FOCUS SOLU<br />

/...<br />

Tancredo Martins, Director General, VSB<br />

“<br />

With four years <strong>of</strong> works<br />

and more than 11 thousand<br />

employees working on <strong>the</strong><br />

construction <strong>of</strong> Vallourec<br />

& Sumitomo Tubos do Brasil<br />

(VSB), <strong>the</strong> new steel making<br />

complex, inaugurated in<br />

September, marks <strong>the</strong> history<br />

<strong>of</strong> <strong>the</strong> Vallourec Group, not<br />

only by it being a steel plant<br />

with cutting-edge technology<br />

equipment, but also for it becoming an important channel<br />

in <strong>the</strong> production <strong>of</strong> seamless steel tubes.<br />

In order to have a dimension <strong>of</strong> <strong>the</strong> importance <strong>of</strong> a new<br />

plant for Vallourec, <strong>the</strong> annual production <strong>of</strong> 600 thousand<br />

tons <strong>of</strong> VSB tubes (<strong>of</strong> which 300 thousand go to Vallourec)<br />

will increase <strong>the</strong> Group’s capacity by 10%.<br />

Due to <strong>the</strong> complexity <strong>of</strong> <strong>the</strong> equipment and <strong>the</strong> concern<br />

with <strong>the</strong> high quality <strong>of</strong> <strong>the</strong> products, step by step, all <strong>the</strong><br />

Plant’s areas have begun to take shape and enter into<br />

operation.<br />

In terms <strong>of</strong> health and safety, we have broken a record<br />

for large-scale, complex Works. The safety results <strong>of</strong> <strong>the</strong><br />

contractors during assembly and installation was achieved<br />

topping <strong>the</strong> goal established by <strong>the</strong> Group. It is operational<br />

process safety that is already worked on every day with<br />

our collaborators by means <strong>of</strong> awareness campaigns.<br />

Since <strong>the</strong> startup <strong>of</strong> <strong>the</strong> plant construction in 2007,<br />

Aerial view <strong>of</strong> <strong>the</strong> VSB<br />

steel making facility, whose<br />

area is 2.5 million m 2 .<br />

Annual production will<br />

be one million tons <strong>of</strong><br />

crude steel and 600<br />

thousand tons <strong>of</strong> seamless<br />

steel tube. Image produced<br />

in February 2011.<br />

VSB has worked under <strong>the</strong> banner <strong>of</strong> sustainability in its<br />

actions. To this end, it develops not only its collaborators<br />

but also <strong>the</strong> surrounding communities to <strong>the</strong> plant.<br />

VSB seeks to make aware and motivate everyone to preserve<br />

<strong>the</strong> environment. For this, it created a Reference Center<br />

in Revegetation <strong>of</strong> <strong>the</strong> Atlantic Forest in a space close<br />

to <strong>the</strong> Plant, where thousands <strong>of</strong> native species saplings<br />

have already been planted. With <strong>the</strong> main objective <strong>of</strong><br />

recovering <strong>the</strong> referred areas through different scientifically<br />

consolidated revegetation models, monitoring will be done<br />

in <strong>the</strong> development <strong>of</strong> <strong>the</strong> saplings planted, periodically<br />

qualifying <strong>the</strong> progress <strong>of</strong> <strong>the</strong> biodiversity <strong>of</strong> fauna and<br />

flora, biomass and stored carbon.<br />

As an installed company, <strong>the</strong>re will be 1,600 direct Jobs.<br />

It is also important to point out <strong>the</strong> role <strong>of</strong> each employee<br />

for VSB’s success. The efforts and commitment <strong>of</strong> all<br />

its collaborators so that <strong>the</strong> Company will obtain <strong>the</strong><br />

recommendation <strong>of</strong> certification in norms API/Q1, API 5l,<br />

API 5ct, ISO/TS 29001 and ISO 9001 <strong>of</strong> <strong>the</strong> American<br />

Petroleum Institute (API), demonstrates that all are<br />

always focused on quality. We have achieved <strong>the</strong> result<br />

without non-conformity with <strong>the</strong> requisites evaluated.<br />

Fruit <strong>of</strong> a joint venture formed between Vallourec and<br />

Sumitomo Metals, partners for more than 30 years in <strong>the</strong><br />

field <strong>of</strong> premium connections for <strong>the</strong> oil and gas industry,<br />

VSB will have <strong>the</strong> commitment to maintain <strong>the</strong> quality <strong>of</strong><br />

its products and maintain credibility <strong>of</strong> <strong>the</strong> two groups in<br />

<strong>the</strong> international seamless steel tube market.”<br />

Even before starting <strong>the</strong> works, <strong>the</strong> first step made<br />

by VSB was in <strong>the</strong> direction <strong>of</strong> sustainability with<br />

<strong>the</strong> study <strong>of</strong> possible environmental impacts caused<br />

by <strong>the</strong> Plant and <strong>the</strong> compliance to <strong>the</strong> conditions<br />

proposed by <strong>the</strong> environmental authorities fo concession<br />

<strong>of</strong> <strong>the</strong> licenses.<br />

From <strong>the</strong>n onward, <strong>the</strong> first challenge would be <strong>the</strong><br />

earthmoving needed in <strong>the</strong> 2.5 million m 2 <strong>of</strong> area<br />

reserved for <strong>the</strong> steel making complex within <strong>the</strong><br />

