26.12.2012 Views

Walipini Construction (The Underground Greenhouse) - Ezra Taft ...

Walipini Construction (The Underground Greenhouse) - Ezra Taft ...

Walipini Construction (The Underground Greenhouse) - Ezra Taft ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This vent is located in the roof at the center, back against the rear wall at the highest point.<br />

When needed, the highest volume<br />

of air exchange, thus far, can be<br />

obtained and no heat-storage mass<br />

is lost in the back wall. However,<br />

if the operable vent in the roof is<br />

not built correctly, even<br />

when in the closed position, it<br />

will leak rain water and will<br />

allow heated air to filter out when<br />

it is most needed. Only a few<br />

boards for the frame and two<br />

hinges are needed to build this 4’ x<br />

4’ vent.<br />

4) Method four uses the same doors in conjunction with the addition of a chimney located at the<br />

bottom center of the rear wall.<br />

Venting Method # 4<br />

-13-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!