Chapter 3: The Reliability of Overhead and Underground <strong>Electric</strong>al Systems<br />

Customer Average Interruption Duration Index (CAIDI)<br />

CAIDI is defined as the average length of an interruption experienced by an interrupted customer, measured<br />

in “minutes.” In this index, a customer can be counted as many times as they experience an outage. Figure<br />

3.1, Customer Average Interruption Duration Index, presents the average CAIDI value for 2004 to 2011, for<br />

transmission and distribution combined, and distribution alone. The data demonstrates that the underground<br />

system has a slight advantage over the overhead system in five of eight years for the combined T&D<br />

reporting and seven of eight years for the D only data.<br />

Minutes<br />

450<br />

400<br />

350<br />

300<br />

250<br />

200<br />

150<br />

100<br />

50<br />

0<br />

18 <strong>Edison</strong> <strong>Electric</strong> <strong>Institute</strong><br />

Figure 3.1 Customer Average Interruption Duration Index<br />

2004 2005 2006 2007 2008 2009 2010 2011<br />

OH T&D UG T&D OH D UG D