Jeceaba Industrial District, whose total area has<br />

12,500,000 m 2 . During <strong>the</strong> works, more than 19<br />

million m 2 <strong>of</strong> earth were moved, 100 thousand<br />

meters <strong>of</strong> piles driven into <strong>the</strong> soil and 200 thousand<br />

cubic meters <strong>of</strong> concrete.<br />

The logistics <strong>of</strong> <strong>the</strong> arrival <strong>of</strong> equipment that would<br />

start to give shape to VSB had special care, due to<br />

<strong>the</strong> complexity and size <strong>of</strong> <strong>the</strong> undertaking. A Dry<br />

Port with an area <strong>of</strong> 40 thousand m 2 was built to<br />

conduct <strong>the</strong> customs clearance and receival <strong>of</strong><br />

imported equipment arriving at <strong>the</strong> complex. “The<br />

organizational and communications part was vital<br />

to a structure such as this. We received crates <strong>of</strong><br />

up to 60 tons down to screws. The lack <strong>of</strong> a determined<br />

equipment could harm <strong>the</strong> rhythm <strong>of</strong> <strong>the</strong> construction<br />

or operation,” emphasized Tancredo<br />

Martins, Director General <strong>of</strong> VSB.<br />

A major differential <strong>of</strong> <strong>the</strong> VSB Steel Complex is <strong>the</strong><br />

management <strong>of</strong> its electrical systems (substations),<br />

water and effluents (capture, treatment systems,<br />

recirculation systems and physical and chemical<br />

analysis laboratories), waste and by-products (internal<br />

transportation <strong>of</strong> flasks, bottles, bins and containers,<br />

physical/chemical characterization, oil regeneration<br />

unit and dispatch to final destination).<br />

Planned from <strong>the</strong> DBOT model (Design, built, operational,<br />

transfer) a contract was signed with <strong>the</strong><br />

company Foz do Brazil for engineering, construction,<br />

operation and management transfer, 15 years after<br />

<strong>the</strong> contract signing, for VSB.<br />

STRUCTURE<br />

The steel shop buildings and rolling mills at <strong>the</strong><br />

Plant were built using Vallourec Group structural<br />

tubes. VSB utilized 40 thousand tons <strong>of</strong> tubular<br />

metallic structures, a volume equivalent to what<br />

would be used to build <strong>the</strong> Eiffel Tower.<br />

Weighing 74 thousand tons each and capable <strong>of</strong><br />

producing approximately two Thousand tons <strong>of</strong> pig<br />

iron per day, <strong>the</strong> VSB two blast furnaces are suited<br />

for using ei<strong>the</strong>r charcoal or coke. Like V & M do<br />

BRASIL, which uses <strong>of</strong>f gases generated by <strong>the</strong> blast<br />

furnaces for generation <strong>of</strong> power, VSB also will adopt<br />

such a system.<br />

The VSB steel making<br />

produces steel bars with<br />

diameters <strong>of</strong> 270 mm,<br />

310 mm and 406 mm.<br />

The methodology adopted in <strong>the</strong> blast furnace process,<br />

besides its effective production, also assures<br />

<strong>the</strong> sustainability <strong>of</strong> <strong>the</strong> process. Flávio Azevedo<br />

points out that <strong>the</strong> environmental model chosen by<br />

VSB is more eco-efficient, with <strong>the</strong> use <strong>of</strong> charcoal,<br />

which contributes to <strong>the</strong> reduction <strong>of</strong> greenhouse<br />

gas effect emissions. “This will be one <strong>of</strong> <strong>the</strong> largest<br />

charcoal based steel plants in <strong>the</strong> world,” he mentions.<br />

The VSB steel shop is <strong>the</strong> first in <strong>the</strong> world built<br />

with a tubular metallic structure and equipped with<br />

unique to Latin America: <strong>the</strong> CONSTEEL process.<br />

Toge<strong>the</strong>r with <strong>the</strong> electric arc furnace (EAF), it optimizes<br />

energy consumption and assures greater control<br />

over <strong>the</strong> steel fusion process, with low level <strong>of</strong><br />

noise and particulate emissions. Ano<strong>the</strong>r differential<br />

<strong>of</strong> <strong>the</strong> area is <strong>the</strong> casting <strong>of</strong> large-diameter bars (406<br />

mm), ano<strong>the</strong>r first in <strong>the</strong> Vallourec Group.<br />

The equipment used by VSB makes <strong>the</strong> difference<br />

in <strong>the</strong> product’s final quality. The three-roll PQF<br />

mill, for example, uses state-<strong>of</strong>-<strong>the</strong>-art. The entire<br />

procedure is made up <strong>of</strong> a rotating heating furnace,<br />

The building that<br />

give VSB its form<br />

was constructed<br />

with structural tubes<br />

produced by<br />

<strong>the</strong> Vallourec Group.<br />

8 T H E V A L L O U R E C O I L & G A S M A G A Z I N E # 0 1 - J A N U A R Y 2 0 1 2 T H E V A L L O U R E C O I L & G A S M A G A Z I N E # 0 1 - J A N U A R Y 2 0 1 2<br />

9<br />

/...

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!