27.12.2012 Views

BAM Abbreviated Annual Report 2011 - Siteseeing in the world of ...

BAM Abbreviated Annual Report 2011 - Siteseeing in the world of ...

BAM Abbreviated Annual Report 2011 - Siteseeing in the world of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>2011</strong><br />

<strong>Abbreviated</strong><br />

<strong>Annual</strong> <strong>Report</strong>


<strong>2011</strong><br />

10,000<br />

8,000<br />

6,000<br />

4,000<br />

2,000<br />

0<br />

1,400<br />

1,200<br />

1,000<br />

800<br />

600<br />

400<br />

200<br />

0<br />

Revenue<br />

(<strong>in</strong> € million)<br />

8,954<br />

Equity / capital base<br />

(<strong>in</strong> € million)<br />

994<br />

1,266<br />

847<br />

1,098<br />

875<br />

1,077<br />

07 08 09<br />

1,100<br />

1,302<br />

10 11<br />

Equity Capital base<br />

Revenue by region year-end <strong>2011</strong><br />

11%<br />

9%<br />

8,835<br />

07 08<br />

Revenue by sector year-end <strong>2011</strong><br />

44%<br />

3%<br />

6%<br />

3%<br />

5%<br />

25%<br />

8,324<br />

09<br />

8%<br />

7,611<br />

39%<br />

46%<br />

7,920<br />

10 11<br />

1,162<br />

1,362<br />

400<br />

320<br />

240<br />

160<br />

80<br />

Net result attributable to shareholders<br />

(<strong>in</strong> € million)<br />

0<br />

3.00<br />

2.40<br />

1.80<br />

1.20<br />

0.60<br />

0.00<br />

349.0<br />

161.9<br />

07 08<br />

31.3<br />

Net result per share<br />

(fully diluted) (<strong>in</strong> €)<br />

2.60<br />

1.20<br />

09<br />

0.18<br />

07 08 09<br />

15.3<br />

126.0<br />

10 11<br />

0.08<br />

0.54<br />

10 11<br />

Order book by sector year-end <strong>2011</strong><br />

44%<br />

Belgium<br />

Germany<br />

Ireland<br />

Worldwide<br />

8%<br />

Ne<strong>the</strong>rlands<br />

United K<strong>in</strong>gdom<br />

10%<br />

38%<br />

Result before tax/revenues<br />

by sector<br />

<strong>2011</strong><br />

Construction and M&E services 2.2%<br />

Property<br />

neg.<br />

Civil eng<strong>in</strong>eer<strong>in</strong>g<br />

2.4%<br />

Public Private Partnerships 2.1%<br />

14,000<br />

12,000<br />

10,000<br />

8,000<br />

6,000<br />

4,000<br />

2,000<br />

0<br />

1.00<br />

0.80<br />

0.60<br />

0.40<br />

Year-end order book<br />

(<strong>in</strong> € million)<br />

13,800<br />

7.770<br />

13,100<br />

07 08<br />

United 0.20K<strong>in</strong>gdom<br />

11,100 8.646<br />

09<br />

Dividend per ord<strong>in</strong>ary share<br />

(<strong>in</strong> €)<br />

0.90<br />

Ne<strong>the</strong>rlands<br />

0.50<br />

Belgium<br />

0.00<br />

Germany<br />

07 08 09<br />

Ireland<br />

*proposal<br />

Worldwide<br />

Result before tax/revenues<br />

by sector<br />

Civil eng<strong>in</strong>eer<strong>in</strong>g<br />

Public Private Partnerships<br />

0.10<br />

Construction and M&E services<br />

Property<br />

12,100<br />

10<br />

0.03<br />

10,400<br />

11<br />

0.16<br />

10 11*<br />

<strong>2011</strong><br />

2.2%<br />

neg.<br />

2.4%<br />

2.1%<br />

2010<br />

3.0%<br />

neg.<br />

2.8%<br />

1.1%<br />

Consultancy and eng<strong>in</strong>eer<strong>in</strong>g 6.8% 6.5%<br />

2010<br />

3.0%<br />

neg.<br />

2.8%<br />

1.1%


Key figures (<strong>in</strong> €million, unless o<strong>the</strong>rwise <strong>in</strong>dicated)<br />

<strong>2011</strong> 2010<br />

Revenue 7,920 7,611<br />

Operat<strong>in</strong>g result 150.7 (30.3)<br />

Result before tax 158.7 26.0<br />

Net result attributable to shareholders 126.0 15.3<br />

Earn<strong>in</strong>gs per share (x €1,–)<br />

• Basic 0.54 0.08<br />

• Fully diluted 0.54 0.08<br />

Dividend per ord<strong>in</strong>ary share (<strong>in</strong> €1,–) 1 0.16 0.03<br />

Payout ratio (as percentage) 30 45<br />

Number <strong>of</strong> issued ord<strong>in</strong>ary shares as at year-end (x 1,000) 232,938 231,766<br />

Total number <strong>of</strong> issued shares as at year-end (x 1,000) 232,938 232,585<br />

Clos<strong>in</strong>g price ord<strong>in</strong>ary shares on 31 December (<strong>in</strong> €1,–) 3.26 4.60<br />

Equity attributable to shareholders 1,162.4 1,099.9<br />

Capital base 1,362.4 1,301.5<br />

Order book 2 10,400 12,100<br />

Net addition to tangible fixed assets<br />

Depreciation/impairments<br />

57.2 68.5<br />

• Tangible assets 94.9 97.3<br />

• Intangible assets 11.1 10.9<br />

• O<strong>the</strong>r impairments - 127.3<br />

Cash flow before dividend 232.0 250.9<br />

Average number <strong>of</strong> employees (fte) 26,639 26,840<br />

Number <strong>of</strong> employees at year-end (fte) 27,007 26,088<br />

Ratios:<br />

• Result before tax as % <strong>of</strong> revenue 3 2.0 2.0<br />

• Net result for <strong>the</strong> year as % <strong>of</strong> revenue 1.6 0.2<br />

• Net result for <strong>the</strong> year as % <strong>of</strong> average equity 11.1 1.6<br />

Capital ratios:<br />

• Equity attributable to shareholders as % <strong>of</strong> total assets 16.1 15.4<br />

• Capital base as % <strong>of</strong> total assets 18.9 18.2<br />

1 Dividend proposal <strong>2011</strong>.<br />

2 The order book comprises both signed contracts, as well as verbally agreed upon orders.<br />

3 Before impairment.<br />

Contents<br />

3 Foreword<br />

5 Outlook<br />

6 Organisational structure and <strong>of</strong>fices<br />

8 Core <strong>of</strong> <strong>BAM</strong>’s strategy, mission and ambition for 2020<br />

13 Royal <strong>BAM</strong> Group shares<br />

17 <strong>Report</strong> by <strong>the</strong> Supervisory Board to <strong>the</strong> shareholders<br />

28 Remuneration report<br />

36 Particulars <strong>of</strong> <strong>the</strong> Supervisory Board members<br />

38 Particulars <strong>of</strong> <strong>the</strong> Executive Board members<br />

<strong>Report</strong> by <strong>the</strong> Executive Board<br />

39 F<strong>in</strong>ancial results<br />

44 Declaration <strong>in</strong> accordance with <strong>the</strong> Dutch<br />

F<strong>in</strong>ancial Supervision Act<br />

44 Acquisitions and disposals<br />

45 Corporate governance<br />

54 Decision on Article 10 <strong>of</strong> <strong>the</strong> Takeover Directive<br />

57 Risk and risk management<br />

65 Corporate social responsibility<br />

67 Human resources management<br />

69 Worker participation<br />

70 Construction <strong>in</strong>dustry barometer<br />

72 Construction and mechanical and<br />

electrical services<br />

80 Civil eng<strong>in</strong>eer<strong>in</strong>g<br />

92 Property<br />

98 Public Private Partnerships<br />

100 Consultancy and eng<strong>in</strong>eer<strong>in</strong>g<br />

F<strong>in</strong>ancial statements <strong>2011</strong><br />

103 Contents <strong>of</strong> <strong>the</strong> f<strong>in</strong>ancial statements <strong>2011</strong><br />

104 Consolidated balance sheet as at 31 December<br />

105 Consolidated <strong>in</strong>come statement<br />

106 Consolidated statement <strong>of</strong> comprehensive <strong>in</strong>come<br />

107 Consolidated statement <strong>of</strong> equity<br />

108 Consolidated cash flow statement<br />

109 Company balance sheet as at 31 December<br />

109 Company <strong>in</strong>come statement<br />

O<strong>the</strong>r <strong>in</strong>formation<br />

110 Proposed appropriation <strong>of</strong> pr<strong>of</strong>it for <strong>2011</strong><br />

110 Provisions <strong>of</strong> <strong>the</strong> Articles <strong>of</strong> Association concern<strong>in</strong>g<br />

pr<strong>of</strong>it appropriation<br />

111 Anti-takeover measures<br />

114 Overview <strong>of</strong> pr<strong>in</strong>ciple subsidiaries and associates<br />

115 Royal <strong>BAM</strong> Group nv executive <strong>of</strong>ficers<br />

116 Ten-year key figures<br />

118 Key f<strong>in</strong>ancial dates<br />

1<br />

<strong>2011</strong>


<strong>Annual</strong> <strong>Report</strong><br />

<strong>2011</strong><br />

Sporen <strong>in</strong> Arnhem: modernisation and expansion <strong>of</strong><br />

Arnhem Station (platforms, ro<strong>of</strong>, new track, viaducts,<br />

noise barriers). <strong>BAM</strong> Rail, <strong>BAM</strong> Civiel, <strong>BAM</strong> Infraconsult,<br />

<strong>BAM</strong> Infratechniek, <strong>BAM</strong> Utiliteitsbouw, <strong>BAM</strong> Wegen,<br />

(<strong>in</strong> jo<strong>in</strong>t venture).


Foreword<br />

Royal <strong>BAM</strong> Group nv hereby presents <strong>the</strong> <strong>Annual</strong> <strong>Report</strong> for <strong>the</strong> f<strong>in</strong>ancial year <strong>2011</strong> with a net<br />

result <strong>of</strong> €126.0 million and a revenue <strong>of</strong> €7.9 billion. Although <strong>the</strong> European construction and<br />

property markets were under great pressure for <strong>the</strong> third year <strong>in</strong> a row (and it is not clear when<br />

volumes and marg<strong>in</strong>s may start to recover), <strong>BAM</strong> can look back on a successful <strong>2011</strong>. <strong>BAM</strong>’s<br />

operat<strong>in</strong>g companies are obviously not immune to decreas<strong>in</strong>g volumes, stiff competition and<br />

a sharp drop <strong>in</strong> prices, but thanks <strong>in</strong> large part to <strong>the</strong> Group’s earlier strategic decisions<br />

– <strong>in</strong>clud<strong>in</strong>g a focus on excellence <strong>in</strong> project execution, risk management and susta<strong>in</strong>able<br />

operations – <strong>BAM</strong> was able to deliver solid and stable performances given <strong>the</strong> conditions on<br />

<strong>the</strong> market.<br />

The currently limited prospects for fur<strong>the</strong>r growth for<br />

<strong>the</strong> Group on most <strong>of</strong> <strong>BAM</strong>’s markets were <strong>the</strong> ma<strong>in</strong><br />

reason why <strong>the</strong> Executive Board took <strong>the</strong> decision <strong>in</strong> <strong>2011</strong><br />

to revise <strong>the</strong> Group’s strategic agenda for 2010-2012. The<br />

result is an enhanced focus on core bus<strong>in</strong>ess, optimum<br />

deployment <strong>of</strong> <strong>the</strong> Group’s strengths through <strong>in</strong>creased<br />

synergy, a re<strong>in</strong>forced f<strong>in</strong>ancial position and <strong>the</strong><br />

development <strong>of</strong> new growth opportunities. This revised<br />

agenda represents a solid basis for <strong>the</strong> new strategic<br />

agenda 2013-2015 which will be presented towards <strong>the</strong><br />

end <strong>of</strong> 2012. As part <strong>of</strong> <strong>the</strong> process <strong>of</strong> updat<strong>in</strong>g <strong>the</strong><br />

Group’s strategy, <strong>BAM</strong> has ga<strong>in</strong>ed access to new growth<br />

opportunities by establish<strong>in</strong>g permanent branches <strong>in</strong><br />

Switzerland and Luxembourg, organis<strong>in</strong>g closer<br />

cooperation between companies <strong>in</strong> <strong>the</strong> <strong>BAM</strong> Group and<br />

re<strong>in</strong>forc<strong>in</strong>g <strong>BAM</strong> International’s positions <strong>in</strong> growth<br />

markets outside Europe. More <strong>in</strong>formation about <strong>the</strong><br />

Group’s strategic choices can be found <strong>in</strong> this <strong>Annual</strong><br />

<strong>Report</strong>, start<strong>in</strong>g on page 8.<br />

This report is structured differently than those <strong>of</strong><br />

previous years, as <strong>the</strong> <strong>in</strong>formation <strong>in</strong> this <strong>Annual</strong> <strong>Report</strong><br />

<strong>2011</strong> is presented accord<strong>in</strong>g to <strong>the</strong> Group’s new<br />

organisational breakdown <strong>in</strong>to four sectors: construction<br />

and mechanical and technical services, civil eng<strong>in</strong>eer<strong>in</strong>g,<br />

property and public-private partnerships (PPP). This<br />

simplified structure improves opportunities to <strong>in</strong>crease<br />

focus and achieve optimum synergy.<br />

Everyone <strong>in</strong> <strong>the</strong> <strong>BAM</strong> Group cont<strong>in</strong>ues to work with<br />

undim<strong>in</strong>ished enthusiasm and commitment to fur<strong>the</strong>r<br />

improve <strong>the</strong> Group’s susta<strong>in</strong>ability performance. <strong>BAM</strong>’s<br />

ambitions and <strong>the</strong> results achieved <strong>in</strong> this area are briefly<br />

discussed <strong>in</strong> this <strong>Annual</strong> <strong>Report</strong> on page 64. More details<br />

can be found <strong>in</strong> a separate susta<strong>in</strong>ability report, which<br />

we highly recommend. Across <strong>the</strong> board, <strong>BAM</strong> is fully<br />

engaged <strong>in</strong> corporate social responsibility, especially<br />

with regard to <strong>the</strong> key priorities <strong>of</strong> safety, reduction <strong>of</strong><br />

CO emissions and waste.<br />

2<br />

<strong>BAM</strong> started <strong>the</strong> 2012 f<strong>in</strong>ancial year with an order book<br />

stand<strong>in</strong>g at €10.4 billion (year-end <strong>2011</strong>: €12.1 billion).<br />

In addition, <strong>the</strong> Group has approximately €2.9 billion<br />

worth <strong>of</strong> contracts <strong>in</strong> <strong>the</strong> order book for post-2016<br />

(ma<strong>in</strong>ly ma<strong>in</strong>tenance work under PPP contracts and<br />

concession <strong>in</strong>come). This healthy amount <strong>of</strong> work <strong>in</strong> <strong>the</strong><br />

order book demonstrates <strong>the</strong> customers’ appreciation<br />

<strong>of</strong> <strong>BAM</strong>’s constructive role as a partner <strong>in</strong> <strong>the</strong><br />

implementation <strong>of</strong> <strong>of</strong>ten large-scale and complex<br />

development and construction projects. This situation<br />

is an excellent start<strong>in</strong>g po<strong>in</strong>t from which to expand on<br />

<strong>BAM</strong> Group’s good reputation and its lead<strong>in</strong>g position<br />

<strong>in</strong> <strong>the</strong> <strong>in</strong>ternational construction and property markets <strong>in</strong><br />

<strong>the</strong> <strong>in</strong>terests <strong>of</strong> all stakeholders.<br />

Bunnik, Ne<strong>the</strong>rlands, 7 March 2012<br />

N.J. de Vries<br />

3<br />

<strong>2011</strong>


University <strong>of</strong> <strong>the</strong> Arts, part <strong>of</strong> <strong>the</strong><br />

regeneration <strong>of</strong> K<strong>in</strong>g’s Cross <strong>in</strong><br />

Central London.<br />

<strong>BAM</strong> Construct UK, <strong>BAM</strong> Nuttall.


Outlook<br />

Royal <strong>BAM</strong> Group started 2012 with an order book worth<br />

€10.4 billion (year-end 2010: €12.1 billion). This reduction<br />

is reflected <strong>in</strong> every sector, ma<strong>in</strong>ly through selective<br />

tender<strong>in</strong>g policies. Of <strong>the</strong> total order book, it is expected<br />

that €5.8 billion will be carried out <strong>in</strong> 2012 and €4.6<br />

billion <strong>in</strong> subsequent years. This means that<br />

almost 80 percent <strong>of</strong> <strong>the</strong> anticipated turnover<br />

for 2012 is assured. This percentage is <strong>the</strong> same<br />

as at year-end 2010. Tak<strong>in</strong>g <strong>in</strong>to account market<br />

circumstances and expected market<br />

developments, <strong>the</strong> size and quality <strong>of</strong> <strong>the</strong> order<br />

book provide a solid basis for 2012.<br />

Royal <strong>BAM</strong> Group is confident about its prospects<br />

based on a sharp focus on its core bus<strong>in</strong>ess<br />

activities, its scope to promote synergies across<br />

<strong>the</strong> Group, its streng<strong>the</strong>ned f<strong>in</strong>ancial position and<br />

its prospects for growth <strong>in</strong> new markets.<br />

However, <strong>BAM</strong> is not yet issu<strong>in</strong>g any pr<strong>of</strong>it<br />

guidance for 2012.<br />

The Euroconstruct forecasts <strong>of</strong> November <strong>2011</strong><br />

for construction output <strong>in</strong> 2012 show a reduction<br />

<strong>in</strong> output <strong>in</strong> <strong>the</strong> construction and mechanical and<br />

electrical services sector, ma<strong>in</strong>ly <strong>in</strong> <strong>the</strong> United K<strong>in</strong>gdom.<br />

Output is forecast to <strong>in</strong>crease once aga<strong>in</strong> after 2012.<br />

Accord<strong>in</strong>g to Euroconstruct (November<br />

<strong>2011</strong>), <strong>the</strong> short-term outlook shows<br />

improvement <strong>in</strong> <strong>the</strong> residential<br />

construction segment. <strong>BAM</strong> is highly active<br />

<strong>in</strong> this segment <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands. <strong>BAM</strong><br />

has not yet experienced this improvement,<br />

however. The turmoil <strong>in</strong> <strong>the</strong> f<strong>in</strong>ancial<br />

markets, <strong>the</strong> limitations on <strong>the</strong> banks’<br />

will<strong>in</strong>gness to issue loans and <strong>the</strong> low level<br />

<strong>of</strong> consumer confidence are caus<strong>in</strong>g<br />

demand to be – excessively – low for<br />

hous<strong>in</strong>g (<strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands and Ireland).<br />

<strong>BAM</strong> expects demand for new-build homes<br />

to hit rock bottom <strong>in</strong> 2012 and <strong>the</strong>n start to<br />

recover slightly.<br />

Accord<strong>in</strong>g to <strong>the</strong> Euroconstruct forecasts<br />

(November <strong>2011</strong>), <strong>the</strong> picture <strong>in</strong> <strong>the</strong> civil<br />

eng<strong>in</strong>eer<strong>in</strong>g sector will be mixed. The<br />

picture for <strong>the</strong> markets shows a drop <strong>in</strong><br />

Ireland and Germany, an <strong>in</strong>crease <strong>in</strong> <strong>the</strong><br />

United K<strong>in</strong>gdom and a drop <strong>in</strong> <strong>the</strong><br />

Ne<strong>the</strong>rlands followed by an <strong>in</strong>crease <strong>in</strong> <strong>the</strong><br />

follow<strong>in</strong>g years, and growth <strong>in</strong> Belgium<br />

which will be more than negated by a sharp<br />

drop <strong>in</strong> 2013 and 2014.<br />

At present, a large number <strong>of</strong> bids for PPP contracts<br />

<strong>in</strong>volv<strong>in</strong>g <strong>the</strong> Group are pend<strong>in</strong>g <strong>in</strong> various countries. The<br />

number <strong>of</strong> new contracts rema<strong>in</strong>s high, given <strong>the</strong> current<br />

economic climate. In accordance with <strong>the</strong> strategic plan,<br />

<strong>the</strong> Group expects to be able to make fur<strong>the</strong>r <strong>in</strong>vestments<br />

<strong>in</strong> PPP contracts to <strong>the</strong> extent that approximately<br />

10 percent <strong>of</strong> <strong>BAM</strong>’s total revenue could ultimately consist<br />

<strong>of</strong> PPP contracts. Royal <strong>BAM</strong> Group set up a jo<strong>in</strong>t venture<br />

with PGGM <strong>in</strong> <strong>2011</strong> for <strong>in</strong>vestments <strong>in</strong> PPP contracts, and<br />

<strong>the</strong> Group expects to be able to transfer more <strong>in</strong>vestments<br />

<strong>in</strong> PPP contracts to <strong>the</strong> jo<strong>in</strong>t venture <strong>in</strong> 2012 and beyond.<br />

The Group’s turnover <strong>in</strong> 2012 is expected to be composed<br />

as shown <strong>in</strong> table 1. The market shares predicted for <strong>the</strong><br />

Group <strong>in</strong> 2012 are shown <strong>in</strong> table 2 based on <strong>the</strong> Group’s<br />

expected turnover and <strong>the</strong> market output forecast<br />

accord<strong>in</strong>g to Euroconstruct.<br />

<strong>BAM</strong> has launched new growth tracks outside <strong>of</strong> its<br />

home markets by establish<strong>in</strong>g permanent branches <strong>in</strong><br />

Switzerland and Luxembourg and streng<strong>the</strong>n<strong>in</strong>g <strong>the</strong><br />

market positions <strong>of</strong> <strong>BAM</strong> International <strong>in</strong> growth markets<br />

outside Europe (South-East Asia, Australia, Africa and <strong>the</strong><br />

Middle East).<br />

Table 1 Turnover forecast for 2012 per sector, as a percentage <strong>of</strong> total gross turnover*<br />

Non-<br />

Mechanical<br />

and<br />

electrical Civil<br />

residential Residential contract<strong>in</strong>g eng<strong>in</strong>eer<strong>in</strong>g Property Total<br />

Ne<strong>the</strong>rlands 11 7 3 20 7 48<br />

Belgium 6 - 1 4 1 12<br />

United K<strong>in</strong>gdom 13 - - 8 1 22<br />

Ireland 1 - - 2 - 3<br />

Germany 7 - - 4 - 11<br />

Worldwide - - - 4 - 4<br />

38 7 4 42 9 100<br />

* Turnover forecast based on <strong>the</strong> activity mix <strong>of</strong> <strong>the</strong> different operat<strong>in</strong>g companies (exclud<strong>in</strong>g turnover<br />

<strong>of</strong>fset between sectors). This may be different from <strong>the</strong> primary segmentation <strong>in</strong> <strong>the</strong> f<strong>in</strong>ancial statements.<br />

Table 2 Expected market share <strong>in</strong> 2012 for <strong>the</strong> construction and mechanical and<br />

electrical services and civil eng<strong>in</strong>eer<strong>in</strong>g sectors<br />

Construction and<br />

Civil<br />

mechanical and electrical services<br />

eng<strong>in</strong>eer<strong>in</strong>g<br />

Ne<strong>the</strong>rlands 2.8% 8.7%<br />

Belgium 3.5% 4.2%<br />

United K<strong>in</strong>gdom 1.4% 2.7%<br />

Ireland 8.2% 3.9%<br />

Germany 0.7% 0.7%<br />

5<br />

<strong>2011</strong>


Ne<strong>the</strong>rlands<br />

Belgium<br />

United K<strong>in</strong>gdom<br />

Ireland<br />

Germany<br />

Worldwide<br />

Construction and mechanical<br />

and electrical services<br />

<strong>BAM</strong> Utiliteitsbouw<br />

<strong>BAM</strong> Won<strong>in</strong>gbouw<br />

Heilijgers<br />

<strong>BAM</strong> Techniek<br />

<strong>BAM</strong> Wallonie<br />

CEI-De Meyer<br />

Interbuild<br />

<strong>BAM</strong> Construction *<br />

<strong>BAM</strong> Build<strong>in</strong>g **<br />

<strong>BAM</strong> Deutschland<br />

<strong>BAM</strong> International<br />

Sector<br />

Operat<strong>in</strong>g company<br />

Active <strong>in</strong> this sector<br />

Organisational structure <strong>of</strong> Royal <strong>BAM</strong> Group<br />

Civil eng<strong>in</strong>eer<strong>in</strong>g<br />

<strong>BAM</strong> Civiel<br />

<strong>BAM</strong> Infratechniek<br />

<strong>BAM</strong> Rail<br />

<strong>BAM</strong> Wegen<br />

<strong>BAM</strong> Wallonie<br />

Betonac<br />

CEI-De Meyer<br />

<strong>BAM</strong> Nuttall<br />

<strong>BAM</strong> Civil **<br />

W&F Ingenieurbau<br />

<strong>BAM</strong> International<br />

Property<br />

AM<br />

AM Real Estate Development<br />

Immo <strong>BAM</strong><br />

Kaïros<br />

* <strong>BAM</strong> Construction en <strong>BAM</strong> Properties vormen samen <strong>BAM</strong> Construct UK.<br />

** <strong>BAM</strong> Build<strong>in</strong>g, <strong>BAM</strong> Property en <strong>BAM</strong> Civil vormen samen <strong>BAM</strong> Contractors.<br />

<strong>BAM</strong> Properties *<br />

<strong>BAM</strong> Property **<br />

Public-private partnerships<br />

<strong>BAM</strong> PPP<br />

* <strong>BAM</strong> Construction and <strong>BAM</strong> Properties toge<strong>the</strong>r form <strong>BAM</strong> Construct UK.<br />

** <strong>BAM</strong> Build<strong>in</strong>g, <strong>BAM</strong> Civil and <strong>BAM</strong> Property toge<strong>the</strong>r form <strong>BAM</strong> Contractors.<br />

<strong>BAM</strong> Utiliteitsbouw, <strong>BAM</strong> Won<strong>in</strong>gbouw and Heilijgers also operate as developers on construction projects <strong>in</strong> <strong>the</strong> property sector.


Construction and mechanical and<br />

electrical services<br />

Offices<br />

Ne<strong>the</strong>rlands<br />

<strong>BAM</strong> Utiliteitsbouw - Bunnik - Almere - Amsterdam -<br />

Arnhem - Breda - The Hague - E<strong>in</strong>dhoven - Emmen -<br />

Enschede - Gron<strong>in</strong>gen - Leeuwarden - Maastricht -<br />

Roermond - Rotterdam - Tiel - Utrecht - Zwolle<br />

<strong>BAM</strong> Advies & Eng<strong>in</strong>eer<strong>in</strong>g - Bunnik<br />

<strong>BAM</strong> Gebouwbeheer - Bunnik<br />

<strong>BAM</strong> HABO - The Hague<br />

Nelis Bouw & Onderhoud - Amsterdam<br />

OfficeUp - Bunnik<br />

Schakel & Schrale - Amsterdam - The Hague -<br />

Roermond<br />

Vitaal ZorgVast - Bunnik<br />

<strong>BAM</strong> Won<strong>in</strong>gbouw - Bunnik - Alkmaar -<br />

Amsterdam - Breda - The Hague - Deventer -<br />

Drachten - Nieuwege<strong>in</strong> - Rotterdam - Weert<br />

Bouwbedrijf Penn<strong>in</strong>gs - Rosmalen<br />

Heilijgers - Amersfoort<br />

<strong>BAM</strong> Materieel - Lelystad - Kesteren<br />

<strong>BAM</strong> Techniek - Bunnik - Amsterdam - Apeldoorn -<br />

Benn<strong>in</strong>gbroek - Capelle aan den IJssel - The Hague -<br />

Emmen - Gron<strong>in</strong>gen - Leeuwarden - Nieuw-Vennep -<br />

Roermond - Veenendaal<br />

Interflow - Wier<strong>in</strong>gerwerf<br />

Belgium<br />

Interbuild - Wilrijk<br />

United K<strong>in</strong>gdom<br />

<strong>BAM</strong> Construct UK - Hemel Hempstead<br />

<strong>BAM</strong> Construction - London - Bristol - Cardiff -<br />

Coventry - Derby - Dewesbury - Ed<strong>in</strong>burgh -<br />

Exeter - Gateshead - Glasgow - Leeds - Manchester -<br />

Poole - St. Albans - Well<strong>in</strong>gborough<br />

<strong>BAM</strong> Facilities Management - Coventry - Glasgow<br />

Ireland<br />

<strong>BAM</strong> Build<strong>in</strong>g - Dubl<strong>in</strong> - Kill, County Kildare -<br />

Little Island, Cork - Galway<br />

Germany<br />

<strong>BAM</strong> Deutschland - Stuttgart - Berl<strong>in</strong> - Dresden -<br />

Düsseldorf - Frankfurt am Ma<strong>in</strong> - Munich<br />

Switzerland<br />

<strong>BAM</strong> Swiss - Basel<br />

Civil eng<strong>in</strong>eer<strong>in</strong>g<br />

Ne<strong>the</strong>rlands<br />

<strong>BAM</strong> Civiel - Gouda - Amsterdam - Breda - Elsloo -<br />

Zuidbroek<br />

<strong>BAM</strong> Civiel Bekist<strong>in</strong>gfabriek - Schiedam<br />

<strong>BAM</strong> Civiel Prefab Beton - Zuidbroek<br />

<strong>BAM</strong> Speciale Technieken - Amsterdam<br />

<strong>BAM</strong> Infratechniek - Culemborg - Barendrecht -<br />

Budel - Halfweg - ’s-Hertogenbosch - Nieuwleusen -<br />

Ootmarsum - Schiphol - Susteren - Utrecht<br />

<strong>BAM</strong> Leid<strong>in</strong>gen & Industrie - Nieuwleusen -<br />

Culemborg<br />

Ravesteyn Kabel- en Montagewerk - Lopik -<br />

Leidschendam - Meer, Belgium<br />

Van den Berg Infrastructuren - Zwammerdam -<br />

Amsterdam - Delft - Montfoort - Rotterdam -<br />

Zoeterwoude<br />

<strong>BAM</strong> Infratechniek Mobiliteit - Culemborg -<br />

Water<strong>in</strong>gen<br />

<strong>BAM</strong> Rail - Breda - Dordrecht - E<strong>in</strong>dhoven -<br />

Rotterdam<br />

<strong>BAM</strong> Wegen - Utrecht - Apeldoorn - Beek - Bergen<br />

op Zoom - The Hague - Helmond - Tynaarlo -<br />

Zaandam<br />

<strong>BAM</strong> Betonwegen/Betontechnieken -<br />

Hard<strong>in</strong>xveld-Giessendam<br />

<strong>BAM</strong> Geleiderail - Drachten<br />

<strong>BAM</strong> Milieu - Hard<strong>in</strong>xveld-Giessendam<br />

<strong>BAM</strong> Wegen Materieel - Tiel<br />

HABO GWW - The Hague<br />

HOKA Verkeerstechniek - ’s-Hertogenbosch -<br />

Apeldoorn - Berkhout - The Hague - Drachten -<br />

Susteren<br />

Mostert De W<strong>in</strong>ter - Hard<strong>in</strong>xveld-Giessendam<br />

Nootenboom/Nootenboom Sport - Barendrecht<br />

Redubel - Geldermalsen<br />

<strong>BAM</strong> Infraconsult - Gouda - Apeldoorn - Breda -<br />

The Hague - Utrecht - S<strong>in</strong>gapore<br />

België<br />

<strong>BAM</strong> Wallonie - Chaudfonta<strong>in</strong>e<br />

Galère - Chaudfonta<strong>in</strong>e - Charleroi<br />

Balteau - Louveigné<br />

Balteau ie - Sa<strong>in</strong>t-Nicolas<br />

Betonac - S<strong>in</strong>t-Truiden<br />

CEI-De Meyer - Brussels - Eke (Nazareth)<br />

Luxembourg<br />

<strong>BAM</strong> Luxembourg - Luxembourg<br />

United K<strong>in</strong>gdom<br />

<strong>BAM</strong> Nuttall - Camberley - London - Bridgend -<br />

Glasgow - Halesowen - Leeds - Maidstone -<br />

Newcastle upon Tyne - Northwich - Southampton -<br />

Wigan<br />

<strong>BAM</strong> Ritchies - Glasgow - Clevedon - Erith -<br />

Dubl<strong>in</strong> - Wigan<br />

Rail North - Wigan<br />

Rail South - Edenbridge<br />

Nuttall Hynes - Tunbridge Wells<br />

Nuttall John Mart<strong>in</strong> - Thetford<br />

Ireland<br />

<strong>BAM</strong> Civil - Dubl<strong>in</strong> - Kill, County Kildare - Little Island,<br />

Cork - Galway<br />

<strong>BAM</strong> Rail - Dubl<strong>in</strong> - Kill, County Kildare - Little Island,<br />

Cork - Galway<br />

Germany<br />

Wayss & Freytag Ingenieurbau - Frankfurt am<br />

Ma<strong>in</strong> - Berl<strong>in</strong> - Düsseldorf - Hamburg -<br />

Kamsdorf - Munich - Stuttgart<br />

Worldwide<br />

<strong>BAM</strong> International - Gouda - Abu Dhabi - Accra -<br />

Al Khuwair - Aqaba - Cairo - Colombo - Dar es Salaam -<br />

Doha - Dubai - Jakarta - Kuala Lumpur - Longmont -<br />

Perth - S<strong>in</strong>gapore - Tripoli<br />

Property<br />

Ne<strong>the</strong>rlands<br />

AM - Nieuwege<strong>in</strong> - Amsterdam - E<strong>in</strong>dhoven -<br />

Rotterdam - Terneuzen - Zwolle<br />

AM Real Estate Development - Utrecht<br />

IPMMC Consult - Utrecht<br />

Belgium<br />

Immo <strong>BAM</strong> - Brussels<br />

Kaïros - Wilrijk<br />

United K<strong>in</strong>gdom<br />

<strong>BAM</strong> Properties - London - Bristol - Glasgow -<br />

Manchester<br />

Ireland<br />

<strong>BAM</strong> Property - Dubl<strong>in</strong> - Kill, County Kildare -<br />

Little Island, Cork<br />

Public-private partnerships<br />

<strong>BAM</strong> PPP - Bunnik - Birm<strong>in</strong>gham - Brussel - Dubl<strong>in</strong> -<br />

Frankfurt am Ma<strong>in</strong> - Glasgow<br />

7<br />

<strong>2011</strong>


8<br />

<strong>2011</strong><br />

Core <strong>of</strong> <strong>BAM</strong>’s strategy<br />

Core <strong>of</strong> <strong>BAM</strong>’s strategy, mission, vision, ambition for 2020<br />

and update <strong>of</strong> strategic agenda 2010-2012<br />

<strong>BAM</strong>’s aim is to achieve strong growth <strong>in</strong> its activities. In<br />

this context, re<strong>in</strong>forc<strong>in</strong>g <strong>BAM</strong>’s market position <strong>in</strong> all <strong>the</strong><br />

home markets is <strong>the</strong> highest priority. The second priority<br />

is to fill <strong>BAM</strong>’s activity matrix by tak<strong>in</strong>g activities that are<br />

already successful <strong>in</strong> one home market and establish<strong>in</strong>g<br />

<strong>the</strong>m <strong>in</strong> o<strong>the</strong>r home markets as well. The third priority is<br />

to develop new concepts or products <strong>in</strong> segments with<br />

growth potential.<br />

This policy is based on four pillars:<br />

1. Expertise at all levels cont<strong>in</strong>ues to be <strong>the</strong> basis for <strong>the</strong><br />

primary process. <strong>BAM</strong> is an organisation <strong>of</strong> highquality<br />

pr<strong>of</strong>essionals and is <strong>in</strong> a permanent state <strong>of</strong><br />

development. The Group will make optimum use <strong>of</strong><br />

<strong>the</strong> advantages <strong>of</strong>fered by virtual and lean<br />

construction as regards prepar<strong>in</strong>g and carry<strong>in</strong>g out<br />

projects.<br />

2. All employees must have access to <strong>the</strong> knowledge and<br />

experience that are widely available with<strong>in</strong> <strong>the</strong> Group<br />

<strong>in</strong> order to make <strong>BAM</strong> stronger. The Group’s potential<br />

(people, knowledge, expertise and equipment) must<br />

be utilised <strong>in</strong> full.<br />

3. Human resources management will create <strong>the</strong><br />

conditions for <strong>the</strong> availability <strong>of</strong> sufficient expertise<br />

and <strong>the</strong> development <strong>of</strong> management potential at<br />

every level <strong>in</strong> <strong>the</strong> Group. The focus will be on <strong>the</strong><br />

development <strong>of</strong> skills and <strong>the</strong> expansion <strong>of</strong> knowledge,<br />

diversity <strong>in</strong> <strong>the</strong> workforce and recruitment and<br />

selection.<br />

4. The policy regard<strong>in</strong>g corporate social responsibility<br />

will focus on promot<strong>in</strong>g good health and safe work<strong>in</strong>g<br />

conditions throughout <strong>the</strong> entire construction<br />

process, reduction <strong>of</strong> <strong>BAM</strong>’s carbon footpr<strong>in</strong>t and<br />

responsible reduction and separation <strong>of</strong> waste.<br />

Mission<br />

<strong>BAM</strong> aims to become one <strong>of</strong> Europe’s best construction<br />

organisations, known for <strong>the</strong> comb<strong>in</strong>ed strength <strong>of</strong> its<br />

constituent parts as well as for its services at <strong>the</strong> local<br />

level.<br />

By tak<strong>in</strong>g responsibility for people and <strong>the</strong> environment<br />

<strong>the</strong> Group can respond to <strong>the</strong> expectations <strong>of</strong> both<br />

current and future stakeholders <strong>in</strong> a <strong>world</strong> <strong>of</strong> rapid<br />

economic, political and ecological change.<br />

Vision<br />

A number <strong>of</strong> global trends are direct<strong>in</strong>g long-term<br />

developments. For example, <strong>the</strong> exist<strong>in</strong>g built<br />

environment determ<strong>in</strong>es energy needs to a significant<br />

extent.<br />

Climate change – and <strong>the</strong> transition to susta<strong>in</strong>able energy<br />

sources – is ano<strong>the</strong>r consideration that has significant<br />

consequences for <strong>the</strong> design and construction <strong>of</strong><br />

build<strong>in</strong>gs and <strong>in</strong>frastructure.<br />

The attitude to health and wellbe<strong>in</strong>g is chang<strong>in</strong>g from a<br />

demand-driven approach to ensur<strong>in</strong>g that people make<br />

<strong>the</strong> necessary changes <strong>in</strong> <strong>the</strong>ir way <strong>of</strong> life.<br />

A constantly chang<strong>in</strong>g society expects an active<br />

contribution from <strong>the</strong> Group, not only <strong>in</strong> <strong>the</strong> form <strong>of</strong><br />

products and services, but first and foremost <strong>in</strong> <strong>the</strong> way <strong>in</strong><br />

which <strong>BAM</strong>’s operat<strong>in</strong>g companies take part <strong>in</strong> <strong>the</strong><br />

construction process and take responsibility for <strong>the</strong><br />

consequences <strong>of</strong> <strong>the</strong>ir activities.<br />

Ambition for 2020<br />

<strong>BAM</strong>’s ambition is based on <strong>the</strong> position that <strong>the</strong> Group<br />

<strong>in</strong>tends to occupy <strong>in</strong> <strong>the</strong> medium term.<br />

In terms <strong>of</strong> turnover, <strong>BAM</strong> will be <strong>in</strong> a strong and<br />

<strong>in</strong>dependent position <strong>in</strong> <strong>the</strong> European construction sector<br />

by 2020. The Group is aim<strong>in</strong>g to achieve a lead<strong>in</strong>g position<br />

<strong>in</strong> Europe, with high-quality operat<strong>in</strong>g companies and a<br />

strong balance sheet and a level <strong>of</strong> pr<strong>of</strong>itability among<br />

<strong>the</strong> highest <strong>in</strong> <strong>the</strong> sector.


Better results are generally accompanied by <strong>in</strong>creased<br />

risks and <strong>the</strong> need to manage those risks, which<br />

obviously requires a sound f<strong>in</strong>ancial structure. This can<br />

only be achieved if <strong>the</strong>re is a fur<strong>the</strong>r improvement <strong>in</strong><br />

solvency. The Group considers risk management to be a<br />

core skill.<br />

<strong>BAM</strong> operates ma<strong>in</strong>ly <strong>in</strong> its five home markets (<strong>the</strong><br />

Ne<strong>the</strong>rlands, Belgium, <strong>the</strong> United K<strong>in</strong>gdom, Ireland and<br />

Germany). Where possible, <strong>the</strong> Group will expand its<br />

activities <strong>in</strong> <strong>the</strong>se markets, <strong>in</strong> l<strong>in</strong>e with economic<br />

realities.<br />

The Group aims to <strong>of</strong>fer a full package <strong>of</strong> products and<br />

services <strong>in</strong> all <strong>of</strong> its home markets. <strong>BAM</strong> will be among<br />

<strong>the</strong> market leaders <strong>in</strong> each home market.<br />

Outside <strong>of</strong> <strong>the</strong> home markets, <strong>BAM</strong> operates <strong>in</strong> pr<strong>of</strong>itable<br />

niche markets where it focuses on <strong>of</strong>fer<strong>in</strong>g an optimum<br />

level <strong>of</strong> service to <strong>the</strong> Group’s global customers. These<br />

<strong>in</strong>ternational activities make a valuable contribution to<br />

<strong>the</strong> knowledge and experience <strong>of</strong> <strong>the</strong> workforce and are<br />

also important as regards <strong>the</strong> Group’s reputation.<br />

<strong>BAM</strong> is <strong>in</strong>creas<strong>in</strong>gly <strong>in</strong>volved <strong>in</strong> <strong>the</strong> very early stages <strong>in</strong><br />

<strong>the</strong> establishment <strong>of</strong> a project and is also tak<strong>in</strong>g <strong>the</strong><br />

<strong>in</strong>itiative <strong>in</strong> an <strong>in</strong>creas<strong>in</strong>g number <strong>of</strong> cases. The Group’s<br />

conceptual strength will be decisive <strong>in</strong> that regard.<br />

Susta<strong>in</strong>ability and <strong>the</strong> life-cycle approach are widely<br />

accepted start<strong>in</strong>g po<strong>in</strong>ts when develop<strong>in</strong>g concepts.<br />

<strong>BAM</strong> positions itself as a full-service provider <strong>of</strong><br />

multidiscipl<strong>in</strong>ary solutions (a full-service provider for <strong>the</strong><br />

built environment).<br />

By <strong>of</strong>fer<strong>in</strong>g a broad range <strong>of</strong> services – <strong>in</strong>clud<strong>in</strong>g facilities<br />

management and ma<strong>in</strong>tenance – <strong>the</strong> Group will rema<strong>in</strong><br />

connected to projects, even once <strong>the</strong> orig<strong>in</strong>al contract is<br />

complete. Customers will <strong>in</strong>creas<strong>in</strong>gly use new<br />

<strong>in</strong>tegrated types <strong>of</strong> contracts or design-and-construct<br />

contracts to transfer <strong>the</strong> risks, sometimes supplemented<br />

by f<strong>in</strong>anc<strong>in</strong>g, ma<strong>in</strong>tenance and operation.<br />

<strong>BAM</strong> will reta<strong>in</strong> its decentralised structure. The Group<br />

draws its strength from l<strong>in</strong>k<strong>in</strong>g and cluster<strong>in</strong>g <strong>the</strong> local<br />

players/sources <strong>in</strong> a smart grid to ensure that systems,<br />

specialties and capacity are deployed <strong>in</strong>telligently over<br />

<strong>the</strong> time available.<br />

The heart <strong>of</strong> <strong>the</strong> Group is <strong>the</strong> operat<strong>in</strong>g companies, each<br />

led by a board <strong>of</strong> directors that reports to <strong>the</strong> Executive<br />

Board. The Executive Board is advised and assisted by<br />

compact management support departments with an<br />

<strong>in</strong>ternational perspective. The Group operates as a<br />

European company with its adm<strong>in</strong>istrative centre <strong>in</strong> <strong>the</strong><br />

Ne<strong>the</strong>rlands and a list<strong>in</strong>g on <strong>the</strong> NYSE Euronext<br />

Amsterdam stock exchange.<br />

The Group ma<strong>in</strong>ta<strong>in</strong>s a management system that<br />

encourages market <strong>in</strong>volvement and registers reports<br />

received from its immediate environment, but that limits<br />

risks and recognises opportunities.<br />

Management development should be fully <strong>in</strong>tegrated<br />

<strong>in</strong>to company procedures as a means <strong>of</strong> achiev<strong>in</strong>g a<br />

susta<strong>in</strong>able workforce that delivers performances <strong>in</strong> l<strong>in</strong>e<br />

with corporate ambitions.<br />

By 2020, corporate social responsibility will have been<br />

fully <strong>in</strong>corporated <strong>in</strong>to corporate processes and – even<br />

more importantly – <strong>in</strong>to <strong>BAM</strong>’s corporate culture. The<br />

ambition rema<strong>in</strong>s to do bus<strong>in</strong>ess on a susta<strong>in</strong>able basis.<br />

The corporate objectives are geared to economic,<br />

environmental and social progress. <strong>BAM</strong> will be an<br />

example to <strong>the</strong> rest <strong>of</strong> <strong>the</strong> construction <strong>in</strong>dustry as<br />

regards healthy and safe work<strong>in</strong>g conditions. <strong>BAM</strong> will<br />

be an employer <strong>of</strong> choice.<br />

<strong>BAM</strong> will cont<strong>in</strong>ue to play an active role <strong>in</strong> <strong>the</strong><br />

development <strong>of</strong> <strong>the</strong> construction sector by participat<strong>in</strong>g<br />

<strong>in</strong> sector organisations and o<strong>the</strong>r pr<strong>of</strong>essional<br />

organisations.<br />

The Group will operate under one name and one brand<br />

image <strong>in</strong> every country:<br />

9<br />

<strong>2011</strong>


10<br />

<strong>2011</strong><br />

Stafelter Tunnel on <strong>the</strong> Route du Nord (A7), Luxembourg.<br />

Wayss & Freytag Ingenieurbau, Galère (<strong>in</strong> jo<strong>in</strong>t venture).<br />

Update <strong>of</strong> strategic agenda 2010 - 2012<br />

Every three years, Royal <strong>BAM</strong> Group publishes a strategic<br />

agenda sett<strong>in</strong>g out <strong>the</strong> targets and strategic action<br />

po<strong>in</strong>ts for <strong>the</strong> plann<strong>in</strong>g period. The Executive Board has<br />

drawn up a strategic agenda for 2010-2012 to serve as a<br />

guide for management <strong>in</strong> <strong>the</strong> Group’s fur<strong>the</strong>r<br />

development. The Executive Board reviewed <strong>the</strong><br />

pr<strong>in</strong>ciple po<strong>in</strong>ts and targets halfway through <strong>the</strong> current<br />

plann<strong>in</strong>g period as described below. At <strong>the</strong> end <strong>of</strong> 2012,<br />

<strong>BAM</strong> will present a new strategic agenda for <strong>the</strong><br />

2013-2015 period.<br />

The Executive Board has reaffirmed <strong>the</strong> pr<strong>in</strong>ciple po<strong>in</strong>ts<br />

as previously stated. This means that <strong>BAM</strong> will cont<strong>in</strong>ue<br />

to position itself as a property and construction group<br />

that can provide its customers with <strong>in</strong>frastructure and<br />

build<strong>in</strong>gs that are ready for immediate use, <strong>of</strong>fer<strong>in</strong>g an<br />

<strong>in</strong>tegrated service package <strong>in</strong>clud<strong>in</strong>g development,<br />

design, build<strong>in</strong>g, f<strong>in</strong>anc<strong>in</strong>g, ma<strong>in</strong>tenance and operation.<br />

<strong>BAM</strong> operat<strong>in</strong>g companies are active pr<strong>in</strong>cipally <strong>in</strong> <strong>the</strong><br />

five European home markets <strong>of</strong> <strong>the</strong> Ne<strong>the</strong>rlands,<br />

Belgium, <strong>the</strong> United K<strong>in</strong>gdom, Ireland and Germany, as<br />

well as <strong>in</strong> a number <strong>of</strong> fast-grow<strong>in</strong>g markets outside<br />

Europe. <strong>BAM</strong> is ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g <strong>the</strong> three previously set<br />

targets: (1) streng<strong>the</strong>n <strong>the</strong> position <strong>of</strong> <strong>the</strong> Group <strong>in</strong> all<br />

home markets, (2) fill <strong>the</strong> activity matrix, and (3) develop<br />

new concepts or product market comb<strong>in</strong>ations.<br />

The M<strong>in</strong>istry <strong>of</strong> Security and Justice and <strong>the</strong> M<strong>in</strong>istry<br />

<strong>of</strong> <strong>the</strong> Interior and K<strong>in</strong>gdom Relations, The Hague.<br />

<strong>BAM</strong> Utiliteitsbouw (<strong>in</strong> jo<strong>in</strong>t venture).<br />

Tak<strong>in</strong>g <strong>in</strong>to consideration <strong>the</strong> current external <strong>in</strong>fluences,<br />

<strong>the</strong> Executive Board has identified specific targets for <strong>the</strong><br />

rest <strong>of</strong> <strong>the</strong> plann<strong>in</strong>g period:<br />

1. Increased focus on core bus<strong>in</strong>ess;<br />

2. Optimum exploitation <strong>of</strong> strength through synergy;<br />

3. Streng<strong>the</strong>n f<strong>in</strong>ancial position; and<br />

4. Invest <strong>in</strong> new growth tracks.<br />

<strong>BAM</strong> will cont<strong>in</strong>ue with previously <strong>in</strong>itiated strategic<br />

programmes, which <strong>in</strong>clude a focus on risk management,<br />

operational excellence, <strong>in</strong>novative concepts and<br />

susta<strong>in</strong>able bus<strong>in</strong>ess operations.<br />

1. Increased focus on core bus<strong>in</strong>ess<br />

<strong>BAM</strong> has structured <strong>the</strong> Group’s organisation <strong>in</strong> l<strong>in</strong>e with<br />

<strong>the</strong> follow<strong>in</strong>g four sectors: construction and mechanical<br />

and electrical services, civil eng<strong>in</strong>eer<strong>in</strong>g, property and<br />

public private partnerships (PPP). This simplified<br />

structure improves opportunities to <strong>in</strong>crease focus and<br />

achieve optimum synergy. In this context, it has been<br />

determ<strong>in</strong>ed <strong>in</strong> consultation with <strong>the</strong> Tebod<strong>in</strong><br />

management team that <strong>the</strong>re is limited synergy between<br />

<strong>the</strong> Consultancy and eng<strong>in</strong>eer<strong>in</strong>g sector (i.e. Tebod<strong>in</strong>). In<br />

light <strong>of</strong> <strong>the</strong> fact that fur<strong>the</strong>r growth <strong>of</strong> Tebod<strong>in</strong>, primarily<br />

<strong>in</strong> eastern Europe, <strong>the</strong> Middle East and Asia, will not br<strong>in</strong>g<br />

about change <strong>in</strong> this regard, <strong>the</strong> Executive Board<br />

<strong>the</strong>refore decided to sell Tebod<strong>in</strong>.


2. Optimum exploitation <strong>of</strong> strength through synergy<br />

There are very limited prospects for fur<strong>the</strong>r growth <strong>in</strong><br />

<strong>the</strong> current sectors and geographic markets.<br />

Accord<strong>in</strong>gly, <strong>the</strong> Executive Board wants to create new<br />

opportunities by present<strong>in</strong>g <strong>BAM</strong> more expressly as a<br />

provider <strong>of</strong> full and multidiscipl<strong>in</strong>ary solutions – a<br />

full-service provider for <strong>the</strong> built environment. The new<br />

sector-based organisational structure referred to above<br />

will also promote synergy. Previously <strong>in</strong>itiated<br />

programmes with regard to lean management, virtual<br />

construction and enhanced collaboration have reduced<br />

costs and <strong>in</strong>creased operational excellence.<br />

3. Streng<strong>the</strong>n f<strong>in</strong>ancial position<br />

The Group’s current f<strong>in</strong>ancial position is solid and stable.<br />

None<strong>the</strong>less, <strong>the</strong> Executive Board aims to improve <strong>the</strong><br />

balance sheet. The priority is to reduce <strong>the</strong> capital<br />

<strong>in</strong>vested <strong>in</strong> property, <strong>the</strong> aim be<strong>in</strong>g to reduce <strong>the</strong> amount<br />

<strong>in</strong>vested <strong>in</strong> property by a third. In light <strong>of</strong> <strong>the</strong> current<br />

difficult market conditions, this will take several years.<br />

The Group’s control <strong>of</strong> <strong>the</strong> work<strong>in</strong>g capital has greatly<br />

improved over <strong>the</strong> last few years. The focus now is on<br />

fur<strong>the</strong>r improvement where possible. On <strong>the</strong> one hand,<br />

<strong>the</strong> jo<strong>in</strong>t venture with PGGM limits <strong>the</strong> capital <strong>in</strong>vested <strong>in</strong><br />

previously acquired PPP contracts, while, on <strong>the</strong> o<strong>the</strong>r<br />

hand, it <strong>of</strong>fers f<strong>in</strong>ancial support for fur<strong>the</strong>r growth.<br />

2.4-kilometres long LNG jetty near Port Moresby,<br />

Papua New Gu<strong>in</strong>ea.<br />

<strong>BAM</strong> International (<strong>in</strong> jo<strong>in</strong>t venture).<br />

4. Invest <strong>in</strong> new growth tracks<br />

The Executive Board sets great store by <strong>the</strong> Group’s fur<strong>the</strong>r<br />

growth and development and has <strong>the</strong>refore decided to<br />

build on <strong>the</strong> success <strong>of</strong> bus<strong>in</strong>ess activities <strong>in</strong> Switzerland<br />

and Luxembourg by establish<strong>in</strong>g permanent branches <strong>in</strong><br />

those countries (<strong>BAM</strong> Swiss and <strong>BAM</strong> Luxembourg). In<br />

addition, market growth should be achieved by full-service<br />

and multidiscipl<strong>in</strong>ary projects through more <strong>in</strong>tensive<br />

collaboration between <strong>BAM</strong> companies and active entry<br />

onto markets outside Europe. <strong>BAM</strong> International is us<strong>in</strong>g<br />

all available opportunities with<strong>in</strong> <strong>the</strong> Group to expand <strong>the</strong><br />

organisation and achieve susta<strong>in</strong>able market positions <strong>in</strong><br />

South-East Asia, Australia, Africa and <strong>the</strong> Middle East.<br />

The targets for 2012 that were set by <strong>BAM</strong> <strong>in</strong> 2009 are not<br />

achievable under <strong>the</strong> given market conditions.<br />

Streng<strong>the</strong>n<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial position rema<strong>in</strong>s a priority.<br />

Royal <strong>BAM</strong> Group cont<strong>in</strong>ues to do its utmost to <strong>of</strong>fer its<br />

shareolders a solid pr<strong>of</strong>it with an attractive dividend and<br />

an <strong>in</strong>crease <strong>in</strong> <strong>the</strong> value <strong>of</strong> shares <strong>in</strong> <strong>the</strong> Group.<br />

11<br />

<strong>2011</strong>


12<br />

<strong>2011</strong><br />

Beverwaard tram depot <strong>in</strong>clud<strong>in</strong>g a ro<strong>of</strong>-top car park<br />

with space for 500 cars, Rotterdam.<br />

<strong>BAM</strong> Civiel.


24<br />

22<br />

20<br />

18<br />

16<br />

14<br />

12<br />

10<br />

8<br />

6<br />

4<br />

2<br />

0<br />

Stock exchange list<strong>in</strong>g<br />

Royal <strong>BAM</strong> Group nv shares<br />

The shares <strong>of</strong> Royal <strong>BAM</strong> Group nv have been listed on<br />

<strong>the</strong> NYSE Euronext Amsterdam stock exchange s<strong>in</strong>ce<br />

1959. <strong>BAM</strong> is listed on <strong>the</strong> AMX <strong>in</strong>dex (Midkap) as well <strong>the</strong><br />

Euronext NEXT-150 Index. Royal <strong>BAM</strong> Group ord<strong>in</strong>ary<br />

share options have been traded by NYSE Liffe, <strong>the</strong><br />

Euronext Amsterdam derivatives division, s<strong>in</strong>ce 2006.<br />

The total stock exchange value (market capitalisation)<br />

<strong>of</strong> <strong>the</strong> Group stood at approximately €0.8 billion at<br />

year-end <strong>2011</strong> (year-end 2010: approximately<br />

€1.1 billion).<br />

Share price<br />

The <strong>2011</strong> clos<strong>in</strong>g price for <strong>the</strong> ord<strong>in</strong>ary share was €3.26,<br />

which was approximately 29 percent lower than <strong>the</strong><br />

clos<strong>in</strong>g price for 2010 (€4.60). This means that <strong>the</strong> share<br />

price lagged slightly beh<strong>in</strong>d <strong>the</strong> AMX <strong>in</strong>dex (-27 percent).<br />

<strong>BAM</strong>’s share price has fallen by almost 72 percent over<br />

<strong>the</strong> last five years. By way <strong>of</strong> comparison, <strong>the</strong> AEX <strong>in</strong>dex<br />

and <strong>the</strong> AMX fell by 37 percent and 31 percent <strong>in</strong> <strong>the</strong><br />

same period.<br />

Graph 1 shows <strong>the</strong> history <strong>of</strong> <strong>the</strong> <strong>BAM</strong> ord<strong>in</strong>ary share<br />

price over <strong>the</strong> past five years.<br />

Graph 1 Ord<strong>in</strong>ary share price movement<br />

(<strong>in</strong> €)<br />

2007<br />

2008<br />

2009 2010<br />

<strong>BAM</strong> sector NL sector Eur AEX<br />

<strong>2011</strong><br />

AMX<br />

Volume <strong>of</strong> trade<br />

The cash value <strong>of</strong> <strong>the</strong> Royal <strong>BAM</strong> Group ord<strong>in</strong>ary share<br />

decreased <strong>in</strong> <strong>2011</strong>. The number <strong>of</strong> ord<strong>in</strong>ary shares traded<br />

fell by a third <strong>in</strong> <strong>the</strong> f<strong>in</strong>ancial year to a total <strong>of</strong> 341.6<br />

million shares (2010: 518.6 million). The average daily<br />

trade was 1,338,500 ord<strong>in</strong>ary shares (2010: 2,010,000).<br />

The value <strong>of</strong> <strong>the</strong> shares traded fell by approximately 44<br />

percent <strong>in</strong> <strong>2011</strong> to €1,434 million (2010: €2,547 million).<br />

An average <strong>of</strong> €5.6 million worth <strong>of</strong> <strong>BAM</strong> shares was<br />

traded every trad<strong>in</strong>g day <strong>in</strong> <strong>2011</strong> (2010: €9.9 million).<br />

Graph 2 shows <strong>the</strong> development <strong>of</strong> <strong>the</strong> average number<br />

<strong>of</strong> ord<strong>in</strong>ary shares traded <strong>in</strong> <strong>2011</strong> on Euronext<br />

Amsterdam. Graph 3 (page 14) shows <strong>the</strong> development<br />

<strong>of</strong> <strong>the</strong> average price on NYSE Euronext Amsterdam.<br />

If necessary, ING, Rabobank and RBS act as liquidity<br />

providers for <strong>the</strong> trade <strong>in</strong> ord<strong>in</strong>ary shares.<br />

Graph 2 Number <strong>of</strong> traded ord<strong>in</strong>ary shares <strong>in</strong> <strong>2011</strong><br />

(average per day)<br />

3,000,000<br />

2,500,000<br />

2,000,000<br />

1,500,000<br />

1,000,000<br />

5,00,000<br />

0<br />

J F M A M J J A S O N D<br />

ord<strong>in</strong>ary trade<br />

large blocks<br />

mov<strong>in</strong>g average<br />

13<br />

<strong>2011</strong>


14<br />

<strong>2011</strong><br />

Movements <strong>in</strong> <strong>the</strong> number <strong>of</strong> outstand<strong>in</strong>g<br />

shares<br />

In <strong>2011</strong>, <strong>the</strong> number <strong>of</strong> outstand<strong>in</strong>g ord<strong>in</strong>ary shares<br />

<strong>in</strong>creased by 1,171,833 to 232,937,569, attributable to <strong>the</strong><br />

payment <strong>of</strong> stock dividend and <strong>the</strong> f<strong>in</strong>al conversion <strong>of</strong><br />

convertible preference shares.<br />

All convertible preference shares were converted <strong>in</strong>to<br />

ord<strong>in</strong>ary shares <strong>in</strong> a mandatory conversion <strong>in</strong> <strong>2011</strong>. The<br />

346,276 outstand<strong>in</strong>g convertible preference shares were<br />

converted <strong>in</strong>to 440,711 new ord<strong>in</strong>ary shares.<br />

The Company repurchased all non-convertible preference<br />

shares dur<strong>in</strong>g <strong>2011</strong> <strong>in</strong> a mandatory repurchase for €4.38<br />

per non-convertible preference share. A total <strong>of</strong> 473,275<br />

non-convertible preference shares were withdrawn <strong>in</strong><br />

<strong>2011</strong>.<br />

Graph 3 Value <strong>of</strong> traded ord<strong>in</strong>ary shares <strong>in</strong> <strong>2011</strong><br />

(average per day)<br />

16,000,000<br />

14,000,000<br />

12,000,000<br />

10,000,000<br />

8,000,000<br />

6,000,000<br />

4,000,000<br />

2,000,000<br />

0<br />

J F M A M J J A S O N D<br />

average traded value<br />

per day<br />

Table 3 Number <strong>of</strong> outstand<strong>in</strong>g shares <strong>in</strong> <strong>2011</strong><br />

mov<strong>in</strong>g average<br />

The development <strong>of</strong> <strong>the</strong> number <strong>of</strong> outstand<strong>in</strong>g shares <strong>in</strong><br />

<strong>2011</strong> (<strong>in</strong>clud<strong>in</strong>g <strong>the</strong> percentage <strong>of</strong> <strong>the</strong> total represented by<br />

each type <strong>of</strong> share) is shown <strong>in</strong> table 3. The average<br />

number <strong>of</strong> ord<strong>in</strong>ary shares <strong>in</strong> <strong>2011</strong> was 232,377,783<br />

(2010 figure adjusted to take account <strong>of</strong> <strong>the</strong> rights issue:<br />

204,183,583).<br />

Accord<strong>in</strong>g to <strong>the</strong> AFM register <strong>of</strong> substantial<br />

sharehold<strong>in</strong>gs, four <strong>in</strong>stitutional <strong>in</strong>vestors have real<br />

<strong>in</strong>terests <strong>of</strong> 5 percent or more. Changes may have<br />

occurred, however, with<strong>in</strong> <strong>the</strong> disclosure thresholds.<br />

Table 4 shows <strong>the</strong> <strong>in</strong>terests <strong>of</strong> 5 percent or more<br />

accord<strong>in</strong>g to <strong>the</strong> AFM register <strong>of</strong> substantial<br />

sharehold<strong>in</strong>gs.<br />

Ord<strong>in</strong>ary CCPS's CPS's Total<br />

Shares <strong>in</strong> issue as at 1 January <strong>2011</strong> 231,765,736 346,276 473,275 232,585,287<br />

99.6% 0.2% 0.2% 100.0%<br />

Stock dividend shares issued 731,122 0 0 731,122<br />

Preference shares repurchased 0 0 -473,275 -473,275<br />

Preference shares converted 440,711 -346,276 0 94,435<br />

Shares <strong>in</strong> issue as at 31 December <strong>2011</strong> 232,937,569 0 0 232,937,569<br />

100.0% 0.0% 0.0% 100.0%<br />

CCPS = Convertible Cumulative Preference shares<br />

CPS = non-convertible Cumulative Preference shares


Dividend policy<br />

Dividend policy and proposed dividend for <strong>2011</strong><br />

Royal <strong>BAM</strong> Group strives to distribute between 30<br />

percent and 50 percent <strong>of</strong> <strong>the</strong> net pr<strong>of</strong>it as dividend on<br />

<strong>the</strong> ord<strong>in</strong>ary shares. The General Meet<strong>in</strong>g <strong>of</strong> 25 April<br />

2012 will be <strong>in</strong>vited to declare a dividend for <strong>2011</strong>, at <strong>the</strong><br />

discretion <strong>of</strong> <strong>the</strong> <strong>in</strong>dividual shareholder, <strong>of</strong> ei<strong>the</strong>r €0.16 <strong>in</strong><br />

cash (2010: €0.03) per ord<strong>in</strong>ary share or a dividend <strong>in</strong><br />

ord<strong>in</strong>ary shares. If <strong>the</strong> shareholder opts for a dividend <strong>in</strong><br />

shares, <strong>the</strong> Group will calculate <strong>the</strong> number <strong>of</strong> dividend<br />

rights needed to acquire one new share <strong>in</strong> such a way<br />

that <strong>the</strong> value <strong>of</strong> <strong>the</strong> share dividend exceeds that <strong>of</strong> <strong>the</strong><br />

cash dividend by approximately 5 percent.<br />

The proposed cash dividend represents a payout<br />

percentage <strong>of</strong> approximately 30 percent based on <strong>the</strong><br />

<strong>2011</strong> net result <strong>of</strong> €126.0 million. The dividend return on<br />

<strong>the</strong> ord<strong>in</strong>ary shares is 4.9 percent based on <strong>the</strong> proposed<br />

dividend and <strong>the</strong> <strong>2011</strong> clos<strong>in</strong>g price (2010: 0.7 percent).<br />

More <strong>in</strong>formation on <strong>the</strong> proposed dividend for <strong>2011</strong> can<br />

be found <strong>in</strong> <strong>the</strong> Executive Board’s report on page 41.<br />

Investor relations<br />

Royal <strong>BAM</strong> Group attaches great importance to <strong>the</strong><br />

provision <strong>of</strong> transparent and identical <strong>in</strong>formation to all<br />

<strong>in</strong>vestors. <strong>BAM</strong>’s <strong>in</strong>vestor relations policy is geared to<br />

<strong>in</strong>form<strong>in</strong>g <strong>in</strong>vestors about <strong>the</strong> Group’s strategy,<br />

objectives, performance and prospects <strong>in</strong> good time,<br />

fully and <strong>in</strong> clear and unambiguous terms. Bus<strong>in</strong>ess<br />

results will not be adequately reflected <strong>in</strong> <strong>the</strong> value <strong>of</strong> <strong>the</strong><br />

shares unless <strong>the</strong>re is high-quality communication with<br />

<strong>in</strong>vestors.<br />

All press and analysts meet<strong>in</strong>gs organised <strong>in</strong> connection<br />

with <strong>the</strong> publication <strong>of</strong> <strong>the</strong> annual, half-yearly and<br />

quarterly figures are accessible to everyone via <strong>the</strong><br />

Internet (webcast).<br />

The press meet<strong>in</strong>gs for <strong>the</strong> annual and half-yearly figures<br />

are held <strong>in</strong> Dutch. The analysts meet<strong>in</strong>gs will be held <strong>in</strong><br />

English start<strong>in</strong>g <strong>in</strong> <strong>2011</strong>. More <strong>in</strong>formation on this subject<br />

can be found on <strong>the</strong> company’s website.<br />

The significant <strong>in</strong>terest from <strong>in</strong>vestors is also expressed<br />

<strong>in</strong> <strong>the</strong> numbers <strong>of</strong> contacts <strong>in</strong> <strong>the</strong> form <strong>of</strong> road shows,<br />

participation <strong>in</strong> sem<strong>in</strong>ars and presentations for<br />

<strong>in</strong>vestment clubs, amongst o<strong>the</strong>rs. All dates and<br />

locations <strong>of</strong> roadshows, sem<strong>in</strong>ars and <strong>the</strong> like are<br />

published on <strong>the</strong> company’s website.<br />

For questions or more <strong>in</strong>formation concern<strong>in</strong>g Royal<br />

<strong>BAM</strong> Group, please visit <strong>the</strong> company’s website at<br />

www.bam.eu. Shareholders (or potential shareholders)<br />

and f<strong>in</strong>ancial analysts can address any questions to <strong>the</strong><br />

Investor Relations Manager <strong>of</strong> Royal <strong>BAM</strong> Group,<br />

Mr P.R.E. Snippe, email p.snippe@bamgroep.nl,<br />

telephone +31 (0)30 659 87 07.<br />

Table 4 Interests <strong>of</strong> 5 percent or more accord<strong>in</strong>g to <strong>the</strong> register <strong>of</strong> substantial sharehold<strong>in</strong>gs kept by <strong>the</strong><br />

Ne<strong>the</strong>rlands Authority for <strong>the</strong> F<strong>in</strong>ancial Markets (AFM)<br />

(As a percentage)<br />

Interest above Date <strong>of</strong> last<br />

Total 5 percent s<strong>in</strong>ce notification<br />

ING Groep 10.2 February 1992 19 November 2009<br />

A. van Herk 9.4 October 2005 31 December 2008<br />

Delta Lloyd 5.6 December 2002 6 May <strong>2011</strong><br />

Governance for Owners LLP 5.0 November 2010 16 November 2010<br />

15<br />

<strong>2011</strong>


16<br />

<strong>2011</strong><br />

Number <strong>of</strong> ord<strong>in</strong>ary shares (<strong>in</strong> €1 unless o<strong>the</strong>rwise <strong>in</strong>dicated) 1<br />

<strong>2011</strong> 2010 2009 4 2008 2007<br />

Number <strong>of</strong> ord<strong>in</strong>ary shares rank<strong>in</strong>g for<br />

dividend as at year-end 232,937,569 231,765,736 135,196,679 135,192,833 129,906,275<br />

Average number <strong>of</strong> ord<strong>in</strong>ary shares 232,377,783 204,183,583 172,193,087 133,833,884 124,825,079<br />

Net result 0.54 0.08 0.18 1.21 2.80<br />

Net result from cont<strong>in</strong>ued operations 0.49 0.08 0.18 1.21 2.15<br />

Average number <strong>of</strong> ord<strong>in</strong>ary shares<br />

rank<strong>in</strong>g for dividend (fully diluted) 232,665,153 204,624,298 172,635,525 135,542,904 135,541,461<br />

Net result (fully diluted)<br />

Net result from cont<strong>in</strong>ued operations<br />

0.54 0.08 0.18 1.20 2.60<br />

(fully diluted) 0.49 0.08 0.18 1.20 2.01<br />

Cash flow 1.00 1.23 1.55 2.67 3.61<br />

Equity attributable to shareholders 4.99 4.75 6.47 6.27 7.65<br />

Dividend 2 0.16 0.03 0.10 0.50 0.90<br />

Payout (as a percentage) 30 45 43 42 34<br />

Dividend yield (as a percentage) 2 4.9 0.7 1.4 7.8 5.6<br />

Highest clos<strong>in</strong>g price 5.76 6.19 7.37 16.60 22.58<br />

Lowest clos<strong>in</strong>g price 2.17 3.62 3.87 4.67 13.79<br />

Price on 31 December 3.26 4.60 5.69 6.41 16.10<br />

Average daily turnover (<strong>in</strong> number <strong>of</strong> shares) 1,338,500 2,010,000 1,152,000 1,126,000 848,000<br />

Market capitalisation at year-end (x €1.000) 3 759,376 1,070,302 984,452 870,585 2,196,373<br />

Figures per f<strong>in</strong>anc<strong>in</strong>g preference share (<strong>in</strong> €1 unless o<strong>the</strong>rwise <strong>in</strong>dicated) 1<br />

<strong>2011</strong> 2010 2009 2008 2007<br />

Convertible shares<br />

Number <strong>of</strong> shares <strong>in</strong> issue - 346,276 346,276 350,122 5,636,534<br />

Conversion price - 3.30 4.20 4.20 4.20<br />

Price on 31 December - 5.70 6.60 4.65 18.15<br />

Dividend - 0.37 0.37 0.37 0.37<br />

Non-convertible shares<br />

Number <strong>of</strong> shares <strong>in</strong> issue - 473,275 473,275 473,275 473,275<br />

Price on 31 December - 4.66 4.21 5.01 5.45<br />

Dividend - 0.38 0.38 0.38 0.38<br />

1 Dividend proposal <strong>2011</strong>.<br />

2 Based on share price at year-end.<br />

3 Based on total number <strong>of</strong> outstand<strong>in</strong>g ord<strong>in</strong>ary shares and f<strong>in</strong>anc<strong>in</strong>g preference shares.<br />

4 2009 adjusted for rights issue.


