+IMPACT MAGAZINE ISSUE 15
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PROJECT<br />
WISHES TO THANK AND CONGRATULATE<br />
Time Projects on a successful project and 5-Star Green Star Rating<br />
Services Provided and Features on the Prime Plaza II project:<br />
n Energy Efficient Chiller selection<br />
n Central Fresh AIr Air Handling Unit Integrated with Chiller to exchange<br />
pre-heating of fresh air with free cooling to internal zone Fan Coil Units<br />
n Chilled Water Fan Coil Units<br />
n Building Management System<br />
www.acend.co.za<br />
Contact: Anton Frylinck 083 660 <strong>15</strong>06/antonf@acend.co.za<br />
for Botswana and other parts of Africa. Green Star<br />
accredited professional on the project, Dash Coville,<br />
from Solid Green Consulting, says that the green<br />
building movement is gaining momentum in Gaborone,<br />
with Solid Green being involved with the certification<br />
of three other projects (including one with PrimeTime).<br />
“Motswere’s achievement is an inspiring first<br />
for Botswana’s budding sustainability journey. As<br />
PrimeTime, Time Projects and the development team,<br />
we are privileged to be able to pioneer this space, and<br />
look forward to more industry players coming onboard,”<br />
says Sebetso.<br />
Motswere boasts high levels<br />
of energy and water efficiency,<br />
as well as state-of-the-art<br />
mechanical ventilation<br />
and building management<br />
systems.<br />
The team values and understands<br />
the concept of not only designing<br />
green but also building green and<br />
without their buy-in and dedication,<br />
we would not have been able to<br />
achieve the certification.<br />
The 2 780m² Motswere<br />
building, designed by<br />
PaulMunnik Architects,<br />
consists of three levels<br />
of A-grade office space.<br />
POSITIVE IMPACT <strong>ISSUE</strong> <strong>15</strong><br />
21