- Page 2 and 3: 2 PLUSH
- Page 4 and 5: 4 PLUSH
- Page 6 and 7: Project TeamGrant Runtsch3 rd yearI
- Page 8 and 9: 8 PLUSH
- Page 10 and 11: 10 PLUSH
- Page 12 and 13: 12 PLUSH
- Page 16 and 17: 16 PLUSH
- Page 18 and 19: 18 PLUSH
- Page 20 and 21: 24 day process to layer concrete ov
- Page 22 and 23: 22 PLUSH
- Page 24 and 25: 6”SMALL SCALE PROTOTYPE TEST45”
- Page 26 and 27: 26 PLUSH
- Page 28 and 29: 28 PLUSH
- Page 30 and 31: Final concrete form is exposedDirt
- Page 32 and 33: 32 PLUSH
- Page 34 and 35: 34 PLUSH
- Page 36 and 37: Begin withmoldablepostiveLoremipsum
- Page 38 and 39: 38 PLUSH
- Page 40 and 41: 40 PLUSH
- Page 42 and 43: 42 PLUSH
- Page 44 and 45: “After a decade making exposedcon
- Page 46 and 47: 46 PLUSH
- Page 48 and 49: Construct jig that will hold thefab
- Page 50 and 51: 50 PLUSH
- Page 52 and 53: 1.80 1.040.261.863.073.073.052.470.
- Page 54 and 55: 54 PLUSH
- Page 56 and 57: 56 PLUSH
- Page 58 and 59: 58 PLUSH
- Page 60 and 61: The URC Quilt-Method byKenzo Unno.
- Page 62 and 63: 62 PLUSH
- Page 64 and 65:
Even though there is still a lot of
- Page 66 and 67:
Low Tech Case StudySourcesBranching
- Page 68 and 69:
Mollard, Manon. “GreenCorner Buil
- Page 70 and 71:
70 PLUSH
- Page 72 and 73:
Concrete printer prints the top pie
- Page 74 and 75:
74 PLUSH
- Page 76 and 77:
76 PLUSH
- Page 78 and 79:
The building is printed in separate
- Page 80 and 81:
80 PLUSHScript for curved wall exte
- Page 82 and 83:
-estudio/5008edd128ba0d27a7000d16-t
- Page 84 and 85:
Temporary Tent StructureLavacrete M
- Page 86 and 87:
86 PLUSH
- Page 88 and 89:
88 PLUSH
- Page 90 and 91:
AXON90 PLUSH
- Page 92 and 93:
92 PLUSH
- Page 94 and 95:
94 PLUSH
- Page 96 and 97:
Make one column out of desired shap
- Page 98 and 99:
98 PLUSH
- Page 100 and 101:
100 PLUSH
- Page 102 and 103:
Final plan view of completed column
- Page 104 and 105:
104 PLUSH
- Page 106 and 107:
106 PLUSH
- Page 108 and 109:
Stress linesVoxel Cubes placed alon
- Page 110 and 111:
110 PLUSHGrasshopper Script for lof
- Page 112 and 113:
112 PLUSHOVERALL PIC
- Page 114 and 115:
First FloorSecond FloorThird FloorF
- Page 116 and 117:
116 PLUSH
- Page 118 and 119:
118 PLUSH
- Page 120 and 121:
A plastic panel is placed in the in
- Page 122 and 123:
122 PLUSH
- Page 124 and 125:
124 PLUSH
- Page 126 and 127:
CURTAINED WALL 1CURTAINED WALL 2CUR
- Page 128 and 129:
128 PLUSH
- Page 130 and 131:
130 PLUSH
- Page 132 and 133:
Two structural curves with resultin
- Page 134 and 135:
General Parameters134 PLUSH
- Page 136 and 137:
136 PLUSH
- Page 138 and 139:
ITERATION 1MATERIALS USED: FINECONC
- Page 140 and 141:
ITERATION 2MATERIALS USED: FINECONC
- Page 142 and 143:
ITERATION 3MATERIALS USED: FINECONC
- Page 144 and 145:
Parametrically, there are a number
- Page 146 and 147:
146 PLUSH
- Page 148 and 149:
ITERATION 1MATERIALS USED: PVCPIPE,
- Page 150 and 151:
ITERATION 2MATERIALS USED: PVC,WOOD
- Page 152 and 153:
ITERATION 3MATERIALS USED:PVC PIPE,
- Page 154 and 155:
ITERATION 4MATERIALS USED:CONCRETE,
- Page 156 and 157:
ITERATION 5MATERIALS USED: WOODENDO