<strong>Report</strong> by <strong>the</strong> Supervisory Board to <strong>the</strong> shareholders<br />

F<strong>in</strong>ancial statements and dividend proposal<br />

The Supervisory Board hereby presents <strong>the</strong> <strong>2011</strong> f<strong>in</strong>ancial<br />

statements, duly prepared by <strong>the</strong> Executive Board, to <strong>the</strong><br />

General Meet<strong>in</strong>g <strong>of</strong> Shareholders for approval. The<br />

f<strong>in</strong>ancial statements have been audited by <strong>the</strong> Group’s<br />

external auditor, PricewaterhouseCoopers Accountants<br />

N.V.; <strong>the</strong> unqualified auditor’s report is <strong>in</strong>cluded on page<br />

191 <strong>of</strong> <strong>the</strong> <strong>Annual</strong> <strong>Report</strong>. The Supervisory Board has<br />

discussed <strong>the</strong> f<strong>in</strong>ancial statements with <strong>the</strong> Executive<br />

Board <strong>in</strong> <strong>the</strong> presence <strong>of</strong> <strong>the</strong> external auditor. The<br />

Supervisory Board is <strong>of</strong> <strong>the</strong> op<strong>in</strong>ion that <strong>the</strong> f<strong>in</strong>ancial<br />

statements, <strong>the</strong> report by <strong>the</strong> Supervisory Board and <strong>the</strong><br />

report by <strong>the</strong> Executive Board form a good basis on<br />

which to hold <strong>the</strong> Executive Board accountable for <strong>the</strong><br />

management policies pursued and <strong>the</strong> Supervisory Board<br />

accountable for its supervision <strong>of</strong> <strong>the</strong> management<br />

policies pursued. The members <strong>of</strong> <strong>the</strong> Supervisory Board<br />

have signed <strong>the</strong> f<strong>in</strong>ancial statements <strong>in</strong> accordance with<br />

<strong>the</strong>ir statutory obligations under Article 2:101, paragraph<br />

2 <strong>of</strong> <strong>the</strong> Dutch Civil Code.<br />

The General Meet<strong>in</strong>g <strong>of</strong> Shareholders to be held on<br />

25 April 2012 will be <strong>in</strong>vited to declare a dividend for<br />

<strong>2011</strong> <strong>of</strong> €0.16 (2010: €0.03) <strong>in</strong> cash per ord<strong>in</strong>ary share or<br />

<strong>in</strong> stock.<br />

Composition <strong>of</strong> <strong>the</strong> Supervisory Board<br />

The General Meet<strong>in</strong>g <strong>of</strong> Shareholders held on 20 April<br />

<strong>2011</strong> appo<strong>in</strong>ted Ms C.M.C. Mahieu and Messrs<br />

P.A.F.W. Elverd<strong>in</strong>g and K.S. Wester as members <strong>of</strong> <strong>the</strong><br />

Supervisory Board for a four-year period. At <strong>the</strong> same<br />

meet<strong>in</strong>g, Mr W.K. Wiechers was reappo<strong>in</strong>ted as a<br />

member <strong>of</strong> <strong>the</strong> Supervisory Board for a one-year period.<br />

Mr Wiechers will step down from <strong>the</strong> Supervisory Board<br />

at <strong>the</strong> end <strong>of</strong> <strong>the</strong> General Meet<strong>in</strong>g to be held on 25 April<br />

2012. Mr Wiechers has been a member <strong>of</strong> <strong>the</strong><br />

Supervisory Board s<strong>in</strong>ce 1999, spend<strong>in</strong>g more than four<br />

years <strong>of</strong> that time as Chairman <strong>of</strong> <strong>the</strong> Supervisory Board.<br />

The Group has undergone a period <strong>of</strong> exceptional growth<br />

dur<strong>in</strong>g Mr Wiechers’ time on <strong>the</strong> Supervisory Board, and<br />

his expertise and balanced analyses have made a major<br />

contribution to that growth. The Supervisory Board and<br />

<strong>the</strong> Executive Board would like to express <strong>the</strong>ir<br />

considerable appreciation to Mr Wiechers for his<br />

substantial <strong>in</strong>volvement <strong>in</strong> <strong>the</strong> Group and for <strong>the</strong> valuable<br />

manner <strong>in</strong> which he has fulfilled his duties as a member<br />

and Chairman <strong>of</strong> <strong>the</strong> Supervisory Board.<br />

Mr J.A. Dekker will also step down from <strong>the</strong> Supervisory<br />

Board after <strong>the</strong> General Meet<strong>in</strong>g on 25 April 2012 when<br />

his third four-year term ends. Mr Dekker has been a<br />

member <strong>of</strong> <strong>the</strong> Supervisory Board s<strong>in</strong>ce 2000, spend<strong>in</strong>g<br />

eight years <strong>of</strong> that time as Chairman <strong>of</strong> <strong>the</strong> Audit<br />

Committee. Thanks to his technical and f<strong>in</strong>ancial<br />

background, Mr Dekker has made a major contribution to<br />

<strong>the</strong> activities <strong>of</strong> <strong>the</strong> Supervisory Board and, as Chairman,<br />

his part <strong>in</strong> <strong>the</strong> work performed by <strong>the</strong> Audit Committee<br />

has been very valuable. The Supervisory Board and <strong>the</strong><br />

Executive Board would like to express <strong>the</strong>ir considerable<br />

appreciation to Mr Dekker, also for his substantial<br />

<strong>in</strong>volvement <strong>in</strong> <strong>the</strong> Group and for <strong>the</strong> manner <strong>in</strong> which he<br />

has performed his duties as a member <strong>of</strong> <strong>the</strong> Supervisory<br />

Board and Chairman <strong>of</strong> <strong>the</strong> Audit Committee.<br />

With regard to <strong>the</strong> vacancy that will arise when Mr Dekker<br />

steps down, <strong>the</strong> Central Works Council stated its<br />

<strong>in</strong>tention to exercise its re<strong>in</strong>forced right <strong>of</strong><br />

recommendation as referred to <strong>in</strong> Article 2:158,<br />

paragraph 6 <strong>of</strong> <strong>the</strong> Dutch Civil Code. The Central Works<br />

Council subsequently recommended that Mr H. Noy be<br />

put forward for appo<strong>in</strong>tment as a member <strong>of</strong> <strong>the</strong><br />

Supervisory Board. The Supervisory Board fully endorses<br />

this recommendation. As <strong>the</strong> director <strong>of</strong> a major<br />

company, Mr Noy has a great deal <strong>of</strong> experience and<br />

expertise relevant to management, board membership<br />

and organisation. His technical background is also well<br />

suited to a company like <strong>BAM</strong>, and he is familiar with <strong>the</strong><br />

construction sector and has <strong>in</strong>ternational experience. If<br />

<strong>the</strong> General Meet<strong>in</strong>g does not make any o<strong>the</strong>r<br />

recommendations, <strong>the</strong> Supervisory Board <strong>in</strong>tends to<br />

propose that Mr Noy be appo<strong>in</strong>ted to <strong>the</strong> Supervisory<br />

Board for a four-year period by <strong>the</strong> General Meet<strong>in</strong>g on<br />

25 April 2012.<br />

Mr Wiechers was Chairman <strong>of</strong> <strong>the</strong> Supervisory Board <strong>in</strong><br />

<strong>the</strong> past f<strong>in</strong>ancial year until 17 November <strong>2011</strong>. The<br />

Supervisory Board appo<strong>in</strong>ted Mr Elverd<strong>in</strong>g to succeed him<br />

as Chairman and Mr Scheffers as Vice-Chairman with<br />

effect from that date. Mr Scheffers took over as Vice-<br />

Chairman from Mr Baar who will step down from <strong>the</strong><br />

Supervisory Board at <strong>the</strong> end <strong>of</strong> his current third term<br />

after <strong>the</strong> <strong>Annual</strong> General Meet<strong>in</strong>g <strong>in</strong> 2013.<br />

The Supervisory Board had five members <strong>in</strong> <strong>the</strong> past<br />

f<strong>in</strong>ancial year until <strong>the</strong> General Meet<strong>in</strong>g on 20 April <strong>2011</strong><br />

at which two fur<strong>the</strong>r members were appo<strong>in</strong>ted. Follow<strong>in</strong>g<br />

<strong>the</strong> changes <strong>in</strong>dicated above, <strong>the</strong> Supervisory Board will<br />

have six members.<br />

17<br />

<strong>2011</strong>


18<br />

<strong>2011</strong><br />

There is a pr<strong>of</strong>ile <strong>of</strong> <strong>the</strong> Supervisory Board, which<br />

shareholders may exam<strong>in</strong>e at <strong>the</strong> company’s <strong>of</strong>fice and<br />

which is also published on <strong>the</strong> company’s website. This<br />

pr<strong>of</strong>ile was discussed with <strong>the</strong> shareholders at <strong>the</strong><br />

General Meet<strong>in</strong>g on 21 April 2009 <strong>in</strong> relation to <strong>the</strong> Dutch<br />

Corporate Governance Code (hereafter: ‘<strong>the</strong> Code’) as<br />

amended at <strong>the</strong> end <strong>of</strong> 2008. The Supervisory Board<br />

believes that its composition is <strong>in</strong> l<strong>in</strong>e with <strong>the</strong> pr<strong>of</strong>ile.<br />

More details about <strong>the</strong> pr<strong>of</strong>ile can be found <strong>in</strong> <strong>the</strong> section<br />

on corporate governance on page 00 <strong>of</strong> <strong>the</strong> <strong>Annual</strong><br />

<strong>Report</strong>.<br />

The retirement schedule for <strong>the</strong> members <strong>of</strong> <strong>the</strong><br />

Supervisory Board is shown on page 37 <strong>of</strong> <strong>the</strong> <strong>Annual</strong><br />

<strong>Report</strong> and is also published on <strong>the</strong> company’s website.<br />

In accordance with <strong>the</strong> Code, Supervisory Board<br />

members can <strong>in</strong> pr<strong>in</strong>ciple serve a maximum <strong>of</strong> three<br />

four-year terms <strong>of</strong> <strong>of</strong>fice. Their reappo<strong>in</strong>tment for<br />

ano<strong>the</strong>r term <strong>of</strong> <strong>of</strong>fice will obviously be put forward to<br />

<strong>the</strong> shareholders on each occasion.<br />

The particulars <strong>of</strong> <strong>the</strong> members <strong>of</strong> <strong>the</strong> Supervisory Board<br />

are stated on pages 36 and 37 <strong>of</strong> <strong>the</strong> <strong>Annual</strong> <strong>Report</strong> and<br />

constitute part <strong>of</strong> this Supervisory Board report.<br />

The remuneration <strong>of</strong> Supervisory Board members is<br />

stated on page 00 <strong>of</strong> <strong>the</strong> <strong>Annual</strong> <strong>Report</strong>.<br />

The Supervisory Board members do not have any o<strong>the</strong>r<br />

relationships <strong>of</strong> a bus<strong>in</strong>ess nature with <strong>the</strong> company. In<br />

<strong>the</strong> op<strong>in</strong>ion <strong>of</strong> <strong>the</strong> Supervisory Board, <strong>the</strong> Code’s<br />

requirement with regard to <strong>in</strong>dependence has been met.<br />

As allowed by <strong>the</strong> Code, <strong>the</strong> Supervisory Board had one<br />

member throughout <strong>the</strong> f<strong>in</strong>ancial year who was not<br />

<strong>in</strong>dependent with<strong>in</strong> <strong>the</strong> mean<strong>in</strong>g <strong>of</strong> <strong>the</strong> Code. Until <strong>the</strong><br />

end <strong>of</strong> <strong>the</strong> General Meet<strong>in</strong>g <strong>of</strong> 20 April <strong>2011</strong>, that<br />

member was Mr Van Vonno, <strong>the</strong> former Chairman and<br />

former member <strong>of</strong> <strong>the</strong> Executive Board; follow<strong>in</strong>g <strong>the</strong><br />

General Meet<strong>in</strong>g on 20 April <strong>2011</strong>, <strong>the</strong> member <strong>in</strong><br />

question was Mr Elverd<strong>in</strong>g who is also a member <strong>of</strong> <strong>the</strong><br />

Supervisory Board <strong>of</strong> ING, which has a sharehold<strong>in</strong>g <strong>of</strong><br />

slightly more than 10 percent <strong>in</strong> <strong>the</strong> <strong>BAM</strong> Group. None <strong>of</strong><br />

<strong>the</strong> Supervisory Board members is a member <strong>of</strong> <strong>the</strong><br />

Supervisory Board <strong>of</strong> more than five Dutch listed<br />

companies. The Supervisory Board is not aware <strong>of</strong> any<br />

conflicts <strong>of</strong> <strong>in</strong>terest between <strong>the</strong> company and members<br />

<strong>of</strong> <strong>the</strong> Supervisory Board, or between <strong>the</strong> company and<br />

natural persons or legal entities that hold at least<br />

10 percent <strong>of</strong> <strong>the</strong> shares <strong>in</strong> <strong>the</strong> company.<br />

Composition <strong>of</strong> <strong>the</strong> Executive Board<br />

Messrs J. Ruis and R.A. van W<strong>in</strong>gerden will be stepp<strong>in</strong>g<br />

down from <strong>the</strong> Executive Board when <strong>the</strong>ir respective<br />

four-year terms end after <strong>the</strong> General Meet<strong>in</strong>g on 25 April<br />

2012. The Supervisory Board <strong>in</strong>tends to put forward a<br />

non-b<strong>in</strong>d<strong>in</strong>g recommendation that <strong>the</strong> General Meet<strong>in</strong>g<br />

reappo<strong>in</strong>t both members to <strong>the</strong> Executive Board on<br />

25 April 2012.<br />

With regard to Mr Ruis, <strong>the</strong> Supervisory Board believes<br />

that it is advisable for him to cont<strong>in</strong>ue as Chief F<strong>in</strong>ancial<br />

Officer and a member <strong>of</strong> <strong>the</strong> Executive Board for a<br />

maximum one-year period to allow time for a successor to<br />

be found and for Mr Ruis to familiarise his successor with<br />

<strong>the</strong> duties <strong>of</strong> <strong>the</strong> position.<br />

Mr Ruis jo<strong>in</strong>ed <strong>BAM</strong> <strong>in</strong> 1971 and has held a number <strong>of</strong><br />

different f<strong>in</strong>ancial positions <strong>in</strong> <strong>the</strong> Group. He has been<br />

Chief F<strong>in</strong>ancial Officer and, as such, a member <strong>of</strong> <strong>the</strong><br />

Executive Board s<strong>in</strong>ce 2004. Mr Ruis was reappo<strong>in</strong>ted for<br />

a four-year term as Chief F<strong>in</strong>ancial Officer and member <strong>of</strong><br />

<strong>the</strong> Executive Board <strong>in</strong> 2008.<br />

As stated, <strong>the</strong> reappo<strong>in</strong>tment<br />

<strong>of</strong> Mr Ruis would be for<br />

a maximum one-year period.<br />

The Supervisory Board<br />

believes with regard to <strong>the</strong><br />

proposed reappo<strong>in</strong>tment <strong>of</strong><br />

Mr Van W<strong>in</strong>gerden that he<br />

possesses a great deal <strong>of</strong><br />

knowledge and experience<br />

<strong>of</strong> <strong>the</strong> markets <strong>in</strong> which <strong>the</strong><br />

Group operates. He has<br />

proven to be <strong>of</strong> great value<br />

to <strong>the</strong> company <strong>in</strong> that<br />

regard over <strong>the</strong> last four<br />

years.<br />

Innova Complex - access build<strong>in</strong>g to<br />

Floriade 2012, Venlo. Architect: Jo Coenen.<br />

<strong>BAM</strong> Utiliteitsbouw.<br />

Mr Van W<strong>in</strong>gerden jo<strong>in</strong>ed<br />

Royal <strong>BAM</strong> Group <strong>in</strong> 1988<br />

and has fulfilled a number <strong>of</strong><br />

managerial positions at <strong>the</strong><br />

Group’s operat<strong>in</strong>g<br />

companies. He was<br />

appo<strong>in</strong>ted as a member <strong>of</strong> <strong>the</strong> Executive Board for <strong>the</strong><br />

first time <strong>in</strong> 2008. Mr Van W<strong>in</strong>gerden’s responsibilities<br />

dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial year <strong>in</strong>cluded <strong>the</strong> operat<strong>in</strong>g<br />

companies that are active on <strong>the</strong> Dutch market.<br />

F


Fotobijschrift:<br />

19<br />

<strong>2011</strong>


20<br />

<strong>2011</strong><br />

Mr Van W<strong>in</strong>gerden’s reappo<strong>in</strong>tment would be for a<br />

four-year period.<br />

The Executive Board had four members dur<strong>in</strong>g <strong>the</strong><br />

f<strong>in</strong>ancial year after Mr J.A.P. van Oosten stepped down on<br />

1 April <strong>2011</strong>. The Chairman <strong>of</strong> <strong>the</strong> Executive Board was<br />

Mr N.J. de Vries.<br />

Dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial year <strong>2011</strong>, <strong>the</strong> Supervisory Board<br />

once aga<strong>in</strong> assessed <strong>the</strong> performance <strong>of</strong> <strong>the</strong> Executive<br />

Board and <strong>of</strong> <strong>the</strong> <strong>in</strong>dividual members <strong>of</strong> <strong>the</strong> Executive<br />

Board. The Supervisory Board notes that <strong>the</strong> Executive<br />

Board once aga<strong>in</strong> had to operate <strong>in</strong> difficult economic<br />

circumstances <strong>in</strong> <strong>2011</strong>. The Supervisory Board greatly<br />

appreciates <strong>the</strong> fact that – <strong>in</strong> spite <strong>of</strong> <strong>the</strong> difficult<br />

economic circumstances – almost all parts <strong>of</strong> <strong>the</strong> Group<br />

made a positive contribution to <strong>the</strong> Group’s result.<br />

Consequently, <strong>the</strong> Supervisory Board believes that <strong>the</strong><br />

Executive Board performed its duties well dur<strong>in</strong>g <strong>the</strong> past<br />

f<strong>in</strong>ancial year. This also applies to <strong>the</strong> <strong>in</strong>dividual members<br />

<strong>of</strong> <strong>the</strong> Executive Board.<br />

The retirement schedule for <strong>the</strong> members <strong>of</strong> <strong>the</strong><br />

Executive Board is shown on page 38 <strong>of</strong> <strong>the</strong> <strong>Annual</strong><br />

<strong>Report</strong> and is also published on <strong>the</strong> company’s website.<br />

Members <strong>of</strong> <strong>the</strong> Executive Board are appo<strong>in</strong>ted for a<br />

period <strong>of</strong> four years. They retire at <strong>the</strong> end <strong>of</strong> <strong>the</strong> first<br />

<strong>Annual</strong> General Meet<strong>in</strong>g to be held <strong>in</strong> <strong>the</strong> fourth year<br />

after <strong>the</strong> year <strong>in</strong> which <strong>the</strong>y were appo<strong>in</strong>ted. The<br />

contractual agreements with members <strong>of</strong> <strong>the</strong> Executive<br />

Board who were appo<strong>in</strong>ted before <strong>the</strong> Code came <strong>in</strong>to<br />

effect will be honoured; <strong>the</strong>ir appo<strong>in</strong>tment is for an<br />

<strong>in</strong>def<strong>in</strong>ite period.<br />

The remuneration <strong>of</strong> <strong>the</strong> members <strong>of</strong> <strong>the</strong> Executive<br />

Board is stated on page 00 <strong>of</strong> <strong>the</strong> <strong>Annual</strong> <strong>Report</strong>.<br />

Mr De Vries was a member <strong>of</strong> Van Oord’s Supervisory<br />

Board dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial year, but stepped down once<br />

<strong>BAM</strong> sold its 21.5 percent share <strong>in</strong> Van Oord. The<br />

members <strong>of</strong> <strong>the</strong> Executive Board are not members <strong>of</strong> <strong>the</strong><br />

Supervisory Board <strong>of</strong> any listed companies. The<br />

Supervisory Board has no evidence <strong>of</strong> any conflicts <strong>of</strong><br />

<strong>in</strong>terest between <strong>the</strong> company and members <strong>of</strong> <strong>the</strong><br />

Executive Board.<br />

The Supervisory Board’s activities<br />

The f<strong>in</strong>ancial year <strong>2011</strong> was marked by ongo<strong>in</strong>g difficult<br />

economic circumstances which saw <strong>the</strong> crisis worsen.<br />

The Supervisory Board and <strong>the</strong> Executive Board held<br />

regular jo<strong>in</strong>t meet<strong>in</strong>gs to discuss <strong>the</strong> impact <strong>of</strong> <strong>the</strong> crisis<br />

on <strong>the</strong> Group and how to respond. The Supervisory<br />

Board’s activities dur<strong>in</strong>g <strong>the</strong> past f<strong>in</strong>ancial year were<br />

<strong>the</strong>refore largely determ<strong>in</strong>ed by <strong>the</strong> economic crisis.<br />

A large amount <strong>of</strong> time at jo<strong>in</strong>t meet<strong>in</strong>gs was spent<br />

discuss<strong>in</strong>g <strong>the</strong> Group’s position on <strong>the</strong> property markets<br />

and <strong>the</strong> Dutch residential construction market <strong>in</strong><br />

particular. The Executive Board drew up a number <strong>of</strong><br />

scenarios which were discussed with <strong>the</strong> Supervisory<br />

Board. Once aga<strong>in</strong>, <strong>the</strong>se discussions focussed <strong>in</strong><br />

particular on <strong>the</strong> property activities, especially those<br />

<strong>in</strong>volv<strong>in</strong>g AM.<br />

Given <strong>the</strong> changed economic circumstances, <strong>the</strong><br />

Supervisory Board and <strong>the</strong> Executive Board also felt it<br />

would be advisable to update <strong>the</strong> strategic agenda. The<br />

two Boards discussed <strong>the</strong> updated strategic agenda <strong>in</strong><br />

detail. There was also a considerable amount <strong>of</strong> time<br />

spent discuss<strong>in</strong>g <strong>the</strong> Group’s f<strong>in</strong>anc<strong>in</strong>g structure and how<br />

to streng<strong>the</strong>n <strong>the</strong> balance sheet. Details about all <strong>the</strong>se<br />

subjects are given later <strong>in</strong> this report.<br />

The Supervisory Board held seven meet<strong>in</strong>gs dur<strong>in</strong>g <strong>the</strong><br />

year <strong>in</strong> <strong>the</strong> presence <strong>of</strong> <strong>the</strong> Executive Board. Six <strong>of</strong> those<br />

can be classed as ord<strong>in</strong>ary meet<strong>in</strong>gs. The Supervisory<br />

Board also held a two-day meet<strong>in</strong>g with <strong>the</strong> Executive<br />

Board to discuss <strong>the</strong> updated strategic agenda and a<br />

number <strong>of</strong> o<strong>the</strong>r subjects that are presented <strong>in</strong> detail<br />

later <strong>in</strong> this <strong>Annual</strong> <strong>Report</strong>. All <strong>of</strong> <strong>the</strong>se jo<strong>in</strong>t meet<strong>in</strong>gs<br />

were attended by <strong>the</strong> entire Supervisory Board and <strong>the</strong><br />

entire Executive Board.<br />

The Supervisory Board also met four times without <strong>the</strong><br />

Executive Board be<strong>in</strong>g present.<br />

The new members who jo<strong>in</strong>ed <strong>the</strong> Supervisory Board<br />

dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial year underwent an <strong>in</strong>troductory<br />

course. They met a number <strong>of</strong> <strong>the</strong> Group’s key <strong>of</strong>ficers<br />

and learnt more about <strong>the</strong> various parts <strong>of</strong> <strong>the</strong> Group.<br />

The talks about implementation <strong>of</strong> Group strategy and<br />

<strong>the</strong> strategy update drawn up dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial year<br />

were a good opportunity for <strong>the</strong> new members to learn<br />

more about <strong>the</strong> Group.<br />

Each <strong>of</strong> <strong>the</strong> Supervisory Board’s meet<strong>in</strong>gs featured a<br />

report on what had been discussed <strong>in</strong> meet<strong>in</strong>gs <strong>of</strong> <strong>the</strong><br />

Board’s committees. In addition, <strong>the</strong> Executive Board


eported <strong>in</strong> each case on <strong>the</strong> state <strong>of</strong> affairs, <strong>the</strong> f<strong>in</strong>ancial<br />

situation and market developments for <strong>the</strong> operat<strong>in</strong>g<br />

companies and <strong>the</strong> risks <strong>the</strong>y face, each report be<strong>in</strong>g<br />

based on <strong>the</strong> operational plan for <strong>the</strong> relevant f<strong>in</strong>ancial<br />

year. Matters also discussed <strong>in</strong>cluded <strong>the</strong> <strong>Annual</strong> <strong>Report</strong><br />

and f<strong>in</strong>ancial statements for 2010, <strong>the</strong> quarterly<br />

statements for <strong>2011</strong>, reserve and dividend policy and <strong>the</strong><br />

dividend proposal for 2010, corporate governance, <strong>the</strong><br />

various effects <strong>of</strong> IFRS (International F<strong>in</strong>ancial <strong>Report</strong><strong>in</strong>g<br />

Standards) on <strong>the</strong> Group’s f<strong>in</strong>ancial reports, <strong>the</strong> Group’s<br />

exist<strong>in</strong>g anti-takeover measures, management<br />

development and <strong>the</strong> quality <strong>of</strong> management and <strong>the</strong><br />

most important claims and legal proceed<strong>in</strong>gs <strong>in</strong>volv<strong>in</strong>g<br />

parts <strong>of</strong> <strong>the</strong> Group.<br />

The subjects discussed <strong>in</strong> <strong>the</strong> meet<strong>in</strong>gs without <strong>the</strong><br />

Executive Board present <strong>in</strong>cluded an <strong>in</strong>ternal discussion<br />

about decisions taken by <strong>the</strong> company <strong>in</strong> <strong>the</strong> f<strong>in</strong>ancial<br />

year, as well as <strong>the</strong> performance <strong>of</strong> <strong>the</strong> Executive Board<br />

as a whole and its <strong>in</strong>dividual members. The Supervisory<br />

Board also discussed its own performance (both <strong>the</strong><br />

Board as a whole and <strong>the</strong> <strong>in</strong>dividual members) and <strong>the</strong><br />

performance <strong>of</strong> <strong>the</strong> Board’s separate committees. The<br />

discussion covered <strong>the</strong> Supervisory Board’s composition<br />

and pr<strong>of</strong>ile, <strong>the</strong> decision-mak<strong>in</strong>g process, <strong>the</strong> quality <strong>of</strong><br />

<strong>the</strong> supervision process and <strong>of</strong> <strong>the</strong> supervision itself, <strong>the</strong><br />

Supervisory Board’s relationship with <strong>the</strong> Executive<br />

Board, <strong>the</strong> composition and assessment <strong>of</strong> <strong>the</strong> Executive<br />

Board (<strong>the</strong> entire Board and <strong>the</strong> <strong>in</strong>dividual members) and<br />

<strong>the</strong> remuneration – <strong>in</strong>clud<strong>in</strong>g sett<strong>in</strong>g <strong>the</strong> variable part<br />

<strong>the</strong>re<strong>of</strong> – for <strong>the</strong> members <strong>of</strong> <strong>the</strong> Executive Board.<br />

The performances <strong>of</strong> <strong>the</strong> Supervisory Board and its<br />

<strong>in</strong>dividual members are assessed periodically based on a<br />

survey <strong>of</strong> <strong>the</strong> Supervisory Board members, plus<br />

<strong>in</strong>dividual <strong>in</strong>terviews if necessary. The performances <strong>of</strong><br />

<strong>the</strong> Supervisory Board and its <strong>in</strong>dividual members were<br />

assessed dur<strong>in</strong>g <strong>the</strong> past f<strong>in</strong>ancial year and <strong>the</strong><br />

Supervisory Board discussed <strong>the</strong> f<strong>in</strong>d<strong>in</strong>gs. One <strong>of</strong> <strong>the</strong><br />

ma<strong>in</strong> subjects discussed was how best to divide <strong>the</strong><br />

Supervisory Board’s time across <strong>the</strong> various subjects. The<br />

assessment <strong>of</strong> <strong>the</strong> performance <strong>of</strong> <strong>the</strong> Executive Board<br />

and its <strong>in</strong>dividual members was based on discussions<br />

held between <strong>the</strong> Selection and Appo<strong>in</strong>tments<br />

Committee and each member <strong>of</strong> <strong>the</strong> Executive Board.<br />

The results were discussed by <strong>the</strong> Supervisory Board <strong>in</strong><br />

<strong>the</strong> absence <strong>of</strong> <strong>the</strong> Executive Board.<br />

The two-day meet<strong>in</strong>g held to discuss <strong>the</strong> updated<br />

strategic agenda covered a range <strong>of</strong> subjects, <strong>in</strong>clud<strong>in</strong>g<br />

<strong>the</strong> current portfolio <strong>of</strong> activities and changes that were<br />

needed <strong>in</strong> <strong>the</strong> portfolio, <strong>the</strong> f<strong>in</strong>ancial preconditions<br />

applicable to <strong>the</strong> strategy, planned disposals and<br />

<strong>in</strong>vestments, <strong>the</strong> development <strong>of</strong> <strong>the</strong> organisation,<br />

management development and risk management. The<br />

conclusion from <strong>the</strong> discussion <strong>of</strong> <strong>the</strong> activities portfolio<br />

was that <strong>the</strong> property and PPP sectors are also very<br />

important to <strong>the</strong> Group <strong>in</strong> addition to its core bus<strong>in</strong>ess <strong>of</strong><br />

construction. It was also decided that consultancy and<br />

eng<strong>in</strong>eer<strong>in</strong>g is needed for <strong>the</strong> Group’s core bus<strong>in</strong>ess,<br />

provid<strong>in</strong>g <strong>the</strong> Group’s consultancy and eng<strong>in</strong>eer<strong>in</strong>g<br />

activities are properly embedded and fit <strong>in</strong> with <strong>the</strong><br />

operational companies. The Supervisory Board shares<br />

<strong>the</strong> Executive Board’s op<strong>in</strong>ion that <strong>the</strong>re is no need for a<br />

separate operat<strong>in</strong>g company with<strong>in</strong> <strong>the</strong> Group <strong>in</strong> <strong>the</strong><br />

consultancy and eng<strong>in</strong>eer<strong>in</strong>g sector. The Supervisory<br />

Board <strong>the</strong>refore agreed to <strong>the</strong> sale <strong>of</strong> Tebod<strong>in</strong>.<br />

The aforementioned meet<strong>in</strong>g also spent a long time<br />

discuss<strong>in</strong>g <strong>the</strong> Executive Board’s plans for a fur<strong>the</strong>r<br />

tighten<strong>in</strong>g up <strong>of</strong> risk management with<strong>in</strong> <strong>the</strong> Group.<br />

Fur<strong>the</strong>r details on this subject can be found on page 57 <strong>of</strong><br />

<strong>the</strong> <strong>Annual</strong> <strong>Report</strong>. As part <strong>of</strong> <strong>the</strong> updated strategy, <strong>the</strong><br />

Supervisory Board agreed to <strong>the</strong> growth tracks for <strong>the</strong><br />

Group identified by <strong>the</strong> Executive Board which are<br />

described <strong>in</strong> more detail on page 10 and 11 <strong>of</strong> <strong>the</strong> <strong>Annual</strong><br />

<strong>Report</strong>.<br />

The Supervisory Board approved <strong>the</strong> 2012 Operational<br />

Plan which sets out <strong>the</strong> Group’s f<strong>in</strong>ancial targets, <strong>the</strong><br />

strategy aimed at achiev<strong>in</strong>g those targets and <strong>the</strong><br />

preconditions to be observed <strong>in</strong> connection with that<br />

strategy. The Executive Board gave more details about<br />

<strong>the</strong> sensitivity <strong>of</strong> <strong>the</strong> Operational Plan at <strong>the</strong> request <strong>of</strong><br />

<strong>the</strong> Supervisory Board.<br />

The Supervisory Board and <strong>the</strong> Executive Board had<br />

regular discussions dur<strong>in</strong>g <strong>the</strong> past f<strong>in</strong>ancial year about<br />

<strong>the</strong> Group’s f<strong>in</strong>ancial position and about <strong>the</strong> way <strong>in</strong> which<br />

<strong>the</strong> Group should be f<strong>in</strong>anced. The Supervisory Board<br />

also exchanged views several times with <strong>the</strong> Executive<br />

Board regard<strong>in</strong>g <strong>the</strong> operat<strong>in</strong>g capital, <strong>the</strong> options for<br />

scal<strong>in</strong>g down <strong>the</strong> amount <strong>of</strong> equity <strong>in</strong>vested <strong>in</strong> property,<br />

<strong>the</strong> liquidity level, <strong>the</strong> terms and conditions <strong>of</strong> <strong>the</strong><br />

current f<strong>in</strong>anc<strong>in</strong>g covenants, <strong>the</strong> Group’s solvency level<br />

and <strong>the</strong> Group’s f<strong>in</strong>anc<strong>in</strong>g requirement for <strong>the</strong> longer<br />

term.<br />

The Supervisory Board discussed <strong>the</strong> importance <strong>of</strong><br />

corporate social responsibility (CSR) for <strong>the</strong> Group with<br />

<strong>the</strong> Executive Board and agrees with <strong>the</strong> factors <strong>of</strong> CSR<br />

identified by <strong>the</strong> Executive Board as be<strong>in</strong>g most relevant<br />

for <strong>BAM</strong>. The discussion <strong>in</strong>cluded <strong>the</strong> progress be<strong>in</strong>g<br />

made by <strong>the</strong> Group <strong>in</strong> relation to safety and <strong>the</strong> steps<br />

21<br />

<strong>2011</strong>


22<br />

<strong>2011</strong><br />

proposed to fur<strong>the</strong>r improve safety. The Supervisory<br />

Board was pleased to note that <strong>the</strong> Group is do<strong>in</strong>g a lot <strong>in</strong><br />

terms <strong>of</strong> corporate social responsibility and that it is a<br />

pioneer <strong>in</strong> this regard <strong>in</strong> <strong>the</strong> construction sector. The<br />

Board highlighted <strong>the</strong> challenge fac<strong>in</strong>g <strong>the</strong> Group as to<br />

how to <strong>in</strong>clude <strong>the</strong> o<strong>the</strong>r participants <strong>in</strong> <strong>the</strong> construction<br />

supply cha<strong>in</strong> <strong>in</strong> <strong>the</strong>se developments.<br />

The Supervisory Board f<strong>in</strong>alised <strong>the</strong> remuneration report<br />

compiled by <strong>the</strong> Remuneration Committee. The<br />

remuneration report is <strong>in</strong>cluded on page 28 as part <strong>of</strong> <strong>the</strong><br />

report by <strong>the</strong> Supervisory Board. Early <strong>in</strong> <strong>the</strong> past<br />

f<strong>in</strong>ancial year, <strong>the</strong> Supervisory Board agreed to a new<br />

long-term benefit plan drawn up by <strong>the</strong> Remuneration<br />

Committee. The Supervisory Board believes <strong>the</strong><br />

remuneration package for Executive Board members<br />

should <strong>in</strong>clude long-term rewards for improvements <strong>in</strong><br />

addition to <strong>the</strong> fixed salary and <strong>the</strong> annual variable<br />

remuneration. A long-term benefit plan has been chosen<br />

that rewards <strong>the</strong> Executive Board members for positive<br />

development <strong>of</strong> <strong>the</strong> <strong>BAM</strong> share price compared to<br />

alternative <strong>in</strong>vestments by shareholders <strong>in</strong> comparable<br />

enterprises.<br />

The long-term benefit plan adopted by <strong>the</strong> General<br />

Meet<strong>in</strong>g on 20 April <strong>2011</strong> is presented <strong>in</strong> detail on<br />

page 29 <strong>of</strong> <strong>the</strong> <strong>Annual</strong> <strong>Report</strong>.<br />

The Board has satisfied itself that <strong>the</strong> Group has <strong>in</strong>ternal<br />

risk management and <strong>in</strong>ternal control systems, f<strong>in</strong>ancial<br />

report<strong>in</strong>g manuals and procedures for draw<strong>in</strong>g up such<br />

reports, as well as an established monitor<strong>in</strong>g and<br />

report<strong>in</strong>g system. While exam<strong>in</strong><strong>in</strong>g <strong>the</strong>se arrangements,<br />

<strong>the</strong> Supervisory Board discussed <strong>the</strong> powers and proxies<br />

available <strong>in</strong> <strong>the</strong> Group with <strong>the</strong> Executive Board. The<br />

Supervisory Board determ<strong>in</strong>ed that <strong>the</strong> Group has clear<br />

rules regard<strong>in</strong>g authorisations that apply <strong>in</strong> <strong>the</strong> Group.<br />

Act<strong>in</strong>g on advice given by <strong>the</strong> Audit Committee, <strong>the</strong><br />

Supervisory Board placed a cap on <strong>in</strong>vestments <strong>in</strong><br />

property and PPP <strong>in</strong> consultation with <strong>the</strong> Executive<br />

Board.<br />

As usual, <strong>the</strong> Supervisory Board’s quarterly meet<strong>in</strong>gs<br />

<strong>in</strong>cluded a discussion <strong>of</strong> <strong>the</strong> course <strong>of</strong> bus<strong>in</strong>ess and<br />

prospects for <strong>the</strong> Group as a whole and <strong>the</strong> respective<br />

sectors and <strong>the</strong> <strong>in</strong>dividual operat<strong>in</strong>g companies on <strong>the</strong><br />

basis <strong>of</strong> written reports and accompany<strong>in</strong>g<br />

presentations. These discussions covered <strong>the</strong> ma<strong>in</strong> risks<br />

<strong>in</strong>volved <strong>in</strong> <strong>the</strong> bus<strong>in</strong>ess, <strong>the</strong> <strong>in</strong>ternal management and<br />

control systems and <strong>the</strong> results from <strong>the</strong> Executive<br />

Board’s assessment <strong>of</strong> <strong>the</strong>se systems. The implications <strong>of</strong><br />

<strong>the</strong> matters addressed <strong>in</strong> <strong>the</strong>se contexts at <strong>the</strong> meet<strong>in</strong>gs<br />

<strong>of</strong> <strong>the</strong> Supervisory Board are discussed elsewhere <strong>in</strong> <strong>the</strong><br />

<strong>Annual</strong> <strong>Report</strong>, <strong>in</strong>clud<strong>in</strong>g on page 29 et seq.<br />

The discussion <strong>of</strong> <strong>the</strong> ma<strong>in</strong> risks attached to <strong>the</strong> bus<strong>in</strong>ess<br />

<strong>in</strong>cluded <strong>the</strong> presence <strong>of</strong> <strong>BAM</strong> International <strong>in</strong> high-risk<br />

areas. In that regard, <strong>the</strong> Supervisory Board would like to<br />

compliment <strong>the</strong> employees who were directly <strong>in</strong>volved<br />

on <strong>the</strong> rapid evacuation <strong>of</strong> <strong>BAM</strong> personnel from Libya.<br />

Dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial year, <strong>the</strong> Supervisory Board aga<strong>in</strong><br />

arranged to be regularly updated by both <strong>the</strong> Executive<br />

Board and <strong>the</strong> external auditor on <strong>the</strong> general course <strong>of</strong><br />

bus<strong>in</strong>ess at <strong>the</strong> operat<strong>in</strong>g companies. These updates also<br />

focussed on <strong>the</strong> developments on <strong>the</strong> Group’s markets.<br />

The Supervisory Board gave its approval for <strong>the</strong><br />

collaboration between <strong>BAM</strong> PPP and PGGM which will<br />

contribute to <strong>the</strong> fur<strong>the</strong>r growth <strong>of</strong> <strong>the</strong> Group’s PPP<br />

activities. This collaboration will also allow <strong>BAM</strong> to<br />

release equity <strong>in</strong> operational PPP projects, <strong>the</strong>refore<br />

ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g <strong>BAM</strong>’s connection to <strong>the</strong>se projects as a<br />

long-term partner.<br />

Dur<strong>in</strong>g <strong>the</strong> annual visit to a number <strong>of</strong> <strong>the</strong> Group’s<br />

operat<strong>in</strong>g companies over several days <strong>in</strong> September<br />

<strong>2011</strong>, <strong>the</strong> Supervisory Board and <strong>the</strong> Executive Board<br />

exchanged views with <strong>the</strong> directors <strong>of</strong> <strong>the</strong> Dutch<br />

operat<strong>in</strong>g companies. The directors gave a brief<br />

presentation on <strong>the</strong>ir companies, <strong>the</strong>ir markets and <strong>the</strong><br />

challenges <strong>the</strong>y currently face. The Supervisory Board<br />

believes that <strong>the</strong> Dutch operat<strong>in</strong>g companies are well<br />

positioned to handle <strong>the</strong> economic crisis.<br />

The Supervisory Board held talks on various occasions<br />

with <strong>the</strong> Executive Board about <strong>the</strong> proposed sale <strong>of</strong> <strong>the</strong><br />

21.5 percent <strong>in</strong>terest held by <strong>BAM</strong> <strong>in</strong> <strong>the</strong> dredg<strong>in</strong>g<br />

company Van Oord. The Supervisory Board ultimately<br />

approved <strong>the</strong> sale <strong>of</strong> that <strong>in</strong>terest. The Supervisory Board<br />

shares <strong>the</strong> Executive Board’s great pleasure that this<br />

transaction was completed because it is <strong>in</strong> l<strong>in</strong>e with <strong>the</strong><br />

Group’s efforts to sharpen <strong>the</strong> focus on core bus<strong>in</strong>ess and<br />

streng<strong>the</strong>n <strong>the</strong> f<strong>in</strong>ancial position.<br />

The Supervisory Board took cognisance <strong>of</strong> <strong>the</strong> reports by<br />

<strong>the</strong> external auditor and <strong>the</strong> 2010 management letter<br />

and discussed <strong>the</strong>se documents with <strong>the</strong> external auditor<br />

and <strong>the</strong> Executive Board. The Supervisory Board also<br />

discussed <strong>the</strong> follow-up to <strong>the</strong> external auditor’s f<strong>in</strong>d<strong>in</strong>gs<br />

with <strong>the</strong> Executive Board. Fur<strong>the</strong>rmore, <strong>the</strong> Supervisory<br />

Board assessed <strong>the</strong> relationship with <strong>the</strong> external auditor<br />

and prepared <strong>the</strong> proposal to <strong>the</strong> General Meet<strong>in</strong>g to<br />

charge PricewaterhouseCoopers with <strong>the</strong> audit <strong>of</strong> <strong>the</strong><br />

f<strong>in</strong>ancial statements for <strong>the</strong> f<strong>in</strong>ancial year <strong>2011</strong>.


Multipurpose complex for care<br />

and support for <strong>the</strong> homeless<br />

provided by <strong>the</strong> Kessler<br />

Foundation, The Hague.<br />

Architect: Soeters Van Eldonk<br />

Architecten.<br />

<strong>BAM</strong> Won<strong>in</strong>gbouw.<br />

The Supervisory Board took note <strong>of</strong> <strong>the</strong> annual<br />

assessment by <strong>the</strong> Audit Committee about <strong>the</strong> lack <strong>of</strong> an<br />

<strong>in</strong>-house audit position with<strong>in</strong> <strong>the</strong> Group. Bear<strong>in</strong>g <strong>in</strong><br />

m<strong>in</strong>d, for example, <strong>the</strong> project-oriented nature <strong>of</strong> a<br />

build<strong>in</strong>g company’s activities, and <strong>the</strong> large number <strong>of</strong><br />

projects be<strong>in</strong>g undertaken both at home and abroad by<br />

divisions <strong>of</strong> <strong>the</strong> Group, it was decided to have <strong>the</strong> audit<br />

process carried out by an external auditor <strong>in</strong> conjunction<br />

with <strong>the</strong> employees from <strong>the</strong> central f<strong>in</strong>ance division and<br />

<strong>the</strong> controllers at <strong>the</strong> operat<strong>in</strong>g companies. This<br />

arrangement – which is governed by clear agreements –<br />

once aga<strong>in</strong> proved satisfactory <strong>in</strong> <strong>2011</strong>. Tak<strong>in</strong>g<br />

everyth<strong>in</strong>g <strong>in</strong>to consideration, <strong>the</strong> Supervisory Board<br />

advised <strong>the</strong> Executive Board to cont<strong>in</strong>ue with <strong>the</strong> current<br />

method <strong>of</strong> conduct<strong>in</strong>g <strong>the</strong> audit process. The<br />

Supervisory Board noted <strong>the</strong> approach taken by <strong>the</strong><br />

Executive Board to mak<strong>in</strong>g fur<strong>the</strong>r improvements <strong>in</strong> risk<br />

management with<strong>in</strong> <strong>the</strong> Group. For example, a risk<br />

management position has been created at Group level to<br />

complement and facilitate <strong>the</strong> activities <strong>of</strong> <strong>the</strong> operat<strong>in</strong>g<br />

companies. A uniform method for assess<strong>in</strong>g risk and <strong>the</strong><br />

potential for improv<strong>in</strong>g <strong>the</strong> risk level has also been<br />

<strong>in</strong>troduced. The whole Group is focussed on improv<strong>in</strong>g<br />

risk management <strong>in</strong> <strong>the</strong> primary process as<br />

regards <strong>the</strong> procedures and <strong>the</strong><br />

development <strong>of</strong> best practices, and also as<br />

regards <strong>the</strong> employees’ competences and<br />

skills.<br />

The Supervisory Board gave its approval for<br />

<strong>the</strong> withdrawal <strong>of</strong> all issued non-convertible<br />

cumulative preference Class F shares to<br />

simplify <strong>the</strong> company’s capital structure. For<br />

<strong>the</strong> same reason, <strong>the</strong> Supervisory Board also<br />

approved <strong>the</strong> conversion <strong>of</strong> all outstand<strong>in</strong>g<br />

convertible cumulative preference Class F<br />

shares <strong>in</strong>to ord<strong>in</strong>ary shares.<br />

The Supervisory Board takes cognisance <strong>of</strong><br />

an overview <strong>of</strong> <strong>the</strong> Group’s <strong>in</strong>vestor relations<br />

activities on a regular basis. As regards contacts with<br />

shareholders, <strong>the</strong> Supervisory Board believes that<br />

contact should primarily take place <strong>in</strong> shareholders’<br />

meet<strong>in</strong>gs. The Board believes that a high level <strong>of</strong><br />

shareholder attendance at those meet<strong>in</strong>gs is extremely<br />

important. The Board also feels, however, that contact<br />

between <strong>the</strong> company and shareholders outside <strong>of</strong><br />

shareholders’ meet<strong>in</strong>gs can be important – for both <strong>the</strong><br />

company and <strong>the</strong> shareholders. The Supervisory Board<br />

will ensure that <strong>the</strong> company accepts shareholders’<br />

requests for talks <strong>in</strong> those cases where talks are<br />

considered important. The company itself can also take<br />

23<br />

<strong>2011</strong>


24<br />

<strong>2011</strong><br />

<strong>the</strong> <strong>in</strong>itiative and request talks with a shareholder. The<br />

company has a general policy on bilateral contacts with<br />

shareholders, <strong>in</strong>vestors, analysts and <strong>the</strong> press.<br />

The <strong>Annual</strong> General Meet<strong>in</strong>g was prepared and <strong>the</strong> events<br />

at <strong>the</strong> meet<strong>in</strong>g were discussed after <strong>the</strong> meet<strong>in</strong>g had<br />

taken place. The Supervisory Board was very pleased that<br />

<strong>the</strong> General Meet<strong>in</strong>g went well and that a thorough,<br />

substantive discussion with <strong>the</strong> shareholders had taken<br />

place. The Supervisory Board approved <strong>the</strong> use <strong>of</strong><br />

electronic communication media for <strong>the</strong> General<br />

Meet<strong>in</strong>g.<br />

Delegations from <strong>the</strong> Supervisory Board, consist<strong>in</strong>g <strong>of</strong><br />

different members on each occasion, aga<strong>in</strong> took part <strong>in</strong><br />

two consultation meet<strong>in</strong>gs with <strong>the</strong> Central Works<br />

Council. The usual <strong>in</strong>formal annual meet<strong>in</strong>g <strong>of</strong> <strong>the</strong><br />

Supervisory Board and <strong>the</strong> Executive Board with <strong>the</strong><br />

Central Works Council was held <strong>in</strong> May <strong>2011</strong>.<br />

The Supervisory Board’s rules and<br />

committees<br />

The Supervisory Board has a set <strong>of</strong> rules, govern<strong>in</strong>g <strong>the</strong><br />

composition, duties and procedures <strong>of</strong> <strong>the</strong> Board and its<br />

deal<strong>in</strong>gs with <strong>the</strong> Executive Board, <strong>the</strong> General Meet<strong>in</strong>g<br />

and <strong>the</strong> Central Works Council. The rules <strong>of</strong> <strong>the</strong><br />

Supervisory Board and those <strong>of</strong> <strong>the</strong> Supervisory Board<br />

committees mentioned below, as well as <strong>the</strong> composition<br />

<strong>of</strong> those committees, can be found on <strong>the</strong> company’s<br />

website.<br />

The Supervisory Board has three permanent committees,<br />

namely an Audit Committee, a Remuneration Committee<br />

and a Selection and Appo<strong>in</strong>tments Committee. It is <strong>the</strong><br />

task <strong>of</strong> <strong>the</strong>se committees to support and advise <strong>the</strong><br />

Supervisory Board concern<strong>in</strong>g <strong>the</strong> activities that are <strong>the</strong><br />

committees’ responsibility and to prepare <strong>the</strong><br />

Supervisory Board’s decisions regard<strong>in</strong>g those activities.<br />

The Supervisory Board as a whole rema<strong>in</strong>s responsible for<br />

<strong>the</strong> way <strong>in</strong> which it performs its tasks and for <strong>the</strong><br />

preparatory work carried out by <strong>the</strong> committees.<br />

The committees submitted reports on all <strong>the</strong>ir meet<strong>in</strong>gs<br />

to <strong>the</strong> Supervisory Board.<br />

In <strong>the</strong> past f<strong>in</strong>ancial year <strong>the</strong> Audit Committee consisted<br />

<strong>of</strong> Messrs Dekker, Scheffers and Van Vonno (<strong>the</strong> latter<br />

until <strong>the</strong> end <strong>of</strong> <strong>the</strong> General Meet<strong>in</strong>g on 20 April <strong>2011</strong>) and<br />

Mr Wester (follow<strong>in</strong>g <strong>the</strong> General Meet<strong>in</strong>g <strong>of</strong> 20 April<br />

<strong>2011</strong>). with Mr Dekker as <strong>the</strong> Chairman.<br />

The composition <strong>of</strong> <strong>the</strong> Audit Committee is <strong>in</strong> l<strong>in</strong>e with<br />

<strong>the</strong> provisions <strong>of</strong> <strong>the</strong> Code. The Audit Committee<br />

supports <strong>the</strong> Supervisory Board <strong>in</strong> <strong>the</strong> performance <strong>of</strong> its<br />

tasks, especially as regards f<strong>in</strong>ancial and account<strong>in</strong>g<br />

matters, and it drafts proposed decisions <strong>of</strong> <strong>the</strong><br />

Supervisory Board <strong>in</strong> respect <strong>of</strong> matters covered by its<br />

remit.<br />

The Committee met four times dur<strong>in</strong>g <strong>the</strong> past f<strong>in</strong>ancial<br />

year <strong>in</strong> <strong>the</strong> presence (at least for part <strong>of</strong> <strong>the</strong> meet<strong>in</strong>g) <strong>of</strong><br />

<strong>the</strong> external auditor. The Chairman and <strong>the</strong> Chief F<strong>in</strong>ancial<br />

Officer from <strong>the</strong> Executive Board also attended <strong>the</strong> Audit<br />

Committee’s meet<strong>in</strong>gs by <strong>in</strong>vitation.<br />

The pr<strong>in</strong>cipal topics addressed at <strong>the</strong>se meet<strong>in</strong>gs were <strong>the</strong><br />

f<strong>in</strong>ancial report<strong>in</strong>g on <strong>the</strong> 2010 annual figures; <strong>the</strong> <strong>2011</strong><br />

quarterly and half-yearly figures; <strong>the</strong> 2010 management<br />

letter; <strong>the</strong> follow-up to <strong>the</strong> external auditor’s<br />

recommendations; <strong>the</strong> risks and risk management and<br />

control systems, <strong>in</strong>clud<strong>in</strong>g those concern<strong>in</strong>g project<br />

development; <strong>the</strong> dividend policy and <strong>the</strong> Group’s tax<br />

plann<strong>in</strong>g. The follow<strong>in</strong>g topics were also addressed: <strong>the</strong><br />

activities and fee <strong>of</strong> and <strong>the</strong> relationship with <strong>the</strong> external<br />

auditor; <strong>the</strong> audit plan for <strong>2011</strong>; <strong>the</strong> 2012 operational plan;<br />

<strong>the</strong> Group’s fund<strong>in</strong>g and solvency; <strong>the</strong> ratios <strong>in</strong> <strong>the</strong><br />

fund<strong>in</strong>g agreements; bank<strong>in</strong>g relationships; <strong>the</strong><br />

movement <strong>of</strong> <strong>the</strong> operat<strong>in</strong>g capital and liquidity level; <strong>the</strong><br />

losses with<strong>in</strong> <strong>the</strong> Group that can be <strong>of</strong>fset aga<strong>in</strong>st tax; <strong>the</strong><br />

f<strong>in</strong>ancial and adm<strong>in</strong>istrative organisation; and some<br />

effects <strong>of</strong> IFRS on f<strong>in</strong>ancial report<strong>in</strong>g. The Audit<br />

Committee also held discussions with <strong>the</strong> Executive Board<br />

on several occasions about <strong>the</strong> ref<strong>in</strong>anc<strong>in</strong>g <strong>of</strong> <strong>the</strong> Group.<br />

The Audit Committee exchanged views with <strong>the</strong><br />

Executive Board about <strong>the</strong> Group’s ICT policy, based<br />

partly on a presentation on <strong>the</strong> subject.<br />

The Audit Committee carried out <strong>the</strong> preparatory work<br />

for <strong>the</strong> withdrawal and conversion <strong>of</strong> <strong>the</strong> cumulative<br />

preference Class F shares.<br />

Particular attention was paid once aga<strong>in</strong> <strong>in</strong> <strong>the</strong> f<strong>in</strong>ancial<br />

year <strong>2011</strong> to <strong>the</strong> consequences <strong>of</strong> <strong>the</strong> economic crisis for<br />

<strong>the</strong> Group, which <strong>in</strong>cluded discussions with <strong>the</strong> Executive<br />

Board about opportunities to reduce <strong>the</strong> amount <strong>of</strong><br />

equity <strong>in</strong>vested <strong>in</strong> property development projects. In<br />

consultation with <strong>the</strong> Executive Board, <strong>the</strong> Audit<br />

Committee also submitted proposals to <strong>the</strong> Supervisory<br />

Board for capp<strong>in</strong>g <strong>in</strong>vestments <strong>in</strong> property and PPP.<br />

The audit committee met with <strong>the</strong> external auditor on<br />

one occasion without <strong>the</strong> Executive Board be<strong>in</strong>g present


and reported to <strong>the</strong> Supervisory Board on <strong>the</strong><br />

relationship with <strong>the</strong> external auditor. The Audit<br />

Committee was <strong>in</strong>volved <strong>in</strong> <strong>the</strong> periodic process <strong>of</strong><br />

chang<strong>in</strong>g <strong>the</strong> partner at <strong>the</strong> external auditor’s firm who is<br />

responsible for audit<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial statements. The<br />

Audit Committee feels that <strong>the</strong> relationship with <strong>the</strong><br />

external auditor is a good one. The Audit Committee also<br />

spoke to <strong>the</strong> Executive Board about <strong>the</strong> advantages and<br />

disadvantages <strong>of</strong> hav<strong>in</strong>g an <strong>in</strong>-house audit department.<br />

The Audit Committee proposed to <strong>the</strong> Supervisory Board<br />

that it should not recommend an <strong>in</strong>ternal audit<br />

department to <strong>the</strong> Executive Board at this time for <strong>the</strong><br />

reasons given earlier <strong>in</strong> this report. One <strong>of</strong> <strong>the</strong><br />

considerations was that <strong>the</strong> Executive Board wishes to<br />

tighten up <strong>the</strong> Group’s risk management, as expla<strong>in</strong>ed<br />

earlier <strong>in</strong> this <strong>Annual</strong> <strong>Report</strong>.<br />

The Remuneration Committee consisted <strong>of</strong> Messrs Baar<br />

and Wiechers until 17 November <strong>2011</strong>, with Mr Baar as<br />

<strong>the</strong> Chair; from 17 November <strong>2011</strong> onwards, <strong>the</strong><br />

Remuneration Committee consisted <strong>of</strong> Ms Mahieu and<br />

Mr Elverd<strong>in</strong>g, with Ms Mahieu as <strong>the</strong> Chair. The<br />

composition <strong>of</strong> <strong>the</strong> Remuneration Committee is <strong>in</strong> l<strong>in</strong>e<br />

with <strong>the</strong> Code.<br />

One <strong>of</strong> <strong>the</strong> tasks <strong>of</strong> <strong>the</strong> Remuneration Committee is to<br />

make proposals to <strong>the</strong> Supervisory Board with regard to<br />

company remuneration policy, <strong>the</strong> level <strong>of</strong> remuneration<br />

and <strong>the</strong> terms <strong>of</strong> employment <strong>of</strong> members <strong>of</strong> <strong>the</strong><br />

Executive Board and <strong>the</strong> remuneration <strong>of</strong> <strong>the</strong> members <strong>of</strong><br />

<strong>the</strong> Supervisory Board. The Committee also consults <strong>the</strong><br />

Chairman <strong>of</strong> <strong>the</strong> Executive Board about <strong>the</strong> policy on<br />

terms and conditions <strong>of</strong> employment for operat<strong>in</strong>g<br />

company directors and executives <strong>of</strong> equivalent rank. In<br />

addition, <strong>the</strong> Remuneration Committee proposes a<br />

remuneration report on <strong>the</strong> way <strong>in</strong> which remuneration<br />

policy has been implemented <strong>in</strong> practice. The<br />

Remuneration Committee met several times dur<strong>in</strong>g <strong>the</strong><br />

past f<strong>in</strong>ancial year. The Chairman <strong>of</strong> <strong>the</strong> Executive Board<br />

was present at <strong>the</strong>se meet<strong>in</strong>gs. The Committee members<br />

consulted with each o<strong>the</strong>r a number <strong>of</strong> times outside <strong>of</strong><br />

<strong>the</strong> context <strong>of</strong> a formal meet<strong>in</strong>g. The Committee<br />

submitted a proposal to <strong>the</strong> Supervisory Board relat<strong>in</strong>g to<br />

<strong>the</strong> remuneration <strong>of</strong> members <strong>of</strong> <strong>the</strong> Executive Board and<br />

to criteria for <strong>the</strong> variable remuneration <strong>in</strong> 2012. The<br />

Remuneration Committee also discussed <strong>the</strong> conditions<br />

perta<strong>in</strong><strong>in</strong>g to <strong>the</strong> remuneration <strong>of</strong> <strong>the</strong> management<br />

teams at <strong>the</strong> operat<strong>in</strong>g companies and <strong>the</strong> staff directors.<br />

The Committee held <strong>in</strong>dividual performance evaluation<br />

<strong>in</strong>terviews with <strong>the</strong> members <strong>of</strong> <strong>the</strong> Executive Board as<br />

part <strong>of</strong> <strong>the</strong> assessment <strong>of</strong> <strong>the</strong> Executive Board.<br />

The Remuneration Committee also prepared <strong>the</strong> new<br />

long-term benefit plan and <strong>the</strong> remuneration report. The<br />

Remuneration Committee used <strong>the</strong> services <strong>of</strong> an<br />

external <strong>in</strong>dependent remuneration adviser dur<strong>in</strong>g <strong>the</strong><br />

f<strong>in</strong>ancial year.<br />

The Selection and Appo<strong>in</strong>tments Committee consisted<br />

<strong>of</strong> Messrs Baar and Wiechers until 17 November <strong>2011</strong>,<br />

with Mr Wiechers as <strong>the</strong> Chairman; from 17 November<br />

<strong>2011</strong> onwards, <strong>the</strong> Committee consisted <strong>of</strong> Messrs<br />

Elverd<strong>in</strong>g and Scheffers, with Mr Elverd<strong>in</strong>g as <strong>the</strong><br />

Chairman. One <strong>of</strong> <strong>the</strong> tasks <strong>of</strong> <strong>the</strong> Selection and<br />

Appo<strong>in</strong>tments Committee is to make proposals to <strong>the</strong><br />

Supervisory Board regard<strong>in</strong>g selection criteria and<br />

appo<strong>in</strong>tment procedures, <strong>the</strong> size, composition,<br />

appo<strong>in</strong>tments and reappo<strong>in</strong>tments to and assessment <strong>of</strong><br />

<strong>the</strong> performance <strong>of</strong> <strong>the</strong> Supervisory Board and <strong>the</strong><br />

Executive Board. The Committee also monitors <strong>the</strong><br />

Executive Board’s policy on selection criteria and<br />

appo<strong>in</strong>tment procedures for senior management.<br />

The Selection and Appo<strong>in</strong>tments Committee met several<br />

times <strong>in</strong> <strong>the</strong> past f<strong>in</strong>ancial year. The Committee members<br />

also consulted with each o<strong>the</strong>r a number <strong>of</strong> times outside<br />

<strong>of</strong> <strong>the</strong> context <strong>of</strong> a formal meet<strong>in</strong>g. On those occasions,<br />

<strong>the</strong> members discussed <strong>the</strong> current and future size and<br />

composition <strong>of</strong> <strong>the</strong> Supervisory Board and <strong>the</strong> Executive<br />

Board.<br />

The Committee prepared <strong>the</strong> proposal for <strong>the</strong><br />

appo<strong>in</strong>tment <strong>of</strong> Mr Noy as a member <strong>of</strong> <strong>the</strong> Supervisory<br />

Board and <strong>the</strong> proposal for <strong>the</strong> reappo<strong>in</strong>tment <strong>of</strong> Messrs<br />

Ruis and Van W<strong>in</strong>gerden.<br />

25<br />

<strong>2011</strong>


26<br />

<strong>2011</strong><br />

Corporate governance<br />

The company’s corporate governance structure and its<br />

compliance with that structure were discussed with <strong>the</strong><br />

shareholders at <strong>the</strong> General Meet<strong>in</strong>g on 21 April 2009.<br />

The Supervisory Board and <strong>the</strong> Executive Board reviewed<br />

<strong>the</strong> corporate governance structure dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial<br />

year and decided that <strong>the</strong>re is no reason to change it. The<br />

Supervisory Board and <strong>the</strong> Executive Board are<br />

conv<strong>in</strong>ced that Royal <strong>BAM</strong> Group’s corporate governance<br />

rema<strong>in</strong>s well organised. Please refer to <strong>the</strong> corporate<br />

governance statement on page 00 <strong>of</strong> <strong>the</strong> <strong>Annual</strong> <strong>Report</strong><br />

concern<strong>in</strong>g <strong>the</strong> company’s compliance with <strong>the</strong> Code.<br />

External auditor<br />

Both <strong>in</strong> its discussion <strong>of</strong> <strong>the</strong> 2010 annual figures and its<br />

discussion <strong>of</strong> <strong>the</strong> <strong>2011</strong> semi-annual figures, <strong>the</strong><br />

Supervisory Board – as usual – called on <strong>the</strong> external<br />

auditor to provide additional <strong>in</strong>formation. The Board<br />

noted that <strong>the</strong> external auditor had received <strong>the</strong> f<strong>in</strong>ancial<br />

<strong>in</strong>formation on which <strong>the</strong> quarterly figures, <strong>the</strong><br />

semi-annual figures, <strong>the</strong> annual figures and <strong>the</strong> o<strong>the</strong>r<br />

<strong>in</strong>terim f<strong>in</strong>ancial reports were based and that he had<br />

been given <strong>the</strong> opportunity to respond to that<br />

<strong>in</strong>formation. The external auditor was present at <strong>the</strong><br />

<strong>Annual</strong> General Meet<strong>in</strong>g <strong>of</strong> Shareholders on 20 April<br />

<strong>2011</strong>. As part <strong>of</strong> its consideration <strong>of</strong> <strong>the</strong> <strong>2011</strong> <strong>Annual</strong><br />

<strong>Report</strong> and f<strong>in</strong>ancial statements, <strong>the</strong> Supervisory Board<br />

assessed <strong>the</strong> relationship with <strong>the</strong> external auditor based<br />

on a report from <strong>the</strong> Executive Board and <strong>the</strong> Audit<br />

Committee. Given <strong>the</strong> Board’s good experience with <strong>the</strong><br />

external auditor and <strong>the</strong> external auditor’s expertise with<br />

regard to <strong>the</strong> construction <strong>in</strong>dustry <strong>in</strong> general and <strong>the</strong><br />

Group <strong>in</strong> particular, <strong>the</strong> Supervisory Board sees no reason<br />

to propose to <strong>the</strong> shareholders that <strong>the</strong> external auditor<br />

be changed. The past f<strong>in</strong>ancial year saw <strong>the</strong> periodic<br />

change <strong>of</strong> <strong>the</strong> partner at <strong>the</strong> external auditor’s firm who<br />

is responsible for <strong>the</strong> audit <strong>of</strong> <strong>the</strong> f<strong>in</strong>ancial statements. A<br />

proposal will <strong>the</strong>refore be put to <strong>the</strong> General Meet<strong>in</strong>g on<br />

25 April 2012 that PricewaterhouseCoopers Accountants<br />

N.V. be re-appo<strong>in</strong>ted as external auditor responsible for<br />

audit<strong>in</strong>g <strong>the</strong> Group’s 2012 f<strong>in</strong>ancial statements.<br />

F<strong>in</strong>al comments<br />

The Supervisory Board wishes to po<strong>in</strong>t out that <strong>the</strong><br />

construction <strong>in</strong>dustry <strong>in</strong> <strong>the</strong> Group’s home markets<br />

cont<strong>in</strong>ued to feel <strong>the</strong> consequences <strong>of</strong> <strong>the</strong> economic<br />

crisis <strong>in</strong> <strong>2011</strong>. Royal <strong>BAM</strong> Group was also faced with<br />

difficult economic circumstances <strong>in</strong> <strong>2011</strong>. The<br />

construction sector <strong>in</strong> <strong>the</strong> Group’s home markets will<br />

experience difficult market conditions <strong>in</strong> 2012 as well.<br />

The Supervisory Board <strong>the</strong>refore believes that attention<br />

and energy must be applied to handl<strong>in</strong>g <strong>the</strong> economic<br />

crisis as well as possible. The fact that almost all parts <strong>of</strong><br />

<strong>the</strong> Group made a positive contribution to <strong>the</strong> result <strong>in</strong><br />

<strong>2011</strong> gives us confidence <strong>in</strong> <strong>the</strong> future. Under difficult<br />

market conditions, <strong>the</strong> management and employees<br />

once aga<strong>in</strong> showed great commitment to <strong>the</strong> Group <strong>in</strong><br />

<strong>the</strong> past year. The Supervisory Board greatly appreciates<br />

all <strong>the</strong>ir efforts.<br />

Bunnik, <strong>the</strong> Ne<strong>the</strong>rlands, 7 March 2012<br />

Supervisory Board<br />

Vopak oil products storage term<strong>in</strong>al,<br />

Amsterdam. <strong>BAM</strong> Leid<strong>in</strong>gen & Industrie<br />

(<strong>BAM</strong> Infratechniek), <strong>BAM</strong> Civiel,<br />

<strong>BAM</strong> Wegen, <strong>BAM</strong> Techniek.


