25.07.2021 Views

GezI Park District

Competition Entry by Building Office / Aras Burak in 2020

Competition Entry by Building Office / Aras Burak in 2020

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

VEHICLE TRAFFIC<br />

ISTANBUL METRO<br />

FENIKULER KABATAS<br />

Gezi <strong>Park</strong> <strong>District</strong><br />

Transportation Strategy<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

INTRODUCING THE URBAN GRID<br />

BUILDING OFFICE | PAGE 16<br />

The tunnel built for the road connecting Golden Horn<br />

to Halaskargazi Street underground was not the<br />

most ideal for the pedestrian experience. However,<br />

it helped Taksim Square become entirely pedestrian.<br />

We are merely proposing an URBAN GRID similar to<br />

manhattan to ease transportation in Gezi <strong>Park</strong> <strong>District</strong>.<br />

This move will encourage walking, cycling, scooter<br />

usage. We also propose to drill a hole on the mega<br />

concrete surface to create a visual connection between<br />

the underground bus station and overground use.<br />

VISUAL CONNECTION WITH THE TUNNEL<br />

By creating a hole in the concrete surface where the inner part<br />

of the tunnel and the Istanbul Metro Galeri is aligned on top of<br />

each other, daylight will be entering into the tunnel and the metro<br />

levels. At the moment for pedestrians on the Taksim level can not<br />

see the bus stops under the concrete plate; therefore, we propose<br />

to open a terracing hole until we reach the metro level.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!