24.12.2012 Views

Maddicks, Henry T., 100 Years of Daylesford Gold Mining History, p ...

Maddicks, Henry T., 100 Years of Daylesford Gold Mining History, p ...

Maddicks, Henry T., 100 Years of Daylesford Gold Mining History, p ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

March 1875: North Cornish has dismissed tributers ... recommencing. 397<br />

March 1875: Jefferies quartz mill, at Mauritius Reef, was destroyed by fire. 398<br />

June 1875: Williams and party, Warrior Reef, have erected a portable engine, 10hp, 7-inch lifts. 399<br />

June 1875: Argus United has sunk No. 1 tribute ... 30 men and boys now employed. 400<br />

June 1875: Long Tunnel is in 2,800 feet, have payable wash. 401<br />

Sept 1875: A few who follow the occupations <strong>of</strong> farmers and miners combined have turned their attention<br />

solely to farming for the present, thus showing an apparent diminution in the number <strong>of</strong><br />

miners. 402<br />

Sept 1875: The water races are all running freely, but cannot do so much longer; 150 heads is the nearest<br />

number that can be stated at work; the prices vary from 5s. to 35s. shift <strong>of</strong> 8 hours, but many <strong>of</strong><br />

the race owners adopt the system <strong>of</strong> payment by results. 403<br />

Dec 1876: The Pyrites Co. have purchased 2,000 tons <strong>of</strong> tailings from Lauriston to operate upon here. 404<br />

Dec 1876: One engine from South Argus and one from Eureka are being re-erected at the North Star. 405<br />

Dec 1876: A new engine is being erected at Ineson's Reef, and some are removed from the division; there<br />

are now 29 engine in the division in quartz workings, value £28,870. 406<br />

March 1876: A new venture, the Spelling Bee Co, Specimen Hill, is down with a new shaft. 407<br />

March 1876: <strong>Daylesford</strong> Q. M. Co., German Gully, down 300ft. 408<br />

March 1876: Union tunnel, from Whitfield Gully, is in 320 feet. 409<br />

March 1876: Perrin's tunnel, King William Gully, is in 360 feet. 410<br />

March 1876: Victor's North Star engine, Doctor’s Gully, has started. 411<br />

March 1876: Ritter's, Smyth's Reef, have sunk four shafts. 412<br />

June 1876: The Specimen Hill Company are erecting a fourth engine (winding), purchased from the<br />

Cornish Company. 413<br />

June 1876: Cornish Co., employ 70 men. 414<br />

397 <strong>Mining</strong> Surveyors' Reports<br />

398 <strong>Mining</strong> Surveyors' Reports<br />

399 <strong>Mining</strong> Surveyors' Reports<br />

400 <strong>Mining</strong> Surveyors' Reports<br />

401 <strong>Mining</strong> Surveyors' Reports<br />

402 <strong>Mining</strong> Surveyors' Reports<br />

403 <strong>Mining</strong> Surveyors' Reports<br />

404 <strong>Mining</strong> Surveyors' Reports<br />

405 <strong>Mining</strong> Surveyors' Reports<br />

406 <strong>Mining</strong> Surveyors' Reports<br />

407 <strong>Mining</strong> Surveyors' Reports<br />

408 <strong>Mining</strong> Surveyors' Reports<br />

409 <strong>Mining</strong> Surveyors' Reports<br />

410 <strong>Mining</strong> Surveyors' Reports<br />

411 <strong>Mining</strong> Surveyors' Reports<br />

412 <strong>Mining</strong> Surveyors' Reports<br />

413 <strong>Mining</strong> Surveyors' Reports

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!