27<br />

<strong>2011</strong>


28<br />

<strong>2011</strong><br />

Gross salary<br />

Variable<br />

remuneration 3<br />

Pension<br />

premiums 4<br />

O<strong>the</strong>r<br />

benefits 5<br />

<strong>2011</strong> 2010 <strong>2011</strong> 2010 <strong>2011</strong> 2010 <strong>2011</strong> 2010<br />

N.J. de Vries 610 554 2 336 89 108 93 8,6 8,6<br />

M.J. Rogers 483 1 420 1 231 1 67 97 82 1,0 1,0<br />

J. Ruis 460 460 253 74 108 82 8,6 8,6<br />

R.P. van W<strong>in</strong>gerden 460 460 253 74 45 44 8,6 8,6<br />

1 Amount <strong>in</strong> pound sterl<strong>in</strong>g.<br />

Remuneration report<br />

The follow<strong>in</strong>g remuneration report from <strong>the</strong> Supervisory<br />

Board describes how <strong>the</strong> remuneration policy has been<br />

put <strong>in</strong>to practice dur<strong>in</strong>g <strong>the</strong> past f<strong>in</strong>ancial year. The<br />

report <strong>in</strong>cludes summaries <strong>of</strong> <strong>in</strong>formation concern<strong>in</strong>g<br />

remuneration received <strong>in</strong> <strong>2011</strong> and also conta<strong>in</strong>s a<br />

summary <strong>of</strong> <strong>the</strong> remuneration policy provided by <strong>the</strong><br />

Supervisory Board for <strong>the</strong> com<strong>in</strong>g f<strong>in</strong>ancial year and<br />

subsequent years.<br />

Remuneration<br />

The Remuneration Committee is a permanent<br />

committee <strong>of</strong> <strong>the</strong> Supervisory Board consist<strong>in</strong>g <strong>of</strong> at least<br />

two members <strong>of</strong> <strong>the</strong> Supervisory Board. The<br />

Remuneration Committee is subject to rules established<br />

by <strong>the</strong> Supervisory Board. The Committee consisted <strong>of</strong><br />

Messrs Baar (Chair) and Wiechers until 17 November<br />

<strong>2011</strong> when <strong>the</strong>y were succeeded by Ms Mahieu (Chair)<br />

and Mr Elverd<strong>in</strong>g. The Remuneration Committee met<br />

several times dur<strong>in</strong>g <strong>the</strong> past f<strong>in</strong>ancial year.<br />

The Remuneration Committee used <strong>the</strong> services <strong>of</strong> an<br />

external <strong>in</strong>dependent remuneration adviser dur<strong>in</strong>g <strong>the</strong><br />

f<strong>in</strong>ancial year.<br />

<strong>Annual</strong> salary <strong>of</strong> members <strong>of</strong> <strong>the</strong> Executive Board<br />

The Supervisory Board looked <strong>in</strong> detail at <strong>the</strong> level and<br />

structure <strong>of</strong> remuneration <strong>of</strong> members <strong>of</strong> <strong>the</strong> Executive<br />

Board dur<strong>in</strong>g <strong>the</strong> year under review. Because <strong>the</strong> period<br />

<strong>of</strong> validity <strong>of</strong> <strong>the</strong> long-term benefit plan had expired (<strong>the</strong><br />

plan was valid from 2007 to 2010), <strong>the</strong> Supervisory Board<br />

first <strong>of</strong> all proposed a new long-term benefit plan which<br />

2 €535,000 per annum until 1 October 2010; €610,000 per annum with effect from 1 October 2010.<br />

3 This is <strong>the</strong> variable remuneration to be paid on an annual basis; see table 6 for <strong>the</strong> long-term benefit plan.<br />

4 The pension premiums are <strong>the</strong> gross pension costs recognised <strong>in</strong> <strong>the</strong> <strong>in</strong>come statement.<br />

5 Consists <strong>of</strong> <strong>the</strong> annual expenses allowance (€7,500) and <strong>the</strong> <strong>in</strong>surance premium (€1,054).<br />

<strong>the</strong> General Meet<strong>in</strong>g adopted on 20 April <strong>2011</strong>. Details <strong>of</strong><br />

this new plan can be found later <strong>in</strong> this report. A market<br />

comparison was also drawn up with <strong>the</strong> assistance <strong>of</strong> <strong>the</strong><br />

external adviser to compare <strong>the</strong> total remuneration <strong>of</strong><br />

<strong>the</strong> members <strong>of</strong> <strong>the</strong> Executive Board with <strong>the</strong> situation at<br />

a peer group <strong>of</strong> thirty companies <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands and<br />

abroad. This market comparison did not reveal any<br />

reasons for propos<strong>in</strong>g amendments to <strong>the</strong> remuneration<br />

structure as expla<strong>in</strong>ed <strong>in</strong> greater detail <strong>in</strong> <strong>the</strong><br />

remuneration policy below.<br />

The fixed salaries <strong>of</strong> <strong>the</strong> Dutch members <strong>of</strong> <strong>the</strong> Executive<br />

Board were not <strong>in</strong>dex-l<strong>in</strong>ked as <strong>of</strong> 1 January <strong>2011</strong>. As <strong>of</strong><br />

1 January <strong>2011</strong>, Mr Rogers’ salary was <strong>in</strong>creased to<br />

£420,000.–, which is <strong>in</strong> l<strong>in</strong>e with <strong>the</strong> reference salary<br />

for his position.<br />

A summary <strong>of</strong> <strong>the</strong> remuneration <strong>of</strong> <strong>the</strong> <strong>in</strong>dividual<br />

members <strong>of</strong> <strong>the</strong> Executive Board can be found <strong>in</strong><br />

tables 5 and 6. No o<strong>the</strong>r compensation was awarded to<br />

members <strong>of</strong> <strong>the</strong> Executive Board <strong>in</strong> <strong>the</strong> f<strong>in</strong>ancial year<br />

o<strong>the</strong>r than <strong>the</strong> compensation <strong>in</strong>dicated <strong>in</strong> tables 5 and 6.<br />

Of <strong>the</strong> former members <strong>of</strong> <strong>the</strong> Executive Board, only<br />

Mr Van Oosten (a member until 1 April <strong>2011</strong>) was paid a<br />

fixed salary <strong>of</strong> €152,500 (plus a €61,000 pension charge<br />

for <strong>the</strong> Group), as well as a one-<strong>of</strong>f amount <strong>of</strong> €610,000,<br />

as expla<strong>in</strong>ed <strong>in</strong> more detail <strong>in</strong> <strong>the</strong> 2010 <strong>Annual</strong> <strong>Report</strong>.<br />

<strong>Annual</strong> variable remuneration and long-term<br />

remuneration for <strong>the</strong> members <strong>of</strong> <strong>the</strong> Executive Board<br />

The members <strong>of</strong> <strong>the</strong> Executive Board were awarded<br />

40 percent <strong>in</strong> variable remuneration for <strong>2011</strong> <strong>in</strong> relation<br />

Table 5 Fixed annual salary, annual variable remuneration, pension premiums and o<strong>the</strong>r benefits (x €1.000,–)


to <strong>the</strong> f<strong>in</strong>ancial objectives (maximum amount <strong>of</strong> variable<br />

remuneration is 40 percent).<br />

Half <strong>of</strong> <strong>the</strong> <strong>in</strong>dividual non-f<strong>in</strong>ancial objective for <strong>the</strong><br />

members <strong>of</strong> <strong>the</strong> Executive Board consisted <strong>of</strong> a jo<strong>in</strong>t<br />

susta<strong>in</strong>able enterprise objective. This objective was to<br />

reduce <strong>the</strong> number <strong>of</strong> safety <strong>in</strong>cidents, to cut CO2 emissions and to reduce waste. The o<strong>the</strong>r half <strong>of</strong> <strong>the</strong><br />

<strong>in</strong>dividual non-f<strong>in</strong>ancial objectives <strong>in</strong> <strong>2011</strong> – depend<strong>in</strong>g<br />

on <strong>the</strong> member’s portfolio – related to improv<strong>in</strong>g <strong>the</strong><br />

<strong>in</strong>ternal organisation, <strong>the</strong> f<strong>in</strong>ancial position <strong>of</strong> <strong>the</strong><br />

company and implement<strong>in</strong>g <strong>the</strong> corporate strategy.<br />

Variable remuneration <strong>of</strong> 15 percent was awarded to<br />

each <strong>of</strong> <strong>the</strong> members <strong>of</strong> <strong>the</strong> Executive Board for<br />

achiev<strong>in</strong>g <strong>the</strong> non-f<strong>in</strong>ancial objectives (maximum<br />

variable remuneration: 20 percent).<br />

As regards <strong>the</strong> <strong>in</strong>dividual non-f<strong>in</strong>ancial objective for <strong>the</strong><br />

members <strong>of</strong> <strong>the</strong> Executive Board for <strong>the</strong> f<strong>in</strong>ancial year<br />

2012, half is a jo<strong>in</strong>t corporate social responsibility<br />

objective <strong>in</strong> <strong>the</strong> form <strong>of</strong> a reduction <strong>in</strong> <strong>the</strong> number <strong>of</strong><br />

safety <strong>in</strong>cidents, a cut <strong>in</strong> CO emissions and a reduction <strong>in</strong><br />

2<br />

<strong>the</strong> amount <strong>of</strong> waste produced. The o<strong>the</strong>r half <strong>of</strong> <strong>the</strong><br />

<strong>in</strong>dividual non-f<strong>in</strong>ancial objective relates to <strong>the</strong> jo<strong>in</strong>t<br />

objective <strong>of</strong> improv<strong>in</strong>g <strong>the</strong> cash flow.<br />

The conditional phantom share awards stated <strong>in</strong> table 6<br />

were given to <strong>the</strong> members <strong>of</strong> <strong>the</strong> Executive Board under<br />

<strong>the</strong> long-term benefit plan.<br />

The company has not awarded any options or shares to<br />

members <strong>of</strong> <strong>the</strong> Executive Board, members <strong>of</strong> operat<strong>in</strong>g<br />

company management teams or employees. The<br />

Table 6 Long–term benefit <strong>2011</strong>/2014 1 , conditional phantom shares<br />

As <strong>of</strong> <strong>the</strong> award date Year-end <strong>2011</strong><br />

number value (€) number value (€) 2<br />

N.J. de Vries 56,027 305,000 56,027 0<br />

M.J. Rogers 43,483 236,713 43,483 0<br />

J. Ruis 42,250 230,000 42,250 0<br />

R.P. van W<strong>in</strong>gerden 42,250 230,000 42,250 0<br />

remuneration <strong>of</strong> <strong>the</strong> Executive Board members is not<br />

affected by a change <strong>of</strong> control at <strong>the</strong> company. No loans<br />

were issued to members <strong>of</strong> <strong>the</strong> Executive Board.<br />

The Supervisory Board did not see any reason dur<strong>in</strong>g <strong>the</strong><br />

f<strong>in</strong>ancial year to use its extraord<strong>in</strong>ary powers to adjust or<br />

reclaim variable or long-term remuneration that had<br />

already been awarded.<br />

Remuneration <strong>of</strong> <strong>the</strong> Supervisory Board members<br />

The annual remuneration for <strong>the</strong> members <strong>of</strong> <strong>the</strong><br />

Supervisory Board, <strong>in</strong> accordance with <strong>the</strong> policy<br />

adopted at <strong>the</strong> shareholders’ meet<strong>in</strong>g on 7 May 2008,<br />

is €50,000 for <strong>the</strong> Chairman, €45,000 for <strong>the</strong> Vice-<br />

Chairman and €40,000 for <strong>the</strong> o<strong>the</strong>r members <strong>of</strong> <strong>the</strong><br />

Board, with a bonus <strong>of</strong> €5,000 for each member who is<br />

on any <strong>of</strong> <strong>the</strong> Committees set up by <strong>the</strong> Supervisory<br />

Board, with a maximum <strong>of</strong> one bonus per member. The<br />

Chairman and <strong>the</strong> o<strong>the</strong>r members <strong>of</strong> <strong>the</strong> Supervisory<br />

Board receive an annual fixed expenses allowance <strong>of</strong><br />

€3,280 and €1,640 respectively.<br />

The Supervisory Board considers that <strong>the</strong> remuneration<br />

<strong>of</strong> members <strong>of</strong> <strong>the</strong> Supervisory Board is at a level which is<br />

currently properly comparable with bus<strong>in</strong>esses <strong>of</strong> a<br />

similar size and nature to <strong>the</strong> Group.<br />

The company has not awarded any options or shares to<br />

members <strong>of</strong> <strong>the</strong> Supervisory Board. The remuneration <strong>of</strong><br />

<strong>the</strong> Supervisory Board members is not affected by <strong>the</strong><br />

company’s results, or by any change <strong>of</strong> control at <strong>the</strong><br />

company. No loans were issued to members <strong>of</strong> <strong>the</strong><br />

Supervisory Board.<br />

1 Awarded on 2 May <strong>2011</strong>; award becomes unconditional on 2 May 2014; lock-up period up to and <strong>in</strong>clud<strong>in</strong>g 2 May 2016.<br />

2 Potential value based on <strong>the</strong> table used to calculate <strong>the</strong> number <strong>of</strong> phantom shares that become unconditional three years after<br />

<strong>the</strong> award. The Total Shareholder’s Return performance used <strong>in</strong> <strong>the</strong> calculation was based on <strong>the</strong> quarterly average for <strong>2011</strong>.<br />

The ultimate TSR performance will be determ<strong>in</strong>ed based on <strong>the</strong> quarterly average for <strong>the</strong> years <strong>2011</strong>, 2012 and 2013. The<br />

long-term benefit paid out <strong>in</strong> cash will never be more than one and a half times <strong>the</strong> fixed annual salary on <strong>the</strong> day <strong>of</strong> <strong>the</strong> award.<br />

29<br />

<strong>2011</strong>


30<br />

<strong>2011</strong><br />

Remuneration policy<br />

The Supervisory Board draws up <strong>the</strong> company’s<br />

remuneration policy on <strong>the</strong> basis <strong>of</strong> advice from its<br />

Remuneration Committee. Royal <strong>BAM</strong> Group’s General<br />

Meet<strong>in</strong>g formally adopts <strong>the</strong> remuneration policy.<br />

Once <strong>the</strong> remuneration policy has been adopted, <strong>the</strong><br />

Supervisory Board determ<strong>in</strong>es <strong>the</strong> remuneration for <strong>the</strong><br />

<strong>in</strong>dividual members <strong>of</strong> <strong>the</strong> Executive Board, aga<strong>in</strong> on <strong>the</strong><br />

basis <strong>of</strong> recommendations by its Remuneration<br />

Committee. The Remuneration Committee’s regulations<br />

are published on Royal <strong>BAM</strong> Group’s website.<br />

The members <strong>of</strong> <strong>the</strong> Executive Board received<br />

remuneration <strong>in</strong> <strong>the</strong> past f<strong>in</strong>ancial year <strong>in</strong> l<strong>in</strong>e with <strong>the</strong><br />

remuneration policy adopted by <strong>the</strong> General Meet<strong>in</strong>g<br />

on 8 May 2007 and amended by <strong>the</strong> General Meet<strong>in</strong>g<br />

on 20 April <strong>2011</strong> because <strong>of</strong> <strong>the</strong> <strong>in</strong>troduction <strong>of</strong> a new<br />

long-term benefit plan.<br />

Po<strong>in</strong>ts <strong>of</strong> departure<br />

The remuneration policy is geared to attract<strong>in</strong>g and<br />

reta<strong>in</strong><strong>in</strong>g qualified people and motivat<strong>in</strong>g <strong>the</strong>m to achieve<br />

Royal <strong>BAM</strong> Group’s objectives. Particular emphasis is<br />

placed on experience <strong>of</strong> <strong>the</strong> Group’s (<strong>in</strong>ternational)<br />

activities and <strong>the</strong> necessary management qualities.<br />

The policy is also aimed at safeguard<strong>in</strong>g growth <strong>in</strong> <strong>the</strong><br />

value <strong>of</strong> <strong>the</strong> enterprise, motivat<strong>in</strong>g <strong>in</strong>dividuals and<br />

<strong>in</strong>creas<strong>in</strong>g <strong>the</strong> attractiveness <strong>of</strong> <strong>the</strong> enterprise for highly<br />

qualified executives, <strong>in</strong>clud<strong>in</strong>g those from o<strong>the</strong>r <strong>in</strong>dustries,<br />

so as to <strong>in</strong>terest <strong>the</strong>m <strong>in</strong> Royal <strong>BAM</strong> Group as an employer.<br />

The remuneration level and structure are based partly on<br />

<strong>the</strong> development <strong>of</strong> results, as well as o<strong>the</strong>r developments<br />

that are relevant to <strong>the</strong> company, <strong>in</strong>clud<strong>in</strong>g non-f<strong>in</strong>ancial<br />

<strong>in</strong>dicators which are relevant for <strong>the</strong> company’s long-term<br />

objectives.<br />

In order to achieve <strong>the</strong>se po<strong>in</strong>ts <strong>of</strong> departure,<br />

remuneration is set at a competitive level for <strong>the</strong> relevant<br />

national general remuneration market for directors and<br />

o<strong>the</strong>r senior managers <strong>of</strong> large companies. In <strong>the</strong> case <strong>of</strong><br />

members <strong>of</strong> <strong>the</strong> Executive Board, <strong>the</strong> equivalent<br />

remuneration possibilities <strong>in</strong> <strong>the</strong>ir country <strong>of</strong> residence<br />

are also taken <strong>in</strong>to account. The Supervisory Board will<br />

regularly check <strong>the</strong> remuneration package to ensure that<br />

it complies with <strong>the</strong> assumptions underly<strong>in</strong>g <strong>the</strong><br />

remuneration policy. The remuneration policy will also<br />

be checked regularly; changes <strong>in</strong> <strong>the</strong> policy will be put<br />

forward for adoption at <strong>the</strong> General Meet<strong>in</strong>g.<br />

Remuneration package<br />

The total remuneration <strong>of</strong> <strong>the</strong> members <strong>of</strong> <strong>the</strong> Executive<br />

Board <strong>of</strong> Royal <strong>BAM</strong> Group consists <strong>of</strong> an annual salary,<br />

variable remuneration, a remuneration plan that gives<br />

long-term rewards for improvements, a pension and<br />

o<strong>the</strong>r secondary conditions. It was decided to use <strong>the</strong><br />

median <strong>of</strong> <strong>the</strong> aforementioned remuneration market for<br />

this total remuneration. The company does not<br />

distribute shares to members <strong>of</strong> <strong>the</strong> Executive Board or<br />

to anyone else work<strong>in</strong>g <strong>in</strong> <strong>the</strong> Group, nor are <strong>the</strong>y given<br />

any entitlements to shares (i.e. share options).<br />

The company does not have any remuneration rules that<br />

are related to a change <strong>of</strong> control at <strong>the</strong> company.<br />

The way <strong>in</strong> which <strong>the</strong> remuneration package is made up<br />

– a fixed salary and limited short and long-term variable<br />

remuneration elements – provides a payment ceil<strong>in</strong>g.<br />

Each year, us<strong>in</strong>g scenarios prepared by <strong>the</strong> Remuneration<br />

Committee, <strong>the</strong> Supervisory Board analyses <strong>the</strong> level <strong>of</strong><br />

this ceil<strong>in</strong>g and <strong>the</strong> make-up and <strong>in</strong>terrelationship <strong>of</strong> <strong>the</strong><br />

elements <strong>in</strong> <strong>the</strong> remuneration package, tak<strong>in</strong>g <strong>in</strong>to<br />

account <strong>the</strong> relevant remuneration market and <strong>the</strong><br />

remuneration ratios with<strong>in</strong> <strong>the</strong> Group.<br />

Fixed annual salary<br />

Upon appo<strong>in</strong>tment, <strong>the</strong> annual salary <strong>of</strong> <strong>the</strong> <strong>in</strong>dividual<br />

member <strong>of</strong> <strong>the</strong> Executive Board orig<strong>in</strong>at<strong>in</strong>g from <strong>the</strong><br />

<strong>BAM</strong> organisation is usually less than <strong>the</strong> standard salary<br />

for this Board appo<strong>in</strong>tment. The Supervisory Board<br />

determ<strong>in</strong>es <strong>the</strong> development <strong>of</strong> <strong>the</strong> member’s salary, <strong>the</strong><br />

pr<strong>in</strong>ciple be<strong>in</strong>g that <strong>the</strong> difference between start<strong>in</strong>g<br />

salary and <strong>the</strong> standard salary will be bridged <strong>in</strong> several<br />

years if <strong>the</strong> Board Member fulfils his or her duties<br />

properly.<br />

The annual evaluation and change <strong>in</strong> <strong>the</strong> annual salary<br />

generally take place on 1 January <strong>of</strong> each year. The<br />

evaluation considers personal performance, <strong>the</strong> results<br />

<strong>of</strong> <strong>the</strong> past year, <strong>the</strong> extent to which <strong>the</strong> Board Member’s<br />

current salary is less than <strong>the</strong> standard salary and general<br />

changes <strong>in</strong> <strong>the</strong> remuneration market.<br />

<strong>Annual</strong> variable remuneration<br />

Each member <strong>of</strong> <strong>the</strong> Executive Board is eligible for annual<br />

variable remuneration, with <strong>the</strong> level depend<strong>in</strong>g on <strong>the</strong><br />

achievement <strong>in</strong> <strong>the</strong> year concerned <strong>of</strong> targets agreed<br />

beforehand between <strong>the</strong> Supervisory Board and <strong>the</strong><br />

Executive Board that support <strong>the</strong> execution <strong>of</strong> Royal <strong>BAM</strong><br />

Group’s strategic agenda. A responsible balance is struck<br />

between short-term and long-term focus.


The variable remuneration<br />

actually achieved is set by <strong>the</strong><br />

Supervisory Board on <strong>the</strong> advice<br />

<strong>of</strong> <strong>the</strong> Remuneration<br />

Committee, at which po<strong>in</strong>t an<br />

assessment is also made <strong>of</strong> <strong>the</strong><br />

possible results <strong>of</strong> <strong>the</strong> variable<br />

remuneration elements and<br />

<strong>the</strong>ir consequences for <strong>the</strong> total<br />

remuneration <strong>of</strong> members <strong>of</strong><br />

<strong>the</strong> Executive Board.<br />

Expansion <strong>of</strong> <strong>the</strong> Mercedes-Benz Arena<br />

(60,000 spectators), Stuttgart.<br />

<strong>BAM</strong> Deutschland.<br />

The maximum annual variable<br />

remuneration is 60 percent <strong>of</strong><br />

<strong>the</strong> fixed part <strong>of</strong> <strong>the</strong> Board<br />

member’s annual salary, a<br />

percentage which <strong>the</strong><br />

Supervisory Board considers at this po<strong>in</strong>t to be properly<br />

proportionate to <strong>the</strong> fixed element <strong>of</strong> <strong>the</strong> remuneration<br />

package. When this percentage is be<strong>in</strong>g set, it is<br />

designed to be <strong>in</strong> l<strong>in</strong>e with <strong>the</strong> relevant remuneration<br />

market and <strong>the</strong> levels <strong>of</strong> variable remuneration<br />

appropriate for senior <strong>of</strong>ficials <strong>of</strong> Royal <strong>BAM</strong> Group.<br />

The annual variable remuneration depends on <strong>the</strong><br />

achievement <strong>of</strong> previously set, measurable targets which<br />

are assessable and which can be <strong>in</strong>fluenced. The portion<br />

<strong>of</strong> <strong>the</strong> variable remuneration that is related to f<strong>in</strong>ancial<br />

targets is a maximum <strong>of</strong> 40 percent <strong>of</strong> <strong>the</strong> fixed part <strong>of</strong><br />

<strong>the</strong> Board member’s annual salary. The annual result <strong>of</strong><br />

Royal <strong>BAM</strong> Group is decisive <strong>in</strong> this regard. If <strong>the</strong> agreed<br />

annual result is achieved, <strong>the</strong> variable remuneration is 40<br />

percent, with a proportionate reduction if <strong>the</strong> budgeted<br />

result is not achieved. If <strong>the</strong> annual result is a great deal<br />

less than <strong>the</strong> budgeted figure, this part <strong>of</strong> <strong>the</strong> Board<br />

Member’s remuneration is not paid out.<br />

A maximum <strong>of</strong> 20 percent <strong>of</strong> <strong>the</strong> annual salary is related<br />

to non-f<strong>in</strong>ancial targets that are derived from <strong>the</strong> Royal<br />

<strong>BAM</strong> Group strategic agenda. The strategic agenda<br />

def<strong>in</strong>es, among o<strong>the</strong>r th<strong>in</strong>gs, objectives that stimulate<br />

long-term value creation for <strong>the</strong> shareholders, such as<br />

fur<strong>the</strong>r growth <strong>in</strong> specific market segments, corporate<br />

social responsibility, product development, risk<br />

management (<strong>in</strong>clud<strong>in</strong>g safety), staff development and<br />

knowledge management. The position <strong>in</strong> relation to<br />

<strong>the</strong>se topics is also that <strong>the</strong>y are formulated and<br />

evaluated as far as possible <strong>in</strong> assessable terms.<br />

The variable remuneration consists <strong>of</strong> an annual cash<br />

payment and is paid out <strong>in</strong> <strong>the</strong> follow<strong>in</strong>g year.<br />

31<br />

<strong>2011</strong>


32<br />

<strong>2011</strong><br />

In cases where <strong>the</strong> variable remuneration is awarded on<br />

<strong>the</strong> basis <strong>of</strong> <strong>in</strong>accurate (f<strong>in</strong>ancial) data, <strong>the</strong> Supervisory<br />

Board can adjust <strong>the</strong> variable remuneration accord<strong>in</strong>gly,<br />

and <strong>the</strong> company is entitled to reclaim (any part <strong>of</strong>) <strong>the</strong><br />

variable remuneration paid to a director on <strong>the</strong> basis <strong>of</strong><br />

<strong>in</strong>correct (f<strong>in</strong>ancial) <strong>in</strong>formation.<br />

In <strong>the</strong> case <strong>of</strong> new awards <strong>of</strong> variable remuneration to<br />

directors, based on quantified performance criteria, <strong>the</strong><br />

Supervisory Board has <strong>the</strong> right to amend <strong>the</strong> awards <strong>in</strong><br />

relation to <strong>the</strong> level <strong>of</strong> previous years if it considers that<br />

<strong>the</strong>re would be an unreasonable outcome, partly based<br />

on <strong>the</strong> remuneration policy adopted by <strong>the</strong> shareholders.<br />

The Supervisory Board also has <strong>the</strong> power to amend <strong>the</strong><br />

exist<strong>in</strong>g conditional awards <strong>of</strong> variable remuneration<br />

with quantified performance criteria if, <strong>in</strong> its op<strong>in</strong>ion,<br />

apply<strong>in</strong>g <strong>the</strong> award without amendment would have an<br />

unreasonable and un<strong>in</strong>tended outcome. The Supervisory<br />

Board would only use <strong>the</strong>se powers as a last resort. These<br />

matters have all been <strong>in</strong>corporated <strong>in</strong>to <strong>the</strong> employment<br />

agreements <strong>of</strong> Executive Board members s<strong>in</strong>ce <strong>the</strong><br />

<strong>in</strong>troduction <strong>of</strong> <strong>the</strong> Dutch Corporate Governance Code.<br />

Long-term benefit<br />

A remuneration element that gives long-term rewards<br />

for improvements has also been <strong>in</strong>corporated <strong>in</strong> <strong>the</strong><br />

remuneration policy for members <strong>of</strong> <strong>the</strong> Executive<br />

Board.<br />

This long-term benefit plan is based on remuneration <strong>in</strong><br />

<strong>the</strong> form <strong>of</strong> conditionally awarded phantom shares.<br />

Three years after <strong>the</strong> conditional award, <strong>the</strong> phantom<br />

shares become unconditional, if <strong>the</strong> level <strong>of</strong> performance<br />

achieved is sufficient. The unconditional phantom shares<br />

are <strong>the</strong>n subject to a transfer restriction for ano<strong>the</strong>r two<br />

years. The cash equivalent will only be paid out at <strong>the</strong> end<br />

<strong>of</strong> this period. A long-term benefit <strong>the</strong>refore rema<strong>in</strong>s<br />

valid for five years. The award consists <strong>of</strong> phantom<br />

shares, i.e. no shares or options are issued.<br />

The amount <strong>of</strong> <strong>the</strong> unconditional long-term benefit<br />

depends on <strong>the</strong> extent to which <strong>the</strong> target performance<br />

level is achieved. The target performance is development<br />

<strong>in</strong> <strong>the</strong> value <strong>of</strong> <strong>BAM</strong> shares (i.e. improved share price plus<br />

dividend) as compared to <strong>the</strong> average development <strong>in</strong><br />

<strong>the</strong> value <strong>of</strong> shares <strong>in</strong> <strong>the</strong> follow<strong>in</strong>g companies which are<br />

similar to <strong>BAM</strong>: Balfour Beatty, Ballast Nedam, Bilf<strong>in</strong>ger<br />

Berger, Heijmans and Skanska (<strong>the</strong> peer group).<br />

Performance is assessed over a three year period<br />

(referred to as <strong>the</strong> ‘performance period’), start<strong>in</strong>g on<br />

1 January <strong>of</strong> <strong>the</strong> year <strong>in</strong> which <strong>the</strong> long-term benefit is<br />

awarded. The development <strong>in</strong> <strong>the</strong> share value (TSR, i.e.<br />

Total Shareholder’s Return) <strong>of</strong> both <strong>BAM</strong> and <strong>the</strong> peer<br />

group (i.e. an average) is recorded at <strong>the</strong> end <strong>of</strong> each<br />

quarter <strong>in</strong> <strong>the</strong> performance period. The development is<br />

<strong>the</strong>n calculated based on <strong>the</strong> average <strong>of</strong> all end <strong>of</strong> quarter<br />

TSRs recorded dur<strong>in</strong>g <strong>the</strong> performance period.<br />

Consequently, <strong>BAM</strong>’s TSR is not absolute, but relative, as<br />

it <strong>in</strong>volves comparison with a peer group.<br />

The Supervisory Board may decide <strong>in</strong> due course that<br />

future performance should not be l<strong>in</strong>ked to <strong>the</strong> Total<br />

Shareholder’s Return alone, but also to o<strong>the</strong>r criteria<br />

such as susta<strong>in</strong>ability as soon as those criteria are<br />

sufficiently measurable. The Supervisory Board can also<br />

opt to change <strong>the</strong> peer group’s composition if it decides<br />

that one <strong>of</strong> <strong>the</strong> peer group companies is no longer<br />

comparable to <strong>BAM</strong>. Any companies to be added to <strong>the</strong><br />

peer group must be deemed comparable to <strong>BAM</strong> by <strong>the</strong><br />

Supervisory Board.<br />

The phantom shares awarded conditionally to <strong>the</strong><br />

Executive Board members are taxed when <strong>the</strong>y become<br />

unconditional (i.e. three years after <strong>the</strong> award). The<br />

Executive Board members have to pay <strong>the</strong> tax<br />

<strong>the</strong>mselves. The company will not provide any loans, nor<br />

can a long-term benefit be paid out <strong>in</strong> part or <strong>in</strong> full for<br />

<strong>the</strong> purposes <strong>of</strong> pay<strong>in</strong>g <strong>the</strong> tax due on <strong>the</strong> long-term<br />

benefit. The long-term benefit is not paid out until two<br />

years after it becomes unconditional.<br />

In practice, each Executive Board member is awarded a<br />

conditional long-term benefit (i.e. a number <strong>of</strong> phantom<br />

shares) every year on <strong>the</strong> sixth day after <strong>the</strong> <strong>Annual</strong><br />

General Meet<strong>in</strong>g. The number <strong>of</strong> conditional phantom<br />

shares awarded is equal to 50 percent <strong>of</strong> <strong>the</strong> member’s<br />

fixed annual salary divided by <strong>the</strong> average clos<strong>in</strong>g price <strong>of</strong><br />

<strong>BAM</strong> shares over <strong>the</strong> five trad<strong>in</strong>g days preced<strong>in</strong>g <strong>the</strong><br />

award date.<br />

The conditionally awarded long-term benefit (i.e. <strong>the</strong><br />

phantom shares) becomes unconditional three years<br />

after <strong>the</strong> date <strong>of</strong> <strong>the</strong> conditional award.<br />

The number <strong>of</strong> phantom shares awarded unconditionally<br />

depends on <strong>the</strong> extent to which <strong>BAM</strong>’s Total<br />

Shareholder’s Return exceeds <strong>the</strong> peer group Total<br />

Shareholder’s Return (as a percentage) for <strong>the</strong><br />

performance period.


The graduated scale shown below applies. If <strong>BAM</strong><br />

outperforms <strong>the</strong> peer group by <strong>the</strong> percentages<br />

<strong>in</strong>dicated, <strong>the</strong> correspond<strong>in</strong>g awards are given:<br />

< 0 percent: 0 percent award<br />

0-5 percent: 35 percent award<br />

5-10 percent: 45 percent award<br />

10-15 percent: 55 percent award<br />

15-20 percent: 65 percent award<br />

20-25 percent: 75 percent award<br />

25-30 percent: 85 percent award<br />

> 30 percent: 100 percent award<br />

(i.e. <strong>the</strong> percentage <strong>in</strong>dicated <strong>of</strong> <strong>the</strong> number <strong>of</strong> phantom<br />

shares conditionally awarded three years previously).<br />

This number <strong>of</strong> phantom shares is now an unconditional<br />

award, but a transfer restriction <strong>the</strong>n applies for a two<br />

year period known as <strong>the</strong> ‘lock-up period’. Dur<strong>in</strong>g <strong>the</strong><br />

lock up period, <strong>the</strong> long-term benefit amount depends<br />

only on <strong>the</strong> development <strong>of</strong> <strong>the</strong> value <strong>of</strong> <strong>BAM</strong> shares (i.e.<br />

share price plus dividend) and is <strong>the</strong>refore no longer<br />

affected by <strong>the</strong> peer group’s performance.<br />

The company will pay out on <strong>the</strong> phantom shares that<br />

have become unconditional on <strong>the</strong> first work<strong>in</strong>g day<br />

after <strong>the</strong> lock-up period (i.e. five years after <strong>the</strong><br />

conditional award). This payout is <strong>in</strong> cash at a value per<br />

phantom share that is equal to <strong>the</strong> average current rate<br />

<strong>of</strong> <strong>the</strong> <strong>BAM</strong> share dur<strong>in</strong>g <strong>the</strong> five trad<strong>in</strong>g days preced<strong>in</strong>g<br />

<strong>the</strong> date <strong>of</strong> <strong>the</strong> payout.<br />

The cash amount per long-term benefit paid to an<br />

Executive Board member will never exceed one and a half<br />

times <strong>the</strong> fixed salary <strong>of</strong> <strong>the</strong> Executive Board member on<br />

<strong>the</strong> day <strong>of</strong> <strong>the</strong> payout.<br />

The authority to implement <strong>the</strong> long-term benefit plan is<br />

vested <strong>in</strong> <strong>the</strong> Supervisory Board. The Supervisory Board<br />

can at all times change or term<strong>in</strong>ate <strong>the</strong> scheme. If <strong>the</strong><br />

Supervisory Board decides to term<strong>in</strong>ate or make material<br />

changes to <strong>the</strong> long-term benefit plan, <strong>the</strong> next General<br />

Meet<strong>in</strong>g will be asked to adopt a resolution to that effect.<br />

In exceptional circumstances and <strong>in</strong> accordance with <strong>the</strong><br />

requirements <strong>of</strong> reasonableness and fairness, <strong>the</strong><br />

Supervisory Board can decide to make a long-term<br />

benefit unconditional or lift <strong>the</strong> transfer restriction. In<br />

exceptional circumstances (e.g. divisions, mergers,<br />

changes <strong>in</strong> company control), <strong>the</strong> Supervisory Board is<br />

authorised to withdraw conditional and unconditional<br />

long-term benefits <strong>in</strong> exchange for a cash payment at<br />

market value.<br />

If <strong>BAM</strong>’s capital changes, <strong>the</strong> Supervisory Board will<br />

modify <strong>the</strong> long-term benefits (both before and after<br />

<strong>the</strong>y become unconditional), such that <strong>the</strong> market value<br />

<strong>of</strong> <strong>the</strong> long-term benefits after modification is as close as<br />

possible to <strong>the</strong> market value before modification.<br />

The Supervisory Board is authorised to change <strong>the</strong><br />

number <strong>of</strong> phantom shares to be awarded conditionally<br />

or unconditionally, if <strong>the</strong> Supervisory Board determ<strong>in</strong>es<br />

that failure to do so would lead to unreasonable results,<br />

<strong>in</strong>clud<strong>in</strong>g with respect to <strong>the</strong> remuneration policy<br />

adopted by <strong>the</strong> General Meet<strong>in</strong>g.<br />

The Supervisory Board’s special powers – as stated <strong>in</strong> <strong>the</strong><br />

last three paragraphs about annual variable<br />

remuneration – also apply to <strong>the</strong> long-term benefit plan.<br />

Only Executive Board members are eligible for <strong>the</strong><br />

long-term benefit plan. A long-term benefit only<br />

becomes unconditional for an Executive Board member if<br />

that member is an Executive Board member on <strong>the</strong> date<br />

when <strong>the</strong> long-term benefit becomes unconditional. If<br />

<strong>the</strong> person concerned is no longer an Executive Board<br />

member as <strong>of</strong> that date due to no fault <strong>of</strong> his/her own, he/<br />

she is entitled to <strong>the</strong> long-term benefit pro rata. The<br />

long-term benefits <strong>of</strong> former Executive Board members<br />

<strong>in</strong> this situation are also subject to a two-year lock-up<br />

period. Former Executive Board members who are no<br />

longer members because <strong>of</strong> o<strong>the</strong>r reasons as <strong>of</strong> <strong>the</strong> date<br />

when <strong>the</strong> long-term benefits become unconditional will<br />

lose <strong>the</strong>ir right to long-term benefits which are still<br />

conditional. However, <strong>the</strong>y do reta<strong>in</strong> <strong>the</strong>ir right to<br />

long-term benefits that are unconditional, subject to <strong>the</strong><br />

two-year lock-up period.<br />

The Supervisory Board can decide that Executive Board<br />

members appo<strong>in</strong>ted after <strong>the</strong> conditional award date<br />

and before 31 December <strong>of</strong> <strong>the</strong> award year will receive<br />

part <strong>of</strong> <strong>the</strong> long-term benefit awarded to Executive<br />

Board members <strong>in</strong> <strong>the</strong> year concerned.<br />

At <strong>the</strong> request <strong>of</strong> <strong>the</strong> Supervisory Board, <strong>the</strong> company’s<br />

external auditor will check <strong>the</strong> calculations carried out<br />

and conclusions reached <strong>in</strong> connection with <strong>the</strong><br />

long-term benefit plan, <strong>in</strong> which case <strong>the</strong> external<br />

auditor’s assessment will be b<strong>in</strong>d<strong>in</strong>g.<br />

33<br />

<strong>2011</strong>


34<br />

<strong>2011</strong><br />

Pension<br />

With respect to pensions, <strong>the</strong> sector regulations will be<br />

adopted wherever possible, with surplus schemes based<br />

on def<strong>in</strong>ed contributions and contributions from <strong>the</strong><br />

participants. Members <strong>of</strong> <strong>the</strong> Executive Board are subject<br />

to <strong>the</strong> new pension scheme and transitional<br />

arrangements with effect from 1 January 2006, as<br />

applicable from that date with<strong>in</strong> Royal <strong>BAM</strong> Group for all<br />

comparable employees follow<strong>in</strong>g <strong>the</strong> <strong>in</strong>troduction <strong>of</strong> <strong>the</strong><br />

Act <strong>of</strong> Parliament concern<strong>in</strong>g early retirement, prepension<br />

and life-course sav<strong>in</strong>gs schemes (wet VPL).<br />

The costs <strong>of</strong> trend-based <strong>in</strong>dexation <strong>of</strong> underly<strong>in</strong>g<br />

pension rights have been <strong>in</strong>cluded <strong>in</strong> <strong>the</strong> pension<br />

contributions with effect from 2009. The company does<br />

not have any early retirement schemes.<br />

O<strong>the</strong>r secondary conditions <strong>of</strong> employment<br />

As for all <strong>the</strong> o<strong>the</strong>r employees, Royal <strong>BAM</strong> Group has a<br />

competitive package <strong>of</strong> secondary conditions <strong>of</strong><br />

employment for <strong>the</strong> members <strong>of</strong> <strong>the</strong> Executive Board.<br />

This package <strong>in</strong>cludes such matters as healthcare and<br />

disability <strong>in</strong>surance, personal accident <strong>in</strong>surance, a car<br />

scheme and directors’ liability <strong>in</strong>surance. Royal <strong>BAM</strong><br />

Group does not give loans, warrants and <strong>the</strong> like to<br />

members <strong>of</strong> <strong>the</strong> Executive Board or to o<strong>the</strong>r employees,<br />

except for <strong>the</strong> arrangements set out below.<br />

Current and former members <strong>of</strong> <strong>the</strong> Supervisory Board<br />

and current and former members <strong>of</strong> <strong>the</strong> Executive Board<br />

are covered by <strong>the</strong> <strong>in</strong>demnity, under <strong>the</strong> Articles <strong>of</strong><br />

Association, aga<strong>in</strong>st claims made aga<strong>in</strong>st <strong>the</strong>m <strong>in</strong> respect<br />

<strong>of</strong> actions or omissions after 1 January 2005 <strong>in</strong> <strong>the</strong><br />

performance <strong>of</strong> <strong>the</strong> duties <strong>of</strong> <strong>the</strong>ir position, unless said<br />

actions or omissions constituted wilful, deliberately<br />

reckless or seriously culpable conduct and/or consisted<br />

<strong>of</strong> traffic <strong>of</strong>fences. This facility also applies to all<br />

employees and former employees <strong>of</strong> Royal <strong>BAM</strong> Group.<br />

The company has taken out directors’ and <strong>of</strong>ficers’<br />

liability <strong>in</strong>surance under standard market terms and<br />

conditions for <strong>the</strong> members <strong>of</strong> <strong>the</strong> Supervisory Board,<br />

<strong>the</strong> members <strong>of</strong> <strong>the</strong> Executive Board, <strong>the</strong> members <strong>of</strong> <strong>the</strong><br />

operat<strong>in</strong>g company management teams and all o<strong>the</strong>r<br />

directors and <strong>of</strong>ficers <strong>in</strong> Royal <strong>BAM</strong> Group.<br />

Period <strong>of</strong> appo<strong>in</strong>tment and contracts <strong>of</strong> employment<br />

Members <strong>of</strong> <strong>the</strong> Executive Board are appo<strong>in</strong>ted for a<br />

period <strong>of</strong> four years. The contractual agreements with<br />

members <strong>of</strong> <strong>the</strong> Executive Board who were appo<strong>in</strong>ted<br />

before <strong>the</strong> Dutch Corporate Governance Code came <strong>in</strong>to<br />

effect will be honoured; <strong>the</strong>ir appo<strong>in</strong>tment is for an<br />

<strong>in</strong>def<strong>in</strong>ite period.<br />

The contracts <strong>of</strong> employment <strong>of</strong> members <strong>of</strong> <strong>the</strong><br />

Executive Board are for an <strong>in</strong>def<strong>in</strong>ite period. The<br />

members <strong>of</strong> <strong>the</strong> Executive Board have a notice period <strong>of</strong><br />

six months for <strong>the</strong> company and three months for <strong>the</strong><br />

member. The company regards a notice period <strong>of</strong> three<br />

months as suitable for a director. The notice period for<br />

<strong>the</strong> company is twice <strong>the</strong> length <strong>of</strong> <strong>the</strong> notice to be given<br />

by <strong>the</strong> director <strong>in</strong> l<strong>in</strong>e with <strong>the</strong> statutory rules on notice<br />

periods <strong>in</strong> employment contracts. On Mr Rogers’<br />

appo<strong>in</strong>tment, <strong>the</strong> rules set out <strong>in</strong> his employment<br />

contract with <strong>BAM</strong> Construct UK Ltd were cont<strong>in</strong>ued.<br />

New proposed legislation that is expected to become law<br />

soon will change <strong>the</strong> relationship between members <strong>of</strong><br />

<strong>the</strong> Executive Board and <strong>the</strong> company, because <strong>in</strong> <strong>the</strong><br />

future it will no longer be possible to classify <strong>the</strong><br />

employment relationship between members <strong>of</strong> <strong>the</strong><br />

Executive Board and <strong>the</strong> company as a contract <strong>of</strong><br />

employment.<br />

If <strong>the</strong> company term<strong>in</strong>ates <strong>the</strong> contract <strong>of</strong> a Board<br />

member appo<strong>in</strong>ted after 1 January 2004, <strong>the</strong> maximum<br />

severance payment will be one year’s salary. If that is<br />

clearly unreasonable for a member <strong>of</strong> <strong>the</strong> Executive<br />

Board who is made redundant dur<strong>in</strong>g or follow<strong>in</strong>g <strong>the</strong><br />

expiry <strong>of</strong> his first term on <strong>the</strong> Board, that Board member<br />

will be eligible for a severance payment <strong>of</strong> a maximum <strong>of</strong><br />

twice his annual salary.<br />

The Supervisory Board can decide on a higher payment if<br />

<strong>the</strong> Board member concerned has been employed by<br />

Royal <strong>BAM</strong> Group for a long period <strong>of</strong> time. This provision<br />

was made because <strong>of</strong> <strong>the</strong> fact that long periods <strong>of</strong><br />

employment at <strong>the</strong> same company are not unusual <strong>in</strong> <strong>the</strong><br />

construction <strong>in</strong>dustry. Reduc<strong>in</strong>g rights accrued <strong>in</strong> that<br />

way may be considered undesirable or unreasonable <strong>in</strong><br />

certa<strong>in</strong> circumstances.<br />

The employment contracts <strong>of</strong> members <strong>of</strong> <strong>the</strong> Executive<br />

Board appo<strong>in</strong>ted before 1 January 2004 do not <strong>in</strong>clude a<br />

provision regard<strong>in</strong>g severance pay. If such a member is<br />

made redundant, <strong>the</strong> Supervisory Board will determ<strong>in</strong>e<br />

<strong>the</strong> amount <strong>of</strong> <strong>the</strong> severance pay tak<strong>in</strong>g <strong>in</strong>to account <strong>the</strong><br />

circumstances <strong>of</strong> <strong>the</strong> case, current practice, prevail<strong>in</strong>g<br />

legislation and <strong>the</strong> requirements <strong>of</strong> good corporate<br />

governance. See table 7.


The company has no o<strong>the</strong>r remuneration rules, beyond<br />

<strong>the</strong> remuneration package mentioned above, <strong>in</strong> relation<br />

to payments on <strong>the</strong> departure <strong>of</strong> members <strong>of</strong> <strong>the</strong><br />

Executive Board or members <strong>of</strong> <strong>the</strong> Supervisory Board,<br />

nor are <strong>the</strong>re any o<strong>the</strong>r rights to one-time payments.<br />

Securities rules<br />

The company has rules relat<strong>in</strong>g to <strong>the</strong> possession <strong>of</strong> and<br />

trad<strong>in</strong>g <strong>in</strong> securities; <strong>the</strong>se rules also <strong>in</strong>clude regulations<br />

for members <strong>of</strong> <strong>the</strong> Executive Board and <strong>the</strong> Supervisory<br />

Board relat<strong>in</strong>g to <strong>the</strong> possession <strong>of</strong> and trad<strong>in</strong>g <strong>in</strong><br />

securities o<strong>the</strong>r than those issued by <strong>the</strong> company. These<br />

rules are published on <strong>the</strong> company’s website.<br />

Year<br />

employed<br />

Date <strong>of</strong><br />

appo<strong>in</strong>tment<br />

Period <strong>of</strong><br />

appo<strong>in</strong>tment<br />

Remuneration policy for 2012 and<br />

subsequent years<br />

The remuneration policy described above will rema<strong>in</strong> <strong>in</strong><br />

effect <strong>in</strong> <strong>the</strong> f<strong>in</strong>ancial year 2012 and subsequent years.<br />

No material changes are planned <strong>in</strong> <strong>the</strong> remuneration<br />

policy <strong>in</strong> <strong>the</strong> com<strong>in</strong>g period.<br />

Bunnik, <strong>the</strong> Ne<strong>the</strong>rlands, 7 March 2012<br />

Supervisory Board<br />

Table 7 Contracts <strong>of</strong> employment/appo<strong>in</strong>tments <strong>of</strong> members <strong>of</strong> <strong>the</strong> Executive Board<br />

Contract<br />

type<br />

Notice period<br />

for <strong>the</strong><br />

company<br />

Notice period<br />

for <strong>the</strong><br />

Director<br />

Severance<br />

payment<br />

N.J. de Vries 1977 28.05.1998 Unlimited Indef<strong>in</strong>ite 6 months 3 months Not agreed<br />

M.J. Rogers 1979 21.04.2009 1 4 years Indef<strong>in</strong>ite 6 months 3 months m<strong>in</strong>imal €600.000,–;<br />

max. 2 years’ salary<br />

4 years Indef<strong>in</strong>ite<br />

J. Ruis 1971 07.05.2008 2 6 months 3 months maximal €800.000,–<br />

R.P. van W<strong>in</strong>gerden 1988 07.05.2008 1 4 years Indef<strong>in</strong>ite 6 months 3 months max. 2 years’ salary<br />

1 Refers to first appo<strong>in</strong>tment.<br />

2 Refers to reappo<strong>in</strong>tment; first appo<strong>in</strong>tment: 07.05.2004.<br />

35<br />

<strong>2011</strong>


36<br />

<strong>2011</strong><br />

P.A.F.W. Elverd<strong>in</strong>g (1948), Chairman<br />

Mr Elverd<strong>in</strong>g studied Law at <strong>the</strong> University <strong>of</strong><br />

Amsterdam. After graduat<strong>in</strong>g <strong>in</strong> 1972, he<br />

began his career <strong>in</strong> <strong>the</strong> healthcare sector<br />

before go<strong>in</strong>g to work at Akzo Chemie<br />

Nederland and De Bijenkorf, <strong>in</strong> various human<br />

resources positions. In 1981, he jo<strong>in</strong>ed <strong>the</strong><br />

management team <strong>of</strong> De Bijenkorf, assum<strong>in</strong>g<br />

responsibility for human resources. In 1985,<br />

Mr Elverd<strong>in</strong>g jo<strong>in</strong>ed DSM, serv<strong>in</strong>g <strong>in</strong> various<br />

management positions <strong>in</strong> different parts <strong>of</strong><br />

<strong>the</strong> DSM Group with responsibility for human<br />

resources and general affairs. He was<br />

appo<strong>in</strong>ted to <strong>the</strong> DSM Executive Board <strong>in</strong><br />

1995 and became Chairman <strong>of</strong> <strong>the</strong> Executive<br />

Board <strong>in</strong> 1999. Mr Elverd<strong>in</strong>g retired <strong>in</strong> 2007.<br />

He holds Dutch nationality and does not own<br />

any shares <strong>in</strong> <strong>the</strong> Company’s capital.<br />

O<strong>the</strong>r <strong>of</strong>fices: Chairman <strong>of</strong> <strong>the</strong> Supervisory<br />

Board <strong>of</strong> Océ; Chairman <strong>of</strong> <strong>the</strong> Supervisory<br />

Board <strong>of</strong> Q-Park; Vice-Chairman <strong>of</strong> <strong>the</strong><br />

Supervisory Board <strong>of</strong> ING; member <strong>of</strong> <strong>the</strong><br />

Supervisory Board <strong>of</strong> SHV Hold<strong>in</strong>gs; member<br />

<strong>of</strong> <strong>the</strong> Supervisory Board <strong>of</strong> Royal<br />

FrieslandCamp<strong>in</strong>a; member <strong>of</strong> <strong>the</strong> Board <strong>of</strong><br />

Sticht<strong>in</strong>g Instituut Gak.<br />

Mr Elverd<strong>in</strong>g was appo<strong>in</strong>ted to <strong>the</strong> Supervisory<br />

Board <strong>in</strong> <strong>2011</strong> and <strong>in</strong> November <strong>2011</strong> as<br />

Chairman <strong>of</strong> <strong>the</strong> Supervisory Board.<br />

H. Scheffers (1948), Vice-Chairman<br />

Mr Scheffers was tra<strong>in</strong>ed as a chartered<br />

accountant. He was employed from 1974<br />

until 1993 at Royal Bunge, where he<br />

successively held <strong>the</strong> positions <strong>of</strong> <strong>in</strong>ternal<br />

auditor, European controller and President<br />

Nor<strong>the</strong>rn Europe. He was subsequently<br />

employed as an Executive Board member at<br />

LeasePlan Corporation from 1993 until 1999.<br />

He jo<strong>in</strong>ed SHV Hold<strong>in</strong>gs <strong>in</strong> 1999, where he<br />

Particulars <strong>of</strong> <strong>the</strong> Supervisory Board members<br />

was CFO on <strong>the</strong> Executive Board until he<br />

retired <strong>in</strong> 2007. Mr Scheffers is a Dutch<br />

national and does not own any shares <strong>in</strong> <strong>the</strong><br />

company.<br />

O<strong>the</strong>r <strong>of</strong>fices: Chairman <strong>of</strong> <strong>the</strong> Supervisory<br />

Board <strong>of</strong> Aalberts Industries; Vice-Chairman<br />

<strong>of</strong> <strong>the</strong> Supervisory Board <strong>of</strong> Fl<strong>in</strong>t Hold<strong>in</strong>g;<br />

member <strong>of</strong> <strong>the</strong> Supervisory Board <strong>of</strong> Royal<br />

FrieslandCamp<strong>in</strong>a; member <strong>of</strong> <strong>the</strong><br />

Supervisory Board <strong>of</strong> Made <strong>in</strong> Scotland;<br />

member <strong>of</strong> <strong>the</strong> Supervisory Board <strong>of</strong> Wolters<br />

Kluwer; member <strong>of</strong> <strong>the</strong> Board <strong>of</strong> Directors <strong>of</strong><br />

Sticht<strong>in</strong>g Adm<strong>in</strong>istratiekantoor KAS BANK;<br />

member <strong>of</strong> <strong>the</strong> Investment Committee <strong>of</strong><br />

NPM Capital; member <strong>of</strong> <strong>the</strong> Supervisory<br />

Board <strong>of</strong> Aon Hewitt Nederland.<br />

Mr Scheffers was appo<strong>in</strong>ted to <strong>the</strong> Supervisory<br />

Board <strong>in</strong> 2009 and <strong>in</strong> November <strong>2011</strong> as<br />

Vice-Chairman <strong>of</strong> <strong>the</strong> Supervisory Board.<br />

A. Baar (1943)<br />

Mr Baar has spent almost his entire work<strong>in</strong>g<br />

life <strong>in</strong> <strong>the</strong> construction sector. Hav<strong>in</strong>g started<br />

at a young age as a construction worker, he<br />

went on to hold many different management<br />

positions (both executive and adm<strong>in</strong>istrative)<br />

at various levels. He held senior management<br />

positions at Van Wijnen and at <strong>the</strong><br />

Amstelland Group, for example. While<br />

work<strong>in</strong>g for Amstelland he also acquired<br />

experience abroad <strong>in</strong> <strong>the</strong> United States <strong>of</strong><br />

America. Mr Baar was Chairman <strong>of</strong> <strong>the</strong><br />

Management Board <strong>of</strong> NBM-Amstelland from<br />

1990 to 2000. Mr Baar is a Dutch national and<br />

does not own any shares <strong>in</strong> <strong>the</strong> company.<br />

Mr Baar was appo<strong>in</strong>ted as a member <strong>of</strong> <strong>the</strong><br />

Supervisory Board <strong>in</strong> 2001 and re-appo<strong>in</strong>ted <strong>in</strong><br />

2005 and 2009. Mr Baar was Vice-Chairman <strong>of</strong><br />

<strong>the</strong> Supervisory Board from 2007 to November<br />

<strong>2011</strong>.<br />

J.A. Dekker (1939)<br />

Mr Dekker graduated from Delft University<br />

<strong>of</strong> Technology with a degree <strong>in</strong> eng<strong>in</strong>eer<strong>in</strong>g<br />

physics. He began his career <strong>in</strong> 1964 at Akzo<br />

Chemie Nederland where he worked <strong>in</strong> <strong>the</strong><br />

area <strong>of</strong> research and production before<br />

becom<strong>in</strong>g International Project Manager and<br />

General Manager <strong>of</strong> a subsidiary <strong>in</strong> Nigeria. In<br />

1981 Mr Dekker jo<strong>in</strong>ed <strong>the</strong> management <strong>of</strong><br />

GTI Hold<strong>in</strong>g as Chairman <strong>of</strong> <strong>the</strong> Board <strong>of</strong><br />

Directors, a position that he held until 1995.<br />

In 1995 Mr Dekker became Chairman <strong>of</strong> <strong>the</strong><br />

Executive Board <strong>of</strong> TNO. He held that<br />

position until he reached retirement age <strong>in</strong><br />

2003. Mr Dekker was President <strong>of</strong> <strong>the</strong> Royal<br />

Institute <strong>of</strong> Eng<strong>in</strong>eers <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands<br />

(KIVI NIRIA) from 2004 to 2010. Mr Dekker is<br />

a Dutch national and does not own any<br />

shares <strong>in</strong> <strong>the</strong> company.<br />

O<strong>the</strong>r <strong>of</strong>fices: member <strong>of</strong> <strong>the</strong> Advisory Board<br />

<strong>of</strong> Agens; Executive Board member at De<br />

Baak; Executive Board member at Sticht<strong>in</strong>g<br />

Cont<strong>in</strong>uïteit Ctac; Executive Board member<br />

at Sticht<strong>in</strong>g Cont<strong>in</strong>uïteit KBW; several<br />

positions <strong>in</strong> <strong>the</strong> healthcare sector; several<br />

positions as a consultant; member <strong>of</strong> <strong>the</strong><br />

Supervisory Board <strong>of</strong> <strong>the</strong> Ne<strong>the</strong>rlands<br />

Broadcast<strong>in</strong>g Music Centre (MCO).<br />

Mr Dekker was first appo<strong>in</strong>ted to <strong>the</strong><br />

Supervisory Board <strong>in</strong> 2000 before be<strong>in</strong>g re<br />

appo<strong>in</strong>ted <strong>in</strong> 2004 and 2008.


C.M.C. Mahieu (1959)<br />

Ms Mahieu graduated cum laude <strong>in</strong><br />

economics from <strong>the</strong> University <strong>of</strong><br />

Amsterdam <strong>in</strong> 1984. She began her career at<br />

Royal Dutch Shell where she held various<br />

management positions <strong>in</strong> human resources,<br />

communications and corporate strategy.<br />

After several years work<strong>in</strong>g as a consultant,<br />

<strong>in</strong>clud<strong>in</strong>g for Spencer Stuart, Ms Mahieu<br />

jo<strong>in</strong>ed Royal Philips Electronics as Senior Vice<br />

President Corporate Human Resources <strong>in</strong><br />

2003. She took up her current position as<br />

Global Head <strong>of</strong> Human Resources at Aegon <strong>in</strong><br />

September 2010. Ms Mahieu is a Dutch<br />

national and does not own any shares <strong>in</strong> <strong>the</strong><br />

Company’s capital.<br />

O<strong>the</strong>r positions: Member <strong>of</strong> <strong>the</strong> Supervisory<br />

Board <strong>of</strong> HagaZiekenhuis hospital; member<br />

<strong>of</strong> <strong>the</strong> Supervisory Board <strong>of</strong> Jeugdformaat;<br />

member <strong>of</strong> <strong>the</strong> Supervisory Board <strong>of</strong><br />

Bakkersland; member <strong>of</strong> <strong>the</strong> Advisory Board<br />

<strong>of</strong> <strong>the</strong> Management Development Office<br />

(ABD) <strong>of</strong> <strong>the</strong> M<strong>in</strong>istry <strong>of</strong> <strong>the</strong> Interior.<br />

Ms Mahieu was appo<strong>in</strong>ted to <strong>the</strong> Supervisory<br />

Board <strong>in</strong> <strong>2011</strong>.<br />

K.S. Wester (1946)<br />

Mr Wester studied civil eng<strong>in</strong>eer<strong>in</strong>g at Delft<br />

University <strong>of</strong> Technology. After graduat<strong>in</strong>g <strong>in</strong><br />

1969, he worked briefly for Fugro as a<br />

geotechnical eng<strong>in</strong>eer. He <strong>the</strong>n took a<br />

position at Costa<strong>in</strong> Blankevoort and later at<br />

Ballast Nedam, work<strong>in</strong>g <strong>in</strong> <strong>the</strong> United<br />

K<strong>in</strong>gdom, <strong>the</strong> United Arab Emirates and<br />

Kuwait. In 1981, he returned to Fugro, where<br />

he held various management positions<br />

before be<strong>in</strong>g appo<strong>in</strong>ted to <strong>the</strong> Fugro<br />

Executive Board as a member under <strong>the</strong><br />

Articles <strong>of</strong> Association <strong>in</strong> 1996 and go<strong>in</strong>g on<br />

to become Chairman <strong>of</strong> <strong>the</strong> Executive Board<br />

Left to right: P.A.F.W. Elverd<strong>in</strong>g, H. Scheffers, A. Baar, J.A. Dekker,<br />

C.M.C. Mahieu, K.S. Wester and W.K. Wiechers.<br />

<strong>in</strong> 2005.<br />

Mr Wester is a Dutch national and does not<br />

own any shares <strong>in</strong> <strong>the</strong> company.<br />

O<strong>the</strong>r positions: Member <strong>of</strong> <strong>the</strong> Supervisory<br />

Board <strong>of</strong> Aard<strong>in</strong>g Management; member <strong>of</strong><br />

<strong>the</strong> Supervisory Board <strong>of</strong> Iv-Groep; member<br />

<strong>of</strong> <strong>the</strong> Advisory Board <strong>of</strong> NYSE Euronext<br />

Exchange Council (Amsterdam).<br />

Mr Wester was appo<strong>in</strong>ted to <strong>the</strong> Supervisory<br />

Board <strong>in</strong> <strong>2011</strong>.<br />

W.K. Wiechers (1940)<br />

Mr Wiechers graduated <strong>in</strong> technical physics<br />

from Delft University Technology. He began<br />

his career <strong>in</strong> 1966 at KEMA <strong>in</strong> Arnhem where<br />

he held a number <strong>of</strong> positions, <strong>in</strong>clud<strong>in</strong>g<br />

Head <strong>of</strong> <strong>the</strong> Electrical Approvals Division,<br />

Deputy Director and Director. In 1987<br />

Mr Wiechers jo<strong>in</strong>ed <strong>the</strong> Board <strong>of</strong> Directors <strong>of</strong><br />

PNEM (Prov<strong>in</strong>ciale Noord-Brabantse<br />

Electriciteits-Maatschappij) and he rema<strong>in</strong>ed<br />

on <strong>the</strong> Board until 1997. In 1998 Mr Wiechers<br />

Retirement schedule for <strong>the</strong> Supervisory Board<br />

became Chairman <strong>of</strong> <strong>the</strong> Executive Board <strong>of</strong><br />

<strong>the</strong> PNEM-MEGA Group and <strong>in</strong> December<br />

1999, after <strong>the</strong> merger with EDON, he<br />

became Chairman <strong>of</strong> <strong>the</strong> Executive Board <strong>of</strong><br />

Essent, which was <strong>the</strong> position he held until<br />

his early retirement <strong>in</strong> 2003.<br />

Mr Wiechers is a Dutch national.<br />

O<strong>the</strong>r <strong>of</strong>fices: Chairman <strong>of</strong> <strong>the</strong> Supervisory<br />

Board <strong>of</strong> Brabant Life Sciences Seed Funds<br />

(BLSF); member <strong>of</strong> <strong>the</strong> Algemene<br />

Energieraad [General Energy Council];<br />

Chairman <strong>of</strong> <strong>the</strong> Commissie van deskundigen<br />

benchmark<strong>in</strong>g nucleaire veiligheid KCB<br />

[Committee <strong>of</strong> Nuclear Safety Benchmark<strong>in</strong>g<br />

Experts for KCB (Borssele Nuclear Power<br />

Station).<br />

Mr Wiechers was appo<strong>in</strong>ted to <strong>the</strong> Supervisory<br />

Board <strong>in</strong> 1999 and re-appo<strong>in</strong>ted <strong>in</strong> 2003, 2007<br />

and <strong>2011</strong> (<strong>in</strong> <strong>2011</strong> for a period <strong>of</strong> one year).<br />

Mr Wiechers was Vice-Chairman <strong>of</strong> <strong>the</strong><br />

Supervisory Board from 2004 to 2007 and<br />

Chairman from 2007 to November <strong>2011</strong>.<br />

Year <strong>of</strong><br />

Year <strong>of</strong> Year <strong>of</strong> Current<br />

As <strong>of</strong> January 2012 appo<strong>in</strong>tment re-appo<strong>in</strong>tment retirement term 1<br />

P.A.F.W. Elverd<strong>in</strong>g <strong>2011</strong> 2015 1<br />

H. Scheffers 2009 2013 1<br />

A. Baar 2001 2005, 2009 2013 3<br />

J.A. Dekker 2000 2004, 2008 2012 3<br />

C.M.C. Mahieu <strong>2011</strong> 2015 1<br />

K.S. Wester <strong>2011</strong> 2015 1<br />

W.K. Wiechers 1999 2003, 2007, <strong>2011</strong> 2012 4<br />

1 Members <strong>of</strong> <strong>the</strong> Supervisory Board are appo<strong>in</strong>ted (and re-appo<strong>in</strong>ted if applicable)<br />

for a period <strong>of</strong> no more than four years.<br />

37<br />

<strong>2011</strong>


38<br />

<strong>2011</strong><br />

N.J. de Vries (1951), Chairman<br />

Mr De Vries completed an architecture<br />

foundation course <strong>in</strong> 1971. He went on to<br />

earn a degree <strong>in</strong> civil eng<strong>in</strong>eer<strong>in</strong>g from Delft<br />

University <strong>of</strong> Technology <strong>in</strong> 1977. In 1977 Mr<br />

De Vries jo<strong>in</strong>ed <strong>BAM</strong> as a plann<strong>in</strong>g eng<strong>in</strong>eer<br />

after which he held positions as project<br />

manager, works manager and branch<br />

director. In 1986 he was appo<strong>in</strong>ted deputy<br />

director and <strong>in</strong> 1990 director <strong>of</strong> <strong>BAM</strong><br />

Utiliteitsbouw, which was followed <strong>in</strong> 1995<br />

by his appo<strong>in</strong>tment as sector director <strong>of</strong> civil<br />

eng<strong>in</strong>eer<strong>in</strong>g for Royal <strong>BAM</strong> Group. Mr De<br />

Vries has been a member <strong>of</strong> <strong>the</strong> Executive<br />

Board <strong>of</strong> Royal <strong>BAM</strong> Group s<strong>in</strong>ce 1998. He<br />

was appo<strong>in</strong>ted as Chairman <strong>of</strong> <strong>the</strong> Executive<br />

Board <strong>in</strong> October 2010. He is a Dutch<br />

national.<br />

O<strong>the</strong>r <strong>of</strong>fices: Member <strong>of</strong> <strong>the</strong> Board <strong>of</strong><br />

Verenig<strong>in</strong>g van Nederlandse aannemers met<br />

belangen <strong>in</strong> het buitenland (NABU); member<br />

<strong>of</strong> <strong>the</strong> Board <strong>of</strong> Directors <strong>of</strong> <strong>the</strong> International<br />

Chamber <strong>of</strong> Commerce Nederland; member<br />

<strong>of</strong> <strong>the</strong> Board <strong>of</strong> Directors <strong>of</strong> Nederlands-<br />

Duitse Handelskamer; member <strong>of</strong> <strong>the</strong> Board<br />

<strong>of</strong> Directors <strong>of</strong> Sticht<strong>in</strong>g Raad van Arbitrage<br />

voor de Bouw.<br />

M.J. Rogers (1955)<br />

Mr Rogers ga<strong>in</strong>ed a higher National Diploma<br />

<strong>in</strong> Build<strong>in</strong>g Studies at <strong>the</strong> Hertfordshire<br />

College <strong>of</strong> Build<strong>in</strong>g. He is a Fellow <strong>of</strong> <strong>the</strong><br />

Chartered Institute <strong>of</strong> Build<strong>in</strong>g (FCIOB) and a<br />

Fellow <strong>of</strong> <strong>the</strong> Institution <strong>of</strong> Civil Eng<strong>in</strong>eers<br />

(FICE). Mr Rogers spent <strong>the</strong> early part <strong>of</strong> his<br />

career with medium-sized construction and<br />

civil eng<strong>in</strong>eer<strong>in</strong>g companies <strong>in</strong> <strong>the</strong> United<br />

K<strong>in</strong>gdom before jo<strong>in</strong><strong>in</strong>g <strong>BAM</strong> <strong>in</strong> 1979. Mr<br />

Rogers’ <strong>in</strong>itial position was plann<strong>in</strong>g<br />

eng<strong>in</strong>eer work<strong>in</strong>g on major pharmaceutical<br />

and <strong>in</strong>dustrial projects, prior to mov<strong>in</strong>g <strong>in</strong>to<br />

project management <strong>in</strong> 1981. He was<br />

appo<strong>in</strong>ted as a construction director <strong>in</strong> 1989<br />

Particulars <strong>of</strong> <strong>the</strong> Executive Board members<br />

before becom<strong>in</strong>g an associate director <strong>in</strong><br />

1992 and regional director <strong>in</strong> 1995. He was<br />

promoted to <strong>the</strong> ma<strong>in</strong> board <strong>of</strong> <strong>BAM</strong><br />

Construct UK <strong>in</strong> 2001 and became manag<strong>in</strong>g<br />

director <strong>in</strong> 2002. In 2007 he became CEO <strong>of</strong><br />

<strong>BAM</strong> Nuttall Ltd. Mr Rogers became a<br />

member <strong>of</strong> <strong>the</strong> Executive Board <strong>of</strong> Royal<br />

<strong>BAM</strong>Group <strong>in</strong> 2009. He is a British national.<br />

O<strong>the</strong>r <strong>of</strong>fices: member <strong>of</strong> <strong>the</strong> CBI<br />

Construction Council; member <strong>of</strong> <strong>the</strong> South<br />

East Regional Council.<br />

J. Ruis (1950)<br />

Mr Ruis jo<strong>in</strong>ed <strong>BAM</strong> <strong>in</strong> 1971 and has held a<br />

number <strong>of</strong> different f<strong>in</strong>ancial positions. Mr<br />

Ruis has been on Royal <strong>BAM</strong> Group’s<br />

Executive Board s<strong>in</strong>ce 2004 (Chief F<strong>in</strong>ancial<br />

Officer). He is a Dutch national.<br />

Retirement schedule for <strong>the</strong> Executive Board<br />

Left to right: N.J. de Vries, M.J. Rogers,<br />

J. Ruis and R.P. van W<strong>in</strong>gerden.<br />

R.P. van W<strong>in</strong>gerden (1961)<br />

Mr Van W<strong>in</strong>gerden graduated as a civil<br />

eng<strong>in</strong>eer from Delft University <strong>of</strong><br />

Technology <strong>in</strong> 1988. He jo<strong>in</strong>ed <strong>the</strong> Group as a<br />

project surveyor <strong>in</strong> 1988 and subsequently<br />

worked <strong>in</strong> a variety <strong>of</strong> (project) management<br />

roles for operat<strong>in</strong>g companies <strong>in</strong> <strong>the</strong><br />

Ne<strong>the</strong>rlands and elsewhere. He completed<br />

his MBA at Twente School <strong>of</strong> Management <strong>in</strong><br />

1994. He was appo<strong>in</strong>ted Director <strong>of</strong> HBG<br />

Bouw en Vastgoed <strong>in</strong> 2000, and<br />

subsequently became Director at <strong>BAM</strong><br />

Utiliteitsbouw <strong>in</strong> 2002, prior to be<strong>in</strong>g<br />

appo<strong>in</strong>ted Chairman <strong>of</strong> <strong>the</strong> Board <strong>of</strong> <strong>BAM</strong><br />

Won<strong>in</strong>gbouw <strong>in</strong> 2005. Mr Van W<strong>in</strong>gerden<br />

has been a member <strong>of</strong> <strong>the</strong> Executive Board <strong>of</strong><br />

Royal <strong>BAM</strong> Group s<strong>in</strong>ce 2008. He is a Dutch<br />

national.<br />

O<strong>the</strong>r <strong>of</strong>fices: member <strong>of</strong> <strong>the</strong> Board <strong>of</strong><br />

Governors <strong>of</strong> <strong>the</strong> Dutch Construction and<br />

Infrastructure Federation (Bouwend<br />

Nederland); member <strong>of</strong> <strong>the</strong> <strong>in</strong>dependent<br />

construction <strong>in</strong>dustry platform Vernieuw<strong>in</strong>g<br />

Bouw; Chairman <strong>of</strong> <strong>the</strong> Supervisory Board <strong>of</strong><br />

GEN (Gebieden Energieneutraal); member <strong>of</strong><br />

<strong>the</strong> Supervisory Board <strong>of</strong> Royal Saan;<br />

member <strong>of</strong> <strong>the</strong> Board <strong>of</strong> Nationaal Renovatie<br />

Platform.<br />

As <strong>of</strong> January 2012 Year <strong>of</strong><br />

Year <strong>of</strong><br />

Period <strong>of</strong><br />

appo<strong>in</strong>tment re-appo<strong>in</strong>tment appo<strong>in</strong>tment 1<br />

N.J. de Vries 1998 Unlimited<br />

M.J. Rogers 2009 Four years<br />

J. Ruis 2004 2008 Four years<br />

R.P. van W<strong>in</strong>gerden 2008 Four years<br />

1 New members <strong>of</strong> <strong>the</strong> Executive Board have been appo<strong>in</strong>ted (re-appo<strong>in</strong>ted where applicable)<br />

for a maximum four-year period s<strong>in</strong>ce 2004.


