04.02.2021 Views

Panels & Furniture Asia January/February 2021

Panels & Furniture Asia (PFA) is a leading regional trade magazine dedicated to the woodbased panel, furniture and flooring processing industry. Published bi-monthly since 2000, PFA delivers authentic journalism to cover the latest news, technology, machinery, projects, products and trade events throughout the sector. With a hardcopy and digital readership comprising manufacturers, designers and specifiers, among others, PFA is the platform of choice for connecting brands across the global woodworking landscape.

Panels & Furniture Asia (PFA) is a leading regional trade magazine dedicated to the woodbased panel, furniture and flooring processing industry. Published bi-monthly since 2000, PFA delivers authentic journalism to cover the latest news, technology, machinery, projects, products and trade events throughout the sector. With a hardcopy and digital readership comprising manufacturers, designers and specifiers, among others, PFA is the platform of choice for connecting brands across the global woodworking landscape.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WOOD CLINIC<br />

and suck the preservatives from<br />

the preservative storage pool. After<br />

filling the pressure tank, pump the<br />

vacuum pump to close the valve.<br />

4. Open the pressure pump and<br />

increase the pressure to 14bar,<br />

maintaining it for one hour or<br />

longer as appropriate.<br />

5. After the pressure-holding phase<br />

ends, open the valve of the<br />

pressure tank to discharge the<br />

remaining preservatives to the<br />

storage pool.<br />

6. Start the vacuum pump to drain the<br />

wet preservatives from the wood<br />

surface and immediately complete<br />

the full-cell process within 15<br />

minutes.<br />

7. Confirm that all remaining<br />

preservatives in the pressure tank<br />

have been drained into the storage<br />

pool before opening the door of the<br />

pressure tank to unload the wood<br />

for air drying.<br />

Selection of preservatives<br />

There are many kinds of preservatives in<br />

the market and they should be selected<br />

according to their environmental<br />

hazard level. One possibility is Copper<br />

Chromium Arsenic (CCA). Chromium<br />

is a fixing agent in CCA preservatives<br />

and can prolong the effectiveness of<br />

preservatives in wood tissues. Copper<br />

and arsenic play a role in preventing<br />

decaying fungi and moths.<br />

Basic safety matters<br />

1. Preservative treatment workshop<br />

a. Workshop ventilation<br />

equipment: the workshop<br />

should have good ventilation<br />

equipment, especially at the<br />

entrance of the preservative<br />

pressure tank or the mixer for<br />

diluting preservatives. The<br />

equipment can pump the gas<br />

volatilised by preservatives<br />

away from the workshop.<br />

b. Wastewater treatment: there<br />

should be a facility for treating<br />

the wastewater recovery tank.<br />

c. Safety dike: a safety dike should<br />

be set around the pressure tank<br />

to prevent the preservative from<br />

leaking all over the ground.<br />

d. Emergency shower room: set up<br />

an emergency shower room at<br />

an appropriate location.<br />

e. Eye washing equipment: set<br />

up eye-washing facilities in<br />

appropriate working areas.<br />

If CCA gets into contact with<br />

the eyes, wash immediately<br />

for about 15 minutes to avoid<br />

damaging the cornea.<br />

f. Hand washing equipment:<br />

there should be a sink near the<br />

working area.<br />

g. Back-up water tank: a back-up<br />

图 一 、 全 细 胞 防 腐 处 理 的 程 序 如 示 意 图 一 。a. 啟 动 抽 真 空 泵 water , a1 tank 直 空 is necessary 保 压 时 in 間 case ,b. 吸 入 防 腐 剖<br />

, c. 啟 动 加 压 力 泵 压 力 达 14bar, d. 保 压 時 間 , e. 减 压 , f.CCA 防 腐<br />

of<br />

剂<br />

a temporary<br />

回 收 , g.<br />

shortage<br />

抽 真 空<br />

of<br />

,<br />

tap<br />

g1 真 空 时 間 ,<br />

water.<br />

h. 觧 除 真 空 压 力 。<br />

15<br />

d<br />

12<br />

Pressure (bar)<br />

9<br />

6<br />

3<br />

0<br />

-1<br />

a<br />

a 1<br />

c<br />

b<br />

Time (hour)<br />

g<br />

e<br />

f<br />

g 1<br />

h<br />

Figure 1. Schematic diagram of the Bethell full-cell process<br />

Legend<br />

a. Start the vacuum pump<br />

a 1 . Vacuum duration<br />

b. Add preservatives<br />

c. Open the pressure pump and<br />

increase the pressure to 14bar<br />

d. Pressurisation duration<br />

e. Decompression<br />

f. CCA preservative<br />

recovery<br />

g. Vacuumise<br />

g 1 . Vacuum duration<br />

h. Release the vacuum pressure<br />

1<br />

<strong>Panels</strong> & <strong>Furniture</strong> <strong>Asia</strong> | <strong>January</strong> / <strong>February</strong> <strong>2021</strong> 59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!