25.12.2012 Views

LS EHV Cable System

LS EHV Cable System

LS EHV Cable System

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Extrusion<br />

The conductor screen, the insulation and the insulation screen are simultaneously<br />

extruded with the compounds supplied from the clean room.<br />

Cross-Linking and Cooling<br />

The corss-linking takes place in curing zone of A by circulating N2 gas and the<br />

insulation is formed into core through precooling zone of B and cooling zone of C.<br />

Take Up<br />

The cable comes to be wound up again around<br />

the drum to go into the next process.<br />

Pay Off<br />

The conductor wound up around<br />

the drum is set at pay off to run to<br />

metering capstan.<br />

Manufacturing Process & VCV Line 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!