F<strong>in</strong>ancial results<br />

<strong>Report</strong> by <strong>the</strong> Executive Board<br />

• Result before tax <strong>2011</strong>: €158.7 million (2010: €25.9<br />

million).<br />

• Operat<strong>in</strong>g revenue up by 4 percent <strong>in</strong> <strong>2011</strong> to €7.9<br />

billion (2010: €7.6 billion).<br />

• Pr<strong>of</strong>it marg<strong>in</strong> before tax: 2.0 percent (2010: 2.0 percent<br />

(before tax and impairments)).<br />

• Net result <strong>2011</strong>: €126.0 million (2010: €15.3 million).<br />

• Proposed dividend <strong>of</strong> €0.16 per ord<strong>in</strong>ary share with<br />

stock alternative (2010: €0.03 or stock alternative).<br />

• Order book: €10.4 billion (year-end 2010: €12.1 billion).<br />

Course <strong>of</strong> bus<strong>in</strong>ess<br />

Across <strong>the</strong> board, <strong>the</strong> Group companies – given <strong>the</strong><br />

market conditions – recorded solid performances <strong>in</strong><br />

<strong>2011</strong>. The course <strong>of</strong> bus<strong>in</strong>ess <strong>in</strong> <strong>the</strong> various sectors is<br />

expla<strong>in</strong>ed elsewhere <strong>in</strong> this <strong>Annual</strong> <strong>Report</strong>.<br />

Operat<strong>in</strong>g revenue<br />

Royal <strong>BAM</strong> Group posted operat<strong>in</strong>g revenue <strong>of</strong> €7,920<br />

million <strong>in</strong> <strong>2011</strong>, which is an <strong>in</strong>crease <strong>of</strong> €309 million<br />

(up 4 percent) compared with 2010 (€7,611 million).<br />

Operat<strong>in</strong>g revenue <strong>in</strong>creased <strong>in</strong> all sectors with <strong>the</strong><br />

exception <strong>of</strong> construction and mechanical and electrical<br />

services. The <strong>in</strong>crease was almost entirely organic and<br />

was primarily due to less severe w<strong>in</strong>try periods and a<br />

number <strong>of</strong> large PPP and civil eng<strong>in</strong>eer<strong>in</strong>g projects that<br />

were <strong>in</strong> progress. The effects <strong>of</strong> exchange rate<br />

differences and takeovers on <strong>the</strong> <strong>in</strong>crease <strong>in</strong> operat<strong>in</strong>g<br />

revenue were small.<br />

Operat<strong>in</strong>g revenue is divided as follows across <strong>the</strong><br />

sectors:<br />

(x €1 million) <strong>2011</strong> 2010<br />

Construction and Mechanical<br />

and Electrical Services<br />

3,390 3,459<br />

Civil Eng<strong>in</strong>eer<strong>in</strong>g 3,834 3,659<br />

Property 674 593<br />

Public-Private Partnerships (PPP) 508 311<br />

Consultancy and Eng<strong>in</strong>eer<strong>in</strong>g 223 210<br />

Less: <strong>in</strong>tercompany sales (709) (621)<br />

7,920 7,611<br />

Operat<strong>in</strong>g revenue <strong>in</strong> construction and mechanical and<br />

electrical services fell, <strong>in</strong> particular at <strong>the</strong> British and to a<br />

lesser extent also at <strong>the</strong> Belgian non-residential<br />

construction company. In <strong>the</strong> Ne<strong>the</strong>rlands and Germany<br />

<strong>the</strong>re was a slight <strong>in</strong>crease <strong>in</strong> operat<strong>in</strong>g revenue.<br />

The civil eng<strong>in</strong>eer<strong>in</strong>g sector recorded strong growth <strong>in</strong><br />

operat<strong>in</strong>g revenue compared with 2010. Earn<strong>in</strong>gs went<br />

up <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands, <strong>the</strong> United K<strong>in</strong>gdom and Belgium<br />

<strong>in</strong> particular, ow<strong>in</strong>g to a number <strong>of</strong> large projects that<br />

were <strong>in</strong> progress. Operat<strong>in</strong>g revenue decreased <strong>in</strong> Ireland<br />

and Germany.<br />

The <strong>in</strong>crease <strong>in</strong> <strong>the</strong> property sector largely concerned <strong>the</strong><br />

Dutch market and was due especially to <strong>the</strong> sale <strong>of</strong> a<br />

substantial number <strong>of</strong> homes from <strong>the</strong> supply <strong>of</strong> unsold<br />

property and good progress <strong>in</strong> current projects.<br />

Operat<strong>in</strong>g revenue also went up <strong>in</strong> <strong>the</strong> United K<strong>in</strong>gdom.<br />

In Ireland, operat<strong>in</strong>g revenue fell to zero. The Belgian<br />

property company recorded lower operat<strong>in</strong>g revenue <strong>in</strong><br />

<strong>2011</strong> than <strong>in</strong> 2010.<br />

The <strong>in</strong>crease <strong>in</strong> operat<strong>in</strong>g revenue <strong>in</strong> <strong>the</strong> PPP sector was<br />

related to <strong>the</strong> <strong>in</strong>creased number <strong>of</strong> projects <strong>in</strong> <strong>the</strong><br />

construction phase. Operat<strong>in</strong>g revenue <strong>in</strong> <strong>the</strong><br />

consultancy and eng<strong>in</strong>eer<strong>in</strong>g sector went up slightly.<br />

Result<br />

The Group’s net result for <strong>the</strong> two years breaks down as<br />

follows:<br />

(x €1 million)<br />

Operat<strong>in</strong>g result before<br />

depreciation/amortisation<br />

<strong>2011</strong> 2010<br />

and impairments<br />

Depreciation/amortisation<br />

<strong>of</strong> tangible and <strong>in</strong>tangible<br />

256.7 206.2<br />

fixed assets (106.0) (108.3)<br />

Impairments - (128.2)<br />

Operat<strong>in</strong>g result 150.7 (30.3)<br />

F<strong>in</strong>ance <strong>in</strong>come 72.8 87.2<br />

F<strong>in</strong>ance expense (99.2) (64.7)<br />

Result from associates 34.4 33.7<br />

Result before tax 158.7 25.9<br />

Taxes (31.0) (7.6)<br />

M<strong>in</strong>ority <strong>in</strong>terest ( 1.7) (3.0)<br />

Net result 126.0 15.3<br />

39<br />

<strong>2011</strong>


40<br />

<strong>2011</strong><br />

The result before tax <strong>in</strong> <strong>2011</strong> was €158.7 million and was<br />

<strong>the</strong>refore considerably higher than <strong>in</strong> 2010 (€25.9<br />

million). The improvement occurred especially <strong>in</strong> <strong>the</strong><br />

property sector, <strong>in</strong> which an impairment <strong>of</strong> €127 million<br />

was recognised <strong>in</strong> 2010. Although <strong>the</strong> property sector<br />

still recorded a negative operat<strong>in</strong>g result <strong>in</strong> <strong>2011</strong> (a loss <strong>of</strong><br />

€23.4 million), this result was significantly better than <strong>in</strong><br />

2010 (a loss <strong>of</strong> €59.7 million). The public-private<br />

partnerships results also improved because <strong>of</strong> <strong>the</strong><br />

projects that were sold to <strong>the</strong> jo<strong>in</strong>t venture with PGGM.<br />

In construction (<strong>in</strong> particular <strong>in</strong> <strong>the</strong> United K<strong>in</strong>gdom) and<br />

civil eng<strong>in</strong>eer<strong>in</strong>g (primarily <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands and<br />

Germany), <strong>the</strong> results fell <strong>in</strong> <strong>2011</strong> compared to 2010.<br />

The pr<strong>of</strong>it marg<strong>in</strong> based on <strong>the</strong> aforementioned result<br />

is 2 percent <strong>of</strong> turnover (2010: 2 percent before<br />

impairments).<br />

At €126 million, <strong>the</strong> net result for <strong>2011</strong> was considerably<br />

higher than <strong>in</strong> 2010 (€15.3 million) when impairments<br />

were recognised <strong>in</strong> <strong>the</strong> property sector.<br />

Results by sector<br />

The distribution <strong>of</strong> <strong>the</strong> result before tax over <strong>the</strong> various<br />

sectors is shown <strong>in</strong> table 8 below. The percentages<br />

reflect <strong>the</strong> result <strong>in</strong> relation to revenue.<br />

Table 8 Results by sectors<br />

Order book<br />

The order book shrank by €1.7 billion (14 percent) to<br />

€10.4 billion by year-end <strong>2011</strong> (2010: €12.1 billion) due to<br />

a selective contract<strong>in</strong>g policy. The level <strong>of</strong> new order<br />

acquisitions was considerably lower than <strong>in</strong> 2010. The<br />

reduction was partly due to <strong>the</strong> cancellation <strong>of</strong> a number<br />

<strong>of</strong> large (hospital) projects and <strong>the</strong> delay <strong>in</strong> commercial<br />

property projects, both <strong>in</strong> <strong>the</strong> United K<strong>in</strong>gdom. In<br />

addition, a PPP road build<strong>in</strong>g project was cancelled <strong>in</strong><br />

Ireland because it proved impossible to f<strong>in</strong>d private<br />

fund<strong>in</strong>g for <strong>the</strong> time be<strong>in</strong>g. Of <strong>the</strong> total order book, it is<br />

expected that €5.8 billion worth <strong>of</strong> work will be carried<br />

out <strong>in</strong> 2012 and €4.6 billion <strong>in</strong> subsequent years.<br />

Accord<strong>in</strong>gly, nearly 80 percent <strong>of</strong> <strong>the</strong> expected operat<strong>in</strong>g<br />

revenue for 2012 is already <strong>in</strong> <strong>the</strong> order book. This is <strong>the</strong><br />

same situation as at year-end 2010 <strong>in</strong> relative terms, but<br />

is a clear reduction when expressed <strong>in</strong> absolute figures.<br />

The aforementioned order book comprises <strong>the</strong> orders for<br />

<strong>the</strong> next five years. In addition, <strong>the</strong> Group’s order book<br />

<strong>in</strong>cludes over €2.9 billion <strong>in</strong> contracts for <strong>the</strong> period<br />

post-2016. This work primarily consists <strong>of</strong> ma<strong>in</strong>tenance<br />

contracts for PPP projects and concession <strong>in</strong>come.<br />

(<strong>in</strong> €million) <strong>2011</strong> 2010<br />

% %<br />

Result Revenues Result Revenues<br />

Construction and mechanical and electrical services 76.2 2.2% 102.6 3.0%<br />

Civil eng<strong>in</strong>eer<strong>in</strong>g 91.9 2.4% 102.6 2.8%<br />

Property (23.4) Neg. (59.7) Neg.<br />

Public-private partnership 10.5 2.1% 3.5 1.1%<br />

Consultancy and eng<strong>in</strong>eer<strong>in</strong>g 15.2 6.8% 13.6 6.5%<br />

Elim<strong>in</strong>ations and o<strong>the</strong>r - (1.8)<br />

Total sectors 170.4 2.2% 160.8 2.1%<br />

Group costs (10.9) (10.6)<br />

Group <strong>in</strong>terests (31.5) (27.6)<br />

Operat<strong>in</strong>g activities 128.0 122.6<br />

Dredg<strong>in</strong>g 30.7 30.3<br />

Result before tax and impairments Property 158.7 2.0% 152.9 2.0%<br />

Impairment Property - (127.0)<br />

Taxes (31.0) (7.6)<br />

M<strong>in</strong>ority <strong>in</strong>terest (1.7) (3.0)<br />

Net result 126.0 1.6% 15.3 0.2%


Result per ord<strong>in</strong>ary share<br />

The number <strong>of</strong> ord<strong>in</strong>ary shares rank<strong>in</strong>g for dividend<br />

<strong>in</strong>creased <strong>in</strong> <strong>2011</strong> to approximately 232.9 million as at<br />

year-end <strong>2011</strong>, ow<strong>in</strong>g to <strong>the</strong> stock option dividend and <strong>the</strong><br />

conversion <strong>of</strong> convertible preference shares that were still<br />

outstand<strong>in</strong>g. At present, no fur<strong>the</strong>r convertible preference<br />

shares rema<strong>in</strong> outstand<strong>in</strong>g.<br />

The average number <strong>of</strong> outstand<strong>in</strong>g ord<strong>in</strong>ary shares <strong>in</strong> <strong>2011</strong><br />

<strong>in</strong>creased <strong>in</strong> relation to <strong>the</strong> previous year to 232.4 million<br />

shares. The average number <strong>of</strong> outstand<strong>in</strong>g ord<strong>in</strong>ary shares<br />

before <strong>the</strong> 2010 rights issue was adjusted <strong>in</strong> accordance with<br />

IFRS to make it possible to compare <strong>the</strong> net result per share.<br />

This adjustment br<strong>in</strong>gs <strong>the</strong> average number <strong>of</strong> outstand<strong>in</strong>g<br />

shares for 2010 to 204.2 million shares. The net result per<br />

ord<strong>in</strong>ary share for <strong>2011</strong> amounts to €0.54 (2010: €0.08). Now<br />

that <strong>the</strong> convertible preference shares have been converted<br />

<strong>in</strong> full, <strong>the</strong>re is no difference any more between <strong>the</strong> net result<br />

per ord<strong>in</strong>ary share and <strong>the</strong> fully diluted net result per<br />

ord<strong>in</strong>ary share.<br />

Dividend policy and proposed dividend for <strong>2011</strong><br />

Royal <strong>BAM</strong> Group endeavours to achieve a dividend<br />

distribution on ord<strong>in</strong>ary shares <strong>of</strong> between 30 percent and<br />

50 percent <strong>of</strong> <strong>the</strong> net pr<strong>of</strong>it. The proposal to <strong>the</strong> General<br />

Meet<strong>in</strong>g <strong>of</strong> Shareholders to be held on 25 April 2012 <strong>in</strong><br />

Amsterdam is to declare a cash dividend for <strong>2011</strong> <strong>of</strong> €0.16<br />

per ord<strong>in</strong>ary share with stock alternative (2010: €0.03 <strong>in</strong><br />

cash or stock dividend). The proposal corresponds to a<br />

payout ratio <strong>of</strong> approximately 30 percent based on <strong>the</strong> net<br />

result for <strong>2011</strong> <strong>of</strong> €126 million. The dividend return on<br />

ord<strong>in</strong>ary shares is <strong>the</strong>refore 4.9 percent, based on <strong>the</strong><br />

clos<strong>in</strong>g price for <strong>2011</strong> (2010: 0.7 percent).<br />

F<strong>in</strong>ancial position<br />

(<strong>in</strong> €million) <strong>2011</strong> 2010<br />

Net cash position 1,008 913<br />

Interest-bear<strong>in</strong>g debts 2,191 2,271<br />

Net debt position 1,178 1,357<br />

Recourse net debt position (56) 112<br />

Non-current assets 2,229 2,560<br />

Net operat<strong>in</strong>g capital (exclud<strong>in</strong>g<br />

cash and cash equivalents and<br />

current liabilities) 621 311<br />

Shareholders’ equity 1,162 1,100<br />

Capital base 1,362 1,302<br />

Balance sheet total 7,218 7,134<br />

Solvency 18.9% 18.2%<br />

Solvency exclud<strong>in</strong>g PPP 21.9% 21.0%<br />

The net cash position, i.e. <strong>the</strong> balance <strong>of</strong> cash and cash<br />

equivalents m<strong>in</strong>us current bank loans, was €1,008 million<br />

as at 31 December <strong>2011</strong> (year-end 2010: €913 million).<br />

This balance was boosted by €200 million <strong>in</strong> <strong>2011</strong><br />

because <strong>of</strong> <strong>the</strong> sale <strong>of</strong> Van Oord. Part <strong>of</strong> <strong>the</strong> cash balance<br />

as at 31 December <strong>2011</strong> represents <strong>the</strong> Group’s share <strong>in</strong><br />

<strong>the</strong> €205 million <strong>in</strong> cash and cash equivalents held by<br />

jo<strong>in</strong>t ventures and o<strong>the</strong>r forms <strong>of</strong> partnership (year-end<br />

2010: €215 million).<br />

The <strong>in</strong>terest-bear<strong>in</strong>g debts amounted to €2,191 million as<br />

at 31 December <strong>2011</strong> (year-end 2010: €2,271 million) and<br />

<strong>the</strong> net debt position was €1,178 million (year-end 2010:<br />

€1,357 million). The majority <strong>of</strong> <strong>the</strong> debt consists <strong>of</strong><br />

non-recourse PPP loans and non-recourse project fund<strong>in</strong>g<br />

(€1,234 million), recourse project fund<strong>in</strong>g (€354 million),<br />

a senior loan (€360 million) and a subord<strong>in</strong>ated loan<br />

(€200 million). The reduction <strong>in</strong> <strong>the</strong> debts was due to a<br />

reduction <strong>in</strong> recourse project fund<strong>in</strong>g as a result <strong>of</strong> <strong>the</strong><br />

scal<strong>in</strong>g down <strong>of</strong> property positions, and due to <strong>the</strong><br />

classification <strong>of</strong> part <strong>of</strong> <strong>the</strong> non-recourse PPP loans as<br />

liabilities held for sale as a consequence <strong>of</strong> <strong>the</strong> proposed<br />

sale <strong>of</strong> a number <strong>of</strong> projects to <strong>the</strong> jo<strong>in</strong>t venture with<br />

PGGM. On <strong>the</strong> o<strong>the</strong>r hand, <strong>the</strong> debts <strong>in</strong>creased because<br />

<strong>of</strong> <strong>the</strong> growth <strong>in</strong> PPP loans on current projects.<br />

The recourse net debt position (exclud<strong>in</strong>g non-recourse<br />

debts), which is part <strong>of</strong> <strong>the</strong> leverage ratio <strong>in</strong> <strong>the</strong> bank<br />

covenants at Group level, stood at €56 million as at<br />

31 December <strong>2011</strong>, hav<strong>in</strong>g fallen compared to year-end<br />

2010 (net debt <strong>of</strong> €112 million).<br />

As at year-end <strong>2011</strong>, <strong>the</strong> Group had three credit facilities at<br />

its disposal: <strong>the</strong> subord<strong>in</strong>ated loan (€200 million), <strong>the</strong> bank<br />

loan (€360 million) and <strong>the</strong> senior facility (€475 million).<br />

The senior facility was not used at year-end <strong>2011</strong> (year-end<br />

2010: ditto). In <strong>2011</strong>, <strong>the</strong> Group complied with <strong>the</strong><br />

covenants agreed with its lenders (2010: ditto). These<br />

facilities were ref<strong>in</strong>anced <strong>in</strong> January 2012. The new credit<br />

facilities consist <strong>of</strong> a subord<strong>in</strong>ated loan <strong>of</strong> €125 million<br />

with a term <strong>of</strong> 5½ years and a bank loan <strong>of</strong> a maximum <strong>of</strong><br />

€500 million (4-year term with an option to extend by<br />

ano<strong>the</strong>r year). The reduction <strong>of</strong> <strong>the</strong> credit facilities is partly<br />

l<strong>in</strong>ked to <strong>the</strong> improved balance sheet ratios, due <strong>in</strong> part to<br />

<strong>the</strong> sale <strong>of</strong> Van Oord.<br />

The non-current assets decreased <strong>in</strong> <strong>2011</strong> and amounted<br />

to €2,229 million as at 31 December <strong>2011</strong> (2010: €2,560<br />

million). The reduction reflects ma<strong>in</strong>ly <strong>the</strong> sale <strong>of</strong> <strong>the</strong><br />

m<strong>in</strong>ority <strong>in</strong>terest <strong>in</strong> Van Oord and <strong>the</strong> disposal<br />

programme <strong>of</strong> PPP contracts.<br />

41<br />

<strong>2011</strong>


42<br />

<strong>2011</strong><br />

Renovation <strong>of</strong> <strong>the</strong> National Maritime Museum, Amsterdam.<br />

<strong>BAM</strong> Utiliteitsbouw, <strong>BAM</strong> Techniek.<br />

Operat<strong>in</strong>g capital (exclud<strong>in</strong>g cash and cash equivalents<br />

and current liabilities) stood at €621 million as at<br />

31 December <strong>2011</strong> (year-end 2010: €311 million). The<br />

<strong>in</strong>crease <strong>in</strong> operat<strong>in</strong>g capital <strong>in</strong> <strong>2011</strong> was partly due to<br />

one-<strong>of</strong>f factors, <strong>in</strong>clud<strong>in</strong>g a number <strong>of</strong> milestone<br />

payments for PPP contracts <strong>in</strong> 2012, and partly due to <strong>the</strong><br />

classification <strong>of</strong> assets held for sale (PPP projects to be<br />

transferred to <strong>the</strong> jo<strong>in</strong>t venture with PGGM and cessation<br />

<strong>of</strong> activities (Tebod<strong>in</strong>)). The total effect <strong>of</strong> <strong>the</strong>se one-<strong>of</strong>f<br />

factors on <strong>the</strong> <strong>in</strong>crease <strong>in</strong> operat<strong>in</strong>g capital amounted to<br />

approximately €160 million.<br />

The Group’s shareholders’ equity stood at €1,162 million<br />

as at 31 December <strong>2011</strong>, hav<strong>in</strong>g <strong>in</strong>creased compared to<br />

<strong>the</strong> position at year-end 2010 (€1,100 million). The<br />

pr<strong>in</strong>cipal changes <strong>in</strong> shareholders’ equity are <strong>the</strong> net<br />

result for <strong>2011</strong> (€126 million) and <strong>the</strong> negative effect <strong>of</strong><br />

hedge account<strong>in</strong>g (a loss <strong>of</strong> €73 million). The dividend<br />

distribution for 2010 and exchange rate <strong>in</strong>creases had a<br />

limited effect.<br />

Apart from <strong>the</strong> aforementioned shareholders’ equity, <strong>the</strong><br />

capital base only comprises <strong>the</strong> subord<strong>in</strong>ated loan, which<br />

did not change <strong>in</strong> <strong>2011</strong>. The preference shares (€1.7<br />

million) were all converted <strong>in</strong> <strong>2011</strong> or repurchased. As a<br />

result, <strong>the</strong> <strong>in</strong>crease <strong>in</strong> <strong>the</strong> capital base was virtually <strong>the</strong><br />

same as <strong>the</strong> <strong>in</strong>crease <strong>in</strong> <strong>the</strong> shareholders’ equity.<br />

Solvency based on <strong>the</strong> capital base stood at 18.9 percent<br />

as at 31 December <strong>2011</strong>, which is higher than <strong>the</strong> position<br />

at year-end 2010 (18.2 percent). Solvency exclud<strong>in</strong>g<br />

public-private partnerships <strong>in</strong>creased as well, stand<strong>in</strong>g at<br />

21.9 percent as at 31 December <strong>2011</strong> (year-end 2010:<br />

21.0 percent).<br />

Recourse solvency, <strong>the</strong> ratio <strong>in</strong> accordance with <strong>the</strong> bank<br />

covenants, also <strong>in</strong>creased to reach 25.7 percent as at<br />

31 December <strong>2011</strong> (year-end 2010: 23.8 percent), which<br />

is well above <strong>the</strong> lower limit <strong>of</strong> 15 percent.<br />

Development <strong>of</strong> (o<strong>the</strong>r) balance sheet positions<br />

Various balance sheet positions were <strong>in</strong>fluenced as at<br />

31 December <strong>2011</strong> by <strong>the</strong> classification ‘held for sale’ <strong>of</strong><br />

several PPP projects to be transferred to <strong>the</strong> jo<strong>in</strong>t venture<br />

with PGGM, and by <strong>the</strong> sale <strong>of</strong> Tebod<strong>in</strong>.<br />

The book value <strong>of</strong> property, plant and equipment fell<br />

slightly to €374 million (2010: €409 million). In <strong>2011</strong>, net<br />

<strong>in</strong>vestment amounted to €57 million (2010: €68 million)<br />

and depreciation amounted to €95 million (2010: €97<br />

million).<br />

The book value <strong>of</strong> <strong>the</strong> <strong>in</strong>tangible assets was €734 million<br />

at year-end <strong>2011</strong> (2010: €850 million). The decrease was<br />

almost entirely due to <strong>the</strong> aforementioned<br />

reclassification as ‘assets held for sale’ <strong>of</strong> both PPP<br />

concessions and <strong>the</strong> goodwill relat<strong>in</strong>g to Tebod<strong>in</strong>.<br />

The total PPP receivables <strong>in</strong>creased <strong>in</strong> <strong>2011</strong> to €879<br />

million (year-end 2010: €765 million). The <strong>in</strong>crease<br />

primarily reflects <strong>the</strong> progress <strong>of</strong> current PPP activities<br />

(new loans granted m<strong>in</strong>us repayments), <strong>in</strong>volv<strong>in</strong>g a net<br />

amount <strong>of</strong> €403 million (2010: €241 million). On <strong>the</strong><br />

o<strong>the</strong>r hand, <strong>the</strong>re are decreases result<strong>in</strong>g from <strong>the</strong><br />

transfer <strong>of</strong> three projects to <strong>the</strong> jo<strong>in</strong>t venture with PGGM<br />

<strong>in</strong> December <strong>2011</strong> (€213 million), and receivables worth<br />

€78 million were classified as assets held for sale.<br />

The total <strong>in</strong>tangible and f<strong>in</strong>ancial PPP assets (<strong>in</strong>clud<strong>in</strong>g<br />

<strong>the</strong> short-term component) amounted to €1,063 million<br />

as at year-end <strong>2011</strong> (2010: €1,019 million). The related<br />

(non-)recourse PPP loans <strong>in</strong>creased by a comparable<br />

amount and stood at €991 million as at 31 December<br />

<strong>2011</strong> (year-end 2010: €942 million). Therefore <strong>the</strong> net<br />

position as at 31 December <strong>2011</strong> was €72 million<br />

(year-end 2010: €77 million). In addition, a net<br />

<strong>in</strong>vestment <strong>of</strong> €16 million was made with regard to o<strong>the</strong>r<br />

assets and liabilities <strong>in</strong> <strong>the</strong>se SPVs and non-consolidated<br />

associates (year-end 2010: €27 million). The Group’s total<br />

net <strong>in</strong>vestment <strong>in</strong> public-private partnerships was<br />

<strong>the</strong>refore €88 million (year-end 2010: €104 million).


Oman Botanical Garden, Muscat.<br />

<strong>BAM</strong> International.<br />

This net <strong>in</strong>vestment decreased because <strong>of</strong> <strong>the</strong><br />

aforementioned transfer <strong>of</strong> projects to <strong>the</strong> jo<strong>in</strong>t venture<br />

with PGGM and <strong>the</strong> classification as assets held for sale.<br />

Additionally, <strong>the</strong> Group had net <strong>in</strong>vestment<br />

commitments as at 31 December <strong>2011</strong> <strong>in</strong> <strong>the</strong> amount<br />

<strong>of</strong> €165 million (2010: €153 million). At present <strong>the</strong><br />

Group’s order book conta<strong>in</strong>s 36 PPP contracts (2010: 31),<br />

<strong>in</strong>clud<strong>in</strong>g two preferred bidder contracts <strong>of</strong> which<br />

22 (2010: 21) contracts are operational.<br />

The book value <strong>of</strong> <strong>the</strong> participat<strong>in</strong>g <strong>in</strong>terests fell to €19<br />

million as at year-end <strong>2011</strong> (2010: €211 million), primarily<br />

because <strong>of</strong> <strong>the</strong> sale <strong>of</strong> <strong>the</strong> participat<strong>in</strong>g <strong>in</strong>terest <strong>in</strong> Van<br />

Oord.<br />

As regards projects for third parties, <strong>the</strong> Group’s balance<br />

sheet as at 31 December <strong>2011</strong> <strong>in</strong>cludes projects <strong>in</strong><br />

progress with a total balance <strong>of</strong> €437 million (year-end<br />

2010: €452 million). The balance consists <strong>of</strong> €936 million<br />

(year-end 2010: €901 million) owed to clients and €499<br />

million (2010: €449 million) receivable from clients.<br />

As at 31 December <strong>2011</strong>, gross <strong>in</strong>vestments <strong>in</strong> property<br />

development amounted to €1,492 million (year-end<br />

2010: €1,540 million). The reduction is primarily related<br />

to <strong>the</strong> scal<strong>in</strong>g down <strong>of</strong> property positions <strong>in</strong> <strong>the</strong><br />

Ne<strong>the</strong>rlands. Project fund<strong>in</strong>g for property development<br />

fell more sharply <strong>in</strong> <strong>2011</strong> and stood at €595 million as at<br />

31 December <strong>2011</strong> (year-end 2010: €709 million). From<br />

this amount, a total <strong>of</strong> €372 million relates to nonrecourse<br />

loans (year-end 2010: €402 million) and €223<br />

million to recourse loans (year-end 2010: €307 million).<br />

The net position (gross <strong>in</strong>vestment m<strong>in</strong>us fund<strong>in</strong>g) as at<br />

year-end <strong>2011</strong> was €897 million (year-end 2010: €831<br />

million).<br />

The assets for pension rights, m<strong>in</strong>us provisions for<br />

employee benefits, amounted to €37 million at year-end<br />

<strong>2011</strong>. At year-end 2010, <strong>the</strong>re was still a liability <strong>of</strong> €9<br />

million. The change to an asset is due to <strong>the</strong> fact that <strong>the</strong><br />

employer’s contributions to <strong>the</strong> pension funds are higher<br />

than <strong>the</strong> pension costs calculated on an actuarial basis.<br />

The total balance sheet position for provisions (longterm<br />

and short-term) <strong>in</strong>creased to €137 million (2010:<br />

€130 million). The <strong>in</strong>crease is related to <strong>the</strong> dividend<br />

guarantee arranged upon <strong>the</strong> sale <strong>of</strong> Van Oord<br />

(€15 million). On <strong>the</strong> o<strong>the</strong>r hand, <strong>the</strong>re is a decrease <strong>in</strong><br />

guarantee and reorganisation provisions.<br />

The balance <strong>of</strong> <strong>the</strong> deferred tax positions on <strong>the</strong> balance<br />

sheet is a deferred tax asset <strong>of</strong> €73 million (year-end<br />

2010: €108 million). The decrease is almost entirely due<br />

to <strong>the</strong> recognition <strong>of</strong> part <strong>of</strong> <strong>the</strong> deferred tax as an<br />

immediate tax asset.<br />

43<br />

<strong>2011</strong>


44<br />

<strong>2011</strong><br />

Declaration <strong>in</strong> accordance with <strong>the</strong> Dutch<br />

F<strong>in</strong>ancial Supervision Act<br />

In accordance with <strong>the</strong>ir statutory obligations under<br />

Article 2:101(2) <strong>of</strong> <strong>the</strong> Ne<strong>the</strong>rlands Civil Code and Article<br />

5:25c(2)(c) <strong>of</strong> <strong>the</strong> Dutch F<strong>in</strong>ancial Supervision Act, <strong>the</strong><br />

members <strong>of</strong> <strong>the</strong> Executive Board declare that, <strong>in</strong> so far as<br />

<strong>the</strong>y are aware:<br />

• <strong>the</strong> f<strong>in</strong>ancial statements provide a true and fair picture<br />

<strong>of</strong> <strong>the</strong> assets, liabilities, f<strong>in</strong>ancial position and <strong>the</strong><br />

result <strong>of</strong> both <strong>the</strong> parent company and <strong>the</strong><br />

consolidated companies; and<br />

• <strong>the</strong> annual report provides a true and fair picture <strong>of</strong><br />

<strong>the</strong> situation on 31 December <strong>2011</strong> and <strong>the</strong> course <strong>of</strong><br />

bus<strong>in</strong>ess dur<strong>in</strong>g <strong>the</strong> <strong>2011</strong> f<strong>in</strong>ancial year at <strong>the</strong> parent<br />

company and at <strong>the</strong> companies associated with <strong>the</strong><br />

parent company, for which <strong>the</strong> data have been<br />

<strong>in</strong>cluded <strong>in</strong> <strong>the</strong> parent company’s f<strong>in</strong>ancial statements,<br />

and <strong>the</strong> annual report describes <strong>the</strong> ma<strong>in</strong> risks fac<strong>in</strong>g<br />

<strong>the</strong> parent company.<br />

Acquisitions and disposals<br />

Acquisitions<br />

Royal <strong>BAM</strong> Group nv acquired all <strong>of</strong> <strong>the</strong> shares <strong>in</strong> Carmans<br />

Spoorwerken nv <strong>of</strong> Alken <strong>in</strong> Belgium on 9 February <strong>2011</strong>.<br />

The management owned <strong>the</strong> shares.<br />

Carmans Spoorwerken has specialised <strong>in</strong> lay<strong>in</strong>g railway<br />

l<strong>in</strong>es and <strong>in</strong>stall<strong>in</strong>g <strong>the</strong> accompany<strong>in</strong>g equipment –<br />

especially <strong>in</strong> <strong>the</strong> Dutch-speak<strong>in</strong>g part <strong>of</strong> Belgium – s<strong>in</strong>ce<br />

1982. Carmans’ annual turnover is approximately €5<br />

million and <strong>the</strong> company has approximately fifteen<br />

employees. Carmans will work closely <strong>in</strong> Belgium with<br />

Betonac (<strong>BAM</strong>’s Belgian operat<strong>in</strong>g company which<br />

specialises <strong>in</strong> build<strong>in</strong>g roads and o<strong>the</strong>r <strong>in</strong>frastructure,<br />

<strong>in</strong>clud<strong>in</strong>g rail <strong>in</strong>frastructure) and with <strong>BAM</strong> Rail (<strong>BAM</strong>’s<br />

Dutch railway builder which also works with local Group<br />

companies <strong>in</strong> Belgium, Ireland and <strong>the</strong> United K<strong>in</strong>gdom).<br />

<strong>BAM</strong> is expect<strong>in</strong>g <strong>the</strong> Belgian rail market to cont<strong>in</strong>ue<br />

<strong>of</strong>fer<strong>in</strong>g good opportunities <strong>in</strong> <strong>the</strong> years ahead and<br />

considers <strong>the</strong> addition <strong>of</strong> Carmans to <strong>the</strong> Group as a<br />

valuable supplement to Group expertise.<br />

After <strong>the</strong> balance sheet date, <strong>BAM</strong> Immobilien-<br />

Dienstleistungen GmbH – <strong>the</strong> <strong>BAM</strong> Deutschland<br />

subsidiary which specialises <strong>in</strong> facility management –<br />

acquired 75 percent <strong>of</strong> <strong>the</strong> share capital <strong>in</strong> MR Facility<br />

Services GmbH <strong>of</strong> Hallbergmoos, near Munich. MR<br />

Facility Services has an annual turnover <strong>of</strong> approximately<br />

€4 million and employs approximately forty people. The<br />

company provides technical equipment services,<br />

domestic services and property management for retail<br />

and <strong>of</strong>fice as well as residential build<strong>in</strong>gs.<br />

<strong>BAM</strong> Deutschland is streng<strong>the</strong>n<strong>in</strong>g its facility<br />

management capacity so that it can cont<strong>in</strong>ue respond<strong>in</strong>g<br />

to <strong>the</strong> <strong>in</strong>creased demand for <strong>the</strong>se services, <strong>in</strong>clud<strong>in</strong>g <strong>in</strong><br />

relation to its own grow<strong>in</strong>g portfolio <strong>of</strong> PPP projects.<br />

Disposals<br />

On 22 December <strong>2011</strong>, Royal <strong>BAM</strong> Group sold its<br />

21.5 percent share <strong>in</strong> <strong>the</strong> dredg<strong>in</strong>g company Van Oord to<br />

a consortium consist<strong>in</strong>g <strong>of</strong> <strong>the</strong> Belgian <strong>in</strong>vestment<br />

company Cobepa and <strong>the</strong> Dutch <strong>in</strong>vestment companies<br />

Janivo, Breed<strong>in</strong>vest and R<strong>in</strong>kelberg. The purchase price<br />

was €200 million. Given <strong>the</strong> guarantees that were<br />

provided, <strong>BAM</strong> took a provision <strong>in</strong> <strong>2011</strong> for <strong>the</strong> risk <strong>of</strong><br />

€15 million. This risk relates to a dividend guarantee for a<br />

five-year period.<br />

The total amount <strong>in</strong> cash received by <strong>BAM</strong> <strong>in</strong> <strong>the</strong> f<strong>in</strong>ancial<br />

year <strong>2011</strong> <strong>in</strong> connection with <strong>the</strong> <strong>in</strong>terest <strong>in</strong> Van Oord<br />

was €238 million. This amount comprises <strong>the</strong> purchase<br />

price <strong>of</strong> €200 million, <strong>the</strong> receipt <strong>of</strong> an ord<strong>in</strong>ary dividend


<strong>of</strong> €16 million and a super dividend paid <strong>of</strong> €22 million.<br />

The Executive Board <strong>of</strong> Royal <strong>BAM</strong> Group is very pleased<br />

with this transaction. <strong>BAM</strong>’s m<strong>in</strong>ority <strong>in</strong>terest <strong>in</strong> <strong>the</strong> Van<br />

Oord dredg<strong>in</strong>g company orig<strong>in</strong>ated from <strong>the</strong> sale <strong>of</strong> <strong>the</strong><br />

dredg<strong>in</strong>g activities to MerweOord <strong>in</strong> 2003. As part <strong>of</strong> that<br />

sale, it was agreed that <strong>BAM</strong> could sell its m<strong>in</strong>ority<br />

<strong>in</strong>terest <strong>in</strong> Van Oord start<strong>in</strong>g <strong>in</strong> 2008. This transaction is<br />

<strong>in</strong> l<strong>in</strong>e with <strong>the</strong> updated strategic agenda presented on<br />

17 November <strong>2011</strong> <strong>in</strong> which <strong>BAM</strong> aims to enhance <strong>the</strong><br />

focus on core bus<strong>in</strong>ess and also streng<strong>the</strong>n <strong>the</strong> f<strong>in</strong>ancial<br />

position.<br />

After <strong>the</strong> balance sheet date, Royal <strong>BAM</strong> Group has<br />

reached agreement to sell consultancy and eng<strong>in</strong>eer<strong>in</strong>g<br />

firm Tebod<strong>in</strong> to Bilf<strong>in</strong>ger Berger. The transaction has a<br />

total cash consideration <strong>of</strong> approximately €145 million.<br />

<strong>BAM</strong> and Bilf<strong>in</strong>ger Berger expect to close <strong>the</strong> transaction<br />

<strong>in</strong> <strong>the</strong> second quarter <strong>of</strong> 2012.<br />

Corporate governance<br />

The Supervisory Board and <strong>the</strong> Executive Board are<br />

responsible for <strong>the</strong> company’s corporate governance<br />

structure and for compliance with that structure.<br />

The ma<strong>in</strong> aspects <strong>of</strong> this corporate governance structure<br />

are set out <strong>in</strong> <strong>the</strong> <strong>Annual</strong> <strong>Report</strong> every year and are<br />

published on <strong>the</strong> company’s website.<br />

The Supervisory Board and <strong>the</strong> Executive Board subscribe<br />

to <strong>the</strong> pr<strong>in</strong>ciples and best practice provisions <strong>of</strong> <strong>the</strong><br />

Dutch corporate governance code (hereafter: ‘<strong>the</strong><br />

Code’). The Supervisory Board and <strong>the</strong> Executive Board<br />

have a qualify<strong>in</strong>g comment <strong>in</strong> respect <strong>of</strong> one <strong>of</strong> <strong>the</strong><br />

provisions <strong>of</strong> <strong>the</strong> Code, and best practice provisions<br />

II.2.13 (performance criteria, variable remuneration) and<br />

II.2.8 (maximum severance payment) are not applied <strong>in</strong><br />

full. See also <strong>the</strong> explanation given below <strong>of</strong> how <strong>the</strong><br />

company complies with <strong>the</strong> Dutch corporate governance<br />

code. The full text <strong>of</strong> <strong>the</strong> Code can be found at www.<br />

commissiecorporategovernance.nl.<br />

Executive Board<br />

The Supervisory Board and <strong>the</strong> Executive Board share <strong>the</strong><br />

premise <strong>of</strong> <strong>the</strong> Code that <strong>the</strong> Executive Board, apart from<br />

look<strong>in</strong>g after <strong>the</strong> day-to-day management <strong>of</strong> <strong>the</strong><br />

company, is also responsible for formulat<strong>in</strong>g and<br />

achiev<strong>in</strong>g corporate objectives, for corporate strategy<br />

with its associated risk pr<strong>of</strong>ile and for corporate social<br />

responsibility. The Executive Board accounts for its<br />

activities to <strong>the</strong> Supervisory Board and to <strong>the</strong> General<br />

Meet<strong>in</strong>g. In perform<strong>in</strong>g its duties, <strong>the</strong> Executive Board is<br />

guided by <strong>the</strong> <strong>in</strong>terests <strong>of</strong> <strong>the</strong> company and <strong>the</strong> related<br />

enterprise, weigh<strong>in</strong>g <strong>the</strong> justifiable <strong>in</strong>terests <strong>of</strong> <strong>the</strong><br />

various stakeholders aga<strong>in</strong>st each o<strong>the</strong>r. The Code’s best<br />

practice provisions evolv<strong>in</strong>g from this premise are<br />

supported.<br />

The members <strong>of</strong> <strong>the</strong> Executive Board jo<strong>in</strong>tly manage <strong>the</strong><br />

company and are jo<strong>in</strong>tly and severally liable for that<br />

management. Subject to <strong>the</strong> approval <strong>of</strong> <strong>the</strong> Supervisory<br />

Board, <strong>the</strong> members <strong>of</strong> <strong>the</strong> Executive Board share out<br />

<strong>the</strong>ir activities. The Chairman manages <strong>the</strong> Executive<br />

Board. The Chief F<strong>in</strong>ancial Officer (CFO) is specifically<br />

charged with f<strong>in</strong>ancial tasks. The Chairman and o<strong>the</strong>r<br />

members <strong>of</strong> <strong>the</strong> Executive Board manage <strong>the</strong> companies<br />

that are entrusted to <strong>the</strong>ir supervision.<br />

The Executive Board ensures proper provision <strong>of</strong><br />

<strong>in</strong>formation to <strong>the</strong> Supervisory Board. In <strong>the</strong> <strong>Annual</strong><br />

<strong>Report</strong>, <strong>the</strong> Executive Board describes <strong>the</strong> pr<strong>in</strong>ciple risks<br />

45<br />

<strong>2011</strong>


46<br />

<strong>2011</strong><br />

related to <strong>the</strong> company’s strategy, <strong>the</strong> organisation and<br />

operation <strong>of</strong> <strong>in</strong>ternal risk management and control<br />

systems <strong>in</strong> relation to <strong>the</strong> pr<strong>in</strong>ciple risks dur<strong>in</strong>g <strong>the</strong><br />

f<strong>in</strong>ancial year and any significant shortcom<strong>in</strong>gs <strong>in</strong> <strong>the</strong><br />

<strong>in</strong>ternal risk management and control systems that were<br />

identified dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial year, any significant<br />

changes that were made and any significant<br />

improvements that are planned.<br />

The Group has implemented general risk-management<br />

measures <strong>in</strong> <strong>the</strong> form <strong>of</strong> <strong>in</strong>ternal procedures and<br />

<strong>in</strong>structions. Besides general risk-management<br />

measures, <strong>the</strong> Group has also implemented specific<br />

measures focused primarily on risks relat<strong>in</strong>g to market,<br />

reputation, safety, projects, currency, credit, debtors,<br />

<strong>in</strong>terest and liquidity positions. These risks are discussed<br />

<strong>in</strong> greater detail on page 57 and page 123 <strong>of</strong> <strong>the</strong> <strong>Annual</strong><br />

<strong>Report</strong>, along with <strong>the</strong> risk-management measures that<br />

<strong>the</strong> Group has taken. The risk section <strong>in</strong> <strong>the</strong> <strong>Annual</strong><br />

<strong>Report</strong> conta<strong>in</strong>s a statement by <strong>the</strong> Executive Board on<br />

<strong>the</strong> risks <strong>of</strong> f<strong>in</strong>ancial report<strong>in</strong>g, as referred to <strong>in</strong> provision<br />

II.1.5 <strong>of</strong> <strong>the</strong> Code.<br />

The Executive Board is subject to a set <strong>of</strong> rules approved<br />

by <strong>the</strong> Supervisory Board, lay<strong>in</strong>g down <strong>the</strong> details <strong>of</strong> how<br />

<strong>the</strong> Executive Board operates and its relationship with<br />

<strong>the</strong> Supervisory Board, <strong>the</strong> shareholders and <strong>the</strong> Central<br />

Works Council. The Executive Board rules have been<br />

published on <strong>the</strong> company’s website. The company also<br />

operates a code <strong>of</strong> conduct and a whistleblowers’<br />

scheme, both <strong>of</strong> which are published on <strong>the</strong> company’s<br />

website.<br />

The company’s Executive Board can consist <strong>of</strong> four or five<br />

members, which is a number that <strong>the</strong> Supervisory Board<br />

considers appropriate <strong>in</strong> today’s circumstances,<br />

especially given <strong>the</strong> size and <strong>in</strong>ternational nature <strong>of</strong> <strong>the</strong><br />

Group.<br />

Members <strong>of</strong> <strong>the</strong> Executive Board are appo<strong>in</strong>ted by <strong>the</strong><br />

General Meet<strong>in</strong>g. The Supervisory Board has <strong>the</strong> right to<br />

make a (b<strong>in</strong>d<strong>in</strong>g) proposal as regards nom<strong>in</strong>ees for<br />

appo<strong>in</strong>tment. However, <strong>the</strong> General Meet<strong>in</strong>g can render<br />

a proposal non-b<strong>in</strong>d<strong>in</strong>g, <strong>in</strong> l<strong>in</strong>e with best practice<br />

provision IV.1.1 <strong>of</strong> <strong>the</strong> Code, <strong>in</strong> which case <strong>the</strong> General<br />

Meet<strong>in</strong>g is <strong>the</strong>n free to fill <strong>the</strong> vacant seat on <strong>the</strong><br />

Executive Board as it deems fit, <strong>in</strong> accordance with <strong>the</strong><br />

formalities stated <strong>in</strong> <strong>the</strong> company’s Articles <strong>of</strong><br />

Association. Decisions by <strong>the</strong> General Meet<strong>in</strong>g regard<strong>in</strong>g<br />

candidates proposed by <strong>the</strong> Supervisory Board for<br />

membership <strong>of</strong> <strong>the</strong> Executive Board require a simple<br />

majority <strong>of</strong> <strong>the</strong> votes cast.<br />

Decisions by <strong>the</strong> General Meet<strong>in</strong>g about candidates for<br />

membership <strong>of</strong> <strong>the</strong> Executive Board who are not<br />

proposed by <strong>the</strong> Supervisory Board require an absolute<br />

majority <strong>of</strong> <strong>the</strong> votes cast, but that majority must<br />

represent at least one third <strong>of</strong> <strong>the</strong> issued capital. The<br />

General Meet<strong>in</strong>g can suspend or dismiss members <strong>of</strong> <strong>the</strong><br />

Executive Board. The Supervisory Board has <strong>the</strong> power to<br />

suspend members <strong>of</strong> <strong>the</strong> Executive Board. Decisions to<br />

suspend or dismiss a member <strong>of</strong> <strong>the</strong> Executive Board can<br />

only be taken by an absolute majority <strong>of</strong> <strong>the</strong> votes,<br />

provid<strong>in</strong>g that majority represents at least one third <strong>of</strong><br />

<strong>the</strong> issued capital, unless <strong>the</strong> proposal to suspend or<br />

dismiss is put forward by <strong>the</strong> Supervisory Board, <strong>in</strong> which<br />

case <strong>the</strong> decision can be taken by an absolute majority <strong>of</strong><br />

<strong>the</strong> votes without <strong>the</strong> requirement for a quorum.<br />

The Supervisory Board appo<strong>in</strong>ts one <strong>of</strong> <strong>the</strong> members <strong>of</strong><br />

<strong>the</strong> Executive Board as Chairman and can appo<strong>in</strong>t one <strong>of</strong><br />

<strong>the</strong> members <strong>of</strong> <strong>the</strong> Executive Board as Vice-Chairman.<br />

Pursuant to <strong>the</strong> Code, members <strong>of</strong> <strong>the</strong> Executive Board<br />

are appo<strong>in</strong>ted for a period <strong>of</strong> no more than four years.<br />

They retire after <strong>the</strong> conclusion <strong>of</strong> <strong>the</strong> first <strong>Annual</strong><br />

General Meet<strong>in</strong>g to be held <strong>in</strong> <strong>the</strong> fourth year after <strong>the</strong><br />

year <strong>in</strong> which <strong>the</strong>y were appo<strong>in</strong>ted. Members <strong>of</strong> <strong>the</strong><br />

Executive Board can be re-appo<strong>in</strong>ted for a fur<strong>the</strong>r period<br />

<strong>of</strong> four years. The contractual agreements with members<br />

<strong>of</strong> <strong>the</strong> Executive Board who were appo<strong>in</strong>ted before <strong>the</strong><br />

Code came <strong>in</strong>to effect will be honoured; <strong>the</strong>ir<br />

appo<strong>in</strong>tment is for an <strong>in</strong>def<strong>in</strong>ite period.<br />

The ma<strong>in</strong> elements <strong>of</strong> <strong>the</strong> employment contracts with<br />

members <strong>of</strong> <strong>the</strong> Executive Board are published on <strong>the</strong><br />

company’s website, <strong>in</strong> accordance with <strong>the</strong> Code.<br />

The Code’s provisions relat<strong>in</strong>g to <strong>the</strong> amount <strong>of</strong> <strong>the</strong><br />

remuneration payable to members <strong>of</strong> <strong>the</strong> Executive<br />

Board and <strong>the</strong> composition <strong>of</strong> <strong>the</strong> remuneration package<br />

as well as <strong>the</strong> disclosure <strong>of</strong> <strong>the</strong>se details are supported.<br />

The Supervisory Board draws up a proposal – prepared<br />

by <strong>the</strong> Remuneration Committee – regard<strong>in</strong>g <strong>the</strong><br />

company’s remuneration policy. This remuneration<br />

policy is put forward for approval at <strong>the</strong> General Meet<strong>in</strong>g<br />

<strong>of</strong> Shareholders. The Supervisory Board also compiles an<br />

annual remuneration report, once aga<strong>in</strong> prepared by <strong>the</strong><br />

Remuneration Committee. The remuneration report<br />

confirms <strong>the</strong> manner <strong>in</strong> which <strong>the</strong> remuneration policy<br />

has been followed <strong>in</strong> practice dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial year. It<br />

also conta<strong>in</strong>s details <strong>of</strong> <strong>the</strong> total remuneration <strong>of</strong> <strong>the</strong><br />

members <strong>of</strong> <strong>the</strong> Executive Board, subdivided <strong>in</strong>to <strong>the</strong><br />

various elements, and a summary <strong>of</strong> <strong>the</strong> remuneration<br />

policy adopted by <strong>the</strong> shareholders for <strong>the</strong> com<strong>in</strong>g


f<strong>in</strong>ancial year and <strong>the</strong> subsequent f<strong>in</strong>ancial years.<br />

As part <strong>of</strong> <strong>the</strong> report by <strong>the</strong> Supervisory Board, <strong>the</strong><br />

remuneration report is <strong>in</strong>cluded <strong>in</strong> <strong>the</strong> <strong>Annual</strong> <strong>Report</strong> and<br />

it is also published on <strong>the</strong> company’s website. The<br />

Supervisory Board determ<strong>in</strong>es <strong>the</strong> remuneration <strong>of</strong> <strong>the</strong><br />

members <strong>of</strong> <strong>the</strong> Executive Board, with<strong>in</strong> <strong>the</strong> framework<br />

<strong>of</strong> <strong>the</strong> remuneration policy, based on a recommendation<br />

by <strong>the</strong> remuneration committee.<br />

The premise when determ<strong>in</strong><strong>in</strong>g <strong>the</strong> variable portion <strong>of</strong><br />

<strong>the</strong> remuneration for members <strong>of</strong> <strong>the</strong> Executive Board is<br />

that it should be l<strong>in</strong>ked to predef<strong>in</strong>ed objectives that are<br />

assessable and that can be <strong>in</strong>fluenced, with a responsible<br />

balance between short-term and long-term focus. The<br />

Supervisory Board analyses <strong>the</strong> possible results <strong>of</strong> <strong>the</strong><br />

variable remuneration components and <strong>the</strong><br />

consequences for <strong>the</strong> directors’ remuneration. The<br />

Supervisory Board determ<strong>in</strong>es <strong>the</strong> level and structure <strong>of</strong><br />

this remuneration on <strong>the</strong> basis <strong>of</strong> scenario analyses,<br />

tak<strong>in</strong>g <strong>in</strong>to account remuneration ratios with<strong>in</strong> <strong>the</strong><br />

Group, and <strong>in</strong> do<strong>in</strong>g so considers f<strong>in</strong>ancial and nonf<strong>in</strong>ancial<br />

<strong>in</strong>dicators which are relevant to <strong>the</strong> Group’s<br />

objectives. Apart from an annual variable component,<br />

<strong>the</strong> remuneration package <strong>of</strong> members <strong>of</strong> <strong>the</strong> Executive<br />

Board also <strong>in</strong>cludes a remuneration plan that rewards<br />

long-term improvements.<br />

In <strong>the</strong> <strong>in</strong>formation on variable remuneration to be stated<br />

<strong>in</strong> <strong>the</strong> remuneration report, <strong>the</strong> company strives to<br />

achieve a proper balance between transparency on <strong>the</strong><br />

one hand and not reveal<strong>in</strong>g <strong>in</strong>formation that may help<br />

competitors on <strong>the</strong> o<strong>the</strong>r hand.<br />

In cases where <strong>the</strong> variable remuneration is awarded on<br />

<strong>the</strong> basis <strong>of</strong> <strong>in</strong>accurate (f<strong>in</strong>ancial) data, <strong>the</strong> Supervisory<br />

Board can adjust <strong>the</strong> variable remuneration accord<strong>in</strong>gly<br />

and <strong>the</strong> company is entitled to reclaim (any part <strong>of</strong>) <strong>the</strong><br />

variable remuneration paid to a director on <strong>the</strong> basis <strong>of</strong><br />

<strong>in</strong>correct (f<strong>in</strong>ancial) <strong>in</strong>formation.<br />

The Supervisory Board also has <strong>the</strong> power to amend <strong>the</strong><br />

exist<strong>in</strong>g conditional awards <strong>of</strong> <strong>the</strong> variable remuneration<br />

by quantified performance criteria if, <strong>in</strong> its op<strong>in</strong>ion,<br />

apply<strong>in</strong>g <strong>the</strong> award without amendment would have an<br />

unreasonable or un<strong>in</strong>tended outcome. The Supervisory<br />

Board would only use <strong>the</strong>se powers as a last resort. These<br />

matters have all been <strong>in</strong>corporated <strong>in</strong>to <strong>the</strong> employment<br />

agreements with members <strong>of</strong> <strong>the</strong> Executive Board s<strong>in</strong>ce<br />

<strong>the</strong> <strong>in</strong>troduction <strong>of</strong> <strong>the</strong> Code.<br />

The payment for members <strong>of</strong> <strong>the</strong> Executive Board if <strong>the</strong>y<br />

are dismissed dur<strong>in</strong>g or after <strong>the</strong> expiry <strong>of</strong> <strong>the</strong> first term<br />

<strong>of</strong> appo<strong>in</strong>tment is a maximum <strong>of</strong> one year’s salary or, if<br />

this is clearly unreasonable, a maximum <strong>of</strong> twice <strong>the</strong><br />

annual salary. If <strong>the</strong> new member <strong>of</strong> <strong>the</strong> Executive Board<br />

comes from with<strong>in</strong> <strong>the</strong> company, <strong>the</strong> company reserves<br />

<strong>the</strong> right to take rights accumulated with<strong>in</strong> <strong>the</strong> Group<br />

<strong>in</strong>to account when determ<strong>in</strong><strong>in</strong>g <strong>the</strong> level <strong>of</strong> severance<br />

pay. This provision was made because <strong>of</strong> <strong>the</strong> fact that<br />

long periods <strong>of</strong> employment at <strong>the</strong> same company are<br />

not unusual <strong>in</strong> <strong>the</strong> construction <strong>in</strong>dustry. Reduc<strong>in</strong>g rights<br />

accrued <strong>in</strong> that way may be considered undesirable or<br />

unreasonable <strong>in</strong> certa<strong>in</strong> circumstances.<br />

The employment contracts <strong>of</strong> members <strong>of</strong> <strong>the</strong> Executive<br />

Board appo<strong>in</strong>ted before 1 January 2004 do not <strong>in</strong>clude a<br />

provision regard<strong>in</strong>g severance pay. In such an event, <strong>the</strong><br />

Supervisory Board will assess <strong>the</strong> amount <strong>of</strong> <strong>the</strong><br />

severance pay, tak<strong>in</strong>g <strong>in</strong>to account <strong>the</strong> circumstances <strong>of</strong><br />

<strong>the</strong> case, current practice, prevail<strong>in</strong>g legislation and <strong>the</strong><br />

requirements <strong>of</strong> good corporate governance.<br />

The company has a long-term benefit plan for members<br />

<strong>of</strong> <strong>the</strong> Executive Board <strong>in</strong> <strong>the</strong> form <strong>of</strong> a benefit<br />

component consist<strong>in</strong>g <strong>of</strong> ‘phantom shares’. The company<br />

does not have any share or options plans, and <strong>the</strong>re are<br />

no serious <strong>in</strong>tentions to <strong>in</strong>troduce such plans. If <strong>the</strong><br />

company ever decides to <strong>in</strong>troduce <strong>the</strong>m, <strong>the</strong> Code’s<br />

recommendations will be followed.<br />

The company does not provide any personal loans or<br />

guarantees to members <strong>of</strong> <strong>the</strong> Executive Board,<br />

managers or any o<strong>the</strong>r employees. The Group has <strong>the</strong><br />

usual <strong>in</strong>demnity and <strong>in</strong>surance arrangements <strong>in</strong> relation<br />

to normal company bus<strong>in</strong>ess, and <strong>the</strong>se arrangements<br />

cover members <strong>of</strong> <strong>the</strong> Executive Board, managers and<br />

<strong>the</strong> o<strong>the</strong>r employees.<br />

Pr<strong>in</strong>ciples and best practice provisions relat<strong>in</strong>g to<br />

conflicts <strong>of</strong> <strong>in</strong>terest are supported. Any form or<br />

appearance <strong>of</strong> conflict<strong>in</strong>g <strong>in</strong>terests between <strong>the</strong><br />

company and members <strong>of</strong> <strong>the</strong> Executive Board must be<br />

avoided. Decisions to enter <strong>in</strong>to transactions that <strong>in</strong>volve<br />

conflicts <strong>of</strong> <strong>in</strong>terest on <strong>the</strong> part <strong>of</strong> members <strong>of</strong> <strong>the</strong><br />

Executive Board and that are <strong>of</strong> material importance to<br />

<strong>the</strong> company and/or <strong>the</strong> Executive Board member <strong>in</strong><br />

question must be approved by <strong>the</strong> Supervisory Board.<br />

The Executive Board’s rules set out <strong>in</strong> detail what action<br />

should be taken <strong>in</strong> <strong>the</strong> event <strong>of</strong> possible conflicts <strong>of</strong><br />

<strong>in</strong>terest. These rules govern such matters as what<br />

situations might constitute conflicts <strong>of</strong> <strong>in</strong>terest, <strong>the</strong><br />

manner <strong>in</strong> which members <strong>of</strong> <strong>the</strong> Executive Board are to<br />

report conflicts <strong>of</strong> <strong>in</strong>terest, <strong>the</strong> impartiality <strong>of</strong> <strong>the</strong><br />

Executive Board member concerned <strong>in</strong> relevant decisions<br />

and <strong>the</strong> Supervisory Board’s approval procedure.<br />

47<br />

<strong>2011</strong>


48<br />

<strong>2011</strong><br />

Supervisory Board<br />

The duty <strong>of</strong> <strong>the</strong> Supervisory Board is to exercise<br />

supervision <strong>of</strong> <strong>the</strong> Executive Board’s policies and <strong>the</strong><br />

general affairs <strong>of</strong> <strong>the</strong> company and <strong>the</strong> related enterprise.<br />

The role <strong>of</strong> <strong>the</strong> Supervisory Board is also to advise <strong>the</strong><br />

Executive Board. The Supervisory Board, too, is guided by<br />

<strong>the</strong> <strong>in</strong>terests <strong>of</strong> <strong>the</strong> company and <strong>the</strong> related enterprise,<br />

weigh<strong>in</strong>g <strong>the</strong> justifiable <strong>in</strong>terests <strong>of</strong> <strong>the</strong> various<br />

stakeholders aga<strong>in</strong>st each o<strong>the</strong>r. The Supervisory Board<br />

also considers corporate social responsibility <strong>in</strong> its<br />

assessments.<br />

The pr<strong>in</strong>ciples and best practice provisions relat<strong>in</strong>g to <strong>the</strong><br />

Supervisory Board are supported.<br />

At its periodic meet<strong>in</strong>gs with <strong>the</strong> Executive Board, <strong>the</strong><br />

Supervisory Board discusses a number <strong>of</strong> subjects,<br />

<strong>in</strong>clud<strong>in</strong>g <strong>the</strong> general state <strong>of</strong> affairs (e.g. order book,<br />

major tenders, special projects, problem areas, major<br />

claims and legal proceed<strong>in</strong>gs) and f<strong>in</strong>ancial report<strong>in</strong>g<br />

based on <strong>the</strong> operational plan for <strong>the</strong> year <strong>in</strong> question<br />

(quarterly reports, balance sheet and <strong>in</strong>come statement,<br />

cash and cash equivalents, capital <strong>in</strong>vestment and<br />

warranties).<br />

The agenda for Supervisory Board meet<strong>in</strong>gs also <strong>in</strong>cludes<br />

subjects such as major <strong>in</strong>vestments (both as regards<br />

acquisitions and disposals and as regards fixed assets),<br />

human resources, corporate social responsibility, <strong>the</strong><br />

relationship with shareholders, <strong>the</strong> dividend proposal,<br />

quarterly and half-yearly reports, <strong>the</strong> auditor’s report, <strong>the</strong><br />

external auditor’s management letter and follow-ups to<br />

that management letter, sett<strong>in</strong>g <strong>the</strong> operational plan with<br />

<strong>the</strong> operational and f<strong>in</strong>ancial goals for <strong>the</strong> follow<strong>in</strong>g<br />

f<strong>in</strong>ancial year (set once a year) and approval <strong>of</strong> <strong>the</strong><br />

strategic plan and <strong>the</strong> related parameter conditions<br />

(every third year).<br />

At least once a year, <strong>the</strong> Supervisory Board discusses <strong>the</strong><br />

strategy and <strong>the</strong> pr<strong>in</strong>ciple risks connected to <strong>the</strong> bus<strong>in</strong>ess,<br />

<strong>the</strong> Executive Board’s assessment <strong>of</strong> <strong>the</strong> organisation and<br />

operation <strong>of</strong> <strong>the</strong> <strong>in</strong>ternal risk management and control<br />

systems, as well as any significant changes to those<br />

systems. A statement that <strong>the</strong>se discussions took place is<br />

<strong>in</strong>cluded <strong>in</strong> <strong>the</strong> report by <strong>the</strong> Supervisory Board.<br />

The Supervisory Board is subject to a set <strong>of</strong> rules lay<strong>in</strong>g<br />

down <strong>the</strong> details <strong>of</strong> how it operates and its relationship<br />

with <strong>the</strong> Executive Board, <strong>the</strong> shareholders and <strong>the</strong><br />

Central Works Council. The Supervisory Board’s rules can<br />

be found on <strong>the</strong> company’s website.<br />

The Supervisory Board can consist <strong>of</strong> five to seven<br />

members, which is a number that <strong>the</strong> Supervisory Board<br />

considers appropriate <strong>in</strong> today’s circumstances,<br />

especially given <strong>the</strong> size and <strong>in</strong>ternational nature <strong>of</strong> <strong>the</strong><br />

Group.<br />

The members <strong>of</strong> <strong>the</strong> Supervisory Board are appo<strong>in</strong>ted by<br />

<strong>the</strong> General Meet<strong>in</strong>g on <strong>the</strong> recommendation <strong>of</strong> <strong>the</strong><br />

Supervisory Board, that recommendation be<strong>in</strong>g made on<br />

<strong>the</strong> basis <strong>of</strong> <strong>the</strong> pr<strong>of</strong>ile. The Board discusses <strong>the</strong> pr<strong>of</strong>ile<br />

with <strong>the</strong> General Meet<strong>in</strong>g and with <strong>the</strong> Works Council<br />

when <strong>the</strong> pr<strong>of</strong>ile is first drawn up (and <strong>in</strong> <strong>the</strong> event <strong>of</strong> any<br />

changes). The General Meet<strong>in</strong>g and <strong>the</strong> Works Council<br />

are entitled to recommend candidates for <strong>in</strong>clusion <strong>in</strong><br />

<strong>the</strong> proposal made by <strong>the</strong> Supervisory Board.<br />

The General Meet<strong>in</strong>g can reject <strong>the</strong> candidates put<br />

forward by <strong>the</strong> Supervisory Board, <strong>in</strong> which case <strong>the</strong><br />

Supervisory Board must draw up a new proposal. The<br />

Works Council has an extended right <strong>of</strong> recommendation<br />

<strong>in</strong> respect <strong>of</strong> one third <strong>of</strong> <strong>the</strong> membership <strong>of</strong> <strong>the</strong><br />

Supervisory Board. If <strong>the</strong> Supervisory Board rejects <strong>the</strong><br />

recommended candidate or candidates, <strong>the</strong> Board and<br />

<strong>the</strong> Works Council consult with each o<strong>the</strong>r and <strong>the</strong> Works<br />

Council makes a new recommendation. If <strong>the</strong><br />

Supervisory Board and <strong>the</strong> Works Council fail to reach<br />

agreement, <strong>the</strong>n <strong>the</strong> matter is submitted to <strong>the</strong><br />

Enterprise Chamber <strong>of</strong> <strong>the</strong> Amsterdam Court <strong>of</strong> Appeal<br />

for a rul<strong>in</strong>g.<br />

If <strong>the</strong> Supervisory Board adopts <strong>the</strong> Works Council’s<br />

recommendation, <strong>the</strong> General Meet<strong>in</strong>g may still reject it.<br />

The General Meet<strong>in</strong>g may dismiss <strong>the</strong> entire Supervisory<br />

Board once <strong>the</strong> Works Council has had <strong>the</strong> opportunity<br />

to give its op<strong>in</strong>ion.<br />

The General Meet<strong>in</strong>g determ<strong>in</strong>es <strong>the</strong> Supervisory Board<br />

members’ remuneration.<br />

In relation to <strong>the</strong> <strong>in</strong>dependence <strong>of</strong> Supervisory Directors,<br />

as detailed <strong>in</strong> best practice provision III.2.1, it should be<br />

po<strong>in</strong>ted out that all <strong>of</strong> <strong>the</strong> current members <strong>of</strong> <strong>the</strong><br />

Supervisory Board qualify as be<strong>in</strong>g <strong>in</strong>dependent with<strong>in</strong><br />

<strong>the</strong> mean<strong>in</strong>g <strong>of</strong> <strong>the</strong> Code.<br />

The Supervisory Board has created a pr<strong>of</strong>ile, which was<br />

discussed with <strong>the</strong> shareholders at <strong>the</strong> <strong>Annual</strong> General<br />

Meet<strong>in</strong>g on 21 April 2009. This pr<strong>of</strong>ile is available for<br />

shareholders to exam<strong>in</strong>e at <strong>the</strong> company’s <strong>of</strong>fice and it is<br />

also published on <strong>the</strong> company’s website. The<br />

composition <strong>of</strong> <strong>the</strong> Supervisory Board must be balanced<br />

and <strong>in</strong> l<strong>in</strong>e with this pr<strong>of</strong>ile.<br />

The members <strong>of</strong> <strong>the</strong> Supervisory Board must have <strong>the</strong><br />

experience needed to perform well <strong>in</strong> a large<br />

mult<strong>in</strong>ational construction company. Each member must<br />

be capable <strong>of</strong> assess<strong>in</strong>g <strong>the</strong> ma<strong>in</strong> aspects <strong>of</strong> <strong>the</strong> overall<br />

policy and <strong>of</strong> behav<strong>in</strong>g <strong>in</strong> a critical and <strong>in</strong>dependent


manner with regard to <strong>the</strong> o<strong>the</strong>r members <strong>of</strong> <strong>the</strong><br />

Supervisory Board and <strong>the</strong> members <strong>of</strong> <strong>the</strong> Executive<br />

Board. The members <strong>of</strong> <strong>the</strong> Supervisory Board must carry<br />

out <strong>the</strong> tasks <strong>of</strong> <strong>the</strong> Supervisory Board as specified by law<br />

and by <strong>the</strong> company’s Articles <strong>of</strong> Association and <strong>the</strong>y<br />

must be able to give <strong>the</strong> Executive Board solicited and<br />

unsolicited advice.<br />

O<strong>the</strong>r, specific criteria applied by <strong>the</strong> Board to its<br />

composition are a general, broad-based understand<strong>in</strong>g<br />

<strong>of</strong> bus<strong>in</strong>ess, knowledge <strong>of</strong> <strong>the</strong> construction <strong>in</strong>dustry,<br />

experience <strong>in</strong> <strong>the</strong> management <strong>of</strong> large, preferably<br />

<strong>in</strong>ternational companies and expertise relat<strong>in</strong>g to issues<br />

with a social dimension and concern<strong>in</strong>g society at large.<br />

The Supervisory Board appo<strong>in</strong>ts one <strong>of</strong> its members to be<br />

chairman, and ano<strong>the</strong>r to be vice-chairman to act <strong>in</strong> <strong>the</strong><br />

chairman’s place as <strong>the</strong> occasion demands. The Board has<br />

among its members a f<strong>in</strong>ancial expert with experience <strong>in</strong><br />

both <strong>the</strong> f<strong>in</strong>ancial and account<strong>in</strong>g discipl<strong>in</strong>es at a large<br />

legal entity.<br />

The company will provide an <strong>in</strong>troduction programme<br />

for directors appo<strong>in</strong>ted to <strong>the</strong> Supervisory Board for <strong>the</strong><br />

first time as referred to <strong>in</strong> provision III.3.3. This provision<br />

will also be met by arrang<strong>in</strong>g work<strong>in</strong>g visits to <strong>the</strong><br />

Group’s operat<strong>in</strong>g companies and through presentations<br />

by operat<strong>in</strong>g company managers for <strong>the</strong> Supervisory<br />

Board.<br />

The Supervisory Board has three permanent committees,<br />

namely an Audit Committee, a Remuneration<br />

Committee and a Selection and Appo<strong>in</strong>tments<br />

Committee. The rules and <strong>the</strong> composition <strong>of</strong> <strong>the</strong>se<br />

committees can be found on <strong>the</strong> company’s website. The<br />

composition and role <strong>of</strong> <strong>the</strong>se committees are <strong>in</strong> l<strong>in</strong>e<br />

with <strong>the</strong> relevant provisions <strong>of</strong> <strong>the</strong> Code. It is <strong>the</strong> task <strong>of</strong><br />

<strong>the</strong> committees to support and advise <strong>the</strong> Supervisory<br />

Board concern<strong>in</strong>g <strong>the</strong> activities that are <strong>the</strong> committees’<br />

responsibility and to prepare <strong>the</strong> Supervisory Board’s<br />

decisions regard<strong>in</strong>g those activities. The Supervisory<br />

Board as a whole rema<strong>in</strong>s responsible for <strong>the</strong> way <strong>in</strong><br />

which it performs its tasks and for <strong>the</strong> preparatory work<br />

carried out by <strong>the</strong> committees. The committees submit<br />

reports on all <strong>the</strong>ir meet<strong>in</strong>gs to <strong>the</strong> Supervisory Board.<br />

The Audit Committee’s assessments <strong>in</strong>clude:<br />

• <strong>the</strong> operation <strong>of</strong> <strong>the</strong> <strong>in</strong>ternal risk management and<br />

control systems;<br />

• <strong>the</strong> provision <strong>of</strong> f<strong>in</strong>ancial <strong>in</strong>formation by <strong>the</strong> company,<br />

<strong>in</strong>clud<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial statements, <strong>the</strong> quarterly<br />

figures and <strong>the</strong> process through which this<br />

<strong>in</strong>formation is generated;<br />

• compliance with recommendations and <strong>the</strong> follow-up<br />

to comments by <strong>the</strong> external auditor;<br />

• <strong>the</strong> audit process and <strong>the</strong> audit plan;<br />

• <strong>the</strong> relationship with <strong>the</strong> external auditor;<br />

• <strong>the</strong> process through which <strong>the</strong> company monitors<br />

compliance with laws and regulations and with its<br />

own code <strong>of</strong> conduct;<br />

• policy <strong>in</strong> respect <strong>of</strong> tax plann<strong>in</strong>g;<br />

• <strong>the</strong> application <strong>of</strong> ICT;<br />

• Group f<strong>in</strong>anc<strong>in</strong>g, and<br />

• <strong>the</strong> f<strong>in</strong>ancial and adm<strong>in</strong>istrative organisation.<br />

The Audit Committee also assesses whe<strong>the</strong>r <strong>the</strong> Group<br />

needs an <strong>in</strong>ternal auditor and makes a recommendation<br />

accord<strong>in</strong>gly to <strong>the</strong> Supervisory Board.<br />

One <strong>of</strong> <strong>the</strong> tasks <strong>of</strong> <strong>the</strong> Remuneration Committee is to<br />

make proposals to <strong>the</strong> Supervisory Board with regard to<br />

company remuneration policy, as well as <strong>the</strong><br />

remuneration structure, <strong>the</strong> level <strong>of</strong> remuneration and<br />

<strong>the</strong> terms and conditions <strong>of</strong> employment <strong>of</strong> members <strong>of</strong><br />

<strong>the</strong> Executive Board and <strong>the</strong> remuneration <strong>of</strong> <strong>the</strong><br />

members <strong>of</strong> <strong>the</strong> Supervisory Board. The Committee also<br />

consults <strong>the</strong> Chairman <strong>of</strong> <strong>the</strong> Executive Board about <strong>the</strong><br />

policy on terms and conditions <strong>of</strong> employment for<br />

operat<strong>in</strong>g company managers and executives <strong>of</strong><br />

equivalent rank. The Remuneration Committee also<br />

proposes a remuneration report on <strong>the</strong> way <strong>in</strong> which<br />

remuneration policy has been implemented <strong>in</strong> practice.<br />

One <strong>of</strong> <strong>the</strong> tasks <strong>of</strong> <strong>the</strong> Selection and Appo<strong>in</strong>tments<br />

Committee is to make proposals to <strong>the</strong> Supervisory<br />

Board with regard to:<br />

• selection criteria and appo<strong>in</strong>tment procedures with<br />

regard to members <strong>of</strong> <strong>the</strong> Supervisory Board and<br />

members <strong>of</strong> <strong>the</strong> Executive Board;<br />

• <strong>the</strong> size and composition <strong>of</strong> <strong>the</strong> Supervisory Board and<br />

<strong>the</strong> Executive Board and a pr<strong>of</strong>ile <strong>of</strong> <strong>the</strong> Supervisory<br />

Board;<br />

• assessment <strong>of</strong> <strong>the</strong> performance <strong>of</strong> <strong>in</strong>dividual members<br />

<strong>of</strong> <strong>the</strong> Supervisory Board and members <strong>of</strong> <strong>the</strong><br />

Executive Board;<br />

• (re-)appo<strong>in</strong>tment <strong>of</strong> members <strong>of</strong> <strong>the</strong> Supervisory<br />

Board and members <strong>of</strong> <strong>the</strong> Executive Board;<br />

• an Executive Board member’s acceptance <strong>of</strong><br />

membership <strong>of</strong> <strong>the</strong> Supervisory Board <strong>of</strong> ano<strong>the</strong>r<br />

listed company;<br />

• possible conflicts <strong>of</strong> <strong>in</strong>terest aris<strong>in</strong>g <strong>in</strong> connection<br />

with <strong>the</strong> acceptance <strong>of</strong> o<strong>the</strong>r positions by members <strong>of</strong><br />

<strong>the</strong> Supervisory Board.<br />

The Committee also monitors <strong>the</strong> Executive Board’s<br />

policy on selection criteria and appo<strong>in</strong>tment procedures<br />

for senior management.<br />

49<br />

<strong>2011</strong>


50<br />

<strong>2011</strong><br />

Pr<strong>in</strong>ciples and best practice provisions relat<strong>in</strong>g to<br />

conflicts <strong>of</strong> <strong>in</strong>terest are supported. The matters set out<br />

above <strong>in</strong> connection with <strong>the</strong> Executive Board apply<br />

equally to <strong>the</strong> members <strong>of</strong> <strong>the</strong> Supervisory Board. The<br />

Supervisory Board rules set out <strong>in</strong> detail what action<br />

should be taken <strong>in</strong> <strong>the</strong> event <strong>of</strong> possible conflicts <strong>of</strong><br />

<strong>in</strong>terest.<br />

The company has prepared rules as regards ownership <strong>of</strong><br />

and transactions <strong>in</strong> shares by members <strong>of</strong> <strong>the</strong><br />

Supervisory Board and members <strong>of</strong> <strong>the</strong> Executive Board,<br />

if those shares are issued by o<strong>the</strong>r companies. These<br />

rules are <strong>in</strong>cluded <strong>in</strong> <strong>the</strong> <strong>BAM</strong> rules on ownership <strong>of</strong> and<br />

transactions <strong>in</strong> shares.<br />

If <strong>the</strong> transactions are not undertaken by an <strong>in</strong>dependent<br />

third party, members <strong>of</strong> <strong>the</strong> Supervisory Board and <strong>of</strong> <strong>the</strong><br />

Executive Board report <strong>the</strong>ir ownership <strong>of</strong> and<br />

transactions <strong>in</strong> shares issued by listed companies<br />

established <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands which operate <strong>in</strong> sectors<br />

where <strong>the</strong> Group operates or <strong>in</strong> associated sectors. This<br />

<strong>in</strong>cludes companies operat<strong>in</strong>g as subcontractors,<br />

advisers or suppliers <strong>in</strong> <strong>the</strong> construction <strong>in</strong>dustry <strong>in</strong> <strong>the</strong><br />

broad sense.<br />

The company does not issue any personal loans or<br />

guarantees to members <strong>of</strong> <strong>the</strong> Supervisory Board. The<br />

Group has taken out <strong>the</strong> usual pr<strong>of</strong>essional <strong>in</strong>demnity<br />

<strong>in</strong>surance to cover members <strong>of</strong> <strong>the</strong> Supervisory Board.<br />

Shareholders<br />

The company supports <strong>the</strong> pr<strong>in</strong>ciples and best practice<br />

provisions <strong>in</strong> Chapter IV <strong>of</strong> <strong>the</strong> Code with regard to <strong>the</strong><br />

shareholders and <strong>the</strong> General Meet<strong>in</strong>g <strong>of</strong> Shareholders.<br />

Pr<strong>in</strong>ciple IV.2 and <strong>the</strong> ensu<strong>in</strong>g best-practice provisions<br />

concern <strong>the</strong> issue <strong>of</strong> depositary receipts for shares. No<br />

depositary receipts for shares <strong>in</strong> <strong>the</strong> company have been<br />

issued with <strong>the</strong> company’s cooperation. Royal <strong>BAM</strong><br />

Group does not have any provisions limit<strong>in</strong>g vot<strong>in</strong>g<br />

rights. One vote may be cast for every share held. The<br />

company’s capital consists <strong>of</strong> ord<strong>in</strong>ary shares and Class B<br />

and F preference shares (not issued at present). The<br />

ord<strong>in</strong>ary shares are listed on NYSE Euronext <strong>in</strong><br />

Amsterdam. Ord<strong>in</strong>ary share options are also traded on<br />

<strong>the</strong> Amsterdam option exchange <strong>of</strong> NYSE Liffe.<br />

The Supervisory Board and <strong>the</strong> Executive Board believe it<br />

to be very important that as many shareholders as<br />

possible take part <strong>in</strong> <strong>the</strong> decision-mak<strong>in</strong>g process <strong>in</strong><br />

shareholders’ meet<strong>in</strong>gs. Notices conven<strong>in</strong>g<br />

shareholders’ meet<strong>in</strong>gs, agendas and documentation to<br />

be discussed are published no later than forty-two days<br />

prior to <strong>the</strong> meet<strong>in</strong>g and placed on <strong>the</strong> company’s<br />

website. The website also <strong>in</strong>cludes an anonymous list,<br />

broken down by agenda item, <strong>of</strong> <strong>the</strong> votes cast by proxy<br />

received by <strong>the</strong> company prior to <strong>the</strong> meet<strong>in</strong>g. Remote<br />

vot<strong>in</strong>g and vot<strong>in</strong>g by proxy also play a role <strong>in</strong> <strong>in</strong>creas<strong>in</strong>g<br />

shareholder participation. The Act <strong>of</strong> Parliament to<br />

promote <strong>the</strong> use <strong>of</strong> electronic communication media<br />

enables shareholders to participate <strong>in</strong> meet<strong>in</strong>gs <strong>of</strong><br />

shareholders and to cast <strong>the</strong>ir votes at such meet<strong>in</strong>gs<br />

without be<strong>in</strong>g physically present. The company has<br />

<strong>in</strong>corporated <strong>the</strong> facilities <strong>of</strong>fered by law for us<strong>in</strong>g<br />

electronic communication media <strong>in</strong>to <strong>the</strong> Articles <strong>of</strong><br />

Association. The company considers that <strong>the</strong> manner <strong>in</strong><br />

which shareholders take part <strong>in</strong> <strong>the</strong>ir meet<strong>in</strong>gs and cast<br />

votes at such meet<strong>in</strong>gs requires a meticulous procedure.<br />

The use <strong>of</strong> electronic means <strong>of</strong> communication <strong>the</strong>refore<br />

depends greatly on <strong>the</strong> degree <strong>of</strong> certa<strong>in</strong>ty that <strong>the</strong>se<br />

means <strong>of</strong> communication will work properly.<br />

In addition, vot<strong>in</strong>g by proxy cont<strong>in</strong>ues to provide<br />

shareholders with a good mechanism for allow<strong>in</strong>g <strong>the</strong>ir<br />

voice to be heard <strong>in</strong> meet<strong>in</strong>gs that <strong>the</strong>y are unable to<br />

attend, so that <strong>the</strong> company can note <strong>the</strong>ir views. When<br />

shareholders’ meet<strong>in</strong>gs are convened, <strong>the</strong> company<br />

<strong>in</strong>vites shareholders to use <strong>the</strong>ir option to vote by proxy,<br />

and ensures that vot<strong>in</strong>g <strong>in</strong>struction forms can be<br />

obta<strong>in</strong>ed and that <strong>the</strong>se forms are also available<br />

electronically.<br />

Shareholders are also advised <strong>of</strong> <strong>the</strong>ir option to give a<br />

proxy electronically. The company <strong>of</strong>fers its shareholders<br />

<strong>the</strong> opportunity to give a proxy, with vot<strong>in</strong>g <strong>in</strong>structions,<br />

to an <strong>in</strong>dependent third party before <strong>the</strong> meet<strong>in</strong>g takes<br />

place. The company also <strong>of</strong>fers shareholders <strong>the</strong><br />

possibility <strong>of</strong> vot<strong>in</strong>g <strong>in</strong> advance <strong>of</strong> <strong>the</strong> meet<strong>in</strong>g. As a rule,<br />

vot<strong>in</strong>g takes place electronically at <strong>the</strong> meet<strong>in</strong>g itself.<br />

The company <strong>in</strong>vites shareholders to submit any<br />

questions to <strong>the</strong> company prior to <strong>the</strong> meet<strong>in</strong>g, which<br />

will <strong>the</strong>n be answered by <strong>the</strong> company at <strong>the</strong> meet<strong>in</strong>g.