- Page 158 and 159:
ITERATION 6MATERIALS USED: BARK,PLY
- Page 160 and 161:
Creating a script for this texturei
- Page 162 and 163:
162 PLUSH
- Page 164 and 165:
ITERATION 1MATERIALS USED: ICEVARIA
- Page 166 and 167:
ITERATION 2MATERIALS USED: BAL-LOON
- Page 168 and 169:
ITERATION 3MATERIALS USED: BAL-LOON
- Page 170 and 171:
ITERATION 4MATERIALS USED: PLAYDOUG
- Page 172 and 173:
ITERATION 5MATERIALS USED: BAL-LOON
- Page 174 and 175:
For our rhino and grasshopperdefini
- Page 176 and 177:
176 PLUSH
- Page 178 and 179:
ITERATION 1MATERIALS USED: SPANDEXF
- Page 180 and 181:
ITERATION 2MATERIALS USED: SPANDEXF
- Page 182 and 183:
ITERATION 3MATERIALS USED: SPANDEXF
- Page 184 and 185:
ITERATION 4MATERIALS USED: SPANDEXF
- Page 186 and 187:
ITERATION 5MATERIALS USED: SPANDEXF
- Page 188 and 189:
ITERATION 6MATERIALS USED: SPANDEXF
- Page 190 and 191:
Components added to create mold par
- Page 192 and 193:
192 PLUSH
- Page 194 and 195:
ITERATION 1MATERIALS USED: TEXTILES
- Page 196 and 197:
ITERATION 2MATERIALS USED: TEXTILES
- Page 198 and 199:
ITERATION 3MATERIALS USED: TEXTILES
- Page 200 and 201:
ITERATION 4MATERIALS USED: TEXTILES
- Page 202 and 203:
ITERATION 5MATERIALS USED: TEXTILES
- Page 204 and 205:
ITERATION 6MATERIALS USED: TEXTILES
- Page 206 and 207:
ITERATION 7MATERIALS USED: TEXTILES
- Page 208 and 209:
Considering the fact that thecreati
- Page 210 and 211:
210 PLUSH
- Page 212 and 213:
ITERATION 1MATERIALS USED:WOODEN FR
- Page 214 and 215:
ITERATION 2MATERIALS USED:WOODEN FR
- Page 216 and 217:
ITERATION 3MATERIALS USED:WOODEN FR
- Page 218 and 219:
ITERATION 4MATERIALS USED: 18” x
- Page 220 and 221:
ITERATION 5MATERIALS USED: 18” x
- Page 222 and 223:
ITERATION 6MATERIALS USED:18” x 1
- Page 224 and 225:
Parametrically, we were able tocrea
- Page 226 and 227:
High-TechCase StudySources32 Biomim
- Page 228 and 229:
Gericke, Oliver, Daria Kovaleva,and
- Page 230 and 231:
230 PLUSH
- Page 232 and 233:
232 PLUSH
- Page 234 and 235:
234 PLUSH
- Page 236 and 237:
236 PLUSH
- Page 238 and 239:
238 PLUSH
- Page 240 and 241:
240 PLUSH
- Page 242 and 243:
242 PLUSH
- Page 244 and 245:
244 PLUSH
- Page 246 and 247:
246 PLUSH
- Page 248 and 249:
248 PLUSH
- Page 250 and 251:
250 PLUSH
- Page 252 and 253:
252 PLUSH
- Page 254 and 255:
254 PLUSH
- Page 256 and 257:
256 PLUSH
- Page 258 and 259:
258 PLUSH
- Page 260 and 261:
260 PLUSH
- Page 262 and 263:
262 PLUSH
- Page 264 and 265:
264 PLUSH
- Page 266 and 267:
266 PLUSH
- Page 268 and 269:
268 PLUSH
- Page 270 and 271:
270 PLUSH\
- Page 272 and 273:
272 PLUSH
- Page 274 and 275:
274 PLUSH
- Page 276 and 277:
276 PLUSH
- Page 278 and 279:
278 PLUSH
- Page 280 and 281:
280 PLUSH
- Page 282 and 283:
282 PLUSH
- Page 284 and 285:
284 PLUSH
- Page 286 and 287:
286 PLUSH
- Page 288 and 289:
288 PLUSH
- Page 290 and 291:
290 PLUSH
- Page 292 and 293:
292 PLUSH
- Page 294 and 295:
294 PLUSHSetting the Table
- Page 296 and 297:
296 PLUSH
- Page 298 and 299:
298 PLUSH
- Page 300 and 301:
300 PLUSH
- Page 302 and 303:
302 PLUSH
- Page 304 and 305:
BudgetPredicted total:Portland Ceme