Executive Summary 4<br />
1.0 BACKGROUND INFORMATION 8<br />
2.0 PROBLEM ANALYSIS 10<br />
3.0 <strong>PROJECT</strong> DESIGN 11<br />
3.1 Goal 11<br />
3.2 Specific Objectives 11<br />
3.3 Expected Out<strong>co</strong>mes 11<br />
3.4 Implementation Strategy 12<br />
3.5 Sustainability Plan/Phase Out Strategy 12<br />
4.0 PROGRESS OF ACTIVITIES 13<br />
4.1 Progress against planned activities 13<br />
4.1.1 Tabulated progress of activities against outputs and out<strong>co</strong>mes 13<br />
4.1.2 Overall performance 13<br />
4.2. Disparities in performance 20<br />
4.3 Unplanned activities that have <strong>co</strong>ntributed to the project 22<br />
4.4 Results obtained. Level of utilisation and out<strong>co</strong>mes against outputs 22<br />
4.4 Degree of integration of each <strong>co</strong>mponent with the others 22<br />
4.6 Case Studies 26<br />
5.0 <strong>PARTNERSHIPS</strong> AND COORDINATION WITH OTHER BODIES 30<br />
6.0 CONSTRAINTS, SOLUTIONS, LESSONS AND RECOMMENDATIONS 27<br />
7.0 PLANS FOR NEXT PERIOD<br />
7.1 FINANCE REPORT SUMMARY 33<br />
8.0 ANNEXES 35<br />
8.1 Work plan for the next six months 35<br />
8.2 Detailed tabulated progress by outputs, out<strong>co</strong>mes and <strong>co</strong>mments 35<br />
8.3 Project Governance Structure 35<br />
KCPP six monthly narrative report - October 2007 to March 2008 2