Sporen <strong>in</strong> Arnhem: modernisation and expansion <strong>of</strong> Arnhem station (platforms, ro<strong>of</strong>, new track,<br />

viaducts, noise barriers).<br />

<strong>BAM</strong> Rail, <strong>BAM</strong> Civiel, <strong>BAM</strong> Infraconsult, <strong>BAM</strong> Infratechniek, <strong>BAM</strong> Utiliteitsbouw, <strong>BAM</strong> Wegen<br />

(<strong>in</strong> jo<strong>in</strong>t venture).<br />

Prior approval from <strong>the</strong> General Meet<strong>in</strong>g is required for<br />

decisions concern<strong>in</strong>g any important changes <strong>in</strong> <strong>the</strong><br />

identity or nature <strong>of</strong> <strong>the</strong> company or <strong>the</strong> bus<strong>in</strong>ess,<br />

<strong>in</strong>clud<strong>in</strong>g <strong>the</strong> entire or near-entire transfer <strong>of</strong> ownership<br />

<strong>of</strong> <strong>the</strong> bus<strong>in</strong>ess, entry <strong>in</strong>to long-term partnerships that<br />

have a significant effect on <strong>the</strong> company and acquir<strong>in</strong>g or<br />

dispos<strong>in</strong>g <strong>of</strong> a participat<strong>in</strong>g <strong>in</strong>terest worth at least a third<br />

<strong>of</strong> <strong>the</strong> amount <strong>of</strong> <strong>the</strong> assets recognised on <strong>the</strong><br />

consolidated balance sheet. In <strong>the</strong> event that a serious<br />

private bid has been announced for part <strong>of</strong> <strong>the</strong> bus<strong>in</strong>ess<br />

or a participat<strong>in</strong>g <strong>in</strong>terest, and that bid is worth at least a<br />

third <strong>of</strong> <strong>the</strong> amount <strong>of</strong> <strong>the</strong> assets recognised on <strong>the</strong><br />

consolidated balance sheet, <strong>the</strong> Executive Board will<br />

publicly announce its standpo<strong>in</strong>t <strong>in</strong> respect <strong>of</strong> <strong>the</strong> bid,<br />

toge<strong>the</strong>r with its reasons, as soon as possible.<br />

Resolutions to amend <strong>the</strong> company’s Articles <strong>of</strong><br />

Association may be adopted by <strong>the</strong> General Meet<strong>in</strong>g by a<br />

simple majority <strong>of</strong> <strong>the</strong> votes cast <strong>in</strong> response to a<br />

proposal by <strong>the</strong> Executive Board with <strong>the</strong> approval <strong>of</strong> <strong>the</strong><br />

Supervisory Board. Material amendments to <strong>the</strong> Articles<br />

<strong>of</strong> Association will each be submitted separately to <strong>the</strong><br />

General Meet<strong>in</strong>g.<br />

Shareholders are entitled to put items on <strong>the</strong> agenda <strong>of</strong><br />

shareholders’ meet<strong>in</strong>gs. Shareholders who on <strong>the</strong>ir own<br />

or jo<strong>in</strong>tly represent at least (i) 1.0 percent <strong>of</strong> <strong>the</strong> issued<br />

capital, or (ii) shares worth €50 million, can place items<br />

on <strong>the</strong> agenda <strong>of</strong> <strong>the</strong> General Meet<strong>in</strong>g if <strong>the</strong> company<br />

receives a written request to that effect (‘written’ can<br />

mean an electronic message), <strong>in</strong>clud<strong>in</strong>g reasons to<br />

substantiate <strong>the</strong> request, not later than sixty days before<br />

<strong>the</strong> day <strong>of</strong> <strong>the</strong> meet<strong>in</strong>g. In addition, shareholders who<br />

represent at least 10 percent <strong>of</strong> <strong>the</strong> company’s issued<br />

capital are entitled to call a shareholders’ meet<strong>in</strong>g.<br />

The General Meet<strong>in</strong>g is asked each year to authorise <strong>the</strong><br />

Executive Board – subject to <strong>the</strong> approval <strong>of</strong> <strong>the</strong><br />

Supervisory Board – to issue shares or share options. This<br />

authorisation is limited <strong>in</strong> time to a period <strong>of</strong> eighteen<br />

months. It is also limited <strong>in</strong> scope <strong>in</strong> respect <strong>of</strong> ord<strong>in</strong>ary<br />

shares and Class F preference shares to 10 percent <strong>of</strong> <strong>the</strong><br />

issued capital, plus an additional 10 percent, which<br />

additional 10 percent may be used exclusively for<br />

mergers and acquisitions by <strong>the</strong> company or by<br />

operat<strong>in</strong>g companies. The General Meet<strong>in</strong>g <strong>of</strong><br />

Shareholders is also asked – subject to <strong>the</strong> approval <strong>of</strong><br />

<strong>the</strong> Supervisory Board – to exclude or limit pre-emptive<br />

rights to issued shares and to exclude or limit <strong>the</strong> issu<strong>in</strong>g<br />

<strong>of</strong> ord<strong>in</strong>ary share options.<br />

The Shareholders’ Meet<strong>in</strong>g is asked each year to<br />

authorise <strong>the</strong> Executive Board for a period <strong>of</strong> eighteen<br />

months to repurchase shares <strong>in</strong> <strong>the</strong> company, with<strong>in</strong> <strong>the</strong><br />

limitations imposed by <strong>the</strong> law and <strong>the</strong> Articles <strong>of</strong><br />

Association. Every request for <strong>the</strong> grant<strong>in</strong>g <strong>of</strong> such an<br />

authorisation is put separately to <strong>the</strong> shareholders.<br />

The company’s policy on reserves and dividends and a<br />

proposal to pay a dividend are discussed as separate<br />

agenda items at <strong>the</strong> General Meet<strong>in</strong>g.<br />

51<br />

<strong>2011</strong>


52<br />

<strong>2011</strong><br />

A proposal for approval or authorisation by <strong>the</strong> General<br />

Meet<strong>in</strong>g will be accompanied by a written explanation<br />

<strong>in</strong>clud<strong>in</strong>g all relevant <strong>in</strong>formation. The agenda for<br />

shareholders’ meet<strong>in</strong>gs will state which <strong>of</strong> <strong>the</strong> agenda<br />

items are for discussion and which items will be put to a<br />

vote.<br />

<strong>Report</strong>s on shareholders’ meet<strong>in</strong>gs are provided to<br />

shareholders, as stipulated <strong>in</strong> <strong>the</strong> Code. With<strong>in</strong> fifteen<br />

calendar days after each shareholders’ meet<strong>in</strong>g, <strong>the</strong><br />

results <strong>of</strong> <strong>the</strong> votes, broken down by agenda item, are<br />

published on <strong>the</strong> company’s website. As regards <strong>the</strong><br />

provision <strong>of</strong> <strong>in</strong>formation as stated <strong>in</strong> Pr<strong>in</strong>ciple IV.3 <strong>of</strong> <strong>the</strong><br />

Code, <strong>the</strong> Supervisory Board and <strong>the</strong> Executive Board<br />

endorse <strong>the</strong> importance <strong>of</strong> provid<strong>in</strong>g transparent and<br />

equal <strong>in</strong>formation. The company endeavours to do so,<br />

subject to exceptions under <strong>the</strong> law.<br />

All press and analysts’ meet<strong>in</strong>gs and conference calls <strong>in</strong><br />

connection with <strong>the</strong> publication <strong>of</strong> <strong>the</strong> annual, half-yearly<br />

and quarterly figures are open to everyone via <strong>the</strong><br />

Internet or by telephone. Shareholders’ meet<strong>in</strong>gs are<br />

open to <strong>the</strong> press and are webcast. All dates and<br />

locations <strong>of</strong> roadshows, sem<strong>in</strong>ars and <strong>the</strong> like are<br />

published on <strong>the</strong> company’s website. F<strong>in</strong>ancial<br />

presentations given to third parties are published on <strong>the</strong><br />

company’s website where <strong>the</strong>re is a material difference<br />

between <strong>the</strong>se and previously published presentations.<br />

For six weeks prior to <strong>the</strong> publication <strong>of</strong> each annual<br />

report and three weeks prior to <strong>the</strong> publication <strong>of</strong> each<br />

quarterly and half-yearly report <strong>the</strong> company will be<br />

extremely reticent about conduct<strong>in</strong>g any conversations<br />

with <strong>in</strong>vestors, analysts or members <strong>of</strong> <strong>the</strong> press about<br />

<strong>the</strong> overall course <strong>of</strong> bus<strong>in</strong>ess at <strong>the</strong> company. The<br />

company does not review analysts’ reports or valuations<br />

by analysts <strong>in</strong> advance, nor add comments or correct<br />

<strong>the</strong>m, except for matters <strong>of</strong> fact.<br />

The company does not pay any fees to parties for<br />

carry<strong>in</strong>g out <strong>in</strong>vestigations for analysts’ reports, nor for<br />

writ<strong>in</strong>g or publish<strong>in</strong>g such reports, with <strong>the</strong> exception <strong>of</strong><br />

credit rat<strong>in</strong>g firms. As a rule, <strong>the</strong> Chairman <strong>of</strong> <strong>the</strong><br />

Executive Board and/or <strong>the</strong> Chief F<strong>in</strong>ancial Officer from<br />

<strong>the</strong> Executive Board, with <strong>the</strong> assistance <strong>of</strong> <strong>the</strong> <strong>in</strong>vestor<br />

relations manager or <strong>the</strong> public relations director, will<br />

speak to <strong>in</strong>vestors, analysts or <strong>the</strong> press. These directors<br />

and <strong>of</strong>ficers are fully up to date regard<strong>in</strong>g all relevant<br />

<strong>in</strong>formation – whe<strong>the</strong>r or not it is already known on <strong>the</strong><br />

market – and <strong>the</strong>y ensure that <strong>the</strong> <strong>in</strong>formation is<br />

provided <strong>in</strong> a clear and unambiguous manner. Should any<br />

price-sensitive <strong>in</strong>formation be provided by mistake<br />

dur<strong>in</strong>g any contact with shareholders, <strong>in</strong>vestors, analysts<br />

or <strong>the</strong> press, a press release will be issued immediately.<br />

The company has a general policy on bilateral contacts<br />

with shareholders, <strong>in</strong>vestors, analysts and <strong>the</strong> press. This<br />

policy has been published on <strong>the</strong> company’s website.<br />

The Executive Board can <strong>in</strong>voke a response period as<br />

specified <strong>in</strong> provision II.1.9 <strong>of</strong> <strong>the</strong> Code. The Supervisory<br />

Board will be <strong>in</strong>volved closely and <strong>in</strong> good time <strong>in</strong> <strong>the</strong><br />

process concern<strong>in</strong>g any <strong>of</strong>fer for shares <strong>in</strong> <strong>the</strong> company,<br />

and <strong>the</strong> Executive Board and <strong>the</strong> Supervisory Board will<br />

immediately discuss any request from a compet<strong>in</strong>g<br />

third-party bidder to exam<strong>in</strong>e company <strong>in</strong>formation. As<br />

regards <strong>the</strong> protective provisions aga<strong>in</strong>st undesirable<br />

developments that might affect <strong>the</strong> <strong>in</strong>dependence,<br />

cont<strong>in</strong>uity and/or identity <strong>of</strong> <strong>the</strong> Group, <strong>the</strong> company has<br />

<strong>the</strong> facility for issu<strong>in</strong>g Class B preference shares.<br />

A call option was issued to Sticht<strong>in</strong>g Aandelenbeheer<br />

<strong>BAM</strong> Groep <strong>in</strong> 1993 for Class B preference shares. The<br />

company gave this foundation <strong>the</strong> right <strong>of</strong> <strong>in</strong>vestigation<br />

<strong>in</strong> 2008. Information relat<strong>in</strong>g to protective measures is<br />

provided on page 188 <strong>of</strong> <strong>the</strong> <strong>Annual</strong> <strong>Report</strong>.<br />

F<strong>in</strong>ancial report<strong>in</strong>g and <strong>the</strong> role <strong>of</strong> <strong>the</strong> auditor<br />

The pr<strong>in</strong>ciples and best practice provisions relat<strong>in</strong>g to<br />

f<strong>in</strong>ancial report<strong>in</strong>g are supported. The Executive Board is<br />

responsible for <strong>the</strong> quality and completeness <strong>of</strong> <strong>the</strong><br />

f<strong>in</strong>ancial reports that are published. The Supervisory<br />

Board ensures that <strong>the</strong> Executive Board carries out this<br />

responsibility.<br />

The pr<strong>in</strong>ciples and best practice provisions regard<strong>in</strong>g <strong>the</strong><br />

role, appo<strong>in</strong>tment, remuneration and assessment <strong>of</strong> <strong>the</strong><br />

performance <strong>of</strong> <strong>the</strong> external auditor are also supported.<br />

It should be emphasised that <strong>the</strong> external auditor will be<br />

present at <strong>the</strong> <strong>Annual</strong> General Meet<strong>in</strong>g to answer<br />

questions from shareholders about his report regard<strong>in</strong>g<br />

<strong>the</strong> truth and fairness <strong>of</strong> <strong>the</strong> f<strong>in</strong>ancial statements.<br />

The company does not have an <strong>in</strong>ternal audit<br />

department. The Audit Committee assesses any possible<br />

need for an <strong>in</strong>ternal auditor every year. Based on this<br />

assessment and on a proposal by <strong>the</strong> Audit Committee,<br />

<strong>the</strong> Supervisory Board makes a recommendation to <strong>the</strong><br />

Executive Board and <strong>in</strong>cludes this recommendation <strong>in</strong><br />

<strong>the</strong> report by <strong>the</strong> Supervisory Board.<br />

The external auditor attends <strong>the</strong> meet<strong>in</strong>gs <strong>of</strong> <strong>the</strong><br />

Supervisory Board at which <strong>the</strong> f<strong>in</strong>ancial statements and


Approximately 130 metres-high ‘De Kroon’<br />

apartment build<strong>in</strong>g <strong>in</strong> The Hague (2,300 m2 retail<br />

space, 8,000 m2 <strong>of</strong>fice space, 125 rental and<br />

128 owner-occupied apartments).<br />

<strong>BAM</strong> Utiliteitsbouw (<strong>in</strong> jo<strong>in</strong>t venture).<br />

<strong>the</strong> half-yearly figures are discussed. The external auditor<br />

reports <strong>the</strong> same <strong>in</strong>formation from his f<strong>in</strong>d<strong>in</strong>gs <strong>in</strong> respect<br />

<strong>of</strong> <strong>the</strong> f<strong>in</strong>ancial statements to both <strong>the</strong> Executive Board<br />

and <strong>the</strong> Supervisory Board. The external auditor is also<br />

present when <strong>the</strong> Audit Committee discusses <strong>the</strong><br />

f<strong>in</strong>ancial statements, <strong>the</strong> half-yearly figures and <strong>the</strong><br />

quarterly figures. The external auditor may also attend<br />

o<strong>the</strong>r meet<strong>in</strong>gs <strong>of</strong> <strong>the</strong> Audit Committee, subject to<br />

ask<strong>in</strong>g <strong>the</strong> Chairman <strong>of</strong> <strong>the</strong> Audit Committee for<br />

permission to attend <strong>in</strong> advance. The external auditor<br />

receives <strong>the</strong> f<strong>in</strong>ancial <strong>in</strong>formation on which <strong>the</strong> quarterly<br />

and half-yearly figures are based and is given <strong>the</strong><br />

opportunity to react to that <strong>in</strong>formation. The partner <strong>in</strong><br />

<strong>the</strong> external audit company who performs <strong>the</strong> required<br />

audits is allowed to audit <strong>the</strong> Group’s f<strong>in</strong>ancial<br />

statements for a maximum <strong>of</strong> seven consecutive years.<br />

The Supervisory Board and <strong>the</strong> Executive Board are<br />

conv<strong>in</strong>ced that Royal <strong>BAM</strong> Group’s corporate governance<br />

is well organised. The corporate governance structure<br />

described above was discussed with <strong>the</strong> shareholders<br />

dur<strong>in</strong>g <strong>the</strong> General Meet<strong>in</strong>g on 21 April 2009. The<br />

company will always submit any substantial changes <strong>in</strong><br />

<strong>the</strong> ma<strong>in</strong> features <strong>of</strong> <strong>the</strong> corporate governance structure<br />

to <strong>the</strong> General Meet<strong>in</strong>g for discussion purposes.<br />

53<br />

<strong>2011</strong>


54<br />

<strong>2011</strong><br />

Decision on Article 10 <strong>of</strong> <strong>the</strong> Takeover<br />

Directive<br />

The follow<strong>in</strong>g <strong>in</strong>formation and explanations relate to <strong>the</strong><br />

provisions <strong>of</strong> <strong>the</strong> Decree <strong>of</strong> 5 April 2006 implement<strong>in</strong>g<br />

Article 10 <strong>of</strong> Directive number 2004/25/EC <strong>of</strong> <strong>the</strong><br />

European Parliament and <strong>the</strong> Council <strong>of</strong> <strong>the</strong> European<br />

Union dated 21 April 2004.<br />

Capital structure<br />

Table 9 may be used as a reference for <strong>the</strong> company’s<br />

capital structure.<br />

No rights apart from those aris<strong>in</strong>g under statute are<br />

attached to <strong>the</strong> shares <strong>in</strong>to which <strong>the</strong> company’s capital<br />

is divided, apart from <strong>the</strong> scheme specified <strong>in</strong> Article 32<br />

<strong>of</strong> <strong>the</strong> Articles <strong>of</strong> Association concern<strong>in</strong>g <strong>the</strong> application<br />

<strong>of</strong> <strong>the</strong> pr<strong>of</strong>it <strong>in</strong> relation to Class B and Class F preference<br />

shares.<br />

A brief summary <strong>of</strong> Article 32 <strong>of</strong> <strong>the</strong> Articles <strong>of</strong><br />

Association is provided below. From <strong>the</strong> pr<strong>of</strong>it realised <strong>in</strong><br />

any f<strong>in</strong>ancial year, an amount will first be distributed,<br />

where possible, on <strong>the</strong> Class B cumulative preference<br />

shares, calculated by apply<strong>in</strong>g <strong>the</strong> percentage stated<br />

below to <strong>the</strong> amount that must be paid up on those<br />

shares as at <strong>the</strong> start <strong>of</strong> <strong>the</strong> f<strong>in</strong>ancial year for which <strong>the</strong><br />

distribution is made. The percentage referred to above<br />

will be equal to <strong>the</strong> average <strong>of</strong> <strong>the</strong> EURIBOR rates for<br />

money market loans with a maturity <strong>of</strong> twelve months<br />

– weighted accord<strong>in</strong>g to <strong>the</strong> number <strong>of</strong> days for which<br />

<strong>the</strong>se rates prevailed – dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial year for which<br />

<strong>the</strong> distribution is made, plus one percentage po<strong>in</strong>t.<br />

EURIBOR refers to <strong>the</strong> Euro Interbank Offered Rate as<br />

determ<strong>in</strong>ed and published by <strong>the</strong> European Central Bank.<br />

Table 9 Number <strong>of</strong> outstand<strong>in</strong>g shares <strong>in</strong> <strong>2011</strong><br />

Subsequently, if possible, a dividend will be distributed<br />

on each f<strong>in</strong>anc<strong>in</strong>g preference share <strong>of</strong> a certa<strong>in</strong> series and<br />

sub-series, with due consideration <strong>of</strong> <strong>the</strong> provisions <strong>of</strong><br />

Article 32(6) <strong>of</strong> <strong>the</strong> Articles <strong>of</strong> Association, equal to an<br />

amount calculated by apply<strong>in</strong>g a percentage to <strong>the</strong><br />

nom<strong>in</strong>al amount <strong>of</strong> <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g preference share<br />

concerned at <strong>the</strong> start <strong>of</strong> that f<strong>in</strong>ancial year, plus <strong>the</strong><br />

amount <strong>of</strong> share premium paid <strong>in</strong> on <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g<br />

preference share issued <strong>in</strong> <strong>the</strong> series and sub-series<br />

concerned at <strong>the</strong> time <strong>of</strong> <strong>in</strong>itial issue <strong>of</strong> <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g<br />

preference shares <strong>of</strong> that series and sub-series, less <strong>the</strong><br />

amount paid out on each f<strong>in</strong>anc<strong>in</strong>g preference share<br />

concerned and charged to <strong>the</strong> share premium reserve<br />

formed at <strong>the</strong> time <strong>of</strong> issue <strong>of</strong> <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g preference<br />

shares <strong>of</strong> that series and sub-series prior to that f<strong>in</strong>ancial<br />

year. If and to <strong>the</strong> extent that a distribution has been<br />

made on <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g preference shares concerned <strong>in</strong><br />

<strong>the</strong> course <strong>of</strong> <strong>the</strong> year and charged to <strong>the</strong> share premium<br />

reserve formed at <strong>the</strong> time <strong>of</strong> issue <strong>of</strong> <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g<br />

preference shares <strong>of</strong> <strong>the</strong> series and sub-series concerned,<br />

or partial repayment has been made on such shares, <strong>the</strong><br />

amount <strong>of</strong> <strong>the</strong> distribution will be reduced pro rata over<br />

<strong>the</strong> period concerned accord<strong>in</strong>g to <strong>the</strong> amount <strong>of</strong> <strong>the</strong><br />

distribution charged to <strong>the</strong> share premium reserve and/<br />

or <strong>the</strong> repayment with respect to <strong>the</strong> amount referred to<br />

<strong>in</strong> <strong>the</strong> preced<strong>in</strong>g sentence. The calculation <strong>of</strong> <strong>the</strong><br />

dividend percentage for <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g preference shares<br />

<strong>of</strong> a certa<strong>in</strong> series will be made for each <strong>of</strong> <strong>the</strong> series <strong>of</strong><br />

f<strong>in</strong>anc<strong>in</strong>g preference shares referred to below, <strong>in</strong> <strong>the</strong><br />

manner set forth for <strong>the</strong> series concerned.<br />

Series FP1 to FP4<br />

The dividend percentage will be calculated by tak<strong>in</strong>g <strong>the</strong><br />

arithmetic mean <strong>of</strong> <strong>the</strong> yield to maturity on euro<br />

government loans issued by <strong>the</strong> K<strong>in</strong>gdom <strong>of</strong> <strong>the</strong><br />

Ord<strong>in</strong>ary CCPS's CPS's Total<br />

Shares <strong>in</strong> issue as at 1 January <strong>2011</strong> 231,765,736 346,276 473,275 232,585,287<br />

99.6% 0.2% 0.2% 100.0%<br />

Issue <strong>of</strong> shares rights issue 731,122 0 0 731,122<br />

Withdrawal <strong>of</strong> preference shares 0 0 -473,275 -473,275<br />

Conversion <strong>of</strong> preference shares 440,711 -346,276 0 94,435<br />

Shares <strong>in</strong> issue as at 31 December <strong>2011</strong> 232,937,569 0 0 232,937,569<br />

CCPS = Convertible Cumulative Preference shares<br />

CPS = Non-Convertible Cumulative Preference shares<br />

100.0% 0.0% 0.0% 100.0%


Ne<strong>the</strong>rlands with a rema<strong>in</strong><strong>in</strong>g term match<strong>in</strong>g as closely<br />

as possible <strong>the</strong> term <strong>of</strong> <strong>the</strong> series concerned, as published<br />

<strong>in</strong> <strong>the</strong> Euronext Prices Lists, plus two percentage po<strong>in</strong>ts.<br />

Series FP5 to FP8<br />

The dividend percentage will be equal to <strong>the</strong> average <strong>of</strong><br />

<strong>the</strong> EURIBOR rates for money market loans with a<br />

maturity <strong>of</strong> 12 months – weighted accord<strong>in</strong>g to <strong>the</strong><br />

number <strong>of</strong> days for which <strong>the</strong>se rates prevailed – dur<strong>in</strong>g<br />

<strong>the</strong> f<strong>in</strong>ancial year for which <strong>the</strong> distribution is made, plus<br />

two percentage po<strong>in</strong>ts.<br />

The above percentages may be <strong>in</strong>creased or reduced by<br />

an amount <strong>of</strong> no more than three hundred basis po<strong>in</strong>ts.<br />

The above percentages apply for <strong>the</strong> follow<strong>in</strong>g periods:<br />

series FP1 and FP5: five years; series FP2 and FP6: six<br />

years; series FP3 and FP7: seven years and series FP4 and<br />

FP8: eight years. After a period expires, <strong>the</strong> percentage<br />

will be modified <strong>in</strong> accordance with <strong>the</strong> rules laid down <strong>in</strong><br />

Article 32 paragraph 6(c) <strong>of</strong> <strong>the</strong> Articles <strong>of</strong> Association.<br />

The Supervisory Board shall determ<strong>in</strong>e, on <strong>the</strong> basis <strong>of</strong> a<br />

proposal by <strong>the</strong> Executive Board, what part <strong>of</strong> <strong>the</strong> pr<strong>of</strong>it<br />

rema<strong>in</strong><strong>in</strong>g after application <strong>of</strong> <strong>the</strong> above provisions will<br />

be added to <strong>the</strong> reserves. The part <strong>of</strong> <strong>the</strong> pr<strong>of</strong>it that<br />

rema<strong>in</strong>s <strong>the</strong>reafter is at <strong>the</strong> disposal <strong>of</strong> <strong>the</strong> General<br />

Meet<strong>in</strong>g, subject to <strong>the</strong> provision that no fur<strong>the</strong>r<br />

dividends will be distributed on <strong>the</strong> preference shares<br />

and with due consideration <strong>of</strong> <strong>the</strong> o<strong>the</strong>r provisions <strong>of</strong><br />

Article 32 <strong>of</strong> <strong>the</strong> Articles <strong>of</strong> Association.<br />

Limits on <strong>the</strong> transfer <strong>of</strong> shares<br />

The company has no limitation, under <strong>the</strong> Articles <strong>of</strong><br />

Association or by contract, on <strong>the</strong> transfer <strong>of</strong> shares or<br />

depositary receipts issued with <strong>the</strong> company’s<br />

cooperation, apart from <strong>the</strong> restriction on <strong>the</strong> transfer <strong>of</strong><br />

preference shares conta<strong>in</strong>ed <strong>in</strong> <strong>the</strong> Articles <strong>of</strong><br />

Association. Article 13 <strong>of</strong> <strong>the</strong> company’s Articles <strong>of</strong><br />

Association stipulates that approval is required from <strong>the</strong><br />

company’s Executive Board for <strong>the</strong> transfer <strong>of</strong> Class B and<br />

Class F preference shares. The scheme is <strong>in</strong>cluded <strong>in</strong><br />

order to <strong>of</strong>fer <strong>the</strong> company <strong>the</strong> facility – because <strong>of</strong> <strong>the</strong><br />

specific purpose <strong>of</strong> issu<strong>in</strong>g <strong>the</strong>se shares, namely <strong>the</strong><br />

acquisition <strong>of</strong> f<strong>in</strong>ance or achiev<strong>in</strong>g protection – <strong>of</strong><br />

<strong>of</strong>fer<strong>in</strong>g <strong>the</strong> holders <strong>of</strong> <strong>the</strong>se shares an alternative <strong>in</strong> <strong>the</strong><br />

event that <strong>the</strong>y wish to dispose <strong>of</strong> <strong>the</strong>ir shares.<br />

As regards <strong>the</strong> Class B preference shares, <strong>the</strong> company<br />

and Sticht<strong>in</strong>g Aandelenbeheer <strong>BAM</strong> Groep have agreed<br />

that <strong>the</strong> company will not proceed to issue <strong>the</strong>se shares<br />

or to grant any rights to purchase <strong>the</strong>m to anyone o<strong>the</strong>r<br />

than <strong>the</strong> said foundation without <strong>the</strong> foundation’s<br />

permission. The foundation will not dispose <strong>of</strong> or<br />

encumber any Class B preference shares, nor renounce<br />

<strong>the</strong> vot<strong>in</strong>g rights relat<strong>in</strong>g to <strong>the</strong>m, without permission<br />

from <strong>the</strong> company. Please refer to pages 189 et seq. <strong>of</strong><br />

<strong>the</strong> <strong>Annual</strong> <strong>Report</strong> with regard to <strong>the</strong> reasons beh<strong>in</strong>d<br />

protect<strong>in</strong>g <strong>the</strong> company and <strong>the</strong> manner <strong>in</strong> which this is<br />

done.<br />

Substantial <strong>in</strong>terests<br />

The company is aware <strong>of</strong> <strong>the</strong> follow<strong>in</strong>g <strong>in</strong>terests <strong>in</strong> its<br />

equity, which are now reported under <strong>the</strong> provisions<br />

concern<strong>in</strong>g <strong>the</strong> report<strong>in</strong>g <strong>of</strong> controll<strong>in</strong>g <strong>in</strong>terests under<br />

<strong>the</strong> Disclosure <strong>of</strong> Major Hold<strong>in</strong>gs Act (‘Wmz Act’), which<br />

Act has now been subsumed with<strong>in</strong> <strong>the</strong> F<strong>in</strong>ancial<br />

Supervision Act. See table 10.<br />

Table 10 Interests <strong>of</strong> 5 percent or more accord<strong>in</strong>g to <strong>the</strong> AFM register <strong>of</strong> substantial sharehold<strong>in</strong>gs<br />

(As a percentage )<br />

Interest above Date <strong>of</strong> last<br />

Total<br />

5% s<strong>in</strong>ce Wmz notification<br />

ING Groep 10.2 February 1992 19 November 2009<br />

A. van Herk 9.4 October 2005 31 December 2008<br />

Delta Lloyd 5.6 December 2002 6 May <strong>2011</strong><br />

Governance for Owners LLP 5.0 November 2010 16 November 2010<br />

55<br />

<strong>2011</strong>


56<br />

<strong>2011</strong><br />

Special control rights<br />

The shares <strong>in</strong>to which <strong>the</strong> company’s equity is divided are<br />

not subject to any special control rights.<br />

Employee share plan or employee option plan<br />

The company does not have any employee share or<br />

employee option plans.<br />

Vot<strong>in</strong>g rights<br />

Each share <strong>in</strong> <strong>the</strong> company provides entitlement to <strong>the</strong><br />

cast<strong>in</strong>g <strong>of</strong> one vote at shareholders’ meet<strong>in</strong>gs. There are<br />

no restrictions on <strong>the</strong> exercis<strong>in</strong>g <strong>of</strong> vot<strong>in</strong>g rights. The<br />

company’s Articles <strong>of</strong> Association conta<strong>in</strong> <strong>the</strong> usual<br />

provisions <strong>in</strong> relation to <strong>in</strong>timation for <strong>the</strong> purpose <strong>of</strong><br />

be<strong>in</strong>g acknowledged as a proxy at shareholders’<br />

meet<strong>in</strong>gs. Where <strong>the</strong> company’s Articles <strong>of</strong> Association<br />

mention holders <strong>of</strong> depositary receipts or depositary<br />

receipt holders, whe<strong>the</strong>r named or bearer, this is<br />

understood to mean holders <strong>of</strong> depositary receipts<br />

issued with <strong>the</strong> company’s cooperation and also<br />

<strong>in</strong>dividuals who, under <strong>the</strong> terms <strong>of</strong> Articles 88 or 89,<br />

Book 2 <strong>of</strong> <strong>the</strong> Dutch Civil Code, have <strong>the</strong> rights accorded<br />

to holders <strong>of</strong> depositary receipts for shares issued with<br />

<strong>the</strong> company’s cooperation.<br />

Shareholders’ agreements<br />

The company is not aware <strong>of</strong> any agreements <strong>in</strong>volv<strong>in</strong>g<br />

one <strong>of</strong> <strong>the</strong> company’s shareholders and which might<br />

provide reasons for (i) restrict<strong>in</strong>g <strong>the</strong> transfer <strong>of</strong> shares or<br />

<strong>of</strong> depositary receipts issued with <strong>the</strong> company’s<br />

cooperation, or (ii) restrict<strong>in</strong>g <strong>the</strong> vot<strong>in</strong>g rights.<br />

Appo<strong>in</strong>tment and dismissal <strong>of</strong> members <strong>of</strong> <strong>the</strong> Supervisory<br />

Board and members <strong>of</strong> <strong>the</strong> Executive Board<br />

The company is obliged by law to operate a mitigated<br />

two-tier structure. The General Meet<strong>in</strong>g appo<strong>in</strong>ts <strong>the</strong><br />

members <strong>of</strong> <strong>the</strong> Supervisory Board, based on a<br />

recommendation from <strong>the</strong> Supervisory Board. The<br />

General Meet<strong>in</strong>g also appo<strong>in</strong>ts <strong>the</strong> members <strong>of</strong> <strong>the</strong><br />

Executive Board, with <strong>the</strong> Supervisory Board hav<strong>in</strong>g <strong>the</strong><br />

right <strong>of</strong> recommendation. The section headed<br />

‘Corporate governance’ on page 45 et seq. <strong>of</strong> <strong>the</strong> report<br />

by <strong>the</strong> Executive Board provides a more detailed<br />

explanation <strong>of</strong> <strong>the</strong> appo<strong>in</strong>tment and dismissal <strong>of</strong><br />

members <strong>of</strong> <strong>the</strong> Supervisory Board and members <strong>of</strong> <strong>the</strong><br />

Executive Board.<br />

Powers <strong>of</strong> <strong>the</strong> Executive Board<br />

The company is managed by an Executive Board. The<br />

Executive Board’s powers are those aris<strong>in</strong>g from<br />

legislation and regulations. A more detailed description<br />

<strong>of</strong> <strong>the</strong> Executive Board’s duties can be found on page 45<br />

et seq. <strong>of</strong> <strong>the</strong> Executive Board’s report, <strong>in</strong> <strong>the</strong> section<br />

headed ‘Corporate governance’. The Executive Board<br />

was authorised by <strong>the</strong> General Meet<strong>in</strong>g held on 20 April<br />

<strong>2011</strong> to issue ord<strong>in</strong>ary shares and Class F preference<br />

shares and/or to grant options to purchase <strong>the</strong>se shares,<br />

subject to approval from <strong>the</strong> Supervisory Board. This<br />

authorisation is limited <strong>in</strong> duration to eighteen months.<br />

It is also limited <strong>in</strong> scope to 10 percent <strong>of</strong> <strong>the</strong> issued<br />

capital, plus an additional 10 percent, which additional<br />

10 percent may be used exclusively for mergers and<br />

acquisitions by <strong>the</strong> company or by operat<strong>in</strong>g companies.<br />

The General Meet<strong>in</strong>g held on 20 April <strong>2011</strong> granted<br />

authority to <strong>the</strong> Executive Board for a period <strong>of</strong> eighteen<br />

months to repurchase shares <strong>in</strong> <strong>the</strong> company, with<strong>in</strong> <strong>the</strong><br />

limitations imposed by <strong>the</strong> Articles <strong>of</strong> Association.<br />

In pr<strong>in</strong>ciple, <strong>the</strong> General Meet<strong>in</strong>g is asked to grant <strong>the</strong>se<br />

authorisations every year. Resolutions to amend <strong>the</strong><br />

Articles <strong>of</strong> Association, or to dissolve <strong>the</strong> company, may<br />

only be passed by <strong>the</strong> General Meet<strong>in</strong>g on <strong>the</strong> basis <strong>of</strong> a<br />

proposal put forward by <strong>the</strong> Executive Board and<br />

approved by <strong>the</strong> Supervisory Board.<br />

Change-<strong>of</strong>-control provisions <strong>in</strong> important agreements<br />

The Group’s most important f<strong>in</strong>ancial rules state that <strong>in</strong><br />

<strong>the</strong> event <strong>of</strong> a change <strong>of</strong> control (<strong>in</strong>clud<strong>in</strong>g <strong>in</strong> <strong>the</strong> event<br />

that more than 50 percent <strong>of</strong> <strong>the</strong> shares <strong>in</strong> Royal <strong>BAM</strong><br />

Group are deemed to be held by one party), <strong>the</strong> banks<br />

may term<strong>in</strong>ate fur<strong>the</strong>r f<strong>in</strong>anc<strong>in</strong>g and <strong>the</strong> Group can be<br />

obliged to repay outstand<strong>in</strong>g loans under <strong>the</strong>se<br />

arrangements and to extend <strong>the</strong> capital base provided<br />

for outstand<strong>in</strong>g bank guarantees.<br />

A change-<strong>of</strong>-control clause is not unusual <strong>in</strong> important<br />

collaboration agreements over a longer period, where<br />

<strong>the</strong> parties <strong>in</strong>clude parts <strong>of</strong> <strong>the</strong> Group. Partly because <strong>of</strong><br />

<strong>the</strong> total size <strong>of</strong> <strong>the</strong> Group, <strong>the</strong>se clauses are not<br />

considered significant with<strong>in</strong> <strong>the</strong> mean<strong>in</strong>g <strong>of</strong> <strong>the</strong> Decree<br />

on Article 10 <strong>of</strong> <strong>the</strong> Takeover Directive.<br />

Change-<strong>of</strong>-control clauses <strong>in</strong> contracts <strong>of</strong> employment<br />

No agreement has been concluded with directors or<br />

employees <strong>of</strong> <strong>the</strong> company provid<strong>in</strong>g for a severance<br />

payment on term<strong>in</strong>ation <strong>of</strong> employment result<strong>in</strong>g from a<br />

public bid for <strong>the</strong> company.


N218 Hartel canal cycle bridge (600 metres),<br />

Spijkenisse, <strong>the</strong> Ne<strong>the</strong>rlands.<br />

<strong>BAM</strong> Civiel.<br />

Risk and risk management<br />

Construction <strong>in</strong>evitably <strong>in</strong>volves risks. For Royal <strong>BAM</strong><br />

Group <strong>the</strong>se risks are not exceptionally high and <strong>the</strong>y are<br />

no different <strong>in</strong> nature from those that are common to <strong>the</strong><br />

<strong>in</strong>dustry. The Group applies a strict policy designed to<br />

identify <strong>the</strong> risks clearly and to control <strong>the</strong>m as effectively<br />

as possible. This policy is expla<strong>in</strong>ed <strong>in</strong> this section.<br />

Activity matrix<br />

The Group operates <strong>in</strong> an <strong>in</strong>dustry that follows <strong>the</strong> general<br />

economic trends – although <strong>of</strong>ten with a certa<strong>in</strong> amount<br />

<strong>of</strong> delay. The result<strong>in</strong>g situation varies from sector to<br />

sector and country to country, depend<strong>in</strong>g on topics such<br />

as whe<strong>the</strong>r <strong>BAM</strong> works for public or private sector<br />

customers.<br />

Royal <strong>BAM</strong> Group decided to spread its activities across<br />

several sectors and geographical areas (<strong>in</strong> what it calls <strong>the</strong><br />

‘activity matrix’) partly <strong>in</strong> order to reduce <strong>the</strong> risk pr<strong>of</strong>ile.<br />

The activity matrix is assessed on a regular basis and be<strong>in</strong>g<br />

amended if necessary.<br />

Project-based work<br />

Work <strong>in</strong> <strong>the</strong> construction <strong>in</strong>dustry is largely carried out <strong>in</strong><br />

projects which vary <strong>in</strong> type, size, complexity, term and a<br />

number <strong>of</strong> o<strong>the</strong>r features. This results <strong>in</strong> a wide range <strong>of</strong><br />

different risk pr<strong>of</strong>iles for <strong>in</strong>dividual projects.<br />

The <strong>in</strong>dustry as a whole exhibits a certa<strong>in</strong> imbalance<br />

(‘asymmetry’) between risks and results. The upward<br />

potential <strong>of</strong> a pr<strong>of</strong>itable project is <strong>of</strong>ten more limited than<br />

<strong>the</strong> downward potential <strong>of</strong> a loss-mak<strong>in</strong>g project.<br />

As a result, <strong>the</strong> Group needs to have a strong project<br />

organisation system that is close to <strong>the</strong> projects and<br />

operates <strong>in</strong> <strong>the</strong> markets concerned. This translates <strong>in</strong>to<br />

a significant regional presence and a decisive role for<br />

project teams and project managers.<br />

Control framework<br />

Because <strong>of</strong> <strong>the</strong> project-based nature <strong>of</strong> <strong>the</strong> work, <strong>the</strong><br />

Group has a decentralised structure <strong>in</strong> which operat<strong>in</strong>g<br />

companies work <strong>in</strong> specific sectors and geographical areas<br />

with<strong>in</strong> <strong>the</strong> activity matrix and are close to <strong>the</strong> projects.<br />

The operat<strong>in</strong>g companies are run by management teams<br />

that report to <strong>the</strong> Executive Board. Both <strong>the</strong> management<br />

teams and <strong>the</strong> Group’s Executive Board are supported by<br />

staff departments with functional relationships <strong>in</strong><br />

between.<br />

57<br />

<strong>2011</strong>


TV record<strong>in</strong>g studio <strong>in</strong>stallations,<br />

DutchView’s Westergasfabriek Studio,<br />

Amsterdam.<br />

<strong>BAM</strong> Techniek.


On <strong>the</strong> one hand, <strong>the</strong> operat<strong>in</strong>g companies are very<br />

diverse – <strong>in</strong> relation to <strong>the</strong>ir specific sectors and<br />

geographical areas <strong>of</strong> operation – and, on <strong>the</strong><br />

o<strong>the</strong>r hand, <strong>the</strong>y also show a significant number<br />

<strong>of</strong> jo<strong>in</strong>t, Group-wide elements.<br />

Risk management philosophy<br />

In l<strong>in</strong>e with <strong>the</strong> Group’s control framework,<br />

risk management is largely placed with<strong>in</strong> <strong>the</strong><br />

<strong>in</strong>dividual operat<strong>in</strong>g companies as part <strong>of</strong> <strong>the</strong>ir<br />

policy-related and operational processes.<br />

As an additional measure, <strong>the</strong> Group operates<br />

an <strong>in</strong>-house control framework based on COSO<br />

(<strong>the</strong> Committee <strong>of</strong> Sponsor<strong>in</strong>g Organizations <strong>of</strong><br />

<strong>the</strong> Treadway Commission), which focuses on<br />

<strong>the</strong> reliability <strong>of</strong> f<strong>in</strong>ancial <strong>in</strong>formation.<br />

General control measures<br />

The Group’s risk management and control<br />

systems <strong>in</strong>volve <strong>the</strong> use <strong>of</strong> various <strong>in</strong>struments. One<br />

general control <strong>in</strong>strument consists <strong>of</strong> <strong>in</strong>structions from<br />

<strong>the</strong> Group to <strong>the</strong> management <strong>of</strong> <strong>the</strong> operat<strong>in</strong>g<br />

companies. These <strong>in</strong>structions set out such matters as<br />

limits for commitments with regards to <strong>in</strong>vestments and<br />

<strong>the</strong> acceptance <strong>of</strong> new projects. These guidel<strong>in</strong>es also<br />

def<strong>in</strong>e <strong>the</strong> powers <strong>in</strong>vested <strong>in</strong> <strong>the</strong> operat<strong>in</strong>g company<br />

managers and lay down quality requirements for<br />

fundamental control measures. These management<br />

<strong>in</strong>structions are reassessed annually and modified if<br />

necessary.<br />

A second general control <strong>in</strong>strument consists <strong>of</strong> <strong>the</strong><br />

guidel<strong>in</strong>es for <strong>the</strong> organisation <strong>of</strong> <strong>the</strong> f<strong>in</strong>ancial reports<br />

compiled by <strong>the</strong> operat<strong>in</strong>g companies, and for <strong>the</strong><br />

procedures to be followed <strong>in</strong> connection with those<br />

reports.<br />

A third general control <strong>in</strong>strument employed by <strong>the</strong><br />

Group <strong>in</strong>volves budget<strong>in</strong>g, report<strong>in</strong>g and (<strong>in</strong>ternal) audit<br />

systems. The entire Group uses uniform guidel<strong>in</strong>es and<br />

account<strong>in</strong>g policies, which serve as <strong>the</strong> basis for all<br />

f<strong>in</strong>ancial and management report<strong>in</strong>g.<br />

As part <strong>of</strong> <strong>the</strong> extensive quarterly reports, which <strong>in</strong>clude<br />

detailed monitor<strong>in</strong>g <strong>of</strong> <strong>the</strong> forecast results and results<br />

already achieved by <strong>the</strong> operat<strong>in</strong>g companies, <strong>the</strong><br />

operat<strong>in</strong>g companies provide <strong>in</strong>terim reports on any<br />

deviations from <strong>the</strong> expected f<strong>in</strong>ancial results and<br />

movements <strong>in</strong> cash positions, supply <strong>of</strong> work, turnover<br />

and results.<br />

Besides general control measures, <strong>the</strong> Group has also<br />

implemented specific measures focused primarily on<br />

risks relat<strong>in</strong>g to market, reputation, safety, projects,<br />

currency, credit, debtors, <strong>in</strong>terest and liquidity positions.<br />

These risks are discussed <strong>in</strong> greater detail ei<strong>the</strong>r below or<br />

on page 123 <strong>of</strong> <strong>the</strong> f<strong>in</strong>ancial statements, along with <strong>the</strong><br />

control measures that <strong>the</strong> Group has taken.<br />

External auditor’s management letter on <strong>in</strong>ternal<br />

control systems<br />

In <strong>2011</strong>, as <strong>in</strong> previous years, <strong>the</strong> external auditor audited<br />

and tested several aspects <strong>of</strong> <strong>the</strong> Group’s <strong>in</strong>ternal control<br />

systems. The auditor’s ma<strong>in</strong> f<strong>in</strong>d<strong>in</strong>g is that <strong>the</strong> quality <strong>of</strong><br />

<strong>the</strong> <strong>in</strong>ternal control systems at <strong>the</strong> Group’s operat<strong>in</strong>g<br />

companies is generally good and develop<strong>in</strong>g <strong>in</strong> a positive<br />

way. However, <strong>the</strong> external auditor also feels that some<br />

improvements are required <strong>in</strong> <strong>the</strong> <strong>in</strong>ternal control<br />

systems <strong>of</strong> a limited number <strong>of</strong> <strong>the</strong> Group’s operat<strong>in</strong>g<br />

companies. In addition, <strong>the</strong> auditor advised <strong>the</strong> Group to<br />

focus its attention <strong>in</strong> particular on <strong>the</strong> outsourced<br />

application management <strong>of</strong> a s<strong>of</strong>tware package that is<br />

widely used with<strong>in</strong> <strong>the</strong> Group.<br />

Market risk<br />

Royal <strong>BAM</strong> Group generates <strong>in</strong>come <strong>in</strong> various<br />

geographical markets, carry<strong>in</strong>g out a range <strong>of</strong> different<br />

types <strong>of</strong> activities. The Group’s f<strong>in</strong>ancial performance<br />

depends partly on <strong>the</strong> economic climate <strong>in</strong> <strong>the</strong> countries<br />

<strong>in</strong> which Royal <strong>BAM</strong> Group operates.<br />

Consumer confidence <strong>in</strong> <strong>the</strong> hous<strong>in</strong>g market is one <strong>of</strong> <strong>the</strong><br />

factors that determ<strong>in</strong>e <strong>the</strong> state <strong>of</strong> <strong>the</strong> property sector<br />

and – to a lesser extent – <strong>the</strong> construction and<br />

mechanical and electrical services sector as a whole <strong>in</strong><br />

<strong>the</strong> Ne<strong>the</strong>rlands. The debates about whe<strong>the</strong>r mortgage<br />

<strong>in</strong>terest should be tax-deductible and about <strong>the</strong><br />

affordability <strong>of</strong> own<strong>in</strong>g one’s own home are key factors<br />

that affect consumer confidence. There are structural<br />

vacancy levels on <strong>the</strong> commercial property market,<br />

especially where <strong>of</strong>fice space is concerned. These issues<br />

can result <strong>in</strong> an <strong>in</strong>crease <strong>in</strong> <strong>the</strong> stock <strong>of</strong> unsold units and<br />

impairments on <strong>the</strong> property portfolio. The control<br />

measures implemented to reduce <strong>the</strong> risks are described<br />

under project risks.<br />

The effects <strong>of</strong> <strong>the</strong> economy on <strong>the</strong> Group’s turnover are<br />

limited <strong>in</strong> many cases – especially <strong>in</strong> <strong>the</strong> <strong>in</strong>frastructure<br />

sector – because <strong>the</strong> contracts <strong>in</strong> question are awarded<br />

by government bodies. The Group has also benefited<br />

fur<strong>the</strong>r because <strong>of</strong> recent government <strong>in</strong>centive schemes<br />

<strong>in</strong> <strong>the</strong> form <strong>of</strong> additional spend<strong>in</strong>g. Government bodies<br />

59<br />

<strong>2011</strong>


60<br />

<strong>2011</strong><br />

are currently under pressure to cut back on contracts <strong>in</strong><br />

many <strong>of</strong> <strong>the</strong> Group’s home countries follow<strong>in</strong>g f<strong>in</strong>ancial<br />

austerity measures. The cutbacks can result <strong>in</strong> contracts<br />

be<strong>in</strong>g worth less than expected, postponed and/or<br />

cancelled altoge<strong>the</strong>r.<br />

The Group aims to limit its sensitivity to <strong>the</strong> economic<br />

climate by focus<strong>in</strong>g even more emphatically on<br />

long-term contracts that generate more predictable<br />

cash flows. This is shown by <strong>the</strong> <strong>in</strong>crease <strong>in</strong> <strong>the</strong> number <strong>of</strong><br />

PPP contracts for which <strong>the</strong> Group is bidd<strong>in</strong>g or on which<br />

<strong>the</strong> Group is already work<strong>in</strong>g.<br />

Risk to reputation<br />

The confidence that pr<strong>in</strong>cipals, shareholders, lenders,<br />

construction partners and employees place <strong>in</strong> Royal <strong>BAM</strong><br />

Group is essential for ensur<strong>in</strong>g <strong>the</strong> cont<strong>in</strong>uity <strong>of</strong> <strong>the</strong><br />

enterprise. The Group accord<strong>in</strong>gly adheres to generally<br />

accepted standards and values and complies with local<br />

statutory and o<strong>the</strong>r rules and regulations, particularly<br />

with respect to <strong>the</strong> acquisition and execution <strong>of</strong><br />

contracts. This basic position is affirmed <strong>in</strong> <strong>the</strong> Group’s<br />

Integrity Code <strong>of</strong> Conduct. All employees are required to<br />

act fairly, to honour agreements and to act with care <strong>in</strong><br />

respect <strong>of</strong> clients and bus<strong>in</strong>ess partners, such as suppliers<br />

and subcontractors. In order to make <strong>in</strong>tegrity a<br />

fundamental part <strong>of</strong> day-today activities, <strong>the</strong> subject is<br />

regularly revisited. The Executive Board has appo<strong>in</strong>ted a<br />

Central Compliance Officer who promotes compliance<br />

with <strong>the</strong> code <strong>of</strong> conduct, and provides advice with<br />

respect to issues <strong>in</strong>volv<strong>in</strong>g <strong>in</strong>tegrity. The operat<strong>in</strong>g<br />

companies, too, have <strong>the</strong>ir own compliance <strong>of</strong>ficers, to<br />

whom breaches <strong>of</strong> <strong>the</strong> code <strong>of</strong> conduct can and must be<br />

reported. In addition to <strong>the</strong> code <strong>of</strong> conduct, <strong>the</strong> Group<br />

also has a ‘whistle-blower scheme’.<br />

The Group believes it to be important that employees are<br />

able to blow <strong>the</strong> whistle on suspected wrongdo<strong>in</strong>g at<br />

work, and that <strong>the</strong>y are able to report such matters<br />

without fear <strong>of</strong> reprisals. Employees have easy access to<br />

both <strong>the</strong> code <strong>of</strong> conduct and <strong>the</strong> whistleblower<br />

procedure. For example, <strong>the</strong>y can be found on <strong>the</strong><br />

Group’s <strong>in</strong>tranet site and on its website.<br />

Safety risks<br />

Royal <strong>BAM</strong> Group attaches a great deal <strong>of</strong> importance to<br />

safe and healthy work<strong>in</strong>g conditions for its employees.<br />

The Group is aware that <strong>the</strong>re is a risk <strong>of</strong> <strong>in</strong>juries on<br />

construction sites <strong>in</strong> particular and <strong>the</strong>refore has a policy<br />

aimed at implement<strong>in</strong>g <strong>the</strong> measures required to<br />

prevent accidents, occupational illnesses and <strong>in</strong>juries.<br />

Health and safety risks are controlled as much as possible<br />

by us<strong>in</strong>g sensible designs, prepar<strong>in</strong>g projects<br />

systematically and provid<strong>in</strong>g employees with proper<br />

<strong>in</strong>structions about safe work<strong>in</strong>g methods. A Group-wide<br />

safety management guidel<strong>in</strong>e provides operat<strong>in</strong>g<br />

companies with a framework with which <strong>the</strong>ir own safety<br />

management systems must comply. Safety Awareness<br />

Audits are carried out to monitor whe<strong>the</strong>r <strong>the</strong> operat<strong>in</strong>g<br />

companies’ safety management systems are <strong>in</strong><br />

accordance with <strong>the</strong> guidel<strong>in</strong>es laid down by <strong>the</strong><br />

Executive Board.<br />

The audits also highlight areas where <strong>the</strong> safety<br />

management system could be improved.<br />

Project risks<br />

Prior to any project, <strong>the</strong> operat<strong>in</strong>g companies assess <strong>the</strong><br />

risk factors, both <strong>in</strong> qualitative and <strong>in</strong> quantitative terms.<br />

Uncerta<strong>in</strong>ties may be related to f<strong>in</strong>ancial and contractual<br />

aspects, safety, construction materials, plant and<br />

equipment, location (<strong>in</strong>clud<strong>in</strong>g site conditions and<br />

build<strong>in</strong>g permits), <strong>the</strong> construction period and <strong>the</strong> work<br />

schedule as well as to clients, subcontractors and<br />

construction partners. A quantitative analysis is carried<br />

out <strong>of</strong> <strong>the</strong> risk factors, based on historical data. This<br />

analysis is used to make adjustments to <strong>the</strong> project<br />

plann<strong>in</strong>g or construction methods <strong>in</strong> order to reduce <strong>the</strong><br />

project risks. The analysis may also result <strong>in</strong> adjustments<br />

to <strong>the</strong> risk mark-up <strong>in</strong> <strong>the</strong> contract price. Bids for major<br />

projects or projects <strong>in</strong>volv<strong>in</strong>g exceptional risks are<br />

submitted to <strong>the</strong> Executive Board for prior approval.<br />

Dur<strong>in</strong>g <strong>the</strong> implementation phase, <strong>the</strong> project team<br />

periodically and systematically assesses <strong>the</strong><br />

opportunities and risks attached to <strong>the</strong> project. If<br />

necessary, <strong>the</strong> project team takes measures to mitigate<br />

newly identified risks with particular attention be<strong>in</strong>g<br />

paid to <strong>the</strong> quality <strong>of</strong> <strong>the</strong> construction work to be<br />

completed, avoidance <strong>of</strong> construction faults and<br />

timel<strong>in</strong>ess <strong>of</strong> completion. Project managers submit<br />

reports on progress, <strong>the</strong> ma<strong>in</strong> possibilities and risks<br />

associated with <strong>the</strong> project, <strong>the</strong> quality and <strong>the</strong> f<strong>in</strong>ancial<br />

aspects <strong>of</strong> <strong>the</strong> project to <strong>the</strong>ir regional <strong>of</strong>fice manager,<br />

who <strong>in</strong> turn reports at least on a monthly basis to <strong>the</strong><br />

operat<strong>in</strong>g company managers. They, <strong>in</strong> turn, report to<br />

<strong>the</strong> Executive Board, through <strong>the</strong> <strong>in</strong>formation systems<br />

described above.<br />

Whe<strong>the</strong>r or not projects, once taken on, are completed<br />

successfully depends to a great extent on <strong>the</strong> quality <strong>of</strong><br />

<strong>the</strong> staff and <strong>the</strong> management. Royal <strong>BAM</strong> Group pays<br />

particular attention to its human resources policy – as<br />

described on page 67 <strong>of</strong> this <strong>Annual</strong> <strong>Report</strong> – <strong>in</strong> order to


ensure that it consistently and effectively attracts<br />

talented employees and cont<strong>in</strong>ues to provide <strong>the</strong>m with<br />

challenges and development opportunities.<br />

In order to limit legal risks, <strong>the</strong> legal documentation<br />

required for <strong>the</strong> projects is based on standard documents<br />

as much as possible. Where a non-standard contract is<br />

used, Royal <strong>BAM</strong> Group lawyers will assess <strong>the</strong> contract<br />

beforehand. Standard contracts <strong>in</strong>clude clauses stat<strong>in</strong>g<br />

that any <strong>in</strong>crease <strong>in</strong> wage and plant and equipment costs<br />

dur<strong>in</strong>g <strong>the</strong> construction period can be passed on to <strong>the</strong><br />

client. Clients can also buy <strong>of</strong>f <strong>the</strong>se risks.<br />

In <strong>the</strong> construction sector it is usual for <strong>the</strong> operat<strong>in</strong>g<br />

company <strong>of</strong> <strong>the</strong> construction company that has won <strong>the</strong><br />

contract to have to issue a guarantee as collateral for<br />

proper execution <strong>of</strong> <strong>the</strong> project. This guarantee may be<br />

provided by <strong>the</strong> parent company, or alternatively by<br />

external parties such as banks or surety <strong>in</strong>stitutions.<br />

Royal <strong>BAM</strong> Group has str<strong>in</strong>gent procedures to guarantee<br />

that <strong>the</strong> contractual terms and conditions <strong>of</strong> guarantees<br />

comply with <strong>the</strong> company’s specific guidel<strong>in</strong>es.<br />

Over 75 percent <strong>of</strong> Royal <strong>BAM</strong> Group’s annual turnover<br />

comes from work done by suppliers and subcontractors.<br />

These parties have a major impact on <strong>the</strong> projects, both<br />

<strong>in</strong> f<strong>in</strong>ancial and technical terms. The Group aims to<br />

ma<strong>in</strong>ta<strong>in</strong> good relations with suppliers and<br />

subcontractors <strong>in</strong> order to ensure that <strong>the</strong> construction<br />

process runs smoothly.<br />

Cooperation should also m<strong>in</strong>imise <strong>the</strong> overall costs and<br />

at <strong>the</strong> same time produce a high quality product. For<br />

cooperation and management <strong>of</strong> price risks to work well,<br />

suppliers need to be <strong>in</strong>volved <strong>in</strong> <strong>the</strong> project from an early<br />

stage. This cooperation is set out <strong>in</strong> framework contracts,<br />

which conta<strong>in</strong> agreements about fees and conditions<br />

(such as delivery times, <strong>in</strong>voic<strong>in</strong>g, risks and bonus<br />

discounts).<br />

Project-specific orders can <strong>the</strong>n be placed under <strong>the</strong><br />

framework contracts. The operat<strong>in</strong>g companies’ broad<br />

range <strong>of</strong> expertise and experience allows Royal <strong>BAM</strong><br />

Group to <strong>in</strong>dependently and successfully carry out<br />

large-scale projects. None<strong>the</strong>less, it can be<br />

advantageous – also from <strong>the</strong> po<strong>in</strong>t <strong>of</strong> view <strong>of</strong> spread<strong>in</strong>g<br />

<strong>the</strong> risks – to work <strong>in</strong> a jo<strong>in</strong>t venture when deal<strong>in</strong>g with<br />

larger projects. In <strong>the</strong> Ne<strong>the</strong>rlands this usually <strong>in</strong>volves<br />

establish<strong>in</strong>g a general partnership (a legal form <strong>in</strong> which<br />

all parties are jo<strong>in</strong>tly and severally liable for mutual<br />

commitments connected with <strong>the</strong> performance <strong>of</strong> <strong>the</strong><br />

project). Royal <strong>BAM</strong> Group mitigates <strong>the</strong> result<strong>in</strong>g risk<br />

associated with construction partners by only enter<strong>in</strong>g<br />

<strong>in</strong>to jo<strong>in</strong>t ventures with solid and solvent partners.<br />

However, if <strong>the</strong> risk presented by <strong>the</strong> partner is still<br />

considered too great, ei<strong>the</strong>r before or dur<strong>in</strong>g <strong>the</strong><br />

construction phase, <strong>the</strong> Royal <strong>BAM</strong> Group operat<strong>in</strong>g<br />

company will require o<strong>the</strong>r guarantees which can take<br />

<strong>the</strong> form <strong>of</strong> a bank guarantee or <strong>of</strong> <strong>the</strong> partner leav<strong>in</strong>g<br />

sufficient cash <strong>in</strong>vested <strong>in</strong> <strong>the</strong> jo<strong>in</strong>t venture.<br />

Operat<strong>in</strong>g companies m<strong>in</strong>imise <strong>the</strong> payment risks<br />

associated with <strong>the</strong> execution <strong>of</strong> projects by means <strong>of</strong><br />

payment schedules that are contractually agreed <strong>in</strong><br />

advance. These contracts ensure as much as possible that<br />

payments made by <strong>the</strong> client at least match <strong>the</strong> cost<br />

<strong>in</strong>curred on <strong>the</strong> completed portion <strong>of</strong> <strong>the</strong> work. In <strong>the</strong><br />

case <strong>of</strong> projects carried out <strong>in</strong> emerg<strong>in</strong>g markets and<br />

develop<strong>in</strong>g countries, adequate security is agreed or<br />

export credit <strong>in</strong>surance is taken out before <strong>the</strong> start <strong>of</strong><br />

<strong>the</strong> project to cover <strong>the</strong> political and payment risk.<br />

<strong>BAM</strong> <strong>in</strong>vestigates its customers’ creditworth<strong>in</strong>ess before<br />

enter<strong>in</strong>g <strong>in</strong>to f<strong>in</strong>anc<strong>in</strong>g arrangements. The Group also<br />

focuses <strong>in</strong> particular on <strong>the</strong> security provided by banks<br />

and <strong>the</strong> payment systems used by government bodies.<br />

Acceptance <strong>of</strong> project development risks requires <strong>the</strong><br />

prior approval <strong>of</strong> <strong>the</strong> Executive Board. The Executive<br />

Board takes a decision regard<strong>in</strong>g <strong>the</strong>se risks, based on<br />

project proposals from <strong>the</strong> operat<strong>in</strong>g company<br />

concerned and an analysis by <strong>the</strong> Group’s Property<br />

Investment Director. For projects <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands, <strong>the</strong><br />

general rule is that construction does not start on<br />

residential or o<strong>the</strong>r projects until a substantial number <strong>of</strong><br />

units have been sold or a large part <strong>of</strong> <strong>the</strong> project has<br />

been let. The AM order book, however, still <strong>in</strong>cludes a<br />

number <strong>of</strong> residential construction projects from <strong>the</strong><br />

past where <strong>the</strong>re is an unconditional obligation to build.<br />

The general rules before start<strong>in</strong>g construction work <strong>in</strong><br />

<strong>the</strong> Ne<strong>the</strong>rlands also apply <strong>in</strong> Belgium and Ireland. In <strong>the</strong><br />

United K<strong>in</strong>gdom – where <strong>BAM</strong> is only active <strong>in</strong><br />

commercial property – pre-lett<strong>in</strong>g is not common<br />

practice. Instead, <strong>the</strong> <strong>in</strong>ventory risk is m<strong>in</strong>imised by<br />

implement<strong>in</strong>g a system <strong>of</strong> phased project execution.<br />

Given <strong>the</strong> date when work will beg<strong>in</strong> on <strong>the</strong> project, <strong>the</strong><br />

book value <strong>of</strong> purchased land reflects no more than <strong>the</strong><br />

current market value.<br />

No PPP or concession contracts may be accepted without<br />

<strong>the</strong> prior approval <strong>of</strong> <strong>the</strong> Executive Board. In its<br />

assessment <strong>of</strong> <strong>the</strong> risks attached to PPP and concession<br />

61<br />

<strong>2011</strong>


62<br />

<strong>2011</strong><br />

contracts, <strong>the</strong> Executive Board is assisted by <strong>the</strong><br />

management <strong>of</strong> <strong>BAM</strong> PPP. This operat<strong>in</strong>g company was<br />

<strong>in</strong>corporated <strong>in</strong> 2004 to optimise <strong>the</strong> utilisation <strong>of</strong> <strong>the</strong><br />

know-how and experience available with<strong>in</strong> <strong>the</strong> Group,<br />

both for acquir<strong>in</strong>g new projects and for properly<br />

assess<strong>in</strong>g <strong>the</strong> specific risks connected with concessions.<br />

Insurance<br />

Insurance is an important part <strong>of</strong> Royal <strong>BAM</strong> Group’s risk<br />

management strategy. A department <strong>of</strong> specialists<br />

ensures that all construction-phase risks that can be<br />

<strong>in</strong>cluded <strong>in</strong> <strong>the</strong> central <strong>in</strong>surance policies are actually<br />

covered <strong>in</strong> those policies and that adequate liability cover<br />

is also taken out. Royal <strong>BAM</strong> Group’s <strong>in</strong>surance coverage<br />

is a frequent subject <strong>of</strong> discussion with pr<strong>of</strong>essional<br />

<strong>in</strong>surance brokers.<br />

Specific risks<br />

Companies work<strong>in</strong>g <strong>in</strong> <strong>the</strong> construction <strong>in</strong>dustry are<br />

<strong>in</strong>volved <strong>in</strong> discussions about <strong>the</strong> f<strong>in</strong>ancial arrangements<br />

for construction projects, e.g. less/more work, <strong>the</strong><br />

completion date and <strong>the</strong> required quality level for <strong>the</strong><br />

work. Most <strong>of</strong> <strong>the</strong>se discussions are concluded to <strong>the</strong><br />

satisfaction <strong>of</strong> all concerned. However, <strong>in</strong> some cases it is<br />

impossible to avoid a discussion end<strong>in</strong>g <strong>in</strong> legal<br />

proceed<strong>in</strong>gs. Royal <strong>BAM</strong> Group, too, is <strong>in</strong>volved <strong>in</strong> a<br />

number <strong>of</strong> legal proceed<strong>in</strong>gs. A provision is usually taken<br />

<strong>in</strong> <strong>the</strong> case <strong>of</strong> legal proceed<strong>in</strong>gs where a f<strong>in</strong>ancial claim is<br />

made aga<strong>in</strong>st <strong>the</strong> Group, unless <strong>the</strong> claim <strong>in</strong> question is<br />

completely lack<strong>in</strong>g <strong>in</strong> substance. F<strong>in</strong>ancial claims that <strong>the</strong><br />

Group has pend<strong>in</strong>g aga<strong>in</strong>st third parties are <strong>in</strong> pr<strong>in</strong>ciple<br />

not capitalised unless it is reasonably certa<strong>in</strong> that <strong>the</strong><br />

amount <strong>in</strong> question will be paid. The Group devotes a lot<br />

<strong>of</strong> effort towards avoid<strong>in</strong>g such legal proceed<strong>in</strong>gs by<br />

implement<strong>in</strong>g quality programmes and provid<strong>in</strong>g<br />

tra<strong>in</strong><strong>in</strong>g for its employees. Some examples <strong>of</strong> major legal<br />

proceed<strong>in</strong>gs <strong>in</strong>volv<strong>in</strong>g Royal <strong>BAM</strong> Group are given briefly<br />

below.<br />

At <strong>the</strong> end <strong>of</strong> 1996 AGIV Real Estate sold <strong>the</strong> German<br />

construction company Wayss & Freytag to HBG. Part <strong>of</strong><br />

<strong>the</strong> sale <strong>in</strong>volved AGIV tak<strong>in</strong>g over rental guarantees<br />

given by Wayss & Freytag. These guarantees concerned<br />

Wayss & Freytag development projects from before 1997<br />

where <strong>the</strong> buyers had been guaranteed a certa<strong>in</strong> rental<br />

<strong>in</strong>come. AGIV failed to fulfil its obligations towards<br />

Wayss & Freytag after 2003. In legal proceed<strong>in</strong>gs before<br />

<strong>the</strong> German court, Royal <strong>BAM</strong> Group – hav<strong>in</strong>g owned<br />

HBG s<strong>in</strong>ce November 2002 – successfully claimed<br />

fulfilment by AGIV <strong>of</strong> its commitments <strong>in</strong> respect <strong>of</strong><br />

Wayss & Freytag. Early <strong>in</strong> 2005, AGIV was declared<br />

bankrupt. As a result, <strong>the</strong> legal proceed<strong>in</strong>gs pend<strong>in</strong>g<br />

aga<strong>in</strong>st AGIV have been suspended. The receiver has<br />

commenced a number <strong>of</strong> legal actions, <strong>in</strong>clud<strong>in</strong>g one<br />

aga<strong>in</strong>st a former AGIV shareholder. The settlement <strong>of</strong><br />

<strong>the</strong>se proceed<strong>in</strong>gs and <strong>of</strong> AGIV’s bankruptcy is expected<br />

to take several years. Based on current <strong>in</strong>formation, <strong>the</strong><br />

Group believes that <strong>the</strong>re will be no substantial negative<br />

f<strong>in</strong>ancial consequences <strong>in</strong> <strong>the</strong> future.<br />

In 2005, dur<strong>in</strong>g <strong>the</strong> construction <strong>of</strong> a bored tunnel for <strong>the</strong><br />

SMART North Tunnel <strong>in</strong> Kuala Lumpur, Wayss & Freytag<br />

Ingenieurbau was faced with ground conditions at<br />

variance with <strong>the</strong> <strong>in</strong>formation supplied by <strong>the</strong> client.<br />

Wayss & Freytag term<strong>in</strong>ated <strong>the</strong> contract at <strong>the</strong> start <strong>of</strong><br />

2006 as a result <strong>of</strong> <strong>the</strong> client’s failure to fulfil its payment<br />

obligations and refusal to deal with Wayss & Freytag’s<br />

claims for an extension <strong>of</strong> <strong>the</strong> construction period and<br />

reimbursement <strong>of</strong> costs. The client <strong>in</strong> turn also<br />

term<strong>in</strong>ated <strong>the</strong> contract <strong>in</strong> January 2006. Wayss &<br />

Freytag lodged a claim aga<strong>in</strong>st <strong>the</strong> client for more than<br />

€20 million as compensation for costs <strong>in</strong>curred. The<br />

client lodged provisional counterclaims amount<strong>in</strong>g to €5<br />

million. The <strong>in</strong>dependent dispute adjudicator, <strong>in</strong> <strong>the</strong><br />

contractually prescribed procedure, has now held that<br />

Wayss & Freytag was entitled to term<strong>in</strong>ate <strong>the</strong> contract.<br />

The proceed<strong>in</strong>gs are ongo<strong>in</strong>g. Based on <strong>the</strong> present state<br />

<strong>of</strong> knowledge, <strong>the</strong> Group considers that <strong>the</strong> provision<br />

that has been made is adequate.<br />

Two <strong>of</strong> <strong>the</strong> Group’s operat<strong>in</strong>g companies, partly <strong>in</strong><br />

comb<strong>in</strong>ation with third parties, are claim<strong>in</strong>g payment<br />

from <strong>the</strong> client, <strong>the</strong> State <strong>of</strong> <strong>the</strong> Ne<strong>the</strong>rlands, <strong>of</strong> <strong>in</strong>voices<br />

for <strong>in</strong>sulat<strong>in</strong>g homes around Schiphol Airport. A dispute<br />

has arisen between <strong>the</strong> construction companies and <strong>the</strong><br />

client <strong>in</strong> relation to <strong>the</strong> f<strong>in</strong>al settlement <strong>in</strong> <strong>the</strong> amount <strong>of</strong><br />

more than €10 million. The construction companies are<br />

also claim<strong>in</strong>g compensation for loss susta<strong>in</strong>ed as a<br />

consequence <strong>of</strong> reduced construction volume and<br />

<strong>in</strong>creased construction site costs due to disruption <strong>of</strong> <strong>the</strong><br />

construction process. The State is mak<strong>in</strong>g a counterclaim<br />

<strong>of</strong> approximately <strong>the</strong> same amount. The dispute<br />

regard<strong>in</strong>g <strong>the</strong> f<strong>in</strong>al settlement is <strong>in</strong> arbitration. The<br />

Group is assum<strong>in</strong>g, as matters currently stand, that no<br />

substantial adverse f<strong>in</strong>ancial consequences will result<br />

from <strong>the</strong>se legal proceed<strong>in</strong>gs.<br />

On 3 March 2009, dur<strong>in</strong>g construction work on part <strong>of</strong><br />

<strong>the</strong> metro system <strong>in</strong> Cologne, several adjacent build<strong>in</strong>gs<br />

– <strong>in</strong>clud<strong>in</strong>g Cologne’s municipal archives build<strong>in</strong>g –<br />

collapsed. Two residents were killed. Wayss & Freytag<br />

Ingenieurbau is a one-third partner <strong>in</strong> <strong>the</strong> consortium


carry<strong>in</strong>g out this project but was not directly <strong>in</strong>volved <strong>in</strong><br />

<strong>the</strong> work be<strong>in</strong>g done at <strong>the</strong> site <strong>of</strong> <strong>the</strong> accident. The<br />

customer has <strong>in</strong>stituted a judicial <strong>in</strong>quiry (known as a<br />

Beweisverfahren) before <strong>the</strong> district court (<strong>the</strong><br />

Landgericht <strong>in</strong> Cologne). As part <strong>of</strong> <strong>the</strong>se proceed<strong>in</strong>gs, a<br />

number <strong>of</strong> specialists are <strong>in</strong>vestigat<strong>in</strong>g <strong>the</strong> cause <strong>of</strong> <strong>the</strong><br />

accident. Their <strong>in</strong>vestigation is expected to take some<br />

time. Only once <strong>the</strong>ir <strong>in</strong>vestigation is complete will it be<br />

possible to determ<strong>in</strong>e whe<strong>the</strong>r <strong>the</strong> consortium is <strong>in</strong> any<br />

way responsible for <strong>the</strong> accident. The German Public<br />

Prosecution Service is also carry<strong>in</strong>g out its own<br />

<strong>in</strong>vestigation to determ<strong>in</strong>e whe<strong>the</strong>r any crim<strong>in</strong>al<br />

<strong>of</strong>fences may have been committed. The damage to<br />

property is considerable and <strong>the</strong> parties <strong>in</strong>volved have<br />

claimed under several different <strong>in</strong>surance policies. The<br />

Group is assum<strong>in</strong>g, as matters currently stand, that no<br />

substantial adverse f<strong>in</strong>ancial consequences for <strong>the</strong> Group<br />

will result from this event.<br />

<strong>BAM</strong> Nuttall designed and built a guided busway <strong>in</strong><br />

Cambridge (United K<strong>in</strong>gdom). A difference <strong>of</strong> op<strong>in</strong>ion<br />

arose with <strong>the</strong> client about <strong>the</strong> delay <strong>in</strong> <strong>the</strong> execution <strong>of</strong><br />

<strong>the</strong> contract and about additional work that had been<br />

carried out. The client believes that <strong>the</strong> damage<br />

susta<strong>in</strong>ed as a result <strong>of</strong> <strong>the</strong> delay should be paid for by<br />

<strong>BAM</strong> Nuttall. The client believes it paid too much and is<br />

demand<strong>in</strong>g reimbursement <strong>of</strong> <strong>the</strong> excess amount. Until<br />

that amount is paid, it is withhold<strong>in</strong>g amounts from<br />

<strong>in</strong>voices submitted by <strong>BAM</strong> Nuttall for work carried out.<br />

<strong>BAM</strong> Nuttall disputes this viewpo<strong>in</strong>t and is demand<strong>in</strong>g<br />

payment <strong>of</strong> <strong>the</strong> withheld amounts. The client took <strong>the</strong><br />

dispute to court <strong>in</strong> mid-<strong>2011</strong>. The size <strong>of</strong> <strong>the</strong> claim lodged<br />

by <strong>the</strong> parties aga<strong>in</strong>st each o<strong>the</strong>r runs <strong>in</strong>to several tens <strong>of</strong><br />

millions <strong>of</strong> euros. The Group is assum<strong>in</strong>g, as matters<br />

currently stand, that no substantial adverse f<strong>in</strong>ancial<br />

consequences for <strong>the</strong> Group will result from <strong>the</strong>se legal<br />

proceed<strong>in</strong>gs.<br />

In 2002, <strong>the</strong> European Commission commenced an<br />

<strong>in</strong>vestigation <strong>in</strong>to possible competition-law<br />

<strong>in</strong>fr<strong>in</strong>gements <strong>in</strong> connection with <strong>the</strong> market conduct <strong>of</strong><br />

several firms <strong>in</strong> <strong>the</strong> bitumen sector, both on <strong>the</strong><br />

production side and on <strong>the</strong> procurement side. One <strong>of</strong> <strong>the</strong><br />

company’s operat<strong>in</strong>g companies is <strong>in</strong>volved <strong>in</strong> this<br />

<strong>in</strong>vestigation, as a purchaser <strong>of</strong> bitumen. In September<br />

2006, <strong>the</strong> European Commission confirmed<br />

<strong>in</strong>fr<strong>in</strong>gements <strong>of</strong> competition law and imposed f<strong>in</strong>es on<br />

<strong>the</strong> companies <strong>in</strong>volved. The f<strong>in</strong>e perta<strong>in</strong><strong>in</strong>g to <strong>the</strong> Group<br />

operat<strong>in</strong>g company concerned amounts to €20.7 million<br />

and is fully covered by provision. An appeal has been<br />

lodged aga<strong>in</strong>st <strong>the</strong> imposition <strong>of</strong> this f<strong>in</strong>e.<br />

Current estimated risk pr<strong>of</strong>ile<br />

The Group sees <strong>the</strong> current and <strong>the</strong> predicted economic<br />

and f<strong>in</strong>ancial circumstances <strong>in</strong> Europe as <strong>the</strong> ma<strong>in</strong><br />

negative factors <strong>in</strong> its current estimated risk pr<strong>of</strong>ile.<br />

These circumstances are putt<strong>in</strong>g pressure on output and<br />

prices <strong>in</strong> <strong>the</strong> construction <strong>in</strong>dustry, result<strong>in</strong>g <strong>in</strong> pressure<br />

on <strong>the</strong> Group’s return on <strong>in</strong>vestment. Fur<strong>the</strong>rmore, <strong>the</strong><br />

Group’s f<strong>in</strong>ancial position (<strong>the</strong> operat<strong>in</strong>g capital) is under<br />

pressure because clients have fewer opportunities and<br />

are less will<strong>in</strong>g to pre-f<strong>in</strong>ance projects.<br />

Ano<strong>the</strong>r effect <strong>of</strong> <strong>the</strong> difficult circumstances on <strong>the</strong><br />

f<strong>in</strong>ancial markets is <strong>the</strong> pressure on borrow<strong>in</strong>g as regards<br />

to both <strong>the</strong> availability and <strong>the</strong> cost <strong>of</strong> loans. This applies<br />

to both property and project loans. There is also pressure<br />

on <strong>the</strong> Group’s balance sheet f<strong>in</strong>anc<strong>in</strong>g and guarantee<br />

l<strong>in</strong>es. The Executive Board is satisfied with <strong>the</strong><br />

ref<strong>in</strong>anc<strong>in</strong>g <strong>in</strong> early 2012 <strong>of</strong> <strong>the</strong> credit facilities for a<br />

five-year period until 2017.<br />

In practice, <strong>the</strong>re has proven to be sufficient PPP<br />

f<strong>in</strong>anc<strong>in</strong>g still available for <strong>the</strong> projects for which <strong>BAM</strong><br />

submits a bid (almost exclusively projects where <strong>the</strong><br />

payment is based on availability). However, <strong>the</strong><br />

conditions attached are an <strong>in</strong>creas<strong>in</strong>g burden.<br />

The Group’s f<strong>in</strong>ancial position – <strong>in</strong> particular its debt<br />

position – is closely related to its extensive property<br />

hold<strong>in</strong>gs because <strong>of</strong> <strong>the</strong> <strong>in</strong>creased risk posed by <strong>the</strong><br />

substantial pressure on <strong>the</strong> value <strong>of</strong> <strong>the</strong> underly<strong>in</strong>g assets<br />

(land, projects, plans).<br />

The current estimate also <strong>in</strong>dicates an <strong>in</strong>creased risk<br />

pr<strong>of</strong>ile with regard to <strong>the</strong> Group’s primary processes, <strong>in</strong><br />

particular sourc<strong>in</strong>g and carry<strong>in</strong>g out projects. This<br />

estimated <strong>in</strong>creased risk is ma<strong>in</strong>ly due to <strong>the</strong><br />

aforementioned market pressure. Increas<strong>in</strong>g pressure on<br />

prices is caus<strong>in</strong>g customers to shift more and more risks<br />

to <strong>the</strong> contractor, add<strong>in</strong>g <strong>in</strong> turn to <strong>the</strong> imbalance<br />

(‘asymmetry’) <strong>in</strong> <strong>the</strong> sector. Ano<strong>the</strong>r factor caus<strong>in</strong>g <strong>the</strong><br />

risk pr<strong>of</strong>ile to grow is <strong>the</strong> <strong>in</strong>creas<strong>in</strong>g complexity <strong>of</strong> new<br />

contract types <strong>in</strong> particular (but also <strong>of</strong> <strong>the</strong> traditional<br />

contract types as well). A somewhat <strong>in</strong>creased risk pr<strong>of</strong>ile<br />

has also been estimated for human capital because <strong>of</strong> <strong>the</strong><br />

fact that <strong>the</strong> primary processes are carried out by people.<br />

Hav<strong>in</strong>g sufficient numbers <strong>of</strong> qualified employees<br />

available is and will rema<strong>in</strong> extremely important to <strong>the</strong><br />

Group.<br />

63<br />

<strong>2011</strong>


64<br />

<strong>2011</strong><br />

Fur<strong>the</strong>r <strong>in</strong>tensify<strong>in</strong>g <strong>of</strong> risk management<br />

Risk management is a dynamic process, keep<strong>in</strong>g up with<br />

strategic objectives, customer demands and new<br />

activities <strong>in</strong> a chang<strong>in</strong>g, complex and competitive<br />

environment.<br />

A fur<strong>the</strong>r <strong>in</strong>tensify<strong>in</strong>g <strong>of</strong> <strong>BAM</strong>’s risk management is one <strong>of</strong><br />

<strong>the</strong> Group’s key focus areas, as stated <strong>in</strong> <strong>the</strong> strategy<br />

update when <strong>the</strong> Q3 <strong>2011</strong> quarterly figures were<br />

announced. <strong>BAM</strong> is tighten<strong>in</strong>g up risk management as<br />

follows:<br />

• <strong>BAM</strong> has created a risk management position at Group<br />

level to facilitate fur<strong>the</strong>r <strong>in</strong>tensify<strong>in</strong>g <strong>of</strong> <strong>the</strong> risk<br />

management systems and to complement <strong>the</strong><br />

activities currently be<strong>in</strong>g carried out by <strong>the</strong> Group’s<br />

operat<strong>in</strong>g companies.<br />

• <strong>BAM</strong> has <strong>in</strong>troduced a uniform assessment method <strong>in</strong><br />

which risks and potential for improvement are<br />

identified. This <strong>in</strong>strument will be embedded <strong>in</strong> <strong>the</strong><br />

system as part <strong>of</strong> <strong>the</strong> general control measures.<br />

• There will be fur<strong>the</strong>r Group-wide focus on risk<br />

management <strong>in</strong> <strong>the</strong> primary process as a result <strong>of</strong><br />

<strong>in</strong>creas<strong>in</strong>g complexity and competition. Best practices<br />

will be developed and shared <strong>in</strong> order to improve <strong>the</strong><br />

primary process related project selection, acquisition,<br />

implementation and a cont<strong>in</strong>ued culture <strong>of</strong><br />

improvement.<br />

• F<strong>in</strong>ally, <strong>the</strong>re will be focus <strong>in</strong> <strong>the</strong> primary process on<br />

benefit<strong>in</strong>g from <strong>the</strong> development <strong>of</strong> accompany<strong>in</strong>g<br />

employee competences and skills <strong>in</strong> this chang<strong>in</strong>g<br />

environment.<br />

Assessment <strong>of</strong> risk management and control systems<br />

The risk management and control systems operated<br />

properly dur<strong>in</strong>g <strong>the</strong> year under review and no<br />

shortcom<strong>in</strong>gs were found <strong>in</strong> <strong>the</strong>se systems or how <strong>the</strong>y<br />

operated that might have material consequences <strong>in</strong> <strong>the</strong><br />

<strong>2011</strong> f<strong>in</strong>ancial year or <strong>the</strong> current f<strong>in</strong>ancial year. It is<br />

<strong>the</strong>refore reasonable to conclude that <strong>the</strong>re are no<br />

<strong>in</strong>dications that <strong>the</strong> risk management and risk control<br />

systems will not work properly <strong>in</strong> <strong>the</strong> 2012 f<strong>in</strong>ancial year.<br />

No significant changes <strong>in</strong> <strong>the</strong>se systems are planned,<br />

apart from fur<strong>the</strong>r <strong>in</strong>tensify<strong>in</strong>g <strong>of</strong> risk management as<br />

described above. The Group cannot guarantee that no<br />

risks will present <strong>the</strong>mselves, and <strong>the</strong> risk management<br />

and control systems do need fur<strong>the</strong>r improvements.<br />

Optimis<strong>in</strong>g <strong>in</strong>ternal risk management and control systems<br />

rema<strong>in</strong>s an important issue for <strong>the</strong> Executive Board and it<br />

may result <strong>in</strong> <strong>the</strong> systems be<strong>in</strong>g improved or expanded.<br />

The aforementioned optimisation <strong>of</strong> risk management is<br />

an example.<br />

Based on <strong>the</strong> above statements, <strong>the</strong> Executive Board<br />

considers, as regards <strong>the</strong> f<strong>in</strong>ancial report<strong>in</strong>g risks, that<br />

<strong>the</strong> <strong>in</strong>ternal systems <strong>in</strong>tended for manag<strong>in</strong>g and<br />

controll<strong>in</strong>g risks provide a reasonable degree <strong>of</strong><br />

assurance that <strong>the</strong> f<strong>in</strong>ancial reports do not conta<strong>in</strong> any<br />

material misstatements. The Executive Board fur<strong>the</strong>r<br />

states that this section on <strong>the</strong> subject <strong>of</strong> risk was<br />

discussed with <strong>the</strong> Audit Committee and <strong>the</strong> Supervisory<br />

Board.


Corporate Social Responsibility<br />

Policy<br />

Royal <strong>BAM</strong> Group plays a central role <strong>in</strong> society and<br />

wishes to make a contribution to mak<strong>in</strong>g society more<br />

susta<strong>in</strong>able. The Group is aware that build<strong>in</strong>g activities<br />

change <strong>the</strong> landscape, which can cause both positive and<br />

negative reactions. The projects carried out by <strong>BAM</strong> for<br />

its customers <strong>in</strong> markets such as hous<strong>in</strong>g, schools, health<br />

care and transport are fundamentally important for <strong>the</strong><br />

quality <strong>of</strong> <strong>the</strong> liv<strong>in</strong>g environment and <strong>the</strong>refore have an<br />

effect on <strong>the</strong> natural environment and on society as a<br />

whole. This also means that future generations will be<br />

affected by <strong>the</strong> Group’s activities.<br />

In terms <strong>of</strong> corporate social responsibility, <strong>BAM</strong> aims to<br />

cont<strong>in</strong>ue play<strong>in</strong>g a pioneer<strong>in</strong>g role <strong>in</strong> <strong>the</strong> construction<br />

and property sector. The Group’s ambition is to provide<br />

customers with susta<strong>in</strong>able returns by <strong>of</strong>fer<strong>in</strong>g socially<br />

responsible, susta<strong>in</strong>able solutions at all stages <strong>of</strong> <strong>the</strong><br />

construction process.<br />

In order to be certa<strong>in</strong> that projects will have as little<br />

impact as possible on <strong>the</strong> natural environment and that<br />

<strong>the</strong> quality level will be as high as possible for <strong>the</strong><br />

occupants, <strong>BAM</strong> is develop<strong>in</strong>g concepts based on <strong>the</strong><br />

vision that it is possible to achieve a positive footpr<strong>in</strong>t.<br />

For example, <strong>BAM</strong> is active <strong>in</strong> <strong>in</strong>tegrated area<br />

development <strong>in</strong> <strong>the</strong> knowledge that multiple functions<br />

comb<strong>in</strong>ed with<strong>in</strong> one area can have a neutral or even a<br />

positive effect on <strong>the</strong> local environment.<br />

<strong>BAM</strong> is <strong>in</strong>creas<strong>in</strong>gly us<strong>in</strong>g a virtual method <strong>in</strong> <strong>the</strong> form <strong>of</strong><br />

Build<strong>in</strong>g Information Model<strong>in</strong>g (BIM) to prepare <strong>the</strong><br />

construction process. This simulation package improves<br />

construction efficiency and allows more accurate<br />

estimates <strong>of</strong> <strong>the</strong> materials needed. It also provides<br />

opportunities for improved collaboration with<br />

subcontractors and suppliers.<br />

<strong>BAM</strong> is also tak<strong>in</strong>g measures to improve its <strong>in</strong>ternal<br />

procedures, <strong>in</strong>clud<strong>in</strong>g by us<strong>in</strong>g lean plann<strong>in</strong>g and lean<br />

construction methods. The use <strong>of</strong> virtual construction<br />

and lean construction methods helps to reduce <strong>the</strong><br />

consumption <strong>of</strong> raw materials and <strong>the</strong> level <strong>of</strong> CO2 emissions, not only <strong>in</strong> <strong>the</strong> production phase, but<br />

throughout <strong>the</strong> entire process cha<strong>in</strong>. More efficient<br />

energy management <strong>in</strong> <strong>the</strong> built environment lowers<br />

operat<strong>in</strong>g costs <strong>in</strong> <strong>the</strong> occupancy phase and generates<br />

future value for <strong>the</strong> owner.<br />

Operat<strong>in</strong>g companies and <strong>the</strong>ir employees are focuss<strong>in</strong>g<br />

on all <strong>of</strong> <strong>the</strong>se areas by implement<strong>in</strong>g <strong>the</strong> pr<strong>in</strong>ciples <strong>of</strong><br />

corporate social responsibility <strong>in</strong> countless areas on a<br />

daily basis and by translat<strong>in</strong>g <strong>the</strong> Group’s expertise <strong>in</strong><br />

susta<strong>in</strong>ability <strong>in</strong>to concrete projects. An <strong>in</strong>creased focus<br />

on susta<strong>in</strong>ability requires an <strong>in</strong>tegrated approach, tak<strong>in</strong>g<br />

<strong>in</strong>to account <strong>the</strong> long term through life-cycle cost<strong>in</strong>g<br />

(<strong>in</strong>tegrality). Aga<strong>in</strong>st this background, <strong>BAM</strong> is work<strong>in</strong>g<br />

with numerous partners <strong>in</strong> <strong>the</strong> construction process on<br />

new and susta<strong>in</strong>able forms <strong>of</strong> cooperation.<br />

The Group <strong>of</strong>fers customers susta<strong>in</strong>able alternatives <strong>in</strong><br />

<strong>the</strong> form <strong>of</strong> concepts developed by <strong>BAM</strong>, such as <strong>the</strong><br />

zero-emission road, <strong>the</strong> (recently award w<strong>in</strong>n<strong>in</strong>g) ‘W&R<br />

all-electric Groenwon<strong>in</strong>g’ (i.e. energy-efficient,<br />

comfortable and affordable homes) and ‘passive <strong>of</strong>fices’.<br />

Royal <strong>BAM</strong> Group’s efforts to promote susta<strong>in</strong>ability are<br />

<strong>in</strong>creas<strong>in</strong>gly be<strong>in</strong>g recognised by <strong>the</strong> outside <strong>world</strong>. For<br />

example, <strong>BAM</strong> has been <strong>in</strong>cluded <strong>in</strong> <strong>the</strong> Ethibel<br />

Excellence Investment Register and <strong>the</strong> Group is also part<br />

<strong>of</strong> Triodos Bank’s <strong>in</strong>vestment universe. Royal <strong>BAM</strong> Group<br />

came n<strong>in</strong>th <strong>in</strong> <strong>2011</strong> <strong>in</strong> <strong>the</strong> Transparency Benchmark<br />

rank<strong>in</strong>g list published by <strong>the</strong> Dutch M<strong>in</strong>istry <strong>of</strong> Economic<br />

Affairs and was also <strong>the</strong> fastest climber – f<strong>in</strong>ish<strong>in</strong>g <strong>in</strong><br />

eighth place – <strong>in</strong> <strong>the</strong> survey conducted by <strong>the</strong> VBDO<br />

(Dutch Association <strong>of</strong> Investors <strong>in</strong> Susta<strong>in</strong>able<br />

Development) <strong>in</strong>to socially responsible supply cha<strong>in</strong><br />

management. Never<strong>the</strong>less, <strong>BAM</strong> believes that fur<strong>the</strong>r<br />

development <strong>of</strong> its susta<strong>in</strong>ability policy is still needed.<br />

The Group has drawn up <strong>the</strong> <strong>BAM</strong> Bus<strong>in</strong>ess Pr<strong>in</strong>ciples<br />

based on its strategic agenda <strong>in</strong> order to embed an<br />

awareness <strong>of</strong> susta<strong>in</strong>ability issues <strong>in</strong> <strong>the</strong> organisation.<br />

The pr<strong>in</strong>ciples were agreed with representatives <strong>of</strong> <strong>the</strong><br />

Group’s ma<strong>in</strong> stakeholders.<br />

Bus<strong>in</strong>ess pr<strong>in</strong>ciples<br />

<strong>BAM</strong> has divided its bus<strong>in</strong>ess pr<strong>in</strong>ciples <strong>in</strong>to twelve<br />

susta<strong>in</strong>ability <strong>the</strong>mes. The <strong>BAM</strong> Bus<strong>in</strong>ess Pr<strong>in</strong>ciples are<br />

<strong>the</strong> basis for develop<strong>in</strong>g and implement<strong>in</strong>g policy and<br />

procedures. The pr<strong>in</strong>ciples relate to:<br />

1. Integrity (do<strong>in</strong>g bus<strong>in</strong>ess <strong>in</strong> an honest manner);<br />

2. Customers (customer satisfaction);<br />

3. Communication with <strong>the</strong> neighbourhood<br />

(good contacts with <strong>the</strong> local residents);<br />

4. Employees: health and safety;<br />

5. Employees: equality and diversity;<br />

6. Employees: education and tra<strong>in</strong><strong>in</strong>g;<br />

7. Supply cha<strong>in</strong> partners (promot<strong>in</strong>g susta<strong>in</strong>ability <strong>in</strong><br />

<strong>the</strong> supply cha<strong>in</strong> through cooperation);<br />

65<br />

<strong>2011</strong>


66<br />

<strong>2011</strong>


Green walls and ro<strong>of</strong>s <strong>of</strong> <strong>the</strong> BSH<br />

Inspiratiehuis (cradle-to-cradle <strong>of</strong>fice),<br />

Ho<strong>of</strong>ddorp, <strong>the</strong> Ne<strong>the</strong>rlands.<br />

Mostert De W<strong>in</strong>ter, <strong>BAM</strong> Wegen.<br />

8. Energy (limit<strong>in</strong>g energy consumption and <strong>the</strong>refore<br />

also <strong>the</strong> impact on <strong>the</strong> climate);<br />

9. Raw materials (limit<strong>in</strong>g <strong>the</strong> use <strong>of</strong> raw materials and<br />

<strong>the</strong> amount <strong>of</strong> waste);<br />

10. Natural environment (limit<strong>in</strong>g <strong>the</strong> impact <strong>of</strong> build<strong>in</strong>g<br />

work on <strong>the</strong> natural environment);<br />

11. Innovation (develop<strong>in</strong>g susta<strong>in</strong>able solutions);<br />

12. Susta<strong>in</strong>ability as a bus<strong>in</strong>ess opportunity (because <strong>the</strong><br />

market demand will <strong>in</strong>crease).<br />

The objectives were drawn up based on dialogue with<br />

stakeholders, <strong>in</strong>clud<strong>in</strong>g an annual ‘multi-stakeholder<br />

dialogue session’. If <strong>the</strong>se issues are to be tackled<br />

effectively, it is essential to ma<strong>in</strong>ta<strong>in</strong> focus. The Group<br />

<strong>the</strong>refore prioritises <strong>the</strong> achievement <strong>of</strong> progress on<br />

safety, reduc<strong>in</strong>g <strong>the</strong> Group’s carbon footpr<strong>in</strong>t and waste<br />

management. There is also an extra focus on diversity, as<br />

part <strong>of</strong> <strong>the</strong> efforts to achieve a workforce that better<br />

reflects society at large.<br />

<strong>BAM</strong> has formulated key performance <strong>in</strong>dicators (KPI)<br />

and ambitious objectives for <strong>the</strong>se focal po<strong>in</strong>ts <strong>in</strong> its<br />

susta<strong>in</strong>ability policy. Details can be found <strong>in</strong> <strong>the</strong><br />

Susta<strong>in</strong>ability <strong>Report</strong>. <strong>BAM</strong> made progress <strong>in</strong> all <strong>of</strong> <strong>the</strong>se<br />

areas dur<strong>in</strong>g <strong>the</strong> year under review.<br />

Susta<strong>in</strong>ability <strong>Report</strong><br />

<strong>BAM</strong> has been publish<strong>in</strong>g a Susta<strong>in</strong>ability <strong>Report</strong> s<strong>in</strong>ce<br />

2007, allow<strong>in</strong>g <strong>the</strong> Group to report as transparently as<br />

possible about susta<strong>in</strong>ability issues and corporate social<br />

responsibility. The Susta<strong>in</strong>ability <strong>Report</strong> is compiled <strong>in</strong><br />

accordance with <strong>the</strong> guidel<strong>in</strong>es <strong>of</strong> <strong>the</strong> Global <strong>Report</strong><strong>in</strong>g<br />

Initiative (GRI). Royal <strong>BAM</strong> Group believes that its<br />

Susta<strong>in</strong>ability <strong>Report</strong> <strong>2011</strong> satisfies <strong>the</strong> requirements <strong>of</strong><br />

level A <strong>of</strong> <strong>the</strong> GRI guidel<strong>in</strong>es.<br />

Interested parties can download <strong>the</strong> <strong>2011</strong> susta<strong>in</strong>ability<br />

report from <strong>the</strong> <strong>BAM</strong> website or ask <strong>the</strong> company to send<br />

<strong>the</strong>m a hard copy. Please refer to this susta<strong>in</strong>ability<br />

report for a more thorough explanation <strong>of</strong> <strong>the</strong> various<br />

focal po<strong>in</strong>ts identified by <strong>BAM</strong> <strong>in</strong> relation to corporate<br />

social responsibility.<br />

Human resources management<br />

Construction is all about build<strong>in</strong>g on people. The qualities<br />

<strong>of</strong> our employees decide <strong>the</strong> quality <strong>of</strong> <strong>the</strong> Group’s<br />

projects and <strong>the</strong>reby also our market position and<br />

returns. Royal <strong>BAM</strong> Group’s human resources policy<br />

focuses on reta<strong>in</strong><strong>in</strong>g and fur<strong>the</strong>r develop<strong>in</strong>g <strong>the</strong> ‘human<br />

capital’ under <strong>the</strong> motto ‘<strong>BAM</strong>: Build<strong>in</strong>g on People’.<br />

The cornerstones <strong>of</strong> <strong>the</strong> Group’s human resources<br />

management are:<br />

• reta<strong>in</strong><strong>in</strong>g good employees by <strong>of</strong>fer<strong>in</strong>g good work<strong>in</strong>g<br />

conditions, <strong>in</strong> which <strong>the</strong> human dimension and<br />

pr<strong>of</strong>essional procedures are crucial;<br />

• an attractive and challeng<strong>in</strong>g employment conditions<br />

package, <strong>in</strong> accordance with market developments;<br />

• ‘steer<strong>in</strong>g’ performance by means <strong>of</strong> clear agreements<br />

about results-related targets and commercial goals as<br />

well as about <strong>the</strong> development <strong>of</strong> personal qualities<br />

such as expertise, experience and personal<br />

competences;<br />

• a proactive approach to <strong>the</strong> labour market to br<strong>in</strong>g <strong>the</strong><br />

Group to <strong>the</strong> attention <strong>of</strong> talented people <strong>in</strong> a wide<br />

range <strong>of</strong> fields;<br />

• tra<strong>in</strong><strong>in</strong>g programmes for employees at all levels,<br />

focuss<strong>in</strong>g <strong>in</strong> particular on <strong>the</strong>mes such as expertise and<br />

entrepreneurship;<br />

• a concrete career development and management<br />

development policy with scope for job rotation, <strong>the</strong><br />

development <strong>of</strong> personal qualities and <strong>the</strong> timely<br />

discovery <strong>of</strong> talents <strong>in</strong> <strong>the</strong> Group.<br />

<strong>BAM</strong> HR Services<br />

The year under review saw fur<strong>the</strong>r work on <strong>the</strong><br />

development <strong>of</strong> <strong>BAM</strong> HR Services, which is a bus<strong>in</strong>ess unit<br />

provid<strong>in</strong>g HR services, payroll and salary adm<strong>in</strong>istration<br />

and pension adm<strong>in</strong>istration services to operat<strong>in</strong>g<br />

companies <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands. <strong>2011</strong> started with <strong>the</strong><br />

<strong>in</strong>troduction <strong>of</strong> Me Onl<strong>in</strong>e, an adm<strong>in</strong>istration system that<br />

employees and managers can use to process requests and<br />

modifications <strong>the</strong>mselves onl<strong>in</strong>e. The aim is for Me Onl<strong>in</strong>e<br />

to be available for all <strong>the</strong> operat<strong>in</strong>g companies <strong>in</strong> <strong>the</strong><br />

Ne<strong>the</strong>rlands by <strong>the</strong> end <strong>of</strong> 2012.<br />

Communication with <strong>the</strong> labour market<br />

In spite <strong>of</strong> less favourable circumstances cont<strong>in</strong>u<strong>in</strong>g on<br />

<strong>the</strong> labour market, Royal <strong>BAM</strong> Group once aga<strong>in</strong> focussed<br />

systematically on communication with <strong>the</strong> labour market<br />

<strong>in</strong> <strong>2011</strong>, <strong>in</strong>clud<strong>in</strong>g by mak<strong>in</strong>g regular visits to educational<br />

establishments, tak<strong>in</strong>g part <strong>in</strong> bus<strong>in</strong>ess fairs, giv<strong>in</strong>g guest<br />

lectures and organis<strong>in</strong>g company excursions.<br />

67<br />

<strong>2011</strong>


68<br />

<strong>2011</strong><br />

In November <strong>2011</strong>, a successful <strong>BAM</strong> In-House Day was<br />

organised for <strong>the</strong> third time for approximately<br />

250 selected students from courses that are relevant to<br />

<strong>BAM</strong>’s activities. Every year, a number <strong>of</strong> young bus<strong>in</strong>ess<br />

graduates from academic courses take part <strong>in</strong> a strict<br />

selection procedure to ga<strong>in</strong> entry to <strong>the</strong> Group’s tra<strong>in</strong>ee<br />

programme where <strong>the</strong>y have <strong>the</strong> opportunity to<br />

familiarise <strong>the</strong>mselves with various operat<strong>in</strong>g<br />

companies. A number <strong>of</strong> promis<strong>in</strong>g bus<strong>in</strong>ess<br />

pr<strong>of</strong>essionals were once aga<strong>in</strong> selected as tra<strong>in</strong>ees and<br />

<strong>in</strong>ducted <strong>in</strong>to <strong>the</strong> programme <strong>in</strong> <strong>2011</strong>.<br />

Performance management and talent management<br />

employee <strong>in</strong>volvement at Royal <strong>BAM</strong> Group is enhanced<br />

by performance management, <strong>in</strong> which <strong>the</strong><br />

consequences <strong>of</strong> formulated commercial goals are<br />

translated <strong>in</strong> terms <strong>of</strong> <strong>in</strong>dividual positions. Performance<br />

management also <strong>in</strong>cludes career development paths for<br />

more successful job performance. A third ma<strong>in</strong>stay <strong>of</strong><br />

performance management is assist<strong>in</strong>g employees to<br />

achieve <strong>the</strong>ir career aims. The fur<strong>the</strong>r development <strong>of</strong><br />

essential pr<strong>of</strong>essional qualities and competences plays<br />

an important part <strong>in</strong> this respect.<br />

With this <strong>in</strong> m<strong>in</strong>d, <strong>BAM</strong> <strong>in</strong>troduced <strong>the</strong> ‘Career Navigator’<br />

<strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands <strong>in</strong> 2008. The Career Navigator was<br />

developed by <strong>BAM</strong> <strong>in</strong> cooperation with a number <strong>of</strong> third<br />

parties and is used to advise employees on <strong>the</strong>ir career<br />

choices, <strong>in</strong>clud<strong>in</strong>g areas for fur<strong>the</strong>r career development.<br />

<strong>2011</strong> saw <strong>the</strong> deployment <strong>of</strong> <strong>the</strong> ‘Group-Wide <strong>in</strong> <strong>the</strong><br />

Ne<strong>the</strong>rlands’ career advice scheme <strong>in</strong> close collaboration<br />

between <strong>the</strong> operat<strong>in</strong>g companies’ HR departments and<br />

<strong>BAM</strong> Bus<strong>in</strong>ess School.<br />

<strong>BAM</strong> Bus<strong>in</strong>ess School also <strong>in</strong>troduced new tra<strong>in</strong><strong>in</strong>g<br />

programmes dur<strong>in</strong>g <strong>2011</strong> on <strong>the</strong> subjects <strong>of</strong> safety and<br />

corporate social responsibility, as well as launch<strong>in</strong>g a<br />

number <strong>of</strong> new programmes as part <strong>of</strong> ‘permanent<br />

education’ for f<strong>in</strong>ancials and lean construction<br />

management. <strong>BAM</strong> Bus<strong>in</strong>ess School now organises a<br />

‘lean community’ day every quarter.<br />

The <strong>BAM</strong> tra<strong>in</strong><strong>in</strong>g centre <strong>BAM</strong> Vakschool at <strong>the</strong> Lelystad<br />

site was fully occupied once aga<strong>in</strong> <strong>in</strong> <strong>2011</strong>. More than 130<br />

groups <strong>of</strong> employees went to <strong>BAM</strong> Vakschool for<br />

practical courses and tra<strong>in</strong><strong>in</strong>g sessions, <strong>the</strong>med days and<br />

workshops. Approximately 3,250 employees took part.<br />

<strong>BAM</strong> operates <strong>the</strong> <strong>BAM</strong> Female Empowerment<br />

Programme for female employees <strong>in</strong> job group 10 and<br />

above with <strong>the</strong> growth potential to eventually take up<br />

senior positions with<strong>in</strong> <strong>the</strong> Group. The participants are<br />

selected by <strong>the</strong> chairmen <strong>of</strong> <strong>the</strong> operat<strong>in</strong>g company<br />

management teams.<br />

Employee satisfaction surveys<br />

There was a follow-up on <strong>the</strong> employee satisfaction<br />

surveys <strong>in</strong> <strong>2011</strong> when various operat<strong>in</strong>g companies<br />

conducted a survey among <strong>the</strong>ir employees to ask how<br />

<strong>the</strong>y feel about <strong>the</strong>ir responsibilities and development<br />

opportunities, how <strong>in</strong>volved <strong>the</strong>y are <strong>in</strong> corporate<br />

objectives and <strong>the</strong> extent to which <strong>the</strong>y are <strong>in</strong>spired to<br />

achieve <strong>the</strong>se objectives.<br />

The medium-term <strong>in</strong>tention is for all operat<strong>in</strong>g<br />

companies <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands to conduct a similar survey<br />

once every two to three years to improve <strong>the</strong> work<strong>in</strong>g<br />

atmosphere and ensure that everyone learns from each<br />

o<strong>the</strong>r. An <strong>in</strong>itial assessment will be made <strong>in</strong> 2012.


Worker participation<br />

European Works Council<br />

The subjects discussed by <strong>the</strong> European Works Council<br />

(EWC) <strong>in</strong>cluded <strong>the</strong> 2010 <strong>Annual</strong> <strong>Report</strong>, <strong>the</strong> <strong>2011</strong><br />

half-yearly figures and <strong>BAM</strong>’s strategic agenda.<br />

The European Works Council also considered <strong>the</strong> Group’s<br />

susta<strong>in</strong>ability policy <strong>in</strong> detail.<br />

The Executive Committee <strong>of</strong> <strong>the</strong> EWC consists <strong>of</strong><br />

E. Dedden (Ne<strong>the</strong>rlands, Chair), F. Dausener (Germany,<br />

Deputy Chair) and E. Borrezee (Belgium, Member).<br />

Ms E. Bout-Hieselaar is <strong>the</strong> <strong>of</strong>ficial secretary to <strong>the</strong> EWC.<br />

Central Works Council<br />

In <strong>the</strong> Ne<strong>the</strong>rlands, <strong>the</strong> Central Works Council (CWC) has<br />

devoted considerable attention to various subjects,<br />

<strong>in</strong>clud<strong>in</strong>g <strong>the</strong> desired harmonisation <strong>of</strong> terms and<br />

conditions <strong>of</strong> employment <strong>in</strong> order to promote <strong>the</strong> flow<br />

<strong>of</strong> employees between <strong>the</strong> Group’s operat<strong>in</strong>g companies<br />

and <strong>the</strong> organisation <strong>of</strong> two workshops on ‘<strong>the</strong> new<br />

<strong>world</strong> <strong>of</strong> work’. The CWC also discussed <strong>the</strong> subject <strong>of</strong><br />

synergy and collaboration between operat<strong>in</strong>g<br />

companies. The CWC has observed that good progress<br />

has been made, but it can still see opportunities for<br />

fur<strong>the</strong>r improvements.<br />

Follow<strong>in</strong>g an earlier request for an op<strong>in</strong>ion regard<strong>in</strong>g<br />

security cameras at <strong>BAM</strong> <strong>of</strong>fices, <strong>the</strong> CWC noted that a<br />

great deal <strong>of</strong> care is taken to guarantee <strong>the</strong> privacy <strong>of</strong><br />

<strong>BAM</strong> employees and local residents who live close to<br />

<strong>BAM</strong> sites.<br />

The CWC consented to a one-year extension <strong>of</strong> <strong>the</strong> <strong>BAM</strong><br />

pension scheme and adm<strong>in</strong>istration agreement, and it<br />

also gave its consent for <strong>the</strong> social media protocol (which<br />

conta<strong>in</strong>s agreements about <strong>the</strong> use <strong>of</strong> media such as<br />

Facebook, Hyves, L<strong>in</strong>kedIn and Twitter for bus<strong>in</strong>ess<br />

purposes), for a proposal regard<strong>in</strong>g <strong>BAM</strong> HR Services and<br />

for <strong>the</strong> ref<strong>in</strong>anc<strong>in</strong>g arrangements. The CWC received an<br />

application for consent regard<strong>in</strong>g a set <strong>of</strong> rules about<br />

tak<strong>in</strong>g holiday days and scheduled days <strong>of</strong>f. The rules are<br />

extremely complex because <strong>BAM</strong> has to take <strong>in</strong>to<br />

account various Collective Labour Agreements. The CWC<br />

will discuss <strong>the</strong> rules with all <strong>of</strong> <strong>the</strong> <strong>in</strong>dividual Works<br />

Councils <strong>in</strong> 2012.<br />

The CWC held its annual <strong>in</strong>formal meet<strong>in</strong>g with <strong>the</strong><br />

Supervisory Board and <strong>the</strong> Executive Board <strong>in</strong> mid-<strong>2011</strong>.<br />

The participants at this successful meet<strong>in</strong>g discussed a<br />

range <strong>of</strong> subjects, <strong>in</strong>clud<strong>in</strong>g various propositions<br />

formulated by <strong>the</strong> CWC about <strong>the</strong> economic climate and<br />

its impact on <strong>BAM</strong>. These propositions were <strong>the</strong> basis for<br />

an open and constructive discussion.<br />

The CWC adopted a positive standpo<strong>in</strong>t regard<strong>in</strong>g <strong>the</strong><br />

long-term benefit plan for members <strong>of</strong> <strong>the</strong> Executive<br />

Board. The CWC also <strong>in</strong>dicated that it would like to<br />

exchange views on this subject with <strong>the</strong> Supervisory<br />

Board’s Remuneration Committee, once factors such as<br />

susta<strong>in</strong>ability and diversity can be measured and taken<br />

<strong>in</strong>to account when determ<strong>in</strong><strong>in</strong>g <strong>the</strong> level <strong>of</strong> benefit.<br />

As <strong>of</strong> <strong>the</strong> end <strong>of</strong> <strong>2011</strong>, <strong>the</strong> CWC consisted <strong>of</strong> Messrs J. van<br />

Akkeren, H.B.C.M. Ansems, H.C. Beeren, P.T.J. van den<br />

Broek (Vice-Chairman), E. Dedden (Chairman), H.J. van<br />

der Donk, J. Dijkstra, L.W.D. van Geest, J.L.M. van Gent,<br />

K.G. Geyteman, I. Hallema, W.J. Heemskerk, A. Jansen,<br />

F. Oudendorp, W.G.H. Peeten, W.L.H. Philippens,<br />

H. Sneep, H. Vanmulken (Secretary) and P.A. van den<br />

Wollenberg. Ms E. Bout-Hieselaar is <strong>the</strong> <strong>of</strong>ficial secretary<br />

to <strong>the</strong> CWC.<br />

69<br />

<strong>2011</strong>


70<br />

<strong>2011</strong><br />

Construction <strong>in</strong>dustry barometer<br />

The construction <strong>in</strong>dustry barometer is based on<br />

Euroconstruct’s Country <strong>Report</strong> as published <strong>in</strong><br />

November <strong>2011</strong>. Given today’s rapidly chang<strong>in</strong>g markets,<br />

forecasts from that Country <strong>Report</strong> may have been<br />

adjusted <strong>in</strong> <strong>the</strong> meantime.<br />

Accord<strong>in</strong>g to Euroconstruct, <strong>the</strong> year under review saw<br />

growth <strong>in</strong> <strong>the</strong> gross domestic product <strong>in</strong> <strong>the</strong> Group’s five<br />

home markets (<strong>the</strong> Ne<strong>the</strong>rlands, Belgium, United<br />

K<strong>in</strong>gdom, Ireland and Germany) <strong>of</strong> between 1.0 percent<br />

(United K<strong>in</strong>gdom) and 3.0 percent (Germany) with an<br />

average <strong>of</strong> 1.8 percent. The average growth was <strong>in</strong> l<strong>in</strong>e<br />

with <strong>the</strong> forecast <strong>in</strong> <strong>the</strong> previous <strong>Annual</strong> <strong>Report</strong>, but <strong>the</strong><br />

range <strong>in</strong> <strong>2011</strong> was wider than expected.<br />

A lower average growth is forecast for <strong>the</strong> Group’s five<br />

home markets <strong>in</strong> 2012: <strong>the</strong> 2012 forecast is based on an<br />

average growth <strong>of</strong> 1.3 percent with figures across <strong>the</strong><br />

different countries rang<strong>in</strong>g from 1.0 percent to 1.7<br />

percent. Increas<strong>in</strong>g average growth is assumed for<br />

subsequent years.<br />

The Ne<strong>the</strong>rlands<br />

The build<strong>in</strong>g <strong>in</strong>dustry experienced a difficult time <strong>in</strong> <strong>2011</strong><br />

because <strong>of</strong> <strong>the</strong> low level <strong>of</strong> work. Never<strong>the</strong>less, accord<strong>in</strong>g<br />

to Euroconstruct (November <strong>2011</strong>), build<strong>in</strong>g output<br />

<strong>in</strong>creased by 3.7 percent. The Dutch economy grew by<br />

1.5 percent <strong>in</strong> <strong>2011</strong>. The growth <strong>in</strong> <strong>the</strong> build<strong>in</strong>g <strong>in</strong>dustry<br />

was reflected <strong>in</strong> all segments, but it was largely <strong>the</strong> result<br />

<strong>of</strong> a slight recovery <strong>in</strong> residential and non-residential<br />

construction which were sectors where output had fallen<br />

sharply <strong>in</strong> previous years.<br />

Accord<strong>in</strong>g to Euroconstruct (November <strong>2011</strong>), <strong>the</strong> output<br />

<strong>of</strong> new homes <strong>in</strong>creased by 6.0 percent <strong>in</strong> <strong>2011</strong> (2010: a<br />

fall <strong>of</strong> 16 percent). Euroconstruct is forecast<strong>in</strong>g fur<strong>the</strong>r<br />

growth from <strong>the</strong> current low level <strong>of</strong> output <strong>in</strong> <strong>the</strong> years<br />

ahead. Includ<strong>in</strong>g this forecast growth, output for <strong>the</strong> next<br />

few years is still well below <strong>the</strong> capacity demonstrated <strong>in</strong><br />

<strong>the</strong> years before <strong>the</strong> economic crisis.<br />

Accord<strong>in</strong>g to Euroconstruct, <strong>the</strong> proportion <strong>of</strong> new build<br />

<strong>in</strong> non-residential output <strong>in</strong>creased by 2.7 percent <strong>in</strong> <strong>the</strong><br />

year under review, which was due especially to growth <strong>in</strong><br />

<strong>the</strong> healthcare, education and agriculture sectors. Many<br />

<strong>of</strong> <strong>the</strong> o<strong>the</strong>r segments saw output fall by between 15 and<br />

30 percent, ma<strong>in</strong>ly because <strong>of</strong> <strong>the</strong> low level <strong>of</strong> spend<strong>in</strong>g <strong>in</strong><br />

<strong>the</strong> private sector, which is not expected to improve <strong>in</strong><br />

<strong>the</strong> next few years. Euroconstruct is forecast<strong>in</strong>g a<br />

1.9 percent drop <strong>in</strong> <strong>the</strong> output <strong>of</strong> new non-residential<br />

projects <strong>in</strong> 2012. However, <strong>the</strong>re will aga<strong>in</strong> be significant<br />

differences between <strong>the</strong> various segments: 2012 is<br />

predicted to see a fur<strong>the</strong>r drop <strong>of</strong> almost 20 percent <strong>in</strong><br />

<strong>the</strong> <strong>of</strong>fice segment, but on <strong>the</strong> o<strong>the</strong>r hand an <strong>in</strong>crease <strong>of</strong><br />

almost 7 percent <strong>in</strong> <strong>in</strong>dustry.<br />

Output <strong>in</strong>creased by approximately 2.4 percent <strong>in</strong> <strong>the</strong><br />

Dutch civil eng<strong>in</strong>eer<strong>in</strong>g market <strong>in</strong> <strong>2011</strong>. Central<br />

government <strong>in</strong>vestment rema<strong>in</strong>s at a relatively high level,<br />

but local government spend<strong>in</strong>g is under considerable<br />

pressure. Euroconstruct is predict<strong>in</strong>g that this next year<br />

will see a drop <strong>in</strong> output <strong>of</strong> almost 2 percent, followed by<br />

growth <strong>in</strong> 2013 and 2014.<br />

Belgium<br />

Build<strong>in</strong>g output <strong>in</strong>creased <strong>in</strong> Belgium by almost 4.0<br />

percent <strong>in</strong> <strong>2011</strong> accord<strong>in</strong>g to Euroconstruct. Most <strong>of</strong> <strong>the</strong><br />

<strong>in</strong>crease was <strong>in</strong> <strong>the</strong> civil eng<strong>in</strong>eer<strong>in</strong>g market, but <strong>the</strong><br />

o<strong>the</strong>r sectors also contributed. A more limited growth <strong>in</strong><br />

output is forecast <strong>in</strong> <strong>the</strong> construction and civil<br />

eng<strong>in</strong>eer<strong>in</strong>g markets over <strong>the</strong> next few years.<br />

The Belgian non-residential market grew by more than<br />

1 percent <strong>in</strong> <strong>2011</strong>, most <strong>of</strong> <strong>the</strong> growth com<strong>in</strong>g from<br />

renovation. Strong growth <strong>of</strong> between 2.3 and 3.4<br />

percent is forecast <strong>in</strong> non-residential new build for <strong>2011</strong>.<br />

Output <strong>in</strong>creased by more than 10 percent on <strong>the</strong> Belgian<br />

civil eng<strong>in</strong>eer<strong>in</strong>g market, ma<strong>in</strong>ly due to <strong>in</strong>creased<br />

spend<strong>in</strong>g on road build<strong>in</strong>g projects. The outlook for 2012<br />

is positive. Euroconstruct is predict<strong>in</strong>g growth <strong>of</strong><br />

approximately 8 percent <strong>in</strong> 2012, followed by a<br />

contract<strong>in</strong>g market, due <strong>in</strong> particular to less <strong>in</strong>vestment<br />

<strong>in</strong> road build<strong>in</strong>g.<br />

United K<strong>in</strong>gdom<br />

Build<strong>in</strong>g output <strong>in</strong> <strong>the</strong> United K<strong>in</strong>gdom fell by 2.0 percent<br />

<strong>in</strong> <strong>the</strong> year under review, ma<strong>in</strong>ly due to <strong>the</strong> drop <strong>in</strong> output<br />

on <strong>the</strong> non-residential market. The growth <strong>in</strong> output on<br />

<strong>the</strong> civil eng<strong>in</strong>eer<strong>in</strong>g market was not enough to<br />

compensate.<br />

Accord<strong>in</strong>g to Euroconstruct, non-residential output<br />

decreased by 6.4 percent <strong>in</strong> <strong>the</strong> UK dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial<br />

year, ma<strong>in</strong>ly because <strong>of</strong> <strong>the</strong> reduced output <strong>in</strong> health care,<br />

education and commercial property. The British<br />

government’s spend<strong>in</strong>g cuts will also impact <strong>the</strong> health<br />

care and education sectors for <strong>the</strong> next few years, which<br />

is one <strong>of</strong> <strong>the</strong> reasons why Euroconstruct is predict<strong>in</strong>g that<br />

<strong>the</strong> UK non-residential construction sector will contract


y 7.7 percent <strong>in</strong> 2012. On <strong>the</strong> o<strong>the</strong>r hand, however, <strong>the</strong><br />

UK private sector is show<strong>in</strong>g signs <strong>of</strong> recovery, result<strong>in</strong>g <strong>in</strong><br />

forecast growth <strong>in</strong> <strong>the</strong> <strong>of</strong>fice market.<br />

Output <strong>in</strong>creased by 6.0 percent on <strong>the</strong> UK civil<br />

eng<strong>in</strong>eer<strong>in</strong>g market <strong>in</strong> <strong>the</strong> year under review. Almost all<br />

segments showed strong growth, <strong>the</strong> only exception<br />

be<strong>in</strong>g road build<strong>in</strong>g where output fell by 8.7 percent. The<br />

prospects for <strong>the</strong> years ahead <strong>in</strong> <strong>the</strong> various segments<br />

vary greatly. The strong growth <strong>in</strong> construction projects<br />

<strong>in</strong> <strong>the</strong> rail sector is <strong>the</strong> ma<strong>in</strong> reason why overall output<br />

from <strong>the</strong> civil eng<strong>in</strong>eer<strong>in</strong>g market cont<strong>in</strong>ues to grow.<br />

Roads and telecommunicationswill fall sharply <strong>in</strong> 2012<br />

and 2013.<br />

Ireland<br />

Accord<strong>in</strong>g to Euroconstruct, <strong>the</strong> Irish economy grew by<br />

1.1 percent dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial year, whereas<br />

construction output contracted by more than 17 percent.<br />

This contraction <strong>in</strong> <strong>the</strong> market occurred <strong>in</strong> all sectors.<br />

A fur<strong>the</strong>r reduction <strong>in</strong> output (by more than 8 percent) is<br />

expected <strong>in</strong> 2012 and <strong>the</strong> construction market is not<br />

forecast to return to growth until 2014. Construction<br />

output has <strong>the</strong>refore shrunk by two thirds compared to<br />

<strong>the</strong> level before <strong>the</strong> economic crisis accord<strong>in</strong>g to<br />

Euroconstruct.<br />

Output on <strong>the</strong> Irish non-residential market has dropped<br />

by 75 percent <strong>in</strong> <strong>the</strong> last three years. Only spend<strong>in</strong>g on<br />

new build <strong>in</strong> <strong>the</strong> health care sector has rema<strong>in</strong>ed around<br />

<strong>the</strong> normal level. Spend<strong>in</strong>g fell sharply <strong>in</strong> all o<strong>the</strong>r<br />

segments. A major contraction <strong>in</strong> all segments is forecast<br />

for 2012. Reduced spend<strong>in</strong>g on new build <strong>in</strong> <strong>the</strong> health<br />

care sector is also expected as a result <strong>of</strong> government<br />

cutbacks. Non-residential output is not expected to<br />

stabilise until 2014, by which time output will have fallen<br />

by 80 percent <strong>in</strong> <strong>the</strong> space <strong>of</strong> five years.<br />

In <strong>2011</strong>, <strong>the</strong> Irish civil eng<strong>in</strong>eer<strong>in</strong>g market contracted by<br />

almost 20 percent and this trend is expected to cont<strong>in</strong>ue<br />

over <strong>the</strong> next few years. By 2014, output will have almost<br />

halved compared to where it was <strong>in</strong> 2008.<br />

Germany<br />

Euroconstruct states that construction output <strong>in</strong>creased<br />

<strong>in</strong> Germany by 3.7 percent dur<strong>in</strong>g <strong>the</strong> year under review.<br />

The prospects for <strong>the</strong> German construction <strong>in</strong>dustry <strong>in</strong><br />

<strong>the</strong> medium term are relatively positive. Accord<strong>in</strong>g to<br />

Euroconstruct, growth is expected to fall from 1.8 to 1.4<br />

percent per annum for <strong>the</strong> years 2012 to 2014.<br />

The German non-residential construction market grew by<br />

2 percent <strong>in</strong> <strong>2011</strong>, most <strong>of</strong> this growth be<strong>in</strong>g <strong>in</strong> <strong>the</strong> private<br />

sector. Growth is forecast to cont<strong>in</strong>ue over <strong>the</strong> next few<br />

years as well, but not at <strong>the</strong> level <strong>of</strong> <strong>2011</strong> because <strong>the</strong><br />

German government will be spend<strong>in</strong>g less <strong>in</strong> <strong>the</strong><br />

education and health care sectors.<br />

The German civil eng<strong>in</strong>eer<strong>in</strong>g market grew by more than<br />

4 percent <strong>in</strong> <strong>2011</strong>. This growth can be partly attributed to<br />

<strong>the</strong> <strong>in</strong>creased <strong>in</strong>vestment <strong>in</strong> energy and hydraulic<br />

eng<strong>in</strong>eer<strong>in</strong>g projects. A slight contraction is forecast for<br />

<strong>the</strong> next few years because <strong>of</strong> f<strong>in</strong>ancial cutbacks at local<br />

government level <strong>in</strong> particular.<br />

<strong>BAM</strong> has launched new growth tracks outside <strong>of</strong> its home<br />

markets by establish<strong>in</strong>g permanent branches <strong>in</strong><br />

Switzerland and Luxembourg and streng<strong>the</strong>n<strong>in</strong>g <strong>the</strong><br />

market positions <strong>of</strong> <strong>BAM</strong> International <strong>in</strong> growth markets<br />

outside Europe (South-East Asia, Australia, Africa and <strong>the</strong><br />

Middle East).<br />

71<br />

<strong>2011</strong>


Construction<br />

and mechanical<br />

and electrical<br />

services<br />

Key figures for <strong>the</strong> construction and mechanical and electrical services sector<br />

(x €million) <strong>2011</strong> 2010<br />

Revenue 3,389 3,459<br />

Result before tax 76.2 102.6<br />

Marg<strong>in</strong> before tax 2.2% 3.0%<br />

Order book (year-end) 4,440 5,013<br />

New-build and conversion <strong>of</strong><br />

Friesland Prov<strong>in</strong>cial Government<br />

Build<strong>in</strong>g, Leeuwarden, <strong>the</strong><br />

Ne<strong>the</strong>rlands. <strong>BAM</strong> Utiliteitsbouw<br />

(<strong>in</strong> jo<strong>in</strong>t venture), <strong>BAM</strong> Techniek.


Royal <strong>BAM</strong> Group is active <strong>in</strong> <strong>the</strong> construction and mechanical and electrical services sector <strong>in</strong> <strong>the</strong> Dutch,<br />

Belgian, British, Irish and German markets. In addition to carry<strong>in</strong>g out non-residential construction works <strong>in</strong><br />

all <strong>the</strong> home markets, <strong>BAM</strong> operat<strong>in</strong>g companies also carry out residential construction contracts (ma<strong>in</strong>ly <strong>in</strong><br />

<strong>the</strong> Ne<strong>the</strong>rlands, Belgium and Germany). <strong>BAM</strong> International also carries out non-residential construction projects<br />

<strong>in</strong> <strong>the</strong> Middle East and Indonesia <strong>in</strong> particular.<br />

Given <strong>the</strong> difficult market circumstances, <strong>the</strong> Dutch<br />

operat<strong>in</strong>g companies <strong>in</strong> <strong>the</strong> construction and mechanical<br />

and electrical services sector achieved a good result from<br />

<strong>in</strong>creased revenues <strong>in</strong> <strong>2011</strong>. The revenues <strong>in</strong> nonresidential<br />

construction, residential construction and<br />

mechanical and electrical contract<strong>in</strong>g <strong>in</strong>creased<br />

compared to 2010. A number <strong>of</strong> organisational<br />

adjustments were made <strong>in</strong> different places <strong>in</strong> <strong>the</strong> second<br />

half <strong>of</strong> <strong>the</strong> year, however, with a view to expected<br />

ongo<strong>in</strong>g difficulties on <strong>the</strong> markets.<br />

The cooperation between <strong>BAM</strong> Techniek and o<strong>the</strong>r <strong>BAM</strong><br />

companies results <strong>in</strong> valuable synergies which are <strong>of</strong><br />

great benefit for <strong>the</strong> successful realisation <strong>of</strong><br />

multidiscipl<strong>in</strong>ary, comprehensive projects. This process<br />

is be<strong>in</strong>g re<strong>in</strong>forced by <strong>the</strong> sectoral restructur<strong>in</strong>g<br />

announced <strong>in</strong> November, whereby <strong>the</strong> mechanical and<br />

electrical contract<strong>in</strong>g sector was comb<strong>in</strong>ed with<br />

construction to form <strong>the</strong> construction and mechanical<br />

and electrical services sector from <strong>the</strong> start <strong>of</strong> 2012.<br />

Generat<strong>in</strong>g higher revenues, <strong>the</strong> Dutch operat<strong>in</strong>g<br />

companies <strong>in</strong> <strong>the</strong> construction and mechanical and<br />

electrical services sector recorded a good result <strong>in</strong> <strong>2011</strong>,<br />

given <strong>the</strong> adverse market conditions. Revenues <strong>in</strong><br />

non-residential construction, residential construction<br />

and mechanical and electrical contract<strong>in</strong>g <strong>in</strong>creased <strong>in</strong><br />

comparison with 2010. Never<strong>the</strong>less, <strong>the</strong> organisation<br />

was adjusted <strong>in</strong> several places <strong>in</strong> <strong>the</strong> second half <strong>of</strong> <strong>the</strong><br />

year <strong>in</strong> view <strong>of</strong> <strong>the</strong> expected cont<strong>in</strong>uation <strong>of</strong> difficult<br />

market conditions.<br />

In <strong>2011</strong>, revenues <strong>in</strong> <strong>the</strong> United K<strong>in</strong>gdom, expressed <strong>in</strong><br />

pounds sterl<strong>in</strong>g, fell by nearly 11 percent <strong>in</strong> comparison<br />

with 2010. The marg<strong>in</strong> realised was also lower. <strong>BAM</strong><br />

Construct UK took significant measures <strong>in</strong> <strong>the</strong> second<br />

half <strong>of</strong> <strong>2011</strong> to align <strong>the</strong> organisation with <strong>the</strong> lower<br />

revenue level expected for <strong>the</strong> com<strong>in</strong>g years.<br />

<strong>BAM</strong> Deutschland recorded higher revenues and a higher<br />

result than <strong>in</strong> 2010. Despite <strong>the</strong> selective contract<strong>in</strong>g<br />

policy, <strong>the</strong> order book is healthy. As a result, prospects<br />

for <strong>the</strong> com<strong>in</strong>g year are good.<br />

In Belgium, lower revenues were realised at a marg<strong>in</strong><br />

comparable to that <strong>in</strong> 2010. However, revenues showed<br />

an upward quarter on quarter trend and <strong>the</strong> year-end<br />

order book was healthy. As a result, revenues are<br />

expected to approximately double <strong>in</strong> 2012.<br />

73<br />

<strong>2011</strong>


74<br />

<strong>2011</strong><br />

Redevelopment <strong>of</strong> <strong>the</strong> De Monarch I <strong>of</strong>fice<br />

block, The Hague (Breeam Excellent).<br />

<strong>BAM</strong> Utiliteitsbouw, <strong>BAM</strong> Techniek.<br />

> <strong>BAM</strong> Utiliteitsbouw focuses on <strong>the</strong> commercial and<br />

technical development, preparation and construction <strong>of</strong><br />

non-residential projects <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands, as well as on<br />

ma<strong>in</strong>tenance and management <strong>of</strong> those projects.<br />

<strong>BAM</strong> Utiliteitsbouw likes to be <strong>in</strong>volved as early as possible<br />

<strong>in</strong> <strong>the</strong> process so that <strong>the</strong> customer has <strong>the</strong> maximum<br />

possible benefit from <strong>the</strong> company’s knowledge and<br />

experience. In order to be close to its customers, <strong>BAM</strong><br />

Utiliteitsbouw operates from ten regional <strong>of</strong>fices and has a<br />

national bus<strong>in</strong>ess unit for Major Projects. <strong>BAM</strong><br />

Utiliteitsbouw has around 1,650 employees.<br />

With approximately 120 employees, <strong>the</strong> <strong>in</strong>-house<br />

consultancy and eng<strong>in</strong>eer<strong>in</strong>g bureau <strong>BAM</strong> Advies &<br />

Eng<strong>in</strong>eer<strong>in</strong>g provides significant support <strong>in</strong> <strong>the</strong> form <strong>of</strong><br />

architectural, structural and project management<br />

expertise. This represents substantial added value for<br />

customers.<br />

<strong>BAM</strong> Utiliteitsbouw’s product concepts are part <strong>of</strong> its<br />

efforts to achieve forward and reverse <strong>in</strong>tegration <strong>in</strong> <strong>the</strong><br />

construction process. For example, Vitaal ZorgVast<br />

deploys <strong>in</strong>novative real estate solutions to respond to<br />

changes <strong>in</strong> <strong>the</strong> health care sector and <strong>the</strong> different<br />

demands as regards accommodation. Vitaal ZorgVast is<br />

responsible for development, realisation and ma<strong>in</strong>tenance<br />

<strong>in</strong> <strong>the</strong> health care sector. OfficeUp is a project developer<br />

that focuses on transform<strong>in</strong>g old <strong>of</strong>fice build<strong>in</strong>gs for o<strong>the</strong>r<br />

designated uses, functions and occupiers.<br />

The order book <strong>in</strong>cludes large projects <strong>in</strong>volv<strong>in</strong>g <strong>of</strong>fice<br />

build<strong>in</strong>gs, shopp<strong>in</strong>g centres, sports facilities and cultural<br />

attractions. The health sector has also provided a<br />

significant portion <strong>of</strong> <strong>the</strong> work <strong>in</strong> progress. Work <strong>in</strong><br />

progress <strong>in</strong>cludes <strong>the</strong> large-scale renovation and<br />

modernisation <strong>of</strong> Roeterseiland university centre for <strong>the</strong><br />

University <strong>of</strong> Amsterdam; phase 2 <strong>of</strong> <strong>the</strong> Public Transport<br />

Term<strong>in</strong>al <strong>in</strong> Arnhem (jo<strong>in</strong>t venture); build<strong>in</strong>g <strong>the</strong> new<br />

<strong>the</strong>atre, c<strong>in</strong>ema, library and underground car park (project<br />

known as ‘De Nieuwe Kolk’) <strong>in</strong> Assen; <strong>the</strong> M<strong>in</strong>istry <strong>of</strong><br />

Security and Justice and <strong>the</strong> M<strong>in</strong>istry <strong>of</strong> <strong>the</strong> Interior and<br />

Repair<strong>in</strong>g <strong>the</strong> fire damage to <strong>the</strong> telecommunications tower,<br />

Hoogersmilde, <strong>the</strong> Ne<strong>the</strong>rlands.<br />

<strong>BAM</strong> Gebouwservices (<strong>BAM</strong> Utiliteitsbouw).<br />

K<strong>in</strong>gdom Relations <strong>in</strong> The Hague (jo<strong>in</strong>t venture); as well as<br />

<strong>the</strong> redevelopment and extension <strong>of</strong> <strong>the</strong> De Monarch<br />

<strong>of</strong>fice build<strong>in</strong>g <strong>in</strong> The Hague.<br />

New projects <strong>in</strong>clude <strong>the</strong> <strong>of</strong>fice for <strong>the</strong> M<strong>in</strong>istry <strong>of</strong> Social<br />

Affairs and Employment <strong>in</strong> Gron<strong>in</strong>gen; <strong>the</strong><br />

Westfriesgasthuis radio<strong>the</strong>rapy build<strong>in</strong>g <strong>in</strong> Hoorn; <strong>the</strong><br />

Woudeste<strong>in</strong> Campus Plaza underground car park <strong>in</strong><br />

Rotterdam; and a laboratory, <strong>of</strong>fice and underground car<br />

park for Danone <strong>in</strong> Utrecht.<br />

<strong>BAM</strong> Utiliteitsbouw delivered <strong>the</strong> follow<strong>in</strong>g projects <strong>in</strong><br />

<strong>2011</strong>: <strong>the</strong> renovation <strong>of</strong> <strong>the</strong> National Maritime Museum <strong>in</strong><br />

Amsterdam; shops, hous<strong>in</strong>g, a library, a school and a<br />

sports centre <strong>in</strong> Kloosterveste <strong>in</strong> Assen; <strong>the</strong> De Kroon<br />

high-rise apartment build<strong>in</strong>g with low-rise <strong>of</strong>fice<br />

build<strong>in</strong>gs <strong>in</strong> The Hague; renovation, restoration and<br />

new-build work on <strong>the</strong> prov<strong>in</strong>cial government build<strong>in</strong>g<br />

‘Prov<strong>in</strong>ciehuis’ <strong>in</strong> Leeuwarden; phase 3 <strong>of</strong> <strong>the</strong> Radboud<br />

Hospital new-build contract <strong>in</strong> Nijmegen; and expansion<br />

<strong>of</strong> <strong>the</strong> Teyl<strong>in</strong>gere<strong>in</strong>d Forensics Centre <strong>in</strong> Sassenheim.<br />

Restoration specialist Schakel & Schrale started restor<strong>in</strong>g<br />

<strong>the</strong> historic house ‘Huis Doorn’ and Loenersloot Castle <strong>in</strong><br />

Amsterdam. Renovation work was completed on <strong>the</strong><br />

facade <strong>of</strong> <strong>the</strong> prov<strong>in</strong>cial government build<strong>in</strong>g ‘Het<br />

Gouvernement’ <strong>in</strong> Maastricht.<br />

> <strong>BAM</strong> Won<strong>in</strong>gbouw is <strong>the</strong> market leader <strong>in</strong> <strong>the</strong><br />

Ne<strong>the</strong>rlands. The company works out <strong>of</strong> n<strong>in</strong>e branches<br />

– each with its own regional expertise – and employs a<br />

workforce <strong>of</strong> 1,450 to carry out consultancy,<br />

development, construction, service and ma<strong>in</strong>tenance,<br />

and renovation work.<br />

<strong>BAM</strong> Won<strong>in</strong>gbouw’s tried and tested W&R hous<strong>in</strong>g<br />

concept allows <strong>the</strong> company to work with specific,<br />

specially selected co-makers – based on supply cha<strong>in</strong><br />

<strong>in</strong>tegration and lean construction work<strong>in</strong>g methods – to<br />

build comfortable homes at a set and affordable price.<br />

More than 15,000 W&R homes have been built <strong>in</strong> <strong>the</strong><br />

Ne<strong>the</strong>rlands. <strong>BAM</strong> Won<strong>in</strong>gbouw has extended this


18 homes <strong>in</strong> <strong>the</strong> Elzenhagen<br />

neighbourhood, north Amsterdam.<br />

<strong>BAM</strong> Won<strong>in</strong>gbouw.<br />

concept for use <strong>in</strong> renovation projects: <strong>the</strong> ‘W&R<br />

renovation’ concept enables <strong>BAM</strong> Won<strong>in</strong>gbouw to<br />

complete energy-efficient, comfortable hous<strong>in</strong>g <strong>in</strong> only<br />

seven days with m<strong>in</strong>imum <strong>in</strong>convenience for <strong>the</strong><br />

occupants.<br />

<strong>BAM</strong> Won<strong>in</strong>gbouw has its own eng<strong>in</strong>eer<strong>in</strong>g & consult<strong>in</strong>g<br />

expertise centre which has expert knowledge <strong>in</strong> a wide<br />

range <strong>of</strong> areas, <strong>in</strong>clud<strong>in</strong>g advice on quality, lean<br />

construction and Build<strong>in</strong>g Information Model<strong>in</strong>g.<br />

<strong>BAM</strong> Won<strong>in</strong>gbouw completed various high-pr<strong>of</strong>ile<br />

projects <strong>in</strong> <strong>2011</strong>, <strong>in</strong>clud<strong>in</strong>g <strong>the</strong> Kotmanpark susta<strong>in</strong>able<br />

low-energy ‘passive home’ apartment complex <strong>in</strong><br />

Enschede (44 apartments); <strong>the</strong> first susta<strong>in</strong>able W&R<br />

‘Green Homes’ <strong>in</strong> ’s-Gravenzande; <strong>the</strong> large-scale<br />

susta<strong>in</strong>able renovation <strong>of</strong> 153 passive homes <strong>in</strong> Kerkrade<br />

based on <strong>the</strong> W&R renovation concept; <strong>the</strong> major project<br />

to build 175 new s<strong>in</strong>gle-family homes <strong>in</strong> Hoorn and Park<br />

Blankenborch <strong>in</strong> Vianen (470 homes); a new homeless<br />

shelter for <strong>the</strong> Kessler Foundation <strong>in</strong> The Hague; <strong>the</strong><br />

home development projects carried out <strong>in</strong> collaboration<br />

with private <strong>in</strong>dividuals <strong>in</strong> locations such as<br />

Valkenswaard (‘De Treksteen’ project); and <strong>the</strong> new build<br />

for <strong>the</strong> Pr<strong>in</strong>sensticht<strong>in</strong>g foundation <strong>in</strong> Purmerend<br />

(construction <strong>of</strong> new build<strong>in</strong>gs for customers and<br />

employees <strong>of</strong> this foundation for people with special<br />

needs).<br />

> Bouwbedrijf Penn<strong>in</strong>gs will be report<strong>in</strong>g to <strong>BAM</strong><br />

Won<strong>in</strong>gbouw with effect from <strong>2011</strong>. Rosmalen-based<br />

Penn<strong>in</strong>gs cont<strong>in</strong>ues to work on residential and nonresidential<br />

construction projects at all stages <strong>in</strong> <strong>the</strong><br />

construction supply cha<strong>in</strong>. Penn<strong>in</strong>gs also has a<br />

renovation division that completes scheduled large-scale<br />

ma<strong>in</strong>tenance work on more than a thousand occupied<br />

homes every year. The year under review saw Penn<strong>in</strong>gs<br />

build care complexes <strong>in</strong> Haaren, Ammerzoden and<br />

Gennep as well as hous<strong>in</strong>g <strong>in</strong> Breda, Utrecht, Vught,<br />

Werkendam and Zaltbommel. Penn<strong>in</strong>gs also has work <strong>in</strong><br />

progress on an <strong>of</strong>fice build<strong>in</strong>g <strong>in</strong> ’s-Hertogenbosch and<br />

Anafora park restaurant, Leidsche Rijn,<br />

Utrecht, <strong>the</strong> Ne<strong>the</strong>rlands.<br />

Heilijgers.<br />

<strong>the</strong> Molenwijk shopp<strong>in</strong>g centre <strong>in</strong> Amsterdam. Penn<strong>in</strong>gs<br />

is carry<strong>in</strong>g out both <strong>the</strong> development and <strong>the</strong> build<strong>in</strong>g<br />

work for <strong>the</strong> large-scale renovation and expansion <strong>of</strong><br />

Meubelple<strong>in</strong> Ekkersrijt shopp<strong>in</strong>g complex <strong>in</strong> Son en<br />

Breugel (45,000 m2 ). The company also performed home<br />

renovations at countless locations <strong>in</strong> <strong>the</strong> prov<strong>in</strong>ces <strong>of</strong><br />

Utrecht and Noord-Brabant.<br />

Amersfoort-based > Heilijgers has all <strong>of</strong> <strong>the</strong> central<br />

Ne<strong>the</strong>rlands as its ma<strong>in</strong> service area for project<br />

development, construction, technical management and<br />

ma<strong>in</strong>tenance work. The company has approximately 170<br />

employees. In <strong>2011</strong> Heilijgers was awarded <strong>the</strong> Keurmerk<br />

Klantgericht Bouwen (quality hallmark for customeroriented<br />

construction) for <strong>the</strong> sixth consecutive year.<br />

Heilijgers and <strong>the</strong> Lopik Municipal Authority reached<br />

agreement <strong>in</strong> <strong>2011</strong> regard<strong>in</strong>g <strong>the</strong> development <strong>of</strong> <strong>the</strong><br />

Benschop-Oost project which consists <strong>of</strong> approximately<br />

one hundred homes <strong>in</strong> various price categories.<br />

Heilijgers is part <strong>of</strong> <strong>the</strong> consortium build<strong>in</strong>g a connect<strong>in</strong>g<br />

bridge between a residential care centre and a new<br />

high-rise apartment block <strong>in</strong> Hilversum and is also a<br />

partner <strong>in</strong> <strong>the</strong> consortium build<strong>in</strong>g a shopp<strong>in</strong>g centre and<br />

hous<strong>in</strong>g on Muntple<strong>in</strong> square <strong>in</strong> Nieuwege<strong>in</strong> for AM Real<br />

Estate Development. The redevelopment <strong>of</strong> <strong>the</strong><br />

Beukenrode Estate <strong>in</strong> Doorn, as well as 37 apartments <strong>in</strong><br />

Amersfoort, <strong>the</strong> police station <strong>in</strong> Doorn and 73 houses<br />

and apartments <strong>in</strong> <strong>the</strong> ’t H<strong>of</strong> development project <strong>in</strong><br />

Zeist are also among Heilijgers’ current contracts.<br />

<strong>2011</strong> saw Heilijgers start work on various residential<br />

construction projects as well as <strong>the</strong> large-scale<br />

renovation <strong>of</strong> <strong>the</strong> susta<strong>in</strong>able solar project <strong>in</strong> Nieuwland<br />

(Amersfoort) and <strong>the</strong> renovation and redesignation <strong>of</strong><br />

Thermion – a former Philips factory – <strong>in</strong> Lent.<br />

The follow<strong>in</strong>g projects were delivered dur<strong>in</strong>g <strong>the</strong> year<br />

under review: Brede School <strong>in</strong> Ouderkerk aan de Amstel,<br />

apartment build<strong>in</strong>gs <strong>in</strong> Amersfoort (Zicht op Amersfoort,<br />

Centro Vido and Amor Forte 2), <strong>the</strong> renovation <strong>of</strong> <strong>the</strong><br />

Paasloo <strong>of</strong>fice villa and a residential villa (both <strong>in</strong><br />

Amersfoort) and <strong>the</strong> Leidsche Rijn tea house (Utrecht).<br />

75<br />

<strong>2011</strong>


76<br />

<strong>2011</strong><br />

Renovation and expansion <strong>of</strong> <strong>the</strong><br />

Walloon Royal Opera House, Liège,<br />

Belgium.<br />

Galère (<strong>in</strong> jo<strong>in</strong>t venture).<br />

Hasselt Court Build<strong>in</strong>g, Hasselt, Belgium.<br />

Architect: TWINS and architects’ group:<br />

J. Mayer H., Lens°ass, a20-architecten.<br />

Interbuild.<br />

> <strong>BAM</strong> Materieel supplies general plant and material and<br />

ancillary services as well as <strong>the</strong> accompany<strong>in</strong>g<br />

consultancy for all <strong>of</strong> <strong>the</strong> construction projects carried<br />

out by <strong>BAM</strong> <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands. The sizeable range <strong>of</strong><br />

plant and material available and <strong>the</strong> extensive package <strong>of</strong><br />

services are managed and organised from Lelystad. <strong>BAM</strong><br />

Materieel has approximately 300 employees.<br />

Many construction projects (both residential and<br />

non-residential) <strong>in</strong>volve tunnel formwork <strong>in</strong> which <strong>the</strong><br />

concrete for <strong>the</strong> walls and <strong>the</strong> floor rest<strong>in</strong>g on <strong>the</strong> walls<br />

are poured <strong>in</strong> a s<strong>in</strong>gle operation.<br />

<strong>BAM</strong> developed a new tunnel formwork method dur<strong>in</strong>g<br />

<strong>the</strong> year under review and successfully tested <strong>the</strong><br />

method <strong>in</strong> a residential construction project <strong>in</strong> Rijen.<br />

This new formwork has a number <strong>of</strong> dist<strong>in</strong>guish<strong>in</strong>g<br />

features, <strong>in</strong>clud<strong>in</strong>g <strong>the</strong> fact that it is lightweight, <strong>the</strong><br />

mould is easy to widen and narrow hydraulically and <strong>the</strong><br />

assembly is <strong>in</strong>stalled us<strong>in</strong>g an advanced position<strong>in</strong>g<br />

system. All <strong>in</strong> all, this new method improves <strong>the</strong> work<strong>in</strong>g<br />

conditions on <strong>the</strong> site.<br />

The formwork product group employed a steel movable<br />

project formwork assembly to build <strong>the</strong> quay wall <strong>in</strong> <strong>the</strong><br />

BAVO Maasvlakte project.<br />

The green-and-orange tower cranes used by <strong>BAM</strong><br />

Materieel are characteristic features <strong>of</strong> many<br />

construction projects, such as <strong>the</strong> Isala Cl<strong>in</strong>ics be<strong>in</strong>g built<br />

<strong>in</strong> Zwolle, for example, where seven tower cranes have<br />

been deployed. Ano<strong>the</strong>r example is <strong>the</strong> NATO<br />

headquarters <strong>in</strong> Brussels where <strong>BAM</strong> Materieel has<br />

supplied eight tower cranes for <strong>the</strong> construction <strong>of</strong> <strong>the</strong><br />

new headquarters build<strong>in</strong>g.<br />

Wilrijk-based > Interbuild undertakes non-residential<br />

construction projects for both private and public sector<br />

customers. Interbuild’s work as a partner <strong>in</strong> construction<br />

consists primarily <strong>of</strong> new build and renovation <strong>of</strong> <strong>of</strong>fices<br />

and distribution and shopp<strong>in</strong>g centres <strong>in</strong> Brussels and<br />

Flanders. Interbuild also won a number <strong>of</strong> major<br />

contracts <strong>in</strong> <strong>the</strong> luxury and service apartment segments<br />

<strong>of</strong> <strong>the</strong> residential sector <strong>in</strong> <strong>2011</strong>.<br />

Zero-emissions (Passivhaus)<br />

Montgomery Primary School, Exeter,<br />

United K<strong>in</strong>gdom.<br />

<strong>BAM</strong> Construct UK.<br />

The company employs more than 250 people and has an<br />

average <strong>of</strong> fifteen construction projects <strong>in</strong> progress at<br />

any given time. Many <strong>of</strong> <strong>the</strong> projects are high-pr<strong>of</strong>ile,<br />

such as <strong>the</strong> new NATO headquarters (a jo<strong>in</strong>t venture with<br />

o<strong>the</strong>r <strong>BAM</strong> operat<strong>in</strong>g companies) and Résidence Palace<br />

(<strong>the</strong> pr<strong>in</strong>cipal seat <strong>of</strong> <strong>the</strong> European Council), both <strong>of</strong><br />

which are <strong>in</strong> Brussels.<br />

Interbuild delivered various projects <strong>in</strong> <strong>2011</strong>, <strong>in</strong>clud<strong>in</strong>g<br />

<strong>the</strong> court build<strong>in</strong>g <strong>in</strong> Hasselt, <strong>the</strong> new <strong>of</strong>fices and <strong>the</strong><br />

warehouse redevelopment for HighCo Shelf Service, <strong>the</strong><br />

conversion <strong>of</strong> <strong>the</strong> old Belgacom build<strong>in</strong>gs (known as <strong>the</strong><br />

‘Impératrice’ complex) <strong>in</strong>to an underground garage,<br />

commercial and <strong>of</strong>fice space, and <strong>the</strong> new North Light<br />

<strong>of</strong>fice block (<strong>the</strong> last three projects all be<strong>in</strong>g <strong>in</strong> Brussels).<br />

Interbuild won various new contracts, <strong>in</strong>clud<strong>in</strong>g <strong>the</strong><br />

Flemish Adm<strong>in</strong>istrative Centre and <strong>the</strong> National Archive<br />

<strong>in</strong> Ghent and Poort van Beveren and Poort van<br />

Dendermonde (both prisons) <strong>in</strong> <strong>the</strong> Waasland area <strong>of</strong><br />

East Flanders. New projects <strong>in</strong> Antwerp <strong>in</strong>clude Artesis<br />

University <strong>of</strong> Applied Sciences, renovation <strong>of</strong> <strong>the</strong> facade<br />

<strong>of</strong> <strong>the</strong> De Mick (Brasschaat) care centre, renovation <strong>of</strong> <strong>the</strong><br />

Desgu<strong>in</strong>lei <strong>of</strong>fice build<strong>in</strong>gs for <strong>the</strong> Vivium <strong>in</strong>surance<br />

company, and <strong>the</strong> new Iglo flats for <strong>the</strong> elderly. The<br />

Hooikaai apartment contract, <strong>the</strong> Meyboom residential<br />

project, <strong>the</strong> Pole Star <strong>of</strong>fice build<strong>in</strong>g, <strong>the</strong> Gerlache<br />

residential project <strong>in</strong> Brussels and <strong>the</strong> Ter Zee residential<br />

care centre project <strong>in</strong> Wendu<strong>in</strong>e were also among <strong>the</strong><br />

contracts won dur<strong>in</strong>g <strong>the</strong> year under review.<br />

> <strong>BAM</strong> Wallonie and > CEI-De Meyer also operate <strong>in</strong> <strong>the</strong><br />

Walloon and Flemish construction and property markets,<br />

respectively, but <strong>the</strong>ir activities are expla<strong>in</strong>ed fur<strong>the</strong>r <strong>in</strong><br />

<strong>the</strong> section on <strong>the</strong> civil eng<strong>in</strong>eer<strong>in</strong>g sector on pages<br />

85 and 86.<br />

> <strong>BAM</strong> Construct UK undertakes construction, property<br />

development, design, services eng<strong>in</strong>eer<strong>in</strong>g and facilities<br />

management <strong>in</strong> Brita<strong>in</strong>. The company has approximately<br />

2,400 employees.


The company cont<strong>in</strong>ued to perform steadily <strong>in</strong> <strong>2011</strong> <strong>in</strong><br />

<strong>the</strong> face <strong>of</strong> very difficult trad<strong>in</strong>g conditions. Education<br />

rema<strong>in</strong>s a key market where <strong>the</strong> company has secured<br />

<strong>the</strong> largest number <strong>of</strong> contracts by any contractor on <strong>the</strong><br />

Government’s revised framework for deliver<strong>in</strong>g Academy<br />

schools. Health is also an important sector and <strong>BAM</strong><br />

Construction delivered two major hospitals <strong>in</strong> Wales<br />

dur<strong>in</strong>g <strong>2011</strong> and <strong>the</strong> £100 million first phase <strong>of</strong> <strong>the</strong> major<br />

redevelopment for Great Ormond Street Hospital,<br />

London.<br />

The subsidiary <strong>BAM</strong> Construction also completed a<br />

number <strong>of</strong> prestigious projects, <strong>in</strong>clud<strong>in</strong>g <strong>the</strong><br />

refurbishment <strong>of</strong> <strong>the</strong> National Portrait Gallery <strong>of</strong><br />

Scotland, <strong>the</strong> restoration <strong>of</strong> <strong>the</strong> Leeds Varieties Hall, and<br />

<strong>the</strong> <strong>in</strong>ternational enterta<strong>in</strong>ment venue Bluewater Events<br />

Centre <strong>in</strong> Kent. The company is close to complet<strong>in</strong>g a<br />

national centre <strong>in</strong> Milton Keynes for Network Rail and <strong>the</strong><br />

new Laboratories for Molecular and Biological Research<br />

<strong>in</strong> Cambridge. Work cont<strong>in</strong>ues on a new headquarters <strong>in</strong><br />

Manchester for The Co-operative Group which, when<br />

completed, is expected to be <strong>the</strong> most susta<strong>in</strong>able<br />

commercial build<strong>in</strong>g <strong>in</strong> <strong>the</strong> UK.<br />

Physics and Chemistry Build<strong>in</strong>g, Warwick<br />

University, United K<strong>in</strong>gdom.<br />

<strong>BAM</strong> Construct UK.<br />

The construction market rema<strong>in</strong>s challeng<strong>in</strong>g with<br />

economic pressures and an elevated risk pr<strong>of</strong>ile.<br />

None<strong>the</strong>less, <strong>BAM</strong> Construction succeeded <strong>in</strong> w<strong>in</strong>n<strong>in</strong>g<br />

more than forty contracts <strong>in</strong> <strong>2011</strong>, <strong>in</strong>clud<strong>in</strong>g many<br />

prestigious projects such as: a national operations centre<br />

for Scottish Water (Dunferml<strong>in</strong>e); ‘K College’ <strong>in</strong> Ashford,<br />

Kent; a Jewish Community Centre <strong>in</strong> Hampstead, London;<br />

and <strong>the</strong> Hadyn Ellis campus build<strong>in</strong>g for <strong>the</strong> University <strong>of</strong><br />

Cardiff.<br />

The activities <strong>of</strong> <strong>the</strong> subsidiary > <strong>BAM</strong> Properties are<br />

described <strong>in</strong> <strong>the</strong> section on <strong>the</strong> property sector on<br />

page 96.<br />

<strong>BAM</strong> Facilities Management provides services at more<br />

than thirty schools where it scores high levels <strong>of</strong><br />

customer satisfaction from both pupils and teach<strong>in</strong>g<br />

staff. In <strong>2011</strong>, <strong>the</strong> company began to expand its bus<strong>in</strong>ess<br />

<strong>in</strong>to <strong>the</strong> private sector with customers such as <strong>the</strong> trade<br />

union Unison. It also manages commercial build<strong>in</strong>gs <strong>in</strong><br />

<strong>BAM</strong> Properties’ portfolio and adds value to <strong>the</strong><br />

construction bus<strong>in</strong>ess <strong>in</strong> commission<strong>in</strong>g completed<br />

build<strong>in</strong>gs and by provid<strong>in</strong>g expertise on energy<br />

management. It assisted with mobilisation <strong>of</strong> completed<br />

schools <strong>in</strong> Camden, London, and <strong>in</strong> Somerset.<br />

<strong>BAM</strong> Design had a successful year with better than<br />

expected turnover and pr<strong>of</strong>it. It is lead<strong>in</strong>g <strong>the</strong> way <strong>in</strong> <strong>the</strong><br />

application <strong>of</strong> Build<strong>in</strong>g Information Model<strong>in</strong>g and<br />

whole-life susta<strong>in</strong>able design (i.e. choos<strong>in</strong>g materials<br />

from susta<strong>in</strong>able sources that will also enable <strong>the</strong><br />

build<strong>in</strong>g to be deconstructed susta<strong>in</strong>ably at <strong>the</strong> end <strong>of</strong> its<br />

life).<br />

<strong>BAM</strong> Construct UK cont<strong>in</strong>ues to work collaboratively with<br />

Royal <strong>BAM</strong> Group’s civil eng<strong>in</strong>eer<strong>in</strong>g company <strong>in</strong> <strong>the</strong> UK,<br />

<strong>BAM</strong> Nuttall. This is yield<strong>in</strong>g tangible bus<strong>in</strong>ess benefits.<br />

For example, <strong>in</strong> <strong>2011</strong>, <strong>BAM</strong> Construction won its third<br />

project to work with Network Rail – a longstand<strong>in</strong>g<br />

customer <strong>of</strong> <strong>BAM</strong> Nuttall – to deliver a new rail operat<strong>in</strong>g<br />

centre and tra<strong>in</strong><strong>in</strong>g facilities <strong>in</strong> York.<br />

77<br />

<strong>2011</strong>


78<br />

<strong>2011</strong><br />

<strong>BAM</strong> Won<strong>in</strong>gbouw hoge<br />

kantoortoren, National Portrait Palais Gallery, Thurn Ed<strong>in</strong>burgh, und Taxis,<br />

maakt United deel K<strong>in</strong>gdom. uit van het project Al<br />

Bidda, <strong>BAM</strong> Construct Qatar. UK.<br />

<strong>BAM</strong> Vastgoed De 134 meter<br />

hoge kantoortoren, Palais Thurn und<br />

Taxis, maakt deel uit van het project<br />

Al Hidmi, Qatar.<br />

The company rema<strong>in</strong>s focused on be<strong>in</strong>g a customercentric,<br />

<strong>in</strong>novative and susta<strong>in</strong>able bus<strong>in</strong>ess. In early <strong>2011</strong>,<br />

<strong>BAM</strong> Construct UK commissioned customer perception<br />

research that was undertaken by <strong>in</strong>dependent<br />

consultants Camargue. The results were favourable. 99<br />

percent <strong>of</strong> <strong>the</strong> respondents said <strong>the</strong>y would work with<br />

<strong>BAM</strong> aga<strong>in</strong> and recommend <strong>the</strong> company to o<strong>the</strong>rs. And<br />

45 percent said <strong>BAM</strong> was better than its competitors.<br />

However, customers also <strong>in</strong>dicated that <strong>the</strong> company<br />

could improve its performance by becom<strong>in</strong>g more<br />

<strong>in</strong>novative and by improv<strong>in</strong>g aftercare.<br />

Increas<strong>in</strong>gly, <strong>BAM</strong> Construct UK looks at susta<strong>in</strong>ability<br />

issues <strong>in</strong> <strong>the</strong> round as part <strong>of</strong> conduct<strong>in</strong>g its bus<strong>in</strong>ess<br />

ethically and responsibly. The company made fur<strong>the</strong>r<br />

progress <strong>in</strong> <strong>2011</strong> on reduc<strong>in</strong>g carbon emissions, reduc<strong>in</strong>g<br />

<strong>the</strong> amount <strong>of</strong> construction waste generated and sent to<br />

landfill and more efficient use <strong>of</strong> energy <strong>in</strong> its <strong>of</strong>fices and<br />

on sites. This improvement <strong>in</strong> performance was validated<br />

by achiev<strong>in</strong>g a gold standard on <strong>the</strong> Bus<strong>in</strong>ess <strong>in</strong> <strong>the</strong><br />

Community Corporate Responsibility Index <strong>2011</strong>. The<br />

company also set a series <strong>of</strong> ambitious targets to be<br />

achieved by 2015, <strong>in</strong>clud<strong>in</strong>g reduc<strong>in</strong>g CO emissions by<br />

2<br />

25 percent aga<strong>in</strong>st a 2008 basel<strong>in</strong>e.<br />

The projects carried out by > <strong>BAM</strong> Contractors – which<br />

operates <strong>in</strong> <strong>the</strong> Irish construction and property sector<br />

through subsidiaries <strong>BAM</strong> Build<strong>in</strong>g and <strong>BAM</strong> Property –<br />

are described <strong>in</strong> more detail <strong>in</strong> <strong>the</strong> section on <strong>the</strong> civil<br />

eng<strong>in</strong>eer<strong>in</strong>g sector on page 87.<br />

<strong>2011</strong> was ano<strong>the</strong>r successful year for > <strong>BAM</strong> Deutschland.<br />

With operat<strong>in</strong>g revenue <strong>of</strong> approximately €525 million,<br />

<strong>BAM</strong> Deutschland is one <strong>of</strong> <strong>the</strong> lead<strong>in</strong>g companies <strong>in</strong> <strong>the</strong><br />

German non-residential construction market. The<br />

company has approximately 700 employees, spread over<br />

branches <strong>in</strong> Stuttgart, Berl<strong>in</strong>, Düsseldorf, Dresden,<br />

Frankfurt am Ma<strong>in</strong> and Munich.<br />

<strong>BAM</strong> Deutschland <strong>of</strong>fers a total service for non-residential<br />

construction across <strong>the</strong> whole <strong>of</strong> Germany. With its two<br />

Eng<strong>in</strong>eer<strong>in</strong>g Build<strong>in</strong>g, National University<br />

<strong>of</strong> Ireland, Galway, Ireland.<br />

<strong>BAM</strong> Contractors.<br />

subsidiaries, HBM Stadien- und Sportstättenbau and<br />

<strong>BAM</strong> Immobilien-Dienstleistungen, it can be on hand for<br />

its clients at every stage <strong>of</strong> <strong>the</strong> construction process. Its<br />

experience and expertise <strong>in</strong> <strong>the</strong> area <strong>of</strong> stadium projects<br />

make HBM Stadien- und Sportstättenbau a much<br />

sought-after partner <strong>in</strong> <strong>the</strong> <strong>in</strong>ternational arena as well.<br />

<strong>BAM</strong> Deutschland is also <strong>in</strong>volved <strong>in</strong> various PPP projects,<br />

such as <strong>the</strong> M<strong>in</strong>istry for Research and Education project<br />

<strong>in</strong> Berl<strong>in</strong> and a hospital project for Ma<strong>in</strong>-Taunus regional<br />

municipality with two cl<strong>in</strong>ic build<strong>in</strong>gs <strong>in</strong> Bad Homburg<br />

and Us<strong>in</strong>gen.<br />

The range <strong>of</strong> knowledge deployed covers <strong>the</strong> full<br />

spectrum <strong>of</strong> large project construction, from hous<strong>in</strong>g<br />

(e.g. IsarBelle <strong>in</strong> Munich), to education (e.g. <strong>the</strong><br />

Corv<strong>in</strong>ianum Nor<strong>the</strong>im Secondary School), exhibition<br />

halls (e.g. Messe Düsseldorf), shopp<strong>in</strong>g centres (e.g.<br />

Boulevard Berl<strong>in</strong>), <strong>of</strong>fices (e.g. BGM 24 Berl<strong>in</strong>) and prisons<br />

(e.g. JVA Brandenburg).<br />

After <strong>the</strong> balance sheet date, <strong>BAM</strong>-Immobiliendienstleistungen<br />

GmbH – <strong>the</strong> <strong>BAM</strong> Deutschland subsidiary<br />

which specialises <strong>in</strong> facility management – acquired<br />

75 percent <strong>of</strong> <strong>the</strong> share capital <strong>in</strong> MR Facility Services<br />

GmbH <strong>of</strong> Hallbergmoos, near Munich. <strong>BAM</strong> Deutschland<br />

is streng<strong>the</strong>n<strong>in</strong>g its facility management capacity so that<br />

it can cont<strong>in</strong>ue respond<strong>in</strong>g to <strong>the</strong> <strong>in</strong>creased demand for<br />

<strong>the</strong>se services, <strong>in</strong>clud<strong>in</strong>g <strong>in</strong> relation to its own grow<strong>in</strong>g<br />

portfolio <strong>of</strong> PPP projects.<br />

> <strong>BAM</strong> Techniek is a national operator <strong>in</strong><br />

multidiscipl<strong>in</strong>ary mechanical and electrical contract<strong>in</strong>g<br />

with more than 1,500 employees. Work<strong>in</strong>g from<br />

fourteen different <strong>of</strong>fices, <strong>BAM</strong> Techniek develops,<br />

designs, builds, manages and operates mechanical and<br />

electrical equipment <strong>in</strong> both <strong>the</strong> non-residential and<br />

residential construction markets as well as for <strong>in</strong>dustry.<br />

The process <strong>of</strong> <strong>in</strong>tegrat<strong>in</strong>g <strong>BAM</strong> Techniek’s subsidiary,<br />

Digacom, <strong>in</strong>to <strong>BAM</strong> Techniek-ICT cont<strong>in</strong>ued dur<strong>in</strong>g <strong>the</strong><br />

year under review. Digacom specialises <strong>in</strong> <strong>the</strong> application


Four school build<strong>in</strong>gs for Alfons Kern<br />

School, Pforzheim, Germany.<br />

<strong>BAM</strong> Deutschland.<br />

IsarBelle high-rise apartment<br />

build<strong>in</strong>g, Munich.<br />

<strong>BAM</strong> Deutschland.<br />

<strong>of</strong> cutt<strong>in</strong>g-edge communications/telecommunications<br />

and Internet technologies.<br />

<strong>BAM</strong> Techniek built a highly susta<strong>in</strong>able <strong>of</strong>fice build<strong>in</strong>g <strong>in</strong><br />

Hengelo for Tebod<strong>in</strong> and Lucassen Constructies <strong>in</strong> close<br />

collaboration with <strong>BAM</strong> Utiliteitsbouw and <strong>the</strong> architect.<br />

Susta<strong>in</strong>able options were selected for all <strong>of</strong> <strong>the</strong><br />

components <strong>in</strong> <strong>the</strong> electrical and mechanical equipment<br />

and thanks to a fully <strong>in</strong>tegrated structural, electrical and<br />

mechanical design, it was possible to construct an <strong>of</strong>fice<br />

build<strong>in</strong>g with energy label A+ with<strong>in</strong> a very competitive<br />

budget.<br />

<strong>2011</strong> also saw <strong>BAM</strong> Techniek complete <strong>the</strong> new and<br />

renovated parts <strong>of</strong> <strong>the</strong> Friesland prov<strong>in</strong>cial government<br />

build<strong>in</strong>g <strong>in</strong> Leeuwarden, <strong>the</strong> new Medimall <strong>in</strong> Rotterdam<br />

and <strong>the</strong> new central <strong>of</strong>fice <strong>of</strong> Hollands Noorderkwartier<br />

Higher Water Board <strong>in</strong> Heerhugowaard. <strong>BAM</strong> Techniek<br />

also worked on <strong>the</strong> new <strong>in</strong>fectious diseases laboratory <strong>in</strong><br />

Gron<strong>in</strong>gen and <strong>the</strong> <strong>in</strong>stallation <strong>of</strong> electrical and<br />

mechanical equipment – <strong>in</strong>clud<strong>in</strong>g heat and cold storage<br />

– at <strong>the</strong> University <strong>of</strong> Leiden. Comb<strong>in</strong>ed <strong>of</strong>fice and<br />

laboratory space was created for Unilever by <strong>BAM</strong><br />

Techniek <strong>in</strong> collaboration with <strong>BAM</strong> Gebouwservices.<br />

<strong>2011</strong> saw <strong>BAM</strong> Techniek and <strong>BAM</strong> Utiliteitsbouw w<strong>in</strong> <strong>the</strong><br />

first BREEAM Excellent Certificate <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands for<br />

<strong>the</strong> design phase <strong>of</strong> <strong>the</strong> De Monarch <strong>of</strong>fice block<br />

redevelopment project <strong>in</strong> The Hague. <strong>BAM</strong> Techniek also<br />

worked closely with <strong>BAM</strong> Utiliteitsbouw dur<strong>in</strong>g <strong>the</strong> year<br />

under review to build a laboratory and warehouse for<br />

Synthon <strong>in</strong> Nijmegen us<strong>in</strong>g <strong>the</strong> fast-track method <strong>of</strong> lean<br />

construction <strong>in</strong> a very short space <strong>of</strong> time.<br />

A large number <strong>of</strong> medium-voltage projects were<br />

delivered <strong>in</strong> <strong>the</strong> <strong>in</strong>dustrial market, <strong>in</strong>clud<strong>in</strong>g at Cabot <strong>in</strong><br />

Rotterdam and Hekema <strong>in</strong> Amstelveen.<br />

A technical management contract was signed <strong>in</strong> <strong>2011</strong> for<br />

<strong>the</strong> ma<strong>in</strong>tenance <strong>of</strong> all structural, electrical and<br />

mechanical build<strong>in</strong>g components at FrieslandCamp<strong>in</strong>a.<br />

Ma<strong>in</strong>tenance and management contracts for build<strong>in</strong>g<br />

equipment were also signed with Ricoh Europe <strong>in</strong> Bergen<br />

op Zoom and with property company Cushman &<br />

Wakefield.<br />

Industrial ma<strong>in</strong>tenance contracts were signed with<br />

He<strong>in</strong>eken, Cabot, Vopak and L<strong>in</strong>de Gas and <strong>BAM</strong><br />

Gebouwbeheer signed a long-term ma<strong>in</strong>tenance contract<br />

with Aalsmeer-based FloraHolland.<br />

The Energy Systems division was especially active <strong>in</strong> <strong>the</strong><br />

area <strong>of</strong> energy management <strong>in</strong> <strong>2011</strong>. Customers such as<br />

DTZ Zadelh<strong>of</strong>f and <strong>the</strong> Amsterdam ArenA were given an<br />

<strong>in</strong>sight <strong>in</strong>to <strong>the</strong> breakdown <strong>of</strong> <strong>the</strong>ir energy costs as well as<br />

advice about how to successfully manage and reduce <strong>the</strong>ir<br />

energy consumption.<br />

<strong>BAM</strong> Techniek-ICT delivered <strong>the</strong> first part <strong>of</strong> a new IP<br />

network along <strong>the</strong> A12 motorway for controll<strong>in</strong>g and<br />

check<strong>in</strong>g traffic signs and signals <strong>in</strong> <strong>2011</strong>. This delivery was<br />

<strong>the</strong> first <strong>in</strong> an extensive network <strong>in</strong>frastructure along this<br />

route which <strong>BAM</strong> (Poort van Bunnik) is widen<strong>in</strong>g.<br />

The <strong>BAM</strong> Techniek division Interflow built and <strong>in</strong>stalled a<br />

cleanroom at <strong>the</strong> Amsterdam Medical Centre for IVF<br />

patients dur<strong>in</strong>g <strong>the</strong> year under review. The cleanroom that<br />

was ultimately delivered is considered to be <strong>the</strong> new<br />

standard for IVF laboratories. Interflow also signed<br />

long-term contracts to validate and take measurements<br />

for a number <strong>of</strong> customers, <strong>in</strong>clud<strong>in</strong>g <strong>the</strong> Franciscus<br />

Hospital <strong>in</strong> Roosendaal, Merck Sharp & Dohme <strong>in</strong> Oss and<br />

<strong>the</strong> Re<strong>in</strong>ier de Graaf Group <strong>in</strong> Delft.<br />

<strong>BAM</strong> Gebouwbeheer <strong>in</strong>troduced <strong>the</strong> ‘Liv<strong>in</strong>gFacility’<br />

concept dur<strong>in</strong>g <strong>2011</strong>. The Liv<strong>in</strong>gFacility concept consists <strong>of</strong><br />

fully <strong>in</strong>tegrated management <strong>of</strong> technical and facilities<br />

processes and is an add-on to <strong>the</strong> current package <strong>of</strong><br />

services.<br />

Tempo Scan high-rise <strong>of</strong>fice block, Jakarta.<br />

<strong>BAM</strong> Decorient Indonesia.<br />

79<br />

<strong>2011</strong>


Civil<br />

eng<strong>in</strong>eer<strong>in</strong>g<br />

Key figures for <strong>the</strong> civil eng<strong>in</strong>eer<strong>in</strong>g sector<br />

(x €million) <strong>2011</strong> 2010<br />

Revenue 3,834 3,659<br />

Result before tax 91.9 102.6<br />

Marg<strong>in</strong> before tax 2.4% 2.8%<br />

Order book (year-end) 5,087 5,517<br />

Soil decontam<strong>in</strong>ation, site preparation, arrangement <strong>of</strong><br />

<strong>in</strong>frastructure and re-designation <strong>of</strong> <strong>the</strong> Olympic Park,<br />

London. <strong>BAM</strong> Nuttall.<br />

Insert: Widen<strong>in</strong>g and improvement <strong>of</strong> <strong>the</strong> Zwolle-Meppel<br />

section <strong>of</strong> <strong>the</strong> A28 motorway, <strong>the</strong> Ne<strong>the</strong>rlands. <strong>BAM</strong> Civiel,<br />

<strong>BAM</strong> Infratechniek, <strong>BAM</strong> Wegen, <strong>BAM</strong> Infraconsult.


Royal <strong>BAM</strong> Group operates <strong>in</strong> <strong>the</strong> Dutch, Belgian, British, Irish and German civil eng<strong>in</strong>eer<strong>in</strong>g markets.<br />

<strong>BAM</strong> International undertakes specialist construction and civil eng<strong>in</strong>eer<strong>in</strong>g projects <strong>world</strong>wide.<br />

The <strong>BAM</strong> Group set up Infraprojectmanagement (civil eng<strong>in</strong>eer<strong>in</strong>g project management) dur<strong>in</strong>g <strong>the</strong> year<br />

to guarantee fully <strong>in</strong>tegrated coord<strong>in</strong>ation <strong>of</strong> large-scale multidiscipl<strong>in</strong>ary civil eng<strong>in</strong>eer<strong>in</strong>g projects.<br />

Although <strong>the</strong> Dutch civil eng<strong>in</strong>eer<strong>in</strong>g companies<br />

recorded higher total revenues <strong>in</strong> <strong>2011</strong>, overall results<br />

were lower on account <strong>of</strong> <strong>the</strong> market conditions.<br />

Although <strong>the</strong> volume <strong>of</strong> new bus<strong>in</strong>ess <strong>in</strong> <strong>the</strong> civil<br />

eng<strong>in</strong>eer<strong>in</strong>g market rema<strong>in</strong>s reasonable, <strong>the</strong>re is severe<br />

pressure on prices because <strong>of</strong> fierce competition.<br />

Accord<strong>in</strong>gly, <strong>BAM</strong> has adopted a selective contract<strong>in</strong>g<br />

policy, which led to a decrease <strong>in</strong> <strong>the</strong> size <strong>of</strong> <strong>the</strong> order<br />

book <strong>in</strong> <strong>2011</strong>.<br />

In <strong>the</strong> United K<strong>in</strong>gdom, <strong>the</strong>re was a sharp rise <strong>in</strong> revenues<br />

<strong>in</strong> <strong>2011</strong> due to work start<strong>in</strong>g on several large contracts<br />

awarded <strong>in</strong> 2010. However, with marg<strong>in</strong>s under<br />

competitive pressure, <strong>the</strong> result <strong>in</strong> <strong>2011</strong> was lower.<br />

Follow<strong>in</strong>g <strong>the</strong> successful acquisition <strong>of</strong> a number <strong>of</strong> large<br />

<strong>in</strong>frastructure projects <strong>in</strong> London, <strong>the</strong> size <strong>of</strong> <strong>BAM</strong><br />

Nuttall’s order book at <strong>the</strong> end <strong>of</strong> <strong>2011</strong> was <strong>in</strong> l<strong>in</strong>e with<br />

year-end 2010.<br />

The revenues <strong>of</strong> <strong>the</strong> Belgian civil eng<strong>in</strong>eer<strong>in</strong>g companies<br />

also rose significantly <strong>in</strong> <strong>2011</strong> <strong>in</strong> comparison with <strong>the</strong><br />

previous year and <strong>the</strong> results, too, <strong>in</strong>creased. The order<br />

book <strong>of</strong> <strong>the</strong> Belgian civil eng<strong>in</strong>eer<strong>in</strong>g companies is<br />

healthy for <strong>the</strong> time be<strong>in</strong>g.<br />

In Ireland, <strong>the</strong> revenues <strong>of</strong> <strong>BAM</strong> Contractors decreased<br />

aga<strong>in</strong> <strong>in</strong> comparison with <strong>the</strong> previous year. Despite this<br />

fall <strong>in</strong> revenues, thanks to decisive cost control measures<br />

<strong>BAM</strong> Contractors rema<strong>in</strong>ed <strong>in</strong> pr<strong>of</strong>it <strong>in</strong> <strong>2011</strong> as well.<br />

Revenues at <strong>the</strong> German civil eng<strong>in</strong>eer<strong>in</strong>g company were<br />

lower <strong>in</strong> <strong>2011</strong>. There was a small positive result. The<br />

overall order book decreased due to <strong>the</strong> strictly selective<br />

tender policy. Wayss & Freytag Ingenieurbau rema<strong>in</strong>s<br />

well placed for <strong>the</strong> com<strong>in</strong>g year.<br />

As expected, <strong>BAM</strong> International realised higher revenues<br />

and recorded a result comparable with that <strong>of</strong> <strong>the</strong><br />

previous year. The order book <strong>in</strong>creased fur<strong>the</strong>r and will<br />

underp<strong>in</strong> growth <strong>in</strong> <strong>the</strong> com<strong>in</strong>g years <strong>in</strong> global niche<br />

markets. In particular, <strong>the</strong> cooperation with Clough <strong>in</strong><br />

Australia <strong>of</strong>fers good opportunities.<br />

81<br />

<strong>2011</strong>


82<br />

<strong>2011</strong><br />

<strong>BAM</strong> Won<strong>in</strong>gbouw hoge<br />

kantoortoren, Palais Thurn und Taxis,<br />

maakt Neste Oil deel biodiesel uit van plant. het project Al<br />

Bidda, <strong>BAM</strong> Civiel, Qatar. <strong>BAM</strong> Techniek.<br />

<strong>BAM</strong> Vastgoed De 134 meter<br />

hoge kantoortoren, Palais Thurn und<br />

Nijmegen Taxis, maakt municipal deel uit bridge. van het project<br />

<strong>BAM</strong> Al Hidmi, Civiel. Qatar.<br />

> <strong>BAM</strong> Civiel concentrates on specialist concrete<br />

construction projects <strong>in</strong> <strong>the</strong> civil eng<strong>in</strong>eer<strong>in</strong>g, park<strong>in</strong>g,<br />

hydraulic eng<strong>in</strong>eer<strong>in</strong>g, <strong>in</strong>dustry and energy markets.<br />

The work varies from concept development, design and<br />

construction to management and ma<strong>in</strong>tenance.<br />

<strong>BAM</strong> Civiel’s ma<strong>in</strong> <strong>of</strong>fice is situated <strong>in</strong> Gouda. <strong>BAM</strong> Civiel<br />

has four regional branches and three specialist divisions:<br />

<strong>BAM</strong> Speciale Technieken, <strong>BAM</strong> Civiel Prefab Beton and<br />

<strong>BAM</strong> Civiel Bekist<strong>in</strong>gfabriek. <strong>BAM</strong> Civiel has around 750<br />

employees.<br />

<strong>BAM</strong> Civiel launched a development programme <strong>in</strong> <strong>2011</strong><br />

to <strong>in</strong>crease <strong>the</strong> added value <strong>of</strong> <strong>the</strong> organisation for<br />

customers and reduce costs. Lean methodology is a<br />

major part <strong>of</strong> this programme, which wiIl cont<strong>in</strong>ue <strong>in</strong><br />

2012. The collaboration between <strong>BAM</strong> Civiel and <strong>the</strong><br />

o<strong>the</strong>r <strong>BAM</strong> civil eng<strong>in</strong>eer<strong>in</strong>g companies also <strong>in</strong>creased <strong>in</strong><br />

order to improve <strong>the</strong> acquisition and implementation <strong>of</strong><br />

<strong>in</strong>tegrated, multidiscipl<strong>in</strong>ary projects.<br />

The civil eng<strong>in</strong>eer<strong>in</strong>g projects completed dur<strong>in</strong>g <strong>the</strong> year<br />

<strong>in</strong>clude <strong>the</strong> Hartel Cycle Bridge <strong>in</strong> <strong>the</strong> Botlek area <strong>of</strong><br />

Rotterdam, <strong>the</strong> tram depot for <strong>the</strong> RET transport<br />

company <strong>in</strong> <strong>the</strong> Rotterdam neighbourhood <strong>of</strong><br />

Beverwaard and <strong>the</strong> renovation <strong>of</strong> <strong>the</strong> IJ Tunnel <strong>in</strong><br />

Amsterdam. Work <strong>in</strong> progress <strong>in</strong>cludes <strong>the</strong> Burgerveen<br />

to Leiden South section <strong>of</strong> <strong>the</strong> A4 motorway, <strong>the</strong><br />

‘Stadsbrug’ bridge <strong>in</strong> Nijmegen, <strong>the</strong> ‘OV SAAL’ project<br />

(expansion <strong>of</strong> rail capacity on <strong>the</strong> Schiphol-Amsterdam-<br />

Almere-Lelystad l<strong>in</strong>e), <strong>the</strong> widen<strong>in</strong>g <strong>of</strong> <strong>the</strong> Utrecht<br />

Lunetten to Veenendaal stretch <strong>of</strong> <strong>the</strong> A12 motorway, <strong>the</strong><br />

‘Green Port Lane’ road-build<strong>in</strong>g project (N295) near<br />

Venlo, <strong>the</strong> ‘Hovenr<strong>in</strong>g’ crossroads <strong>in</strong> E<strong>in</strong>dhoven, <strong>the</strong><br />

‘Poortvrije Passages’ (shopp<strong>in</strong>g arcades) at Amsterdam<br />

Central Station and <strong>the</strong> renovation <strong>of</strong> <strong>the</strong> Vollenhover<br />

Bridge which l<strong>in</strong>ks <strong>the</strong> prov<strong>in</strong>ces <strong>of</strong> Overijssel and<br />

Flevoland. Construction <strong>of</strong> Europapark Station <strong>in</strong><br />

Gron<strong>in</strong>gen <strong>of</strong>ficially started.<br />

The underground civil eng<strong>in</strong>eer<strong>in</strong>g works for <strong>the</strong> New<br />

Rijksmuseum <strong>in</strong> Amsterdam (lot 1) are now complete <strong>in</strong> a<br />

project that won <strong>the</strong> Schreuder Award <strong>in</strong> <strong>2011</strong> for<br />

<strong>in</strong>novative and socially responsible use <strong>of</strong> underground<br />

space. The deepen<strong>in</strong>g <strong>of</strong> <strong>the</strong> basement for Ardagh Glass<br />

<strong>in</strong> Dongen was completed. Work is <strong>in</strong> progress on<br />

underground car parks <strong>in</strong> Apeldoorn, Nijmegen and<br />

Rotterdam.<br />

<strong>2011</strong> saw <strong>BAM</strong> Civiel <strong>in</strong>troduce ‘<strong>BAM</strong> GO-Park’, an<br />

<strong>in</strong>tegrated approach to build<strong>in</strong>g underground car parks<br />

that <strong>in</strong>cludes <strong>the</strong> entire process from <strong>in</strong>itiation and<br />

design<strong>in</strong>g <strong>the</strong> underground car park through calculation<br />

<strong>of</strong> <strong>the</strong> costs, construction and exploitation.<br />

In <strong>the</strong> hydraulic eng<strong>in</strong>eer<strong>in</strong>g segment, construction <strong>of</strong><br />

<strong>the</strong> quay walls is at an advanced stage <strong>in</strong> Maasvlakte 2<br />

and <strong>in</strong> <strong>the</strong> Wilhelm<strong>in</strong>ahaven part <strong>of</strong> <strong>the</strong> Eemshaven<br />

harbour area. Build<strong>in</strong>g work started on <strong>the</strong> Sluiskil Tunnel<br />

under <strong>the</strong> Ghent-to-Terneuzen canal.<br />

The projects delivered <strong>in</strong> <strong>the</strong> <strong>in</strong>dustry and energy<br />

segments <strong>in</strong>cluded <strong>the</strong> concrete and steel work for a<br />

comb<strong>in</strong>ed-cycle gas turb<strong>in</strong>e (CCGT) for Essent <strong>in</strong><br />

Moerdijk. The SITA ReEnergy waste energy plant <strong>in</strong><br />

Roosendaal was <strong>of</strong>ficially opened <strong>in</strong> October. BritNed’s<br />

convertor stations – <strong>the</strong> electricity l<strong>in</strong>k between <strong>the</strong><br />

Ne<strong>the</strong>rlands and England – were completed by <strong>BAM</strong><br />

Civiel and <strong>BAM</strong> Nuttall. The cool<strong>in</strong>g water station at <strong>the</strong><br />

EnecoGEN power plant also came on l<strong>in</strong>e <strong>in</strong> <strong>2011</strong>.<br />

<strong>BAM</strong> Civiel has been certified at <strong>the</strong> highest level <strong>of</strong><br />

ProRail’s CO performance ladder s<strong>in</strong>ce 2010 and is now<br />

2<br />

certified under version 2.0 as well. <strong>BAM</strong> Civiel was also<br />

awarded <strong>the</strong> ISO 14001 Environmental Management<br />

Certificate <strong>in</strong> <strong>2011</strong>.


Underground high-voltage l<strong>in</strong>k for <strong>the</strong> Randstad<br />

380 kV project TenneT, Delft-Pijnacker, <strong>the</strong> Ne<strong>the</strong>rlands.<br />

<strong>BAM</strong> Infratechniek.<br />

> <strong>BAM</strong> Infratechniek designs, builds and ma<strong>in</strong>ta<strong>in</strong>s cable<br />

and pipel<strong>in</strong>e networks for telecommunications, data,<br />

rail, gas, electricity, water/waste water and heat<strong>in</strong>g<br />

systems. The company’s key competencies also <strong>in</strong>clude<br />

traffic systems, tunnel equipment and <strong>in</strong>dustrial pipe<br />

and storage systems. <strong>BAM</strong> Infratechniek’s ma<strong>in</strong> specialist<br />

niche markets <strong>in</strong>clude electric transport, heat and cold<br />

storage systems, pipe renovation techniques, digital<br />

registration <strong>of</strong> <strong>the</strong> locations <strong>of</strong> pipel<strong>in</strong>es and services<br />

pursuant to <strong>the</strong> Underground Grids (Information<br />

Exchange) Act.<br />

<strong>BAM</strong> Infratechniek comprises three regional bus<strong>in</strong>esses<br />

(<strong>in</strong> <strong>the</strong> central/western, north-east and sou<strong>the</strong>rn regions<br />

<strong>of</strong> <strong>the</strong> Ne<strong>the</strong>rlands) which are more process-based, as<br />

well as four national, ma<strong>in</strong>ly project-based bus<strong>in</strong>esses<br />

(<strong>BAM</strong> Infratechniek Mobiliteit, <strong>BAM</strong> Leid<strong>in</strong>gen & Industrie<br />

and Ravesteyn Consultants). <strong>BAM</strong> Nelis De Ruiter,<br />

Headl<strong>in</strong>e and Geodan Van den Berg (50 percent share)<br />

are also part <strong>of</strong> <strong>BAM</strong> Infratechniek.<br />

<strong>BAM</strong> Infratechniek <strong>of</strong>fers a full-service package from<br />

design to management and ma<strong>in</strong>tenance. The factors<br />

driv<strong>in</strong>g <strong>the</strong> success <strong>of</strong> this package <strong>in</strong>clude reliability,<br />

craftsmanship, eng<strong>in</strong>eer<strong>in</strong>g capacity, and a large, well<br />

tra<strong>in</strong>ed field organisation.<br />

<strong>BAM</strong> Infratechniek’s customers <strong>in</strong>clude nearly every<br />

telecommunications, gas, electricity, water and heat<strong>in</strong>g<br />

network operator and many thousands <strong>of</strong> small and large<br />

contracts are performed for <strong>the</strong>se customers every year.<br />

The company also works for Gasunie, ProRail, <strong>the</strong><br />

Directorate-General for Public Works and Water<br />

Management, Shell, TenneT and Vopak.<br />

The large Randstad 380 kV project (partly underground<br />

expansion <strong>of</strong> <strong>the</strong> high-voltage network) is progress<strong>in</strong>g<br />

extremely well.<br />

Track functionality expansion, Lage Zwaluwe,<br />

<strong>the</strong> Ne<strong>the</strong>rlands.<br />

<strong>BAM</strong> Rail.<br />

Various notable contracts were won dur<strong>in</strong>g <strong>the</strong> year,<br />

<strong>in</strong>clud<strong>in</strong>g a number <strong>of</strong> fibre-to-<strong>the</strong>-home jobs for<br />

Reggefiber, Rabo CIF and KPN, <strong>the</strong> renovation <strong>of</strong> <strong>the</strong><br />

IJ Tunnel and several transport projects for <strong>the</strong><br />

Directorate-General for Public Works and Water<br />

Management and local government.<br />

Trad<strong>in</strong>g under <strong>the</strong> <strong>BAM</strong> Infra logo, <strong>BAM</strong> Infratechniek<br />

works toge<strong>the</strong>r with o<strong>the</strong>r <strong>BAM</strong> operat<strong>in</strong>g companies on<br />

projects such as <strong>the</strong> PPP project to widen <strong>the</strong> Utrecht<br />

Lunetten to Veenendaal section <strong>of</strong> <strong>the</strong> A12 motorway.<br />

Several electric transport contracts were won <strong>in</strong> <strong>2011</strong>.<br />

Design<strong>in</strong>g and build<strong>in</strong>g <strong>the</strong> <strong>in</strong>frastructure required for<br />

electric transport is one <strong>of</strong> <strong>the</strong> company’s key activities.<br />

The first phase <strong>of</strong> <strong>the</strong> Vopak Term<strong>in</strong>al Westpoort was<br />

delivered on schedule <strong>in</strong> <strong>2011</strong>.<br />

<strong>BAM</strong> Infratechniek has CO certification at level 5<br />

2<br />

accord<strong>in</strong>g to ProRail’s performance ladder system.<br />

> <strong>BAM</strong> Rail <strong>of</strong>fers a complete package <strong>of</strong> rail and<br />

associated services – both <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands and abroad<br />

– from eng<strong>in</strong>eer<strong>in</strong>g to full construction and ma<strong>in</strong>tenance<br />

<strong>of</strong> rail l<strong>in</strong>ks. Multidiscipl<strong>in</strong>ary rail contracts are completed<br />

<strong>in</strong> conjunction with <strong>the</strong> local Royal <strong>BAM</strong> Group civil<br />

eng<strong>in</strong>eer<strong>in</strong>g companies.<br />

<strong>BAM</strong> Rail’s largest customer is ProRail, <strong>the</strong> manager <strong>of</strong><br />

<strong>the</strong> ma<strong>in</strong> rail network <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands. <strong>BAM</strong> Rail also<br />

works for regional and local public transport companies<br />

(tram and metro l<strong>in</strong>es) and national and local network<br />

managers <strong>in</strong> <strong>the</strong> United K<strong>in</strong>gdom, Ireland and Belgium.<br />

The ma<strong>in</strong> <strong>of</strong>fice <strong>in</strong> Breda is <strong>the</strong> base for all new-build and<br />

renovation projects. <strong>BAM</strong> Rail also has branches <strong>in</strong><br />

Dordrecht (plant and material), E<strong>in</strong>dhoven and<br />

Rotterdam. In addition, services for <strong>the</strong> Belgian market<br />

are provided from <strong>the</strong> Carmans Spoorwerken base near<br />

Hasselt, while <strong>BAM</strong> Rail Ltd operates on <strong>the</strong> Irish market<br />

from its <strong>of</strong>fice near Dubl<strong>in</strong>.<br />

83<br />

<strong>2011</strong>


84<br />

<strong>2011</strong><br />

<strong>BAM</strong> Won<strong>in</strong>gbouw hoge<br />

kantoortoren, Cycle path on Vliss<strong>in</strong>gen Palais Thurn Boulevard, und Taxis,<br />

maakt <strong>the</strong> Ne<strong>the</strong>rlands deel uit van het project Al<br />

Bidda, <strong>BAM</strong> Wegen. Qatar.<br />

<strong>BAM</strong> Rail completed a range <strong>of</strong> both large and small<br />

projects <strong>in</strong> <strong>2011</strong>, such as ‘Sporen <strong>in</strong> Arnhem’ <strong>in</strong> which four<br />

<strong>BAM</strong> operat<strong>in</strong>g companies were expand<strong>in</strong>g <strong>the</strong> capacity<br />

<strong>of</strong> Arnhem tra<strong>in</strong> station and OV SAAL (expansion <strong>of</strong> <strong>the</strong><br />

Schiphol-Amsterdam-Almere-Lelystad rail network).<br />

September <strong>2011</strong> saw <strong>the</strong> start <strong>of</strong> <strong>the</strong> first phase <strong>of</strong><br />

Maasvlakte 2. W<strong>in</strong>n<strong>in</strong>g <strong>the</strong> Gron<strong>in</strong>gen Europapark<br />

Station contract also showed that collaboration between<br />

<strong>BAM</strong> operat<strong>in</strong>g companies on <strong>in</strong>tegrated,<br />

multidiscipl<strong>in</strong>ary works is reap<strong>in</strong>g rewards.<br />

ProRail launched a call for tenders for ma<strong>in</strong>tenance work<br />

on <strong>the</strong> Dutch railway network. The project is divided <strong>in</strong>to<br />

so-called ‘contract zones’.<br />

<strong>BAM</strong> Rail carried out a lot <strong>of</strong> ma<strong>in</strong>tenance work, <strong>in</strong>clud<strong>in</strong>g<br />

<strong>in</strong> <strong>the</strong> contract zones. The company won <strong>the</strong> five-year rail<br />

ma<strong>in</strong>tenance contract for <strong>the</strong> Betuwe contract area.<br />

<strong>BAM</strong> Rail – toge<strong>the</strong>r with three o<strong>the</strong>r <strong>BAM</strong> operat<strong>in</strong>g<br />

companies – was also awarded <strong>the</strong> ten-year ma<strong>in</strong>tenance<br />

contract for <strong>the</strong> Maeslant, Hartel and IJssel flood<br />

defences by <strong>the</strong> Directorate-General for Public Works<br />

and Water Management.<br />

<strong>BAM</strong> Rail jo<strong>in</strong>ed forces with sister company Betonac (<strong>the</strong><br />

Belgian road and <strong>in</strong>frastructure specialist) to take over <strong>the</strong><br />

railway construction company Carmans Spoorwerken. An<br />

additional contract was signed <strong>in</strong> Scotland for completion<br />

<strong>of</strong> <strong>the</strong> Ed<strong>in</strong>burgh tram l<strong>in</strong>k project.<br />

Bus<strong>in</strong>ess and employee development at <strong>BAM</strong> Rail is<br />

centred on implementation <strong>of</strong> <strong>the</strong> lean philosophy, <strong>the</strong><br />

objectives be<strong>in</strong>g to improve safety, change <strong>the</strong> corporate<br />

culture and <strong>in</strong>crease commitment by improv<strong>in</strong>g both<br />

<strong>in</strong>ternal and external processes throughout <strong>the</strong> entire<br />

supply cha<strong>in</strong>.<br />

<strong>BAM</strong> Vastgoed De 134 meter<br />

Widen<strong>in</strong>g hoge kantoortoren, <strong>of</strong> <strong>the</strong> Utrecht Palais Lunetten-Veenendaal Thurn und section <strong>of</strong> <strong>the</strong> A12 motorway,<br />

<strong>the</strong> Taxis, Ne<strong>the</strong>rlands. maakt deel uit van het project<br />

<strong>BAM</strong> Al Hidmi, Wegen Qatar. with <strong>BAM</strong> PPP, <strong>BAM</strong> Civiel, <strong>BAM</strong> Infratechniek, <strong>BAM</strong> Infraconsult.<br />

The core activities <strong>of</strong> > <strong>BAM</strong> Wegen are <strong>the</strong> design,<br />

construction, management and ma<strong>in</strong>tenance <strong>of</strong> traffic<br />

<strong>in</strong>frastructure, ground, sewage and environmental<br />

activities, noise abatement and area development. <strong>BAM</strong><br />

Wegen employs approximately 1,650 people who carry<br />

out around 2,500 projects every year <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands.<br />

The operat<strong>in</strong>g company has seven regional <strong>of</strong>fices and<br />

eleven specialist subsidiaries active <strong>in</strong> a wide range <strong>of</strong><br />

activities <strong>in</strong>volv<strong>in</strong>g noise barriers, environmental and<br />

concrete technology, landscap<strong>in</strong>g, sports grounds,<br />

mechanical road build<strong>in</strong>g, traffic management measures<br />

(temporary or o<strong>the</strong>rwise), and crash barriers.<br />

<strong>BAM</strong> Wegen and a number <strong>of</strong> sister companies<br />

successfully completed <strong>the</strong> urgent widen<strong>in</strong>g <strong>of</strong> <strong>the</strong><br />

Zwolle to Meppel section <strong>of</strong> <strong>the</strong> A28 motorway <strong>in</strong> <strong>2011</strong>.<br />

The DBFM project ‘Poort van Bunnik’ be<strong>in</strong>g carried out<br />

by various <strong>BAM</strong> companies comprises <strong>the</strong> widen<strong>in</strong>g <strong>of</strong><br />

<strong>the</strong> A12 motorway between <strong>the</strong> Utrecht Lunetten<br />

junction and Veenendaal, <strong>the</strong> construction and<br />

modification <strong>of</strong> viaducts and traffic systems and<br />

ma<strong>in</strong>tenance for twenty years. Significant quantities <strong>of</strong><br />

Low-Energy Asphalt Concrete (LEAB) are be<strong>in</strong>g laid on<br />

<strong>the</strong> A12 to reduce energy consumption and CO2 emissions by approximately 25 percent.<br />

In Rotterdam, Mostert De W<strong>in</strong>ter won <strong>the</strong> contract to<br />

build a ro<strong>of</strong> park <strong>the</strong> size <strong>of</strong> eight football pitches that will<br />

<strong>in</strong>clude water features, concrete steps, gardens and<br />

playground equipment. In Limburg, near Venlo, <strong>BAM</strong><br />

Wegen is build<strong>in</strong>g <strong>the</strong> Green Port Lane (N295) which will<br />

l<strong>in</strong>k <strong>the</strong> A67 and A73 motorways and enable <strong>the</strong> fur<strong>the</strong>r<br />

development <strong>of</strong> <strong>the</strong> Klavertje 4 work area. Green Port<br />

Lane will be <strong>the</strong> artery for <strong>the</strong> expansion <strong>of</strong> economic<br />

activity <strong>in</strong> that region and <strong>the</strong> ideal access route for<br />

Floriade 2012.<br />

<strong>BAM</strong> Wegen laid a yellow and black asphalt cycle path<br />

along <strong>the</strong> boulevard <strong>in</strong> Vliss<strong>in</strong>gen that constitute a<br />

fully-fledged part <strong>of</strong> <strong>the</strong> cyclists’ network along <strong>the</strong>


Design <strong>of</strong> quay wall and moor<strong>in</strong>g jetty <strong>in</strong><br />

Monrovia Harbour, Liberia.<br />

<strong>BAM</strong> Infraconsult, construction: <strong>BAM</strong> International.<br />

Walcheren coastl<strong>in</strong>e. StreetPr<strong>in</strong>t pr<strong>in</strong>ted decorative wave<br />

patterns <strong>in</strong> <strong>the</strong> black asphalt. Autumn <strong>2011</strong> saw <strong>BAM</strong><br />

Wegen start <strong>the</strong> shoal<strong>in</strong>g <strong>of</strong> <strong>the</strong> Meeslouwerplas<br />

recreation area near Voorschoten. The deepest po<strong>in</strong>t <strong>of</strong><br />

<strong>the</strong> water <strong>in</strong> <strong>the</strong> recreation area will be reduced from<br />

forty to twenty metres for safety reasons. The highest<br />

noise barrier <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands (thirteen metres high)<br />

was delivered dur<strong>in</strong>g <strong>the</strong> year.<br />

The barrier was built by <strong>BAM</strong>’s ‘Geluidsscherm Portland’<br />

consortium and runs for almost two kilometres along <strong>the</strong><br />

A15 motorway near Barendrecht.<br />

> <strong>BAM</strong> Infraconsult is <strong>the</strong> consultancy and eng<strong>in</strong>eer<strong>in</strong>g<br />

<strong>of</strong>fice for Royal <strong>BAM</strong> Group’s civil eng<strong>in</strong>eer<strong>in</strong>g sector.<br />

<strong>BAM</strong> Infraconsult has approximately 250 employees and<br />

has branches <strong>in</strong> Gouda (head <strong>of</strong>fice), Apeldoorn, Breda,<br />

The Hague, Utrecht and S<strong>in</strong>gapore.<br />

<strong>BAM</strong> Infraconsult translates functions and requirements<br />

<strong>in</strong>to designs, performs <strong>in</strong>spections and provides<br />

consultancy services. <strong>BAM</strong> Infraconsult leads <strong>the</strong> design<br />

and calculation work for urban <strong>in</strong>frastructure, large-scale<br />

<strong>in</strong>frastructure projects and harbour and coastl<strong>in</strong>e work <strong>in</strong><br />

<strong>the</strong> design, construction and management phases <strong>of</strong> a<br />

project.<br />

In <strong>2011</strong>, <strong>BAM</strong> Infraconsult won both national and<br />

<strong>in</strong>ternational awards for its designs for major Royal <strong>BAM</strong><br />

Group projects. New technologies for <strong>in</strong>tegrat<strong>in</strong>g virtual<br />

construction, plann<strong>in</strong>g and cash flows are fur<strong>the</strong>r<br />

pr<strong>of</strong>essionalis<strong>in</strong>g <strong>the</strong> construction process, mak<strong>in</strong>g it<br />

possible to reduce <strong>in</strong>convenience and shorten<br />

construction periods for <strong>BAM</strong>’s customers.<br />

Digital communication facilities were used to <strong>the</strong> full by<br />

work<strong>in</strong>g on projects from various locations <strong>in</strong> different<br />

countries. The concept <strong>of</strong> ‘safety by design’ was<br />

<strong>in</strong>troduced to <strong>in</strong>crease safety start<strong>in</strong>g from <strong>the</strong> design<br />

phase.<br />

Widen<strong>in</strong>g <strong>the</strong> track bed and construction <strong>of</strong> a railway<br />

viaduct for Gewestelijk ExpresNet, Genval, Belgium.<br />

<strong>BAM</strong> Wallonie, Betonac.<br />

> <strong>BAM</strong> Wallonie br<strong>in</strong>gs toge<strong>the</strong>r all <strong>of</strong> <strong>the</strong> <strong>BAM</strong><br />

companies that operate <strong>in</strong> <strong>the</strong> French-speak<strong>in</strong>g part <strong>of</strong><br />

Belgium (<strong>the</strong> Walloon prov<strong>in</strong>ces and Brussels), namely<br />

Galère, Balteau and Balteau ie. With a turnover <strong>of</strong><br />

approximately €310 million and a workforce <strong>of</strong> 1,400,<br />

<strong>BAM</strong> Wallonie occupies a lead<strong>in</strong>g position on this market.<br />

The company is <strong>in</strong>volved <strong>in</strong> almost all major Walloon<br />

construction projects. In each case, <strong>the</strong> bus<strong>in</strong>ess units<br />

contribute <strong>the</strong>ir own special skills. Galère constructs<br />

both build<strong>in</strong>gs and <strong>in</strong>frastructure. Balteau focuses on<br />

design<strong>in</strong>g and construct<strong>in</strong>g electro-mechanical systems<br />

for purify<strong>in</strong>g, treat<strong>in</strong>g and pump<strong>in</strong>g water. Balteau ie<br />

specialises <strong>in</strong> heat<strong>in</strong>g and electrical eng<strong>in</strong>eer<strong>in</strong>g.<br />

Galère was <strong>in</strong>volved <strong>in</strong> a range <strong>of</strong> projects <strong>in</strong> <strong>the</strong> year<br />

under review, such as <strong>the</strong> build<strong>in</strong>g <strong>of</strong> a new lock on <strong>the</strong><br />

River Maas <strong>in</strong> Ivoz-Ramet, three construction projects for<br />

<strong>the</strong> Gewestelijk ExpresNet (rapid rail transit system) <strong>in</strong><br />

Limal-Limelette, Genval and Rixensart, <strong>the</strong> Schuman-<br />

Josaphat tunnel project <strong>in</strong> <strong>the</strong> centre <strong>of</strong> Brussels and a<br />

metro l<strong>in</strong>e <strong>in</strong> Charleroi. The Build<strong>in</strong>gs division handled<br />

<strong>the</strong> restoration <strong>of</strong> <strong>the</strong> Opera <strong>in</strong> Liège. In its capacity as a<br />

partner <strong>in</strong> <strong>BAM</strong> Alliance, Galère was once aga<strong>in</strong> <strong>in</strong>volved<br />

<strong>in</strong> <strong>the</strong> build<strong>in</strong>g <strong>of</strong> <strong>the</strong> new NATO headquarters <strong>in</strong> Evere<br />

near Brussels <strong>in</strong> <strong>2011</strong>. Galère and Interbuild formed a<br />

jo<strong>in</strong>t venture which won <strong>the</strong> contract to build two prisons<br />

<strong>in</strong> Beveren and Dendermonde. Galère also has projects <strong>in</strong><br />

Luxembourg, such as <strong>the</strong> Stafelter Tunnel and <strong>the</strong><br />

Pulvermühle Railway Viaduct.<br />

Balteau works ma<strong>in</strong>ly <strong>in</strong> <strong>the</strong> Walloon part <strong>of</strong> Belgium,<br />

where <strong>the</strong> company has built countless water<br />

purification plants. A lot <strong>of</strong> projects <strong>in</strong>volv<strong>in</strong>g work on<br />

civil eng<strong>in</strong>eer<strong>in</strong>g <strong>in</strong>frastructure and build<strong>in</strong>gs are carried<br />

out <strong>in</strong> close cooperation with Galère. There is <strong>in</strong>terest<br />

from round <strong>the</strong> <strong>world</strong> <strong>in</strong> Balteau’s specialist knowledge.<br />

S<strong>in</strong>ce Balteau-ie jo<strong>in</strong>ed <strong>BAM</strong> Wallonie <strong>in</strong> 2008, this group<br />

<strong>of</strong> specialist electrical eng<strong>in</strong>eer<strong>in</strong>g companies has<br />

worked on numerous projects with Galère and Balteau,<br />

as well as with CEI-De Meyer and Interbuild. The largest<br />

85<br />

<strong>2011</strong>


86<br />

<strong>2011</strong><br />

<strong>BAM</strong> Won<strong>in</strong>gbouw hoge<br />

kantoortoren, Redesign <strong>of</strong> <strong>the</strong> Palais E313/E314 Thurn Lummen und Taxis,<br />

maakt motorway deel junction, uit van het Belgium. project Al<br />

Bidda, Betonac Qatar. (<strong>in</strong> jo<strong>in</strong>t venture).<br />

projects <strong>in</strong> <strong>the</strong> year under review <strong>in</strong>cluded <strong>the</strong> renovation<br />

<strong>of</strong> <strong>the</strong> Marnix Build<strong>in</strong>g for ING <strong>in</strong> Brussels and <strong>the</strong> Le<br />

Valdor Cl<strong>in</strong>ic <strong>in</strong> Liège. Balteau ie is also responsible for <strong>the</strong><br />

heat<strong>in</strong>g system and electrical eng<strong>in</strong>eer<strong>in</strong>g projects<br />

carried out <strong>in</strong> various hospitals, homes for <strong>the</strong> elderly<br />

and residential complexes, as well as for <strong>the</strong> new NATO<br />

headquarters. The company is <strong>in</strong>volved <strong>in</strong> <strong>the</strong> build<strong>in</strong>g <strong>of</strong><br />

new prisons <strong>in</strong> Beveren and Dendermonde.<br />

Established <strong>in</strong> S<strong>in</strong>t Truiden, > Betonac specialises <strong>in</strong> <strong>the</strong><br />

construction <strong>of</strong> concrete and asphalt roads and <strong>of</strong> major<br />

civil eng<strong>in</strong>eer<strong>in</strong>g works. Betonac employs more than 300<br />

people and has a well-equipped laboratory to monitor<br />

<strong>the</strong> quality <strong>of</strong> concrete and asphalt mixtures as well as its<br />

own design <strong>of</strong>fice. Betonac has also been active on <strong>the</strong><br />

private projects market and has successfully completed<br />

projects for Armasteel, Elia, Vopak and Kraft.<br />

Betonac has been <strong>in</strong>volved <strong>in</strong> <strong>the</strong> construction <strong>of</strong> nearly<br />

every concrete or asphalt motorway <strong>in</strong> Belgium. For<br />

<strong>in</strong>stance, <strong>the</strong> company resurfaced <strong>the</strong> A3, <strong>the</strong> E19 and<br />

<strong>the</strong> E411. In addition, <strong>the</strong> ma<strong>in</strong>tenance contract for <strong>the</strong><br />

Prov<strong>in</strong>ce <strong>of</strong> Liège is still <strong>in</strong> progress. The redesign <strong>of</strong> <strong>the</strong><br />

junction <strong>of</strong> <strong>the</strong> E313 and <strong>the</strong> E314 near Lummen is largely<br />

complete. In <strong>2011</strong>, Betonac’s asphalt plant (<strong>BAM</strong> Asphalt)<br />

<strong>in</strong> V<strong>in</strong>almont had its busiest year, which means that it has<br />

doubled its workload <strong>in</strong> <strong>the</strong> space <strong>of</strong> four years. Betonac<br />

specialises <strong>in</strong> lay<strong>in</strong>g concrete road surfaces and relaid <strong>the</strong><br />

concrete surface <strong>in</strong> both directions over seven kilometres<br />

<strong>of</strong> <strong>the</strong> E313 between Ham and Ber<strong>in</strong>gen <strong>in</strong> <strong>2011</strong>.<br />

Betonac <strong>in</strong>stalled noise barriers along major transport<br />

arteries, such as <strong>the</strong> E313 at Hasselt, <strong>the</strong> E314 at<br />

Heusden-Zolder and <strong>the</strong> E411 at Hoeilaart, under a<br />

contract with <strong>the</strong> Flemish Government.<br />

Betonac jo<strong>in</strong>ed forces with Breda-based sister company<br />

<strong>BAM</strong> Rail to take over Carmans Spoorwerken <strong>of</strong> Alken.<br />

<strong>BAM</strong> Vastgoed De 134 meter<br />

Bridge hoge kantoortoren, across <strong>the</strong> Albert Palais Canal Thurn <strong>in</strong> Vroenhoven, und Belgium. Architect: Ney + Partners.<br />

The Taxis, pier maakt on <strong>the</strong> deel Riemst uit van side het <strong>in</strong>cludes project projectspace<br />

for a museum.<br />

CEI-De Al Hidmi, Meyer. Qatar.<br />

The o<strong>the</strong>r civil eng<strong>in</strong>eer<strong>in</strong>g projects <strong>in</strong>clude everyth<strong>in</strong>g<br />

from tunnels and bridges to quay walls. A range <strong>of</strong> major<br />

projects are <strong>in</strong> progress <strong>in</strong> <strong>the</strong> Brussels region for <strong>the</strong><br />

Belgian railway <strong>in</strong>frastructure manager, Infrabel, as part<br />

<strong>of</strong> <strong>the</strong> Gewestelijk ExpresNet (Regional Express<br />

Network). Betonac is work<strong>in</strong>g with sister company Galère<br />

on one <strong>of</strong> <strong>the</strong> most important projects <strong>in</strong> this transport<br />

plan <strong>in</strong> Genval and with ano<strong>the</strong>r sister company, CEI-De<br />

Meyer, and a company called Jan De Nul on <strong>the</strong> expansion<br />

<strong>of</strong> <strong>the</strong> railway <strong>in</strong>frastructure at Watermaal-Bosvoorde.<br />

Betonac ended <strong>2011</strong> successfully with <strong>the</strong> start <strong>of</strong> work<br />

to build a new lock <strong>in</strong> Antwerp’s Waasland Harbour,<br />

which is one <strong>of</strong> <strong>the</strong> largest <strong>in</strong>frastructure projects due to<br />

take place <strong>in</strong> Flanders <strong>in</strong> <strong>the</strong> next few years.<br />

> CEI-De Meyer has approximately 450 employees and is<br />

based <strong>in</strong> Brussels and Nazareth-Eke (near Ghent). The<br />

company’s civil eng<strong>in</strong>eer<strong>in</strong>g division cont<strong>in</strong>ued work on<br />

giant projects such as <strong>the</strong> Liefkenshoek Railway Tunnel,<br />

Schuman-Josaphat and <strong>the</strong> Diabolo project <strong>in</strong> <strong>2011</strong>. The<br />

projects that were delivered <strong>in</strong>cluded <strong>the</strong> modernisation<br />

work along <strong>the</strong> route <strong>of</strong> <strong>the</strong> River Leie through Kortrijk,<br />

<strong>in</strong>frastructure for <strong>the</strong> Gewestelijk ExpresNet regional<br />

express network <strong>in</strong> and around Brussels (especially <strong>in</strong><br />

Limal, Watermaal-Bosvoorde and Rixensart), <strong>the</strong> new<br />

bridges over <strong>the</strong> Nete <strong>in</strong> Duffel and <strong>the</strong> bridges at <strong>the</strong><br />

Flanders Expo site known as ‘The Loop’ <strong>in</strong> Ghent. The<br />

bridge over <strong>the</strong> Albert Canal <strong>in</strong> Riemst was completed at<br />

<strong>the</strong> end <strong>of</strong> <strong>2011</strong>. CEI-De Meyer has been work<strong>in</strong>g on<br />

several projects for <strong>in</strong>dustry customers, especially <strong>in</strong> <strong>the</strong><br />

Port <strong>of</strong> Antwerp. Storage tanks were successfully<br />

<strong>in</strong>stalled for Ineos and Sea-Tank, for example.<br />

The Build<strong>in</strong>gs division also had a healthy order book <strong>in</strong><br />

<strong>2011</strong> with work ongo<strong>in</strong>g or start<strong>in</strong>g on unique projects<br />

such as HanzePark <strong>in</strong> Bruges, Doss<strong>in</strong>kazerne barracks <strong>in</strong><br />

Mechelen, a residential care centre <strong>in</strong> S<strong>in</strong>t-Niklaas, an<br />

adm<strong>in</strong>istrative centre <strong>in</strong> Willebroek, a service centre <strong>in</strong><br />

Boom and <strong>the</strong> Vanderelst <strong>of</strong>fice block <strong>in</strong> Leuven.


