During the completion of intermediary and/or whole scope areas, our team works closely with the project team
to identify and track all incomplete or unsatisfactory items. A punch list is developed wherein all items are
assigned a responsible part and completion date.
Training services will be organized and led by project staff and coordinated with third party experts such that
the owner’s maintenance staff will be fully educated in the operation and maintenance of all primary
and miscellaneous mechanical and electrical systems.
Upon final completion, we will prepare final project manuals for handover to the project owner
and/or agent. Project manuals include key items such as:
• Warranty information
• Equipment manuals and data
• Redline as-built drawings
• Subcontractor contact information - Operating manuals as required
Methods to encourage MBE/WBE Participation
MBE/WBE Selection
Our staff have consistently achieved both required as well as “suggested” content requirements for
Minority Business Enterprises and Women Owned Business Enterprises, while maintaining cost
competitiveness for our clients. Through our work with non-profit and state and federally funded programs,
we have successfully exceeded content requirements in trade areas such as:
• Demolition
• Masonry
• Sheetmetal and Flashing
• Roofing and Moisture Protection • Interior Finishes
• Painting
• Floor and Finishes
We have established relationships with various MBE/ WBE subcontractors and are confident in our ability to
successfully create awareness and implementation of this requirement for any construction program
interested specifying in this requirement.