INSTALLATION<br />

CONDITIONS


1<br />

ADDITIONAL WORK<br />

Following our template visit we may have asked<br />

you to carry out some additional work. This<br />

additional work is vitally important and had<br />

been requested to help ensure a smooth<br />

installation as well as give the work surfaces a<br />

foundation to last a lifetime.<br />

Please make sure that the requested work has<br />

been carried out as failure to do so could result<br />

in an aborted installation visit of which is<br />

chargeable.<br />

If you have any questions surrounding any<br />

requested additional work, please feel free to<br />

contact us.


2<br />

REPRESENTATIVE<br />

Please ensure a representative is on-site during<br />

the installation of the work surfaces.<br />

Whether this is the client, kitchen fitter, designer<br />

or the like, they must be authorised to inspect<br />

and sign off the completed installation.<br />

A representative doesn't have to be present for<br />

the duration of the installation but it is advised<br />

in case our installation teams have any<br />

questions or the client has any suggestions.


3<br />

ACCESS<br />

Please make sure all routes to the kitchen are<br />

clear and safe. Worktops are heavy and can<br />

weigh 100KG/M2. It is vitally important that the<br />

installation team can carry the work surfaces<br />

into the kitchen safely.<br />

Please also make sure there is ample parking<br />

for a large van and any parking permits are<br />

ready for the arrival of the installation team.<br />

Please also ensure that no other trades are<br />

working in the kitchen who could obstruct our<br />

installation teams.<br />

<strong>Installation</strong>s can take between 2-8 hours<br />

depending on the installation and level of work<br />

required on-site. Please bear this in mind.


4<br />

DISCONNECT<br />

If temporary worktops have been installed post<br />

template, please make sure these tops have<br />

been removed prior to our installation visit.<br />

Our installations teams cannot remove or<br />

dispose of temporary worktops.<br />

Please also ensure that all sinks, taps and hobs<br />

have been disconnected preceding to our<br />

arrival.<br />

Our teams do not have the tools or<br />

qualifications to undertake plumbing or<br />

electrical work therefore it is your<br />

responsibility to arrange the disconnection of<br />

appliances which affect the installation of the<br />

work surfaces.


5<br />

WALLS<br />

Any tiling in areas around the work surfaces<br />

must take place after the surfaces have been<br />

installed. Do not tile the walls between our<br />

template and installation visits unless you have<br />

left ample room for the work surfaces to be<br />

installed.<br />

The same applies to plaster; any plastering<br />

work should be carried out post-installation.<br />

In the event of plasterwork being disturbed<br />

during the installation, all costs associated with<br />

making good are the clients responsibility. The<br />

same applies to any disturbance caused to the<br />

paintwork of the walls.


6<br />

TRADES<br />

Where other trades follow the installation, it is<br />

the responsibility of the client to cover the work<br />

surfaces with protective sheeting.<br />

Marble Building Products (Yorkshire) Ltd. are<br />

not liable for any damage caused to the work<br />

surfaces after our installation visit.<br />

Upon request, we can provide protective<br />

sheeting for the work surfaces.<br />

Items such as dust sheets, cardboard and jiffy<br />

foam can be used as protection.<br />

The client must advise other trades that<br />

standing on the work surfaces is not advised.


7<br />

ADHESIVES<br />

To allow joints and sealants to harden and set<br />

correctly, we strongly advise leaving the work<br />

surfaces alone for 24 hours.<br />

This includes the connection of sinks, taps and<br />

appliances as any movement in the work<br />

surfaces could cause a break in the joints or<br />

seals. Please also avoid creating any dust in<br />

the room as this can settle on wet sealants,<br />

ruining the standard of finish.<br />

After 24 hours, you're safe to use the surfaces<br />

as intended.


8<br />

INSPECTION<br />

Upon completion of the installation, please<br />

thoroughly check the work carried out before<br />

signing off the job.<br />

In the unlikely event that you later find damage,<br />

shortage of goods or anything which renders<br />

the work surfaces as unacceptable, please<br />

inform us within 24 hours.<br />

If you find any deficiencies in the service<br />

provided, you must inform us within 3 days of<br />

the completed installation.<br />

Further information can be found at the bottom<br />

of the delivery note.