Renovation and expansion <strong>of</strong> Tottenham<br />

Court Road underground station, London.<br />

<strong>BAM</strong> Nuttall.<br />

Substantial progress was also made at <strong>the</strong> follow<strong>in</strong>g<br />

major construction sites (as part <strong>of</strong> a consortium): <strong>the</strong><br />

new permanent NATO headquarters <strong>in</strong> Brussels, <strong>the</strong><br />

Ernotte, Bervoets and Bruyn-West residential projects<br />

and <strong>the</strong> renovation <strong>of</strong> <strong>the</strong> Cross<strong>in</strong>g Schaarbeek football<br />

stadium. The construction projects carried out by CEI-De<br />

Meyer for subsidiary Immo <strong>BAM</strong> proceeded as expected,<br />

<strong>the</strong> Bara-De Lijn residential complex <strong>in</strong> Anderlecht, <strong>the</strong><br />

Remy II <strong>of</strong>fice complex <strong>in</strong> Leuven and <strong>the</strong> HanzePark<br />

residential project be<strong>in</strong>g particular highlights. A large<br />

part <strong>of</strong> <strong>the</strong> Kantienberg PPP project was delivered earlier<br />

than planned <strong>in</strong> <strong>the</strong> second half <strong>of</strong> <strong>the</strong> year – to <strong>the</strong> great<br />

satisfaction <strong>of</strong> <strong>the</strong> University <strong>of</strong> Ghent.<br />

Rebuild<strong>in</strong>g <strong>of</strong> Lizard Lifeboat Station,<br />

Kilcobben Cove, United K<strong>in</strong>gdom.<br />

<strong>BAM</strong> Nuttall.<br />

<strong>2011</strong> saw > <strong>BAM</strong> Nuttall achieve ano<strong>the</strong>r year <strong>of</strong> record<br />

revenues. Dur<strong>in</strong>g <strong>the</strong> year under review, a number <strong>of</strong><br />

prestigious contracts were <strong>in</strong> progress, such as <strong>the</strong><br />

remediation <strong>of</strong> <strong>the</strong> Olympic Park at Stratford (<strong>in</strong>clud<strong>in</strong>g<br />

<strong>the</strong> <strong>in</strong>frastructure, <strong>the</strong> green areas and <strong>the</strong> bridges), <strong>the</strong><br />

upgrade <strong>of</strong> Blackpool’s historic tram system (with<br />

<strong>in</strong>volvement from <strong>BAM</strong> Rail), <strong>the</strong> upgrade <strong>of</strong> Tottenham<br />

Court Road and Victoria tube stations <strong>in</strong> Central London,<br />

<strong>the</strong> refurbishment <strong>of</strong> <strong>the</strong> northbound bore <strong>of</strong> <strong>the</strong><br />

Blackwall road tunnel <strong>in</strong> London, <strong>the</strong> Luton to Dunstable<br />

Guided Busway, <strong>the</strong> Evergreen 3 rail improvement<br />

scheme between London Marylebone and Birm<strong>in</strong>gham<br />

and <strong>the</strong> Managed Motorways Framework.<br />

Major contracts secured by <strong>BAM</strong> Nuttall <strong>in</strong>clude <strong>the</strong><br />

construction <strong>of</strong> <strong>the</strong> new station at Farr<strong>in</strong>gdon and <strong>the</strong><br />

removal <strong>of</strong> surplus material across all schemes <strong>in</strong> <strong>the</strong><br />

build<strong>in</strong>g <strong>of</strong> <strong>the</strong> Crossrail Tunnel. Two contracts were<br />

awarded for legacy work on <strong>the</strong> Olympic Park.<br />

Confirmation has been received as preferred contractor<br />

<strong>in</strong> a consortium for <strong>the</strong> earthworks contract for <strong>the</strong> new<br />

H<strong>in</strong>kley Po<strong>in</strong>t C nuclear power station.<br />

Despite <strong>the</strong> current recession, <strong>the</strong> forward order book<br />

position rema<strong>in</strong>s fairly healthy. Opportunities to tender<br />

for projects rema<strong>in</strong> solid although work w<strong>in</strong>n<strong>in</strong>g activity<br />

is now conf<strong>in</strong>ed to small geographical pockets. The<br />

Beyond Zero ethos cont<strong>in</strong>ues to be embedded<br />

throughout <strong>the</strong> entire workforce with <strong>the</strong> aim <strong>of</strong><br />

chang<strong>in</strong>g behaviour and challeng<strong>in</strong>g current safety<br />

standards.<br />

87<br />

<strong>2011</strong>


88<br />

<strong>2011</strong><br />

<strong>BAM</strong> Stabilisation Won<strong>in</strong>gbouw <strong>of</strong> ‘Hooley hoge Cutt<strong>in</strong>g’ rock<br />

kantoortoren, faces on <strong>the</strong> London-Brighton<br />

Palais Thurn und Taxis,<br />

maakt railway deel l<strong>in</strong>e. uit van het project Al<br />

Bidda, <strong>BAM</strong> Nuttall, Qatar. <strong>BAM</strong> Ritchies.<br />

> <strong>BAM</strong> Contractors operates <strong>in</strong> <strong>the</strong> Irish construction<br />

market as <strong>BAM</strong> Civil, <strong>BAM</strong> Build<strong>in</strong>g, <strong>BAM</strong> Rail and <strong>BAM</strong><br />

Property and has approximately 615 staff. Under <strong>the</strong> PPP<br />

process it has successfully delivered major <strong>in</strong>frastructure<br />

projects. After several years <strong>of</strong> excellent performance,<br />

<strong>BAM</strong> Contractors cont<strong>in</strong>ues to experience <strong>the</strong> negative<br />

impact <strong>of</strong> Ireland’s economic downturn. Construction<br />

output is negatively affected by Government measures<br />

to restructure <strong>the</strong> bank<strong>in</strong>g sector and keep <strong>the</strong> national<br />

debt <strong>in</strong> check. <strong>BAM</strong> Contractors was none<strong>the</strong>less able to<br />

end <strong>the</strong> year with a good result. Despite challeng<strong>in</strong>g<br />

market circumstances, <strong>the</strong> company sees good<br />

opportunities <strong>in</strong> <strong>the</strong> Irish civil eng<strong>in</strong>eer<strong>in</strong>g and<br />

construction market, particularly <strong>in</strong> <strong>the</strong> health care,<br />

education, transport, water management and waste/<br />

water management sectors.<br />

Projects completed <strong>in</strong> <strong>2011</strong> <strong>in</strong>clude Curraheen Hospital,<br />

Cork and The Eng<strong>in</strong>eer<strong>in</strong>g Build<strong>in</strong>g, National University<br />

<strong>of</strong> Ireland, Galway. This project was awarded ‘School &<br />

Education Build<strong>in</strong>g Project <strong>of</strong> <strong>the</strong> Year’ at <strong>the</strong> CMG <strong>2011</strong><br />

Build<strong>in</strong>g & Design Awards.<br />

Build<strong>in</strong>g projects underway <strong>in</strong> <strong>2011</strong>: 7,000 m2 <strong>of</strong>fice<br />

development for US s<strong>of</strong>tware company Quest <strong>in</strong> Cork;<br />

3,000 m2 headquarters for <strong>the</strong> Community Workers<br />

Union, Dubl<strong>in</strong>; 10,220 m2 bulk feed facility for Arkady<br />

Feed <strong>in</strong> R<strong>in</strong>gaskiddy, Cork and <strong>the</strong> Centre for Applied<br />

Science for Health for <strong>the</strong> Institute <strong>of</strong> Technology<br />

Tallaght. <strong>BAM</strong> cont<strong>in</strong>ues to beat <strong>of</strong>f stiff competition to<br />

w<strong>in</strong> work contracts at <strong>the</strong> Major Microchip<br />

Manufactur<strong>in</strong>g Facility at Leixlip.<br />

<strong>BAM</strong> Civil is <strong>the</strong> market leader <strong>in</strong> <strong>the</strong> civil eng<strong>in</strong>eer<strong>in</strong>g<br />

sector and makes significant contributions to <strong>the</strong><br />

provision <strong>of</strong> Ireland’s built <strong>in</strong>frastructure. <strong>BAM</strong> Civil<br />

began work on <strong>the</strong> N22 Tralee Bypass Road Improvement<br />

Scheme and f<strong>in</strong>ished <strong>the</strong> 353 metres Adamstown<br />

Footbridge and <strong>the</strong> Green Route Extension <strong>in</strong> Dubl<strong>in</strong>.<br />

<strong>BAM</strong> Civil toge<strong>the</strong>r with Wayss & Freytag Ingenieurbau is<br />

work<strong>in</strong>g on a major tunnel project <strong>in</strong> Ireland.<br />

<strong>BAM</strong> Vastgoed De 134 meter<br />

Cyclists’ hoge kantoortoren, and pedestrian Palais bridge Thurn over und <strong>the</strong> Grand Canal<br />

on Taxis, <strong>the</strong> maakt ‘Green deel Route’ uit near van het Adamstown, project Ireland.<br />

<strong>BAM</strong> Al Hidmi, Civil. Qatar.<br />

<strong>BAM</strong> Contractors cont<strong>in</strong>ues to be active <strong>in</strong> <strong>the</strong> Irish PPP<br />

market: as part <strong>of</strong> a consortium it has been appo<strong>in</strong>ted<br />

preferred bidder on <strong>the</strong> Second Level Schools, Bundle 3,<br />

PPP and <strong>the</strong> Newlands Cross / N11 PPP Schemes. Little<br />

activity was recorded <strong>in</strong> <strong>the</strong> Irish property market <strong>in</strong> <strong>2011</strong><br />

due to <strong>the</strong> bank<strong>in</strong>g and general economic crisis. <strong>BAM</strong><br />

Contractors, <strong>in</strong> jo<strong>in</strong>t venture with He<strong>in</strong>eken Ireland, has<br />

just been granted plann<strong>in</strong>g permission for a €150 million<br />

redevelopment <strong>of</strong> <strong>the</strong> former Beamish and Crawford site<br />

<strong>in</strong> Cork City Centre. Little significant <strong>in</strong>crease <strong>in</strong> activity is<br />

expected through 2012. Development sites held by <strong>BAM</strong><br />

Property are strategically located <strong>in</strong> urban areas and<br />

have good potential for future development. The<br />

company ran a very successful Rent to Buy Scheme on<br />

residential property <strong>in</strong> <strong>2011</strong>.<br />

> Wayss & Freytag Ingenieurbau is a prom<strong>in</strong>ent<br />

company <strong>in</strong> <strong>the</strong> German civil eng<strong>in</strong>eer<strong>in</strong>g sector and<br />

commands an impressive reputation for build<strong>in</strong>g tunnels<br />

<strong>in</strong> particular.<br />

Collaboration with o<strong>the</strong>r <strong>BAM</strong> companies once aga<strong>in</strong><br />

reaped rewards <strong>in</strong> <strong>2011</strong>: Wayss & Freytag Ingenieurbau is<br />

part <strong>of</strong> <strong>the</strong> consortium build<strong>in</strong>g <strong>the</strong> Sluiskil Tunnel under<br />

<strong>the</strong> canal that runs from Ghent to Terneuzen (<strong>the</strong> tunnel<br />

is 1,339 metres long with an outer diameter <strong>of</strong><br />

approximately eleven metres).<br />

The company is also work<strong>in</strong>g on <strong>the</strong> largest<br />

<strong>in</strong>frastructure project currently <strong>in</strong> progress <strong>in</strong> Europe:<br />

<strong>the</strong> BFK consortium (<strong>BAM</strong>-Ferrovial-Kier) <strong>in</strong> collaboration<br />

with Wayss & Freytag Ingenieurbau was awarded <strong>the</strong><br />

London Crossrail contracts to build access shafts to Bond<br />

Street and Tottenham Court Road stations and to build<br />

<strong>the</strong> l<strong>in</strong>k between Farr<strong>in</strong>gdon Station and <strong>the</strong> Crossrail<br />

tunnel. The customer, Crossrail, is a jo<strong>in</strong>t venture formed<br />

by Transport <strong>of</strong> London and <strong>the</strong> British M<strong>in</strong>istry <strong>of</strong><br />

Transport. Crossrail awarded both contracts (which are<br />

worth a comb<strong>in</strong>ed total <strong>of</strong> approximately €555 million)<br />

to <strong>the</strong> consortium.


Silberberg Railway Tunnel (7.4 kilometres).<br />

Wayss & Freytag Ingenieurbau (<strong>in</strong> jo<strong>in</strong>t venture).<br />

On <strong>the</strong> site where <strong>the</strong> six kilometre long Liefkenshoek<br />

Railway Tunnel is be<strong>in</strong>g built <strong>in</strong> Antwerp, <strong>the</strong> sou<strong>the</strong>rn<br />

tunnel bor<strong>in</strong>g mach<strong>in</strong>e broke through to <strong>the</strong> end shaft six<br />

weeks ahead <strong>of</strong> schedule thanks to an excellent pressure<br />

system. Wayss & Freytag Ingenieurbau is provid<strong>in</strong>g <strong>the</strong><br />

specific bor<strong>in</strong>g expertise. The construction <strong>of</strong> <strong>the</strong><br />

Liefkenshoek rail l<strong>in</strong>k is a public-private partnership<br />

project which is currently <strong>the</strong> largest <strong>in</strong>frastructure<br />

project <strong>in</strong> Belgium. <strong>BAM</strong> PPP is a 50 percent partner <strong>in</strong><br />

<strong>the</strong> SPC Locorail consortium which is carry<strong>in</strong>g out <strong>the</strong><br />

project.<br />

Wayss & Freytag won <strong>the</strong> contract to build <strong>the</strong> Schleitz-<br />

Triptis section <strong>of</strong> <strong>the</strong> A9 motorway as a partner <strong>in</strong> a jo<strong>in</strong>t<br />

venture with Eurovia. This PPP project has a twenty-year<br />

contract term (start<strong>in</strong>g <strong>in</strong> October <strong>2011</strong>). The new<br />

section <strong>of</strong> <strong>the</strong> motorway will be 47 kilometres long,<br />

approximately 19 kilometres <strong>of</strong> which will be widened to<br />

six lanes and relaid. The contract also <strong>in</strong>cludes build<strong>in</strong>g<br />

24 new civil eng<strong>in</strong>eer<strong>in</strong>g structures, a junction and a<br />

motorway service area as well as <strong>the</strong> demolition <strong>of</strong> six<br />

exist<strong>in</strong>g civil eng<strong>in</strong>eer<strong>in</strong>g structures. The construction<br />

work is worth a comb<strong>in</strong>ed total <strong>of</strong> €130 million and is<br />

expected to be complete at <strong>the</strong> end <strong>of</strong> 2014.<br />

A follow-up contract was won for <strong>the</strong> third time for work<br />

on <strong>the</strong> giant Koralm l<strong>in</strong>e project <strong>in</strong> Austria. This time, <strong>the</strong><br />

customer – ÖBB Infrastruktur (Vienna) – awarded <strong>the</strong><br />

contract to build <strong>the</strong> ventilation system <strong>in</strong> Paierdorf. As<br />

part <strong>of</strong> <strong>the</strong> Transeuropean rail network, <strong>the</strong> Koralm l<strong>in</strong>e<br />

will l<strong>in</strong>k <strong>the</strong> Baltic States to <strong>the</strong> Adriatic Sea.<br />

In its capacity as technical lead represent<strong>in</strong>g a<br />

consortium, Wayss & Freytag Ingenieurbau was awarded<br />

a contract by <strong>the</strong> Düsseldorf municipal authority to build<br />

<strong>the</strong> Kö-Bogen Tunnel under <strong>the</strong> H<strong>of</strong>garten <strong>in</strong> Düsseldorf.<br />

New tunnels will be built for <strong>the</strong> new Wehrhahnl<strong>in</strong>ie<br />

underground l<strong>in</strong>e under Königsallee and <strong>the</strong> H<strong>of</strong>garten.<br />

Liefkenshoek rail tunnel l<strong>in</strong>k, Antwerp.<br />

<strong>BAM</strong> PPP, CEI-De Meyer, Wayss & Freytag<br />

Ingenieurbau, <strong>BAM</strong> Techniek (<strong>in</strong> jo<strong>in</strong>t venture).<br />

A large public party was held to mark <strong>the</strong> open<strong>in</strong>g <strong>of</strong><br />

Moosach Station <strong>in</strong> Munich, which is <strong>the</strong> city’s onehundredth<br />

underground station. Wayss & Freytag was<br />

contracted by <strong>the</strong> Munich municipal authority to build<br />

<strong>the</strong> two s<strong>in</strong>gle-track underground tunnel sections on<br />

L<strong>in</strong>e 3 North as well as <strong>the</strong> Moosach and Leipziger Straße<br />

underground stations. This extension work means that<br />

Munich’s underground system has now grown to more<br />

than 102 kilometres <strong>in</strong> length.<br />

89<br />

<strong>2011</strong>


90<br />

<strong>2011</strong><br />

Design and build fish<strong>in</strong>g harbour, Dikkowita, Sri Lanka.<br />

<strong>BAM</strong> International, <strong>BAM</strong> Infraconsult.<br />

In Thur<strong>in</strong>gia, Wayss & Freytag Ingenieurbau is part <strong>of</strong> <strong>the</strong><br />

consortium carry<strong>in</strong>g out <strong>the</strong> ‘Silberberg Tunnel’ and<br />

‘Nor<strong>the</strong>rn Thür<strong>in</strong>gen Forest’ projects for DB Projektbau.<br />

These two projects <strong>in</strong>volve <strong>the</strong> construction <strong>of</strong> a total <strong>of</strong><br />

9.5 kilometres <strong>of</strong> railway tunnel and two viaducts as part<br />

<strong>of</strong> <strong>the</strong> 107 kilometres long new Ebensfeld-Erfurt rail l<strong>in</strong>k.<br />

Delivery <strong>of</strong> <strong>the</strong> construction work is planned for <strong>the</strong><br />

spr<strong>in</strong>g <strong>of</strong> 2012.<br />

In Wilhelmshaven <strong>the</strong> two tunnel bor<strong>in</strong>g mach<strong>in</strong>es broke<br />

through to <strong>the</strong> end shaft after only four-and-a-half<br />

months. Dur<strong>in</strong>g <strong>the</strong> tunnel-bor<strong>in</strong>g process <strong>the</strong> company<br />

will also be <strong>in</strong>stall<strong>in</strong>g four cool<strong>in</strong>g water pipes for a new<br />

coal-fired power station <strong>in</strong> Wilhelmshaven. The customer<br />

is GDF SUEZ Energie Deutschland.<br />

Before <strong>the</strong> second sub-project was complete, <strong>the</strong><br />

topp<strong>in</strong>g-out ceremony for <strong>the</strong> Kathar<strong>in</strong>a Hospital was<br />

held <strong>in</strong> Stuttgart at <strong>the</strong> customer’s request. This project<br />

is currently <strong>the</strong> largest hospital construction project <strong>in</strong><br />

Baden-Württemberg. As <strong>the</strong> consortium’s technical<br />

manager, Wayss & Freytag Ingenieurbau is responsible<br />

for <strong>the</strong> construction <strong>of</strong> <strong>the</strong> new ultramodern Olga<br />

Hospital and <strong>the</strong> women’s cl<strong>in</strong>ic. In Büttel/Schleswig-<br />

Holste<strong>in</strong>, <strong>the</strong> foundation stone was laid to mark <strong>the</strong> start<br />

<strong>of</strong> <strong>the</strong> project to build <strong>the</strong> HelW<strong>in</strong> 1 converter station<br />

which will be needed <strong>in</strong> connection with <strong>the</strong> Meerw<strong>in</strong>d<br />

and Nordsee Ost <strong>of</strong>fshore w<strong>in</strong>d farms <strong>in</strong> <strong>the</strong> North Sea.<br />

The customer is Siemens, Sector Energy.<br />

> <strong>BAM</strong> International is active <strong>in</strong> <strong>the</strong> Gulf States, Jordan,<br />

Australia, Papua New Gu<strong>in</strong>ea, Indonesia, Sri Lanka,<br />

Malaysia, Tanzania, Sierra Leone, Liberia and Libya.<br />

Currently <strong>the</strong> company has several projects <strong>in</strong> progress<br />

<strong>world</strong>wide <strong>in</strong> <strong>the</strong> non-residential, construction and civil<br />

eng<strong>in</strong>eer<strong>in</strong>g sectors.<br />

In <strong>the</strong> Middle East, <strong>BAM</strong> International started phase 4 <strong>of</strong><br />

<strong>the</strong> Oman Botanic Garden, some forty kilometres from<br />

<strong>the</strong> capital Muscat. The project <strong>in</strong>cludes <strong>the</strong> construction<br />

<strong>of</strong> two climate-controlled biomes with a total area <strong>of</strong><br />

17,000 m2 , as well as entry gates, garages, workshops,<br />

tra<strong>in</strong> stations, a mosque, an educational centre, facility<br />

build<strong>in</strong>gs, extensive habitats and sundry build<strong>in</strong>gs. In<br />

<strong>2011</strong> a contract was awarded for <strong>the</strong> extension <strong>of</strong> a wharf<br />

for a conta<strong>in</strong>er term<strong>in</strong>al <strong>in</strong> Aqaba, Jordan. At year-end<br />

<strong>2011</strong>, <strong>the</strong> contract for <strong>the</strong> construction <strong>of</strong> two pipel<strong>in</strong>es<br />

<strong>in</strong> Doha, Qatar, was completed and a new contract was<br />

secured for <strong>the</strong> construction <strong>of</strong> a new port <strong>in</strong> Aqaba,<br />

Jordan.<br />

In Tanzania, <strong>BAM</strong> International completed <strong>the</strong> 150<br />

kilometre Iyovia-Ir<strong>in</strong>ga Tanzania-Gambia Highway road<br />

improvement scheme (phases 1, 2, 3 and 5). Dur<strong>in</strong>g <strong>2011</strong><br />

<strong>BAM</strong> was also awarded <strong>the</strong> variation order <strong>of</strong> phase 4 <strong>of</strong><br />

this highway, which is <strong>the</strong> 68-kilometre stretch between<br />

Ir<strong>in</strong>ga and Mafenga, planned to be completed <strong>in</strong> 2013.<br />

The 95-kilometre road improvement scheme for <strong>the</strong><br />

Laela Sumbawanga road section <strong>in</strong> south-west Tanzania<br />

is mov<strong>in</strong>g forward accord<strong>in</strong>g to schedule and will be<br />

completed at <strong>the</strong> beg<strong>in</strong>n<strong>in</strong>g <strong>of</strong> 2013. <strong>BAM</strong> International is<br />

execut<strong>in</strong>g both road construction projects <strong>in</strong> a jo<strong>in</strong>t<br />

venture with <strong>the</strong> Danish construction company Per<br />

Aarsleff.<br />

In Sierra Leone <strong>BAM</strong> completed <strong>the</strong> renovation <strong>of</strong> an iron<br />

ore jetty, as well as <strong>the</strong> construction <strong>of</strong> navigation aid<br />

structures and two moor<strong>in</strong>g dolph<strong>in</strong>s <strong>in</strong> Pepel, close to<br />

<strong>the</strong> capital Freetown.


Laela-Sumbawanga road improvement<br />

project (south-west Tanzania).<br />

<strong>BAM</strong> International (<strong>in</strong> jo<strong>in</strong>t venture).<br />

In <strong>2011</strong> <strong>BAM</strong> was awarded <strong>the</strong> contract for <strong>the</strong> design and<br />

construction <strong>of</strong> a 600-metre quay wall for a conta<strong>in</strong>er<br />

term<strong>in</strong>al <strong>in</strong> Monrovia, <strong>the</strong> capital city <strong>of</strong> Liberia. <strong>BAM</strong><br />

Infraconsult is responsible for <strong>the</strong> design.<br />

In February all employees were safely evacuated from<br />

Libya. As <strong>the</strong> hostilities <strong>in</strong> <strong>the</strong> country ended by <strong>the</strong> end<br />

<strong>of</strong> <strong>the</strong> year, <strong>the</strong>re is optimism about a return by <strong>BAM</strong><br />

International to resume operations <strong>in</strong> Libya.<br />

In <strong>the</strong> Australia region, <strong>BAM</strong> International – toge<strong>the</strong>r<br />

with its Australian partner Clough – is execut<strong>in</strong>g <strong>the</strong><br />

design and build contract for an LNG jetty <strong>in</strong> Papua New<br />

Gu<strong>in</strong>ea, <strong>in</strong>clud<strong>in</strong>g <strong>the</strong> <strong>in</strong>stallation <strong>of</strong> all <strong>the</strong> pipes and<br />

electro-mechanical systems. Completion is scheduled<br />

for year-end 2012. <strong>BAM</strong> Decorient Indonesia produced<br />

<strong>the</strong> concrete elements for this project. The Indonesian<br />

subsidiary also made 40,000 Xbloc concrete armour<br />

units for use by third parties at <strong>the</strong> construction <strong>of</strong> a jetty<br />

for <strong>the</strong> Gorgon LNG project on Barrow Island <strong>in</strong> Australia.<br />

In <strong>the</strong> Asia Pacific area <strong>BAM</strong> Decorient Indonesia<br />

completed a 36-storey <strong>of</strong>fice tower for Tempo Realty <strong>in</strong><br />

Jakarta, as well as a design and build contract for an LNG<br />

jetty <strong>in</strong> Tanjung Priok.<br />

37 navigation beacons and two moor<strong>in</strong>g facilities<br />

on Sierra Leone River near Pepel.<br />

<strong>BAM</strong> International.<br />

In Sri Lanka, <strong>the</strong> new fishery harbour <strong>in</strong> Dikkowita, ten<br />

kilometres north <strong>of</strong> Colombo, was handed over to <strong>the</strong><br />

client.<br />

In <strong>2011</strong> <strong>BAM</strong> received a major contract for <strong>the</strong> design and<br />

construction <strong>of</strong> a jetty for Vale, <strong>the</strong> <strong>world</strong>’s largest iron<br />

ore exporter. <strong>BAM</strong> Malaysia is execut<strong>in</strong>g <strong>the</strong> project <strong>in</strong><br />

partnership with <strong>the</strong> Australian construction company<br />

McConnell Dowell and <strong>the</strong> Malaysian contractor See<br />

Yong & Son. The jo<strong>in</strong>t venture will complete <strong>the</strong> project<br />

<strong>in</strong> 2013.<br />

<strong>BAM</strong> Decorient Indonesia has been awarded a contract<br />

for <strong>the</strong> onshore civil works <strong>of</strong> a cement plant for Holcim<br />

<strong>in</strong> Tuban, East Java, Indonesia. Completion is scheduled<br />

for 2013.<br />

91<br />

<strong>2011</strong>


Property<br />

Key figures for <strong>the</strong> property sector<br />

(x €million) <strong>2011</strong> 2010<br />

Revenue 674 593<br />

Result before tax (23.4) (59.7)<br />

Marg<strong>in</strong> before tax - -<br />

Order book (year-end) 1,103 1,394<br />

Het Meesterwerk (70 houses and 59 apartments),<br />

Amersfoort, <strong>the</strong> Ne<strong>the</strong>rlands. AM (<strong>in</strong> jo<strong>in</strong>t venture).<br />

Insert: Development and construction <strong>of</strong> 100 apartments<br />

<strong>in</strong> <strong>the</strong> Karspelh<strong>of</strong> project, Amsterdam-Zuidoost.<br />

<strong>BAM</strong> Won<strong>in</strong>gbouw.


The Dutch property activities recorded a break-even operat<strong>in</strong>g result <strong>in</strong> <strong>2011</strong>. The market for newly built homes<br />

cont<strong>in</strong>ued to deteriorate <strong>in</strong> <strong>2011</strong> and fur<strong>the</strong>r worsen<strong>in</strong>g is expected <strong>in</strong> 2012. The area and property developer<br />

AM has adjusted its organisation to <strong>the</strong>se negative market conditions.<br />

The focus on reduc<strong>in</strong>g <strong>the</strong> <strong>in</strong>vested capital <strong>in</strong> <strong>the</strong><br />

com<strong>in</strong>g years led to provisions <strong>of</strong> €20 million for a few<br />

property positions that are eligible for accelerated sale<br />

or where development might be delayed.<br />

2,230 homes were sold from own development projects<br />

<strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands <strong>in</strong> <strong>2011</strong> (2010: 2,174 homes). Dur<strong>in</strong>g<br />

<strong>the</strong> second half <strong>of</strong> <strong>2011</strong>, <strong>the</strong> sales to <strong>in</strong>dividual buyers<br />

fell sharply. The Group’s completed but unsold or unlet<br />

stock <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands <strong>in</strong>creased to 170 homes and<br />

approximately 10,760 m2 <strong>of</strong> commercial property as at<br />

31 December <strong>2011</strong> (year-end 2010: 111 homes and<br />

approximately 2,300 m2 <strong>of</strong> commercial property). The<br />

<strong>in</strong>crease <strong>in</strong> unlet commercial property relates to retail<br />

shops. The number <strong>of</strong> unsold homes still under<br />

construction fell to 308 as at 31 December <strong>2011</strong><br />

(year-end 2010: 642). Thus <strong>the</strong> total number <strong>of</strong> unsold<br />

homes under construction or completed as at 31<br />

December <strong>2011</strong> fell by a third compared to <strong>the</strong> total<br />

number at year-end 2010 (478 compared to 753).<br />

In <strong>the</strong> United K<strong>in</strong>gdom, <strong>BAM</strong> Properties recorded a<br />

small negative result <strong>in</strong> <strong>2011</strong> because <strong>of</strong> <strong>in</strong>sufficient<br />

coverage <strong>of</strong> overheads. The sale <strong>of</strong> a commercial<br />

property <strong>in</strong> Glasgow caused <strong>the</strong> <strong>in</strong>vested capital <strong>in</strong> <strong>the</strong><br />

United K<strong>in</strong>gdom to decrease. Conditions <strong>in</strong> <strong>the</strong> British<br />

property market rema<strong>in</strong>ed difficult. As at 31 December<br />

<strong>2011</strong>, <strong>the</strong> Group’s supply <strong>of</strong> unsold and unlet<br />

commercial property <strong>in</strong> <strong>the</strong> United K<strong>in</strong>gdom was<br />

around 18,900 m2 (at year-end 2010: 22,700 m2 ).<br />

In Ireland, <strong>the</strong> property market <strong>of</strong>fers no opportunities<br />

for sales at present. This led to a small negative result,<br />

ow<strong>in</strong>g to <strong>in</strong>sufficient coverage <strong>of</strong> overheads and<br />

<strong>in</strong>terest charges.<br />

The Belgian property company Kaïros posted a good<br />

result, ow<strong>in</strong>g to <strong>the</strong> successful development or<br />

redevelopment <strong>of</strong> a number <strong>of</strong> residential projects <strong>in</strong><br />

urban centres such as Brussels and <strong>the</strong> sale <strong>of</strong><br />

commercial property projects for <strong>the</strong> Belgian<br />

Government. The order book <strong>of</strong>fers favourable<br />

prospects for <strong>the</strong> com<strong>in</strong>g years.<br />

Total <strong>in</strong>vestment <strong>in</strong> <strong>the</strong> stock <strong>of</strong> property decreased to<br />

€1,492 million as at 31 December <strong>2011</strong> (year end 2010:<br />

€1,540 million), primarily due to dis<strong>in</strong>vestments <strong>in</strong> <strong>the</strong><br />

fourth quarter. €1,167 million <strong>of</strong> this total was <strong>in</strong>vested<br />

<strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands, €169 million <strong>in</strong> <strong>the</strong> United K<strong>in</strong>gdom,<br />

€45 million <strong>in</strong> Ireland and €111 million <strong>in</strong> Belgium. The<br />

<strong>in</strong>vestments <strong>in</strong> stock are funded <strong>in</strong> part by recourse and<br />

non-recourse project-related property loans. As at<br />

31 December <strong>2011</strong>, <strong>the</strong> recourse property loans stood<br />

at €223 million (year-end 2010: €307 million) and <strong>the</strong><br />

non recourse property loans at €372 million (year-end<br />

2010: €402 million).<br />

93<br />

<strong>2011</strong>


94<br />

<strong>2011</strong><br />

Capgem<strong>in</strong>i Ne<strong>the</strong>rlands head <strong>of</strong>fice,<br />

Utrecht.<br />

AM Real Estate Development,<br />

<strong>BAM</strong> Utiliteitsbouw, <strong>BAM</strong> Techniek.<br />

> AM was aga<strong>in</strong> faced with difficult market<br />

circumstances <strong>in</strong> <strong>2011</strong>. The Dutch property market was<br />

<strong>in</strong> <strong>the</strong> grip <strong>of</strong> <strong>the</strong> bad economic situation, <strong>the</strong> grow<strong>in</strong>g<br />

uncerta<strong>in</strong>ty surround<strong>in</strong>g <strong>the</strong> Euro crisis, dim<strong>in</strong>ish<strong>in</strong>g<br />

consumer confidence and <strong>the</strong> <strong>in</strong>creas<strong>in</strong>g difficulties<br />

experienced by private <strong>in</strong>dividuals attempt<strong>in</strong>g to take<br />

out a mortgage.<br />

AM’s policy <strong>in</strong> this stagnat<strong>in</strong>g market was focussed on<br />

dynamic development and sales <strong>of</strong> its property<br />

products, creat<strong>in</strong>g unique new product/market<br />

comb<strong>in</strong>ations and reduc<strong>in</strong>g <strong>the</strong> amount <strong>of</strong> capital<br />

<strong>in</strong>vested <strong>in</strong> projects. AM successfully implemented this<br />

policy by simplify<strong>in</strong>g partnerships and rel<strong>in</strong>quish<strong>in</strong>g<br />

land development, usually while still reta<strong>in</strong><strong>in</strong>g <strong>the</strong> rights<br />

to develop and build property. AM was also able to<br />

substantially reduce <strong>the</strong> stock <strong>of</strong> unsold homes <strong>in</strong> ei<strong>the</strong>r<br />

projects <strong>in</strong> progress or <strong>in</strong> completed projects. The focus<br />

with<strong>in</strong> <strong>the</strong> organisation was still on cost sav<strong>in</strong>gs and<br />

synergy.<br />

AM concentrated its efforts on <strong>the</strong> <strong>in</strong>ventive<br />

development <strong>of</strong> projects that meet <strong>the</strong> current market<br />

demand, which <strong>in</strong>cludes affordable homes for first-time<br />

buyers and people mov<strong>in</strong>g up <strong>the</strong> hous<strong>in</strong>g ladder, based<br />

on a rational design with relatively low liv<strong>in</strong>g costs<br />

thanks to practical susta<strong>in</strong>ability provisions. By cutt<strong>in</strong>g<br />

<strong>the</strong>se projects <strong>in</strong>to small phases and cont<strong>in</strong>ually<br />

monitor<strong>in</strong>g specific consumer wishes and adjust<strong>in</strong>g <strong>the</strong><br />

product accord<strong>in</strong>gly per sub-project, AM was able to<br />

successfully develop and sell projects. AM and <strong>BAM</strong><br />

Won<strong>in</strong>gbouw <strong>in</strong>tensified <strong>the</strong>ir collaboration <strong>in</strong> order to<br />

develop homes tailored to modern wishes with a<br />

shorter preparation time and at lower costs.<br />

Although output was relatively low on <strong>the</strong> residential<br />

market as a whole, AM managed to record sales<br />

successes at various locations. For example, <strong>the</strong> sale <strong>of</strong><br />

<strong>the</strong> homes followed by <strong>the</strong> start <strong>of</strong> construction work<br />

went well <strong>in</strong> projects such as Fourty5High <strong>in</strong><br />

Amersfoort, De Oosterkolk <strong>in</strong> Alkmaar, Thorbeckepark<br />

Artist’s impression <strong>of</strong> De Studio: student<br />

accommodation and starter homes <strong>in</strong> <strong>the</strong> former<br />

GAK <strong>of</strong>fice block <strong>in</strong> Amsterdam.<br />

AM.<br />

<strong>in</strong> Utrecht, Korpershoek <strong>in</strong> Schipluiden and Tu<strong>in</strong>veld <strong>in</strong><br />

’s-Gravenzande.<br />

In Amsterdam, AM is respond<strong>in</strong>g to <strong>the</strong> huge shortage<br />

<strong>of</strong> high-quality, affordable student accommodation by<br />

<strong>of</strong>fer<strong>in</strong>g large numbers <strong>of</strong> student homes to buy or rent<br />

<strong>in</strong> <strong>the</strong> De Studio and Villa-Mokum projects. The 320<br />

student and first-time buyer’s apartments went on sale<br />

<strong>in</strong> <strong>the</strong> De Studio apartment complex (<strong>the</strong><br />

redevelopment <strong>of</strong> <strong>the</strong> former GAK build<strong>in</strong>g <strong>in</strong> Bos en<br />

Lommer on <strong>the</strong> western r<strong>in</strong>g road). Shortly afterwards,<br />

a total <strong>of</strong> 348 student homes went on sale <strong>in</strong> <strong>the</strong> Amstel<br />

district on <strong>the</strong> wide bend <strong>in</strong> <strong>the</strong> River Amstel between<br />

<strong>the</strong> Amsterdam-Zuid and Watergraafsmeer areas <strong>of</strong> <strong>the</strong><br />

city. In total, <strong>the</strong> plan comprises 627 homes. In<br />

Amsterdam-Zuid, <strong>the</strong> OPZUID terrace apartments –<br />

vary<strong>in</strong>g from bedsits and two-storey townhouses to<br />

penthouses – were also put up for sale.<br />

In addition to develop<strong>in</strong>g homes for private buyers, AM<br />

is now work<strong>in</strong>g <strong>in</strong>creas<strong>in</strong>gly for <strong>in</strong>vestors and hous<strong>in</strong>g<br />

corporations. For example, AM sold large numbers <strong>of</strong><br />

properties <strong>in</strong> DeoNeo <strong>in</strong> Haarlem (apartments and<br />

commercial space for Bouw<strong>in</strong>vest), De Lo<strong>of</strong>meesters <strong>in</strong><br />

Maassluis (s<strong>in</strong>gle-family houses for Sticht<strong>in</strong>g<br />

Pensioenfonds Openbaar Vervoer), De Banne <strong>in</strong><br />

Amsterdam (care homes for Cordaan, apartments for<br />

Syntrus Achmea and rented apartments for <strong>the</strong><br />

Rochdale hous<strong>in</strong>g foundation), Laauwik <strong>in</strong> Lent (bow<br />

houses for Bouw<strong>in</strong>vest), Ciboga <strong>in</strong> Gron<strong>in</strong>gen<br />

(townhouses for <strong>the</strong> Nijestee hous<strong>in</strong>g corporation), <strong>the</strong><br />

Amstel district <strong>in</strong> Amsterdam (apartments for Syntrus<br />

Achmea), De Hoven <strong>in</strong> ’s-Hertogenbosch (care homes<br />

for <strong>the</strong> Zayaz hous<strong>in</strong>g foundation) and Vathorst <strong>in</strong><br />

Amersfoort (s<strong>in</strong>gle-family homes for Bouw<strong>in</strong>vest). <strong>2011</strong><br />

also saw <strong>the</strong> start <strong>of</strong> work on <strong>the</strong> eye-catch<strong>in</strong>g<br />

‘100hoog’ complex, compris<strong>in</strong>g 152 apartments, <strong>in</strong> <strong>the</strong><br />

Wijnhaven district <strong>in</strong> Rotterdam. At ground level, <strong>the</strong>re<br />

is space for commercial facilities which will be owned by<br />

Hoogvliet Beheer. Syntrus Achmea will be buy<strong>in</strong>g some<br />

<strong>of</strong> <strong>the</strong> apartments.


Redevelopment <strong>of</strong> a former domestic science school and a former<br />

police station (10 apartments, 2 town houses and a doctor’s surgery),<br />

The Hague.<br />

AM, <strong>BAM</strong> Habo.<br />

AM is a participant <strong>in</strong> a number <strong>of</strong> large-scale and<br />

long-term plans for multi-purpose area development,<br />

ma<strong>in</strong>ly <strong>in</strong> city-centre areas. Examples <strong>in</strong>clude <strong>the</strong><br />

redevelopment <strong>of</strong> Stadswerven <strong>in</strong> Dordrecht, <strong>the</strong><br />

Schelde district <strong>in</strong> Vliss<strong>in</strong>gen, Groot ZiekenGasthuis and<br />

CarolusZiekenhuis hospitals <strong>in</strong> ‘s-Hertogenbosch, <strong>the</strong><br />

plan for <strong>the</strong> town centre <strong>in</strong> Best, Enka <strong>in</strong> Ede,<br />

Brouwerspoort <strong>in</strong> Veenendaal, Lange Wemen <strong>in</strong><br />

Hengelo, Drie Hoefijzers <strong>in</strong> Breda, Nieuw Zaailand <strong>in</strong><br />

Leeuwarden and Kraanbolwerk <strong>in</strong> Zwolle.<br />

The partnership formed by Rotterdam municipal<br />

authority and a development consortium (<strong>in</strong>clud<strong>in</strong>g<br />

AM) on <strong>the</strong> Newport Nesselande project – apartments,<br />

shops and leisure facilities at Lake Zevenhuizerplas –<br />

was given <strong>the</strong> NEPROM Award for Location<br />

Development for <strong>2011</strong>. The project development sector<br />

association NEPROM presents this award every two<br />

years to encourage and reward partnerships between<br />

public and private sector parties <strong>in</strong> spatial development.<br />

When devis<strong>in</strong>g and develop<strong>in</strong>g susta<strong>in</strong>able and <strong>in</strong>spir<strong>in</strong>g<br />

liv<strong>in</strong>g environments, AM actively considers all <strong>the</strong><br />

<strong>in</strong>terests and all <strong>the</strong> stakeholders <strong>in</strong> an open plann<strong>in</strong>g<br />

process to ensure that optimum use is made <strong>of</strong> locations<br />

– both <strong>in</strong> <strong>the</strong> urban and <strong>in</strong> <strong>the</strong> rural environment.<br />

Susta<strong>in</strong>ability is always an <strong>in</strong>tegral component <strong>of</strong> any<br />

project. AM works closely with o<strong>the</strong>r <strong>BAM</strong> operat<strong>in</strong>g<br />

companies, <strong>in</strong>clud<strong>in</strong>g <strong>BAM</strong> Utiliteitsbouw, <strong>BAM</strong><br />

Won<strong>in</strong>gbouw, <strong>BAM</strong> Civiel, <strong>BAM</strong> Wegen, <strong>BAM</strong> Techniek<br />

and <strong>BAM</strong> PPP.<br />

> AM Real Estate Development focuses on <strong>the</strong><br />

development <strong>of</strong> commercial real estate. In order to<br />

cluster <strong>the</strong> activities <strong>in</strong> this market, IPMMC Vastgoed<br />

and AM Real Estate Development merged with effect<br />

from 1 September <strong>2011</strong> under <strong>the</strong> name AM Real Estate<br />

Development. Open s<strong>in</strong>ce April <strong>2011</strong>, <strong>the</strong> company’s<br />

new <strong>of</strong>fice won <strong>the</strong> Concrete Award <strong>2011</strong>.<br />

Transformation <strong>of</strong> <strong>the</strong> former Enka factory site <strong>in</strong>to a<br />

liv<strong>in</strong>g and work<strong>in</strong>g environment, Ede, <strong>the</strong> Ne<strong>the</strong>rlands.<br />

AM, <strong>BAM</strong> Won<strong>in</strong>gbouw (<strong>in</strong> jo<strong>in</strong>t venture).<br />

Pr<strong>in</strong>cess Margriet <strong>of</strong> <strong>the</strong> Ne<strong>the</strong>rlands opened<br />

Rabobank’s new f<strong>in</strong>ancial advice centre, an AM Real<br />

Estate Development project <strong>in</strong> Van Gelderpark <strong>in</strong><br />

Apeldoorn.<br />

The centre was developed us<strong>in</strong>g <strong>the</strong> pr<strong>in</strong>ciples <strong>of</strong> ‘highly<br />

susta<strong>in</strong>able non-residential construction’ adopted by<br />

<strong>the</strong> Agentschap NL.<br />

In Enschede, Rabobank Enschede-Haaksbergen, AM<br />

Real Estate Development and Rabo Eigen Steen<br />

<strong>of</strong>ficially gave <strong>the</strong> green light for <strong>the</strong> construction <strong>of</strong> <strong>the</strong><br />

new Rabobank build<strong>in</strong>g on Zuiderval. The build<strong>in</strong>g<br />

comprises approximately 6,000 m² <strong>of</strong> <strong>of</strong>fice space and<br />

<strong>of</strong>fers a high level <strong>of</strong> susta<strong>in</strong>ability. Elsewhere <strong>in</strong><br />

Enschede, thanks to <strong>the</strong> Kotmanpark plan, <strong>the</strong> hous<strong>in</strong>g<br />

corporation De Woonplaats and AM took a fur<strong>the</strong>r step<br />

towards <strong>the</strong> objective <strong>of</strong> develop<strong>in</strong>g energy-neutral<br />

build<strong>in</strong>gs with<strong>in</strong> <strong>the</strong> next few years.<br />

AM Real Estate Development and project partner Multi<br />

Vastgoed started <strong>the</strong> construction <strong>of</strong> <strong>the</strong> prestigious<br />

Nieuwe Haagse Passage shopp<strong>in</strong>g centre <strong>in</strong> <strong>the</strong> centre<br />

<strong>of</strong> The Hague. The Green Build<strong>in</strong>g Council awarded <strong>the</strong><br />

‘BREEAM Good’ susta<strong>in</strong>ability certificate to this project.<br />

AM Real Estate Development and various partners also<br />

presented <strong>the</strong> Susta<strong>in</strong>able Shopp<strong>in</strong>g Centres Toolkit.<br />

The toolkit is a practical <strong>in</strong>strument for municipal<br />

authorities, developers, <strong>in</strong>vestors, retailers and<br />

construction companies to develop, build and operate<br />

shopp<strong>in</strong>g centres <strong>in</strong> a susta<strong>in</strong>able manner. The parties<br />

<strong>in</strong>volved <strong>in</strong> develop<strong>in</strong>g <strong>the</strong> toolkit expect it to<br />

systematically help to improve <strong>the</strong> susta<strong>in</strong>ability <strong>of</strong><br />

exist<strong>in</strong>g and new shopp<strong>in</strong>g centres <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands.<br />

Part <strong>of</strong> AM Real Estate Development s<strong>in</strong>ce 1 September<br />

<strong>2011</strong>, IPMMC Consult is a full-service provider <strong>of</strong>fer<strong>in</strong>g<br />

consultancy, project management, accommodation<br />

advice and real estate conceptualisation.<br />

95<br />

<strong>2011</strong>


96<br />

<strong>2011</strong><br />

IPMMC Consult is <strong>in</strong>volved <strong>in</strong> various large<br />

accommodation programmes, such as <strong>the</strong> total<br />

rebrand<strong>in</strong>g <strong>of</strong> <strong>the</strong> layout <strong>of</strong> more than 280 ING bank<br />

shops throughout <strong>the</strong> Ne<strong>the</strong>rlands. IPMMC Consult has<br />

also successfully managed <strong>the</strong> construction <strong>of</strong> <strong>the</strong> De<br />

Brauw Blackstone Westbroek law <strong>of</strong>fice and <strong>the</strong><br />

renovations <strong>of</strong> <strong>the</strong> Allen en Overy and DLA Piper <strong>of</strong>fices<br />

<strong>in</strong> Amsterdam.<br />

> Kaïros, <strong>the</strong> high-end <strong>of</strong>fice developer, has been part<br />

<strong>of</strong> <strong>the</strong> Group s<strong>in</strong>ce 2007. The company is one <strong>of</strong> <strong>the</strong><br />

largest and most successful players on <strong>the</strong> Belgian<br />

property market. Despite <strong>the</strong> difficult economic<br />

climate, Kaïros has been able to fur<strong>the</strong>r streng<strong>the</strong>n its<br />

earn<strong>in</strong>g capacity by proactively diversify<strong>in</strong>g <strong>in</strong>to various<br />

segments <strong>of</strong> <strong>the</strong> development sector.<br />

In <strong>the</strong> <strong>of</strong>fice market, Kaïros completed <strong>the</strong> Flemish<br />

Adm<strong>in</strong>istrative Centre <strong>in</strong> Leuven (24,000 m²) and was<br />

awarded <strong>the</strong> contract to build an <strong>of</strong>fice block <strong>in</strong> Ghent<br />

(40,000 m²) which is also for <strong>the</strong> Flemish Government.<br />

Work also started on build<strong>in</strong>g a new <strong>of</strong>fice (5,700 m²) <strong>in</strong><br />

Brussels for <strong>the</strong> German State <strong>of</strong> Hessen.<br />

Kaïros is focuss<strong>in</strong>g <strong>in</strong>creas<strong>in</strong>gly on development<br />

possibilities outside <strong>the</strong> <strong>of</strong>fice market. This<br />

diversification strategy is prov<strong>in</strong>g successful, as is<br />

shown by <strong>the</strong> range <strong>of</strong> projects that are <strong>in</strong> development.<br />

In <strong>the</strong> residential market, <strong>the</strong> first phase <strong>of</strong> <strong>the</strong> Geneva<br />

project (199 apartments) <strong>in</strong> Evere is almost complete.<br />

The second phase (157 apartments) will start <strong>in</strong> January<br />

2012. Various o<strong>the</strong>r projects also started or are at <strong>the</strong><br />

feasibility study stage, <strong>in</strong>clud<strong>in</strong>g Hooikaai, Werfkaai and<br />

Gerlache <strong>in</strong> Brussels.<br />

In <strong>the</strong> health care sector, <strong>the</strong> permits were obta<strong>in</strong>ed for<br />

<strong>the</strong> Gallifort and Silsburg projects (300 serviced<br />

apartments) <strong>in</strong> Deurne. These build<strong>in</strong>gs will be<br />

completed <strong>in</strong> <strong>the</strong> course <strong>of</strong> 2012. Feasibility studies are<br />

underway for numerous o<strong>the</strong>r projects.<br />

The company also won <strong>the</strong> contract to build two new<br />

national archive build<strong>in</strong>gs (9,000 m²) that are under<br />

long-term lease to <strong>the</strong> Belgian Government Build<strong>in</strong>gs<br />

Agency.<br />

> <strong>BAM</strong> Properties is a subsidiary <strong>of</strong> <strong>BAM</strong> Construct UK.<br />

In <strong>2011</strong>, it cont<strong>in</strong>ued to concentrate on achiev<strong>in</strong>g<br />

lett<strong>in</strong>gs and sales at full value <strong>of</strong> its current <strong>of</strong>fice and<br />

retail portfolio.<br />

Redevelopment <strong>of</strong> <strong>of</strong>fice and retail<br />

space <strong>in</strong> Buchanan Street, Glasgow.<br />

<strong>BAM</strong> Properties, <strong>BAM</strong> Construction.<br />

<strong>BAM</strong> Properties sold <strong>the</strong> f<strong>in</strong>al part <strong>of</strong> its retail<br />

development on Buchanan Street, Glasgow to a German<br />

<strong>in</strong>vestor client <strong>of</strong> La Salle Investment Management for<br />

£24.5 million reflect<strong>in</strong>g a yield <strong>of</strong> 5 percent <strong>in</strong> l<strong>in</strong>e with<br />

<strong>in</strong>ternational <strong>in</strong>vestor demand for prime property. The<br />

company also achieved significant lett<strong>in</strong>gs. Two<br />

<strong>in</strong>ternational tenants, S<strong>in</strong>clair Knight Merz and Insight,<br />

between <strong>the</strong>m took half <strong>the</strong> space at <strong>the</strong> Metro<br />

development <strong>in</strong> Salford Quays, Manchester. Ano<strong>the</strong>r<br />

floor <strong>of</strong> <strong>the</strong> development at St Peter’s Square Stockport<br />

was let to BSkyB and <strong>the</strong> company now occupies over<br />

60 percent <strong>of</strong> <strong>the</strong> build<strong>in</strong>g. Early on <strong>in</strong> <strong>the</strong> year, <strong>the</strong><br />

company secured alternative plann<strong>in</strong>g consent for its<br />

land at Parklands, Birm<strong>in</strong>gham, and subsequently sold it<br />

to Redrow plc.<br />

Construction work cont<strong>in</strong>ued dur<strong>in</strong>g <strong>2011</strong> on a highly<br />

susta<strong>in</strong>able <strong>of</strong>fice build<strong>in</strong>g <strong>in</strong> Chiswick, West London,<br />

and a market<strong>in</strong>g campaign is underway prior to <strong>the</strong><br />

completion <strong>of</strong> <strong>the</strong> build<strong>in</strong>g <strong>in</strong> early 2012.<br />

<strong>BAM</strong> Properties engaged <strong>in</strong> a successful public<br />

consultation about <strong>the</strong> plans for its proposed<br />

development follow<strong>in</strong>g <strong>the</strong> purchase <strong>of</strong> a prime site at<br />

110 Queen Street, Glasgow. A formal plann<strong>in</strong>g<br />

application is currently be<strong>in</strong>g considered by Glasgow<br />

City Council.<br />

The company is also pursu<strong>in</strong>g a number <strong>of</strong> jo<strong>in</strong>t venture<br />

and pre-let <strong>of</strong>fice developments for corporate land<br />

owners and occupiers.<br />

The property market <strong>in</strong> Brita<strong>in</strong> rema<strong>in</strong>s subdued,<br />

although opportunities are emerg<strong>in</strong>g for quality,<br />

susta<strong>in</strong>able developments on prime sites <strong>in</strong> prime<br />

locations. This has been <strong>the</strong> ma<strong>in</strong> focus <strong>of</strong> <strong>BAM</strong><br />

Properties’ strategy s<strong>in</strong>ce <strong>the</strong> economic downturn and<br />

it will cont<strong>in</strong>ue to pursue this strategy throughout 2012.


97<br />

<strong>2011</strong>


Public-Private<br />

Partnerships<br />

(PPP)<br />

Key figures for <strong>the</strong> PPP sector<br />

(x €million) <strong>2011</strong> 2010<br />

Revenue 508 311<br />

Result before tax 10.5 3.5<br />

Marg<strong>in</strong> before tax 2.1% 1.1%<br />

Order book (year-end) 908 1,288<br />

‘Neumatt - Cantonal Adm<strong>in</strong>istration Center Burgdorf’: design, f<strong>in</strong>ance, build<br />

and operate a new, regional prison complex for 110 <strong>in</strong>mates, <strong>in</strong>clud<strong>in</strong>g work<strong>in</strong>g<br />

space and <strong>of</strong>fice space. <strong>BAM</strong> PPP, <strong>BAM</strong> Deutschland (<strong>in</strong> jo<strong>in</strong>t venture).<br />

Insert: Widen<strong>in</strong>g <strong>of</strong> <strong>the</strong> Utrecht Lunetten to Veenendaal stretch <strong>of</strong> <strong>the</strong><br />

A12 motorway (<strong>the</strong> Ne<strong>the</strong>rlands). <strong>BAM</strong> Wegen with <strong>BAM</strong> PPP, <strong>BAM</strong> Civiel,<br />

<strong>BAM</strong> Infratechniek, <strong>BAM</strong> Infraconsult.


<strong>BAM</strong> PPP is responsible for Royal <strong>BAM</strong> Group’s <strong>in</strong>volvement <strong>in</strong> <strong>the</strong> European Public-Private Partnerships (PPP) market.<br />

<strong>BAM</strong> PPP’s result reflects <strong>the</strong> <strong>in</strong>vestment activities. Pr<strong>of</strong>it aris<strong>in</strong>g from construction and ma<strong>in</strong>tenance activities<br />

associated with PPP projects is reported under <strong>the</strong> relevant sectors.<br />

Operat<strong>in</strong>g from <strong>of</strong>fices <strong>in</strong> Bunnik, Birm<strong>in</strong>gham, Brussels,<br />

Dubl<strong>in</strong>, Frankfurt am Ma<strong>in</strong> and Glasgow, <strong>BAM</strong> PPP is<br />

active <strong>in</strong> <strong>the</strong> roads, rail, education, health care, judicial<br />

and general accommodation sectors <strong>in</strong> <strong>the</strong> <strong>BAM</strong> Group’s<br />

European home markets.<br />

The result before tax <strong>in</strong> <strong>2011</strong> was €10.5 million<br />

(2010: €3.5 million). The improvement <strong>in</strong><br />

pr<strong>of</strong>itability dur<strong>in</strong>g <strong>2011</strong> reflects <strong>the</strong> cont<strong>in</strong>u<strong>in</strong>g<br />

successes <strong>in</strong> w<strong>in</strong>n<strong>in</strong>g projects, <strong>the</strong> <strong>in</strong>itial impact<br />

<strong>of</strong> <strong>the</strong> jo<strong>in</strong>t venture with PGGM <strong>in</strong>to which <strong>the</strong><br />

first transfer <strong>of</strong> projects was completed.<br />

In <strong>2011</strong>, <strong>BAM</strong> PPP was awarded five new<br />

concessions, three <strong>of</strong> which reached f<strong>in</strong>ancial<br />

close dur<strong>in</strong>g <strong>the</strong> year. The two projects<br />

rema<strong>in</strong><strong>in</strong>g at <strong>the</strong> preferred bidder stage are<br />

expected to reach f<strong>in</strong>ancial close dur<strong>in</strong>g <strong>the</strong> first<br />

half <strong>of</strong> 2012. The new concessions <strong>in</strong>crease <strong>the</strong><br />

committed net <strong>in</strong>vestment obligation for <strong>the</strong><br />

portfolio by €54 million which – after tak<strong>in</strong>g<br />

account <strong>of</strong> <strong>the</strong> impact <strong>of</strong> transfers <strong>in</strong>to <strong>the</strong> jo<strong>in</strong>t<br />

venture with PGGM – <strong>in</strong>creases committed net<br />

<strong>in</strong>vestment to €253 million (2010: €240 million), <strong>of</strong> which<br />

€88 million (2010: €87 million) has actually been<br />

<strong>in</strong>vested. The directors’ valuation <strong>of</strong> <strong>the</strong> portfolio at<br />

31 December <strong>2011</strong> was approximately €300 million<br />

(31 December 2010: approximately €300 million)<br />

reflect<strong>in</strong>g <strong>the</strong> net impact <strong>of</strong> our successful <strong>in</strong>vestment<br />

and strategic divestment activities dur<strong>in</strong>g <strong>the</strong> year.<br />

As at 31 December <strong>2011</strong>, <strong>BAM</strong> had 36 PPP contracts <strong>in</strong><br />

its order book (<strong>in</strong>clud<strong>in</strong>g <strong>the</strong> two preferred bidder<br />

contracts), <strong>of</strong> which 29 are managed by <strong>BAM</strong> PPP; <strong>the</strong><br />

rema<strong>in</strong><strong>in</strong>g seven contracts <strong>in</strong>volve a very limited amount<br />

<strong>of</strong> shareholders’ equity and are managed by sister<br />

companies responsible for <strong>the</strong> construction and<br />

ma<strong>in</strong>tenance work under <strong>the</strong> contract.<br />

Additions to <strong>the</strong> PPP portfolio <strong>in</strong> <strong>2011</strong> <strong>in</strong>cluded:<br />

• two prison projects at Beveren and Dendermonde<br />

<strong>in</strong> Belgium;<br />

• <strong>the</strong> extension <strong>of</strong> <strong>the</strong> A9 motorway <strong>in</strong> Thur<strong>in</strong>gia<br />

<strong>in</strong> Germany;<br />

• <strong>the</strong> upgrade <strong>of</strong> <strong>the</strong> N11 and junction improvements<br />

on <strong>the</strong> N7 <strong>in</strong> Ireland (preferred bidder) and<br />

• Schools Bundle 3 <strong>in</strong> Ireland consist<strong>in</strong>g <strong>of</strong> 8 new<br />

schools on 7 sites (preferred bidder).<br />

<strong>BAM</strong> PPP’s projects are distributed across all <strong>of</strong> <strong>BAM</strong>’s<br />

European markets and are predom<strong>in</strong>antly availability<br />

based. The ratio <strong>of</strong> accommodation to civil eng<strong>in</strong>eer<strong>in</strong>g<br />

projects is also balanced, although civil eng<strong>in</strong>eer<strong>in</strong>g<br />

schemes are <strong>of</strong>ten greater <strong>in</strong> scope and <strong>the</strong>refore, when<br />

expressed as a percentage <strong>of</strong> committed equity,<br />

<strong>in</strong>frastructure projects represent 61 percent <strong>of</strong> <strong>BAM</strong>’s<br />

current portfolio.<br />

In May <strong>2011</strong> <strong>BAM</strong> PPP signed a jo<strong>in</strong>t venture agreement<br />

with Dutch pension fund manager PGGM. The<br />

committed <strong>in</strong>vestment <strong>in</strong> <strong>the</strong> jo<strong>in</strong>t venture totalled €390<br />

million, <strong>of</strong> which €240 million is to be allocated to new<br />

projects and €150 million to exist<strong>in</strong>g projects. The<br />

agreement provided <strong>BAM</strong> PPP with <strong>the</strong> tw<strong>in</strong> benefits <strong>of</strong> a<br />

significant and robust position from which to pursue<br />

fur<strong>the</strong>r projects and a stable platform with<strong>in</strong> which<br />

equity can be recycled whilst also allow<strong>in</strong>g <strong>BAM</strong> PPP to<br />

reta<strong>in</strong> a long term <strong>in</strong>terest <strong>in</strong> concessions. Progress<br />

achieved by <strong>the</strong> jo<strong>in</strong>t venture to date has been good with<br />

eight bids commenced and three exist<strong>in</strong>g projects<br />

transferred <strong>in</strong> December <strong>2011</strong>.<br />

Notwithstand<strong>in</strong>g cont<strong>in</strong>u<strong>in</strong>g economic uncerta<strong>in</strong>ty, <strong>the</strong><br />

PPP market rema<strong>in</strong>ed robust dur<strong>in</strong>g <strong>2011</strong> and is<br />

cont<strong>in</strong>u<strong>in</strong>g to <strong>of</strong>fer an attractive level <strong>of</strong> bidd<strong>in</strong>g<br />

opportunities. There is a clear trend towards bigger<br />

<strong>in</strong>frastructure projects which are particularly <strong>in</strong>terest<strong>in</strong>g<br />

to <strong>BAM</strong> which is well positioned to play a key role <strong>in</strong> this<br />

market because <strong>of</strong> <strong>the</strong> comprehensive range <strong>of</strong><br />

<strong>in</strong>tegrated services available with<strong>in</strong> <strong>the</strong> <strong>BAM</strong><br />

organisation. The high level <strong>of</strong> bidd<strong>in</strong>g activity<br />

experienced dur<strong>in</strong>g <strong>2011</strong> is expected to cont<strong>in</strong>ue <strong>in</strong> 2012.<br />

The Ne<strong>the</strong>rlands and Belgium are expected to be <strong>the</strong><br />

most active markets <strong>of</strong>fer<strong>in</strong>g a wide range <strong>of</strong> road, rail,<br />

judicial, education and general accommodation<br />

schemes. The United K<strong>in</strong>gdom appears likely to <strong>of</strong>fer<br />

improved deal flow particularly from schemes located <strong>in</strong><br />

Scotland, however projects <strong>in</strong> England rema<strong>in</strong> subject to<br />

<strong>the</strong> current review <strong>of</strong> PFI by <strong>the</strong> Government and it is<br />

currently unclear as to when and <strong>in</strong> what form fur<strong>the</strong>r<br />

projects will be progressed. The German and Swiss<br />

markets appear likely to cont<strong>in</strong>ue to <strong>of</strong>fer steady growth.<br />

It is not likely that <strong>the</strong>re will be many opportunities<br />

emerg<strong>in</strong>g from <strong>the</strong> Irish market <strong>in</strong> <strong>the</strong> short to medium<br />

term follow<strong>in</strong>g <strong>the</strong> announcement <strong>of</strong> <strong>the</strong> recent<br />

Government spend<strong>in</strong>g review. The underly<strong>in</strong>g<br />

performances <strong>of</strong> projects <strong>in</strong> <strong>the</strong>ir construction and<br />

operational phases were stable and <strong>in</strong> l<strong>in</strong>e with<br />

expectations <strong>in</strong> <strong>2011</strong>.<br />

99<br />

<strong>2011</strong>


Construction management for 36 MW Green Bear w<strong>in</strong>d farm<br />

for Vestas, north Poland.<br />

Insert: Nitrogen buffer <strong>in</strong> salt cavern for Gasunie, Heiligerlee,<br />

<strong>the</strong> Ne<strong>the</strong>rlands.<br />

Consultancy en<br />

eng<strong>in</strong>eer<strong>in</strong>g<br />

Key figures for <strong>the</strong> consultancy and eng<strong>in</strong>eer<strong>in</strong>g sector<br />

(x €million) <strong>2011</strong> 2010<br />

Revenue 1 223 210<br />

Result before tax 1 15.2 13.6<br />

Marg<strong>in</strong> before tax 1 6.8% 6.5%<br />

Order book (year-end) 1 n.a. 101<br />

1 Classified as discont<strong>in</strong>ued operations.


Tebod<strong>in</strong> Consultants & Eng<strong>in</strong>eers is an <strong>in</strong>dependent multidiscipl<strong>in</strong>ary consultancy and eng<strong>in</strong>eer<strong>in</strong>g firm that<br />

operates <strong>world</strong>wide with 3,500 employees. Tebod<strong>in</strong> has some 50 <strong>of</strong>fices throughout Western, Central,<br />

South-Eastern and Eastern Europe, <strong>the</strong> Middle East, Asia and Africa. Tebod<strong>in</strong>’s <strong>world</strong>wide <strong>of</strong>fice network is<br />

important for provid<strong>in</strong>g optimum services not only to local clients, but also to ‘global clients’ that Tebod<strong>in</strong><br />

serves <strong>in</strong> many countries.<br />

Tebod<strong>in</strong>’s turnover for <strong>2011</strong> <strong>in</strong>creased by<br />

6 percent to €223 million (2010: €210 million).<br />

The result before tax was €15.2 million (2010:<br />

€13.6 million). The marg<strong>in</strong> was 6.8 percent<br />

(2010: 6.5 percent). The company’s staff<br />

<strong>in</strong>creased by 700 people to a total <strong>of</strong> 3,500.<br />

Tebod<strong>in</strong> achieves approximately 40 percent <strong>of</strong> its<br />

turnover <strong>in</strong> <strong>the</strong> oil and gas market. The energy<br />

and environment, health and nutrition, <strong>in</strong>dustrial<br />

and <strong>in</strong>frastructure sectors each account for<br />

approximately 10 percent <strong>of</strong> turnover, while <strong>the</strong><br />

chemical sector contributes 15 percent. The<br />

rema<strong>in</strong><strong>in</strong>g 5 percent comes from projects from<br />

<strong>the</strong> property sector.<br />

Tebod<strong>in</strong>’s global client list grew significantly,<br />

accompanied by an <strong>in</strong>creas<strong>in</strong>g number <strong>of</strong> countries <strong>in</strong><br />

which Tebod<strong>in</strong> has worked for specific global clients.<br />

Examples <strong>of</strong> global clients <strong>in</strong> new countries are DSM <strong>in</strong> <strong>the</strong><br />

Ne<strong>the</strong>rlands, Belgium, Germany, Ch<strong>in</strong>a, India, Vietnam<br />

and Taiwan, Huntsman <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands, Germany and<br />

Indonesia, Michel<strong>in</strong> <strong>in</strong> Hungary, Romania, Poland, Brazil,<br />

Ch<strong>in</strong>a and India, Praxair <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands, Belgium,<br />

Russia and <strong>the</strong> Ukra<strong>in</strong>e and SGL Carbon <strong>in</strong> Germany, Ch<strong>in</strong>a<br />

and Malaysia.<br />

The proactive approach towards susta<strong>in</strong>ability all through<br />

<strong>the</strong> network produced an <strong>in</strong>creased amount <strong>of</strong> work.<br />

Team<strong>in</strong>g-up and shar<strong>in</strong>g knowledge between <strong>of</strong>fices and<br />

countries is key for provid<strong>in</strong>g susta<strong>in</strong>able solutions.<br />

Several LEED/BREEAM certification projects have been<br />

realised (for example, DSM, DMS Zealand, Ne<strong>in</strong>ver and<br />

Caterpillar). The number <strong>of</strong> certified LEED/BREEAM<br />

consultants grew to a total <strong>of</strong> 17.<br />

The <strong>in</strong>ternational <strong>of</strong>fice network cont<strong>in</strong>ued to grow. With<br />

<strong>the</strong> new <strong>of</strong>fice <strong>in</strong> Jakarta, Indonesia, Tebod<strong>in</strong> entered<br />

ano<strong>the</strong>r country to <strong>of</strong>fer consultancy and eng<strong>in</strong>eer<strong>in</strong>g<br />

services. It is <strong>the</strong> fourth Tebod<strong>in</strong> <strong>of</strong>fice <strong>in</strong> <strong>the</strong> South Asia<br />

and Asia Pacific region.<br />

In Western Europe <strong>the</strong> <strong>of</strong>fices <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands saw a<br />

growth <strong>in</strong> <strong>the</strong> number <strong>of</strong> employees s<strong>in</strong>ce <strong>the</strong> economic<br />

crisis began at <strong>the</strong> end <strong>of</strong> 2008.<br />

New framework contracts were obta<strong>in</strong>ed from Nuon<br />

and BP. Bigger projects were scored for Huntsman and<br />

Gasunie. The major EPC underground nitrogen storage<br />

project for Gasunie is runn<strong>in</strong>g on schedule with <strong>the</strong> <strong>of</strong>ficial<br />

‘take-over’ <strong>of</strong> <strong>the</strong> nitrogen <strong>in</strong>jection section. Overall<br />

completion is also on schedule for <strong>the</strong> third quarter <strong>of</strong><br />

2012. Fur<strong>the</strong>rmore, <strong>the</strong> Ne<strong>the</strong>rlands scored projects for<br />

AgriPure, He<strong>in</strong>z and DMV-Fonterra.<br />

In Germany, <strong>the</strong> organisation was adapted to market<br />

conditions <strong>in</strong> early <strong>2011</strong>. Kemira awarded a sizeable<br />

project which comprises <strong>the</strong> eng<strong>in</strong>eer<strong>in</strong>g and construction<br />

management <strong>of</strong> a new flock<strong>in</strong>g agent plant. Tebod<strong>in</strong><br />

f<strong>in</strong>alised <strong>the</strong> design <strong>of</strong> pip<strong>in</strong>g for a new power plant <strong>in</strong><br />

Boxberg for KSC (<strong>in</strong>vestor: Vattenfall).<br />

Sales activities from <strong>the</strong> Belgian <strong>of</strong>fice resulted <strong>in</strong> a<br />

long-term framework agreement for eng<strong>in</strong>eer<strong>in</strong>g and<br />

project management services from BASF Antwerp.<br />

In most places <strong>in</strong> Central and South-Eastern Europe sales<br />

<strong>in</strong>creased. The Czech Republic scored projects for <strong>the</strong><br />

extension <strong>of</strong> Skoda Auto plants <strong>in</strong> <strong>the</strong> home country and <strong>in</strong><br />

India. In Poland and Hungary, several new contracts were<br />

won from producers <strong>of</strong> green energy. In Poland especially,<br />

where ‘w<strong>in</strong>d energy’ is a significant topic, Tebod<strong>in</strong> became<br />

<strong>in</strong>volved <strong>in</strong> 15 w<strong>in</strong>d farms. O<strong>the</strong>r w<strong>in</strong>d farms are under<br />

construction <strong>in</strong> Romania.<br />

In Eastern Europe, good market opportunities comb<strong>in</strong>ed<br />

with <strong>the</strong> strong market position led to great sales <strong>in</strong><br />

Russia. Several green field projects were contracted, such<br />

as those for Knauf Insulation, IKEA, Siemens, Magna<br />

International, Cargill and He<strong>in</strong>z. With two projects won for<br />

Cargill, Tebod<strong>in</strong> worked for <strong>the</strong>m <strong>in</strong> Russia on four projects<br />

simultaneously.<br />

The Ukra<strong>in</strong>ian market conditions were more difficult<br />

ma<strong>in</strong>ly due to political reasons. Many projects were<br />

acquired from clients <strong>in</strong> <strong>the</strong> steel market and from<br />

<strong>in</strong>ternational f<strong>in</strong>ancial <strong>in</strong>stitutions.<br />

The <strong>of</strong>fices <strong>in</strong> <strong>the</strong> Middle East – United Arab Emirates,<br />

Qatar, Oman and Bahra<strong>in</strong> – toge<strong>the</strong>r kept on grow<strong>in</strong>g,<br />

thanks to a general positive climate on <strong>the</strong> one hand, and<br />

<strong>the</strong> staff<strong>in</strong>g <strong>of</strong> <strong>the</strong> big EMC service contract for PDO <strong>in</strong><br />

Oman on <strong>the</strong> o<strong>the</strong>r hand. The <strong>of</strong>fices work for clients <strong>in</strong><br />

<strong>the</strong> oil and gas, <strong>in</strong>dustrial, <strong>in</strong>frastructure, water and<br />

chemical sectors. A major order was won from <strong>the</strong> Qaiwan<br />

Group for a ref<strong>in</strong>ery expansion <strong>in</strong> Kurdistan, Iraq. O<strong>the</strong>r<br />

101<br />

<strong>2011</strong>


102<br />

<strong>2011</strong><br />

projects were scored from BASF <strong>in</strong> Bahra<strong>in</strong> (EPCm<br />

services), Dusup Pipel<strong>in</strong>es (Abu Dhabi), ENOC (Dubai) and<br />

ADMA-OPCO (Abu Dhabi). The first projects relat<strong>in</strong>g to<br />

<strong>the</strong> seven-year EMC contract for PDO started. In <strong>2011</strong><br />

Tebod<strong>in</strong> welcomed <strong>the</strong>ir 1,000th employee <strong>in</strong> <strong>the</strong> Middle<br />

East. At <strong>the</strong> end <strong>of</strong> <strong>the</strong> year <strong>the</strong> total number <strong>of</strong> employees<br />

was around 1,300.<br />

India also developed well with two large orders from<br />

Michel<strong>in</strong> and Gestamp, a manufacturer <strong>of</strong> automotive<br />

parts. EPCm projects were awarded by Hettich and Bayer<br />

Crop Science.<br />

Tebod<strong>in</strong>’s network <strong>in</strong> Asia grew significantly. South Asia<br />

and <strong>the</strong> Asia Pacific region are straightforward growth<br />

areas. The fact that economic powers have moved to <strong>the</strong><br />

region comb<strong>in</strong>ed with advantageous demographic<br />

circumstances creates a huge market. The <strong>of</strong>fices <strong>in</strong> Ch<strong>in</strong>a,<br />

Vietnam, Indonesia and India employ a comb<strong>in</strong>ed total <strong>of</strong><br />

around 400 people. Based on cooperation between <strong>the</strong><br />

<strong>of</strong>fices <strong>in</strong> Shanghai, Guangzhou, Ho Chi M<strong>in</strong> City and<br />

Jakarta, several projects for major global clients (Cabot,<br />

AkzoNobel, Knauf Insulation and Huntsman) were<br />

awarded.<br />

Both <strong>of</strong>fices <strong>in</strong> Ch<strong>in</strong>a worked for several major global<br />

clients especially <strong>in</strong> <strong>the</strong> chemical sector, but also <strong>in</strong> <strong>the</strong><br />

automotive and food <strong>in</strong>dustries. New contracts <strong>in</strong>clude<br />

projects for IKEA, Cargill, DSM, Semicron Electronics and<br />

Nuplex. The <strong>of</strong>fice <strong>in</strong> Vietnam has developed well. Projects<br />

were executed for Bunge, Procter & Gamble, De Heus,<br />

DSM and Nestlé.<br />

The Indonesian market <strong>of</strong>fered many opportunities. The<br />

first project for <strong>the</strong> new <strong>of</strong>fice <strong>in</strong> Indonesia was an EPCm<br />

contract for AkzoNobel Pa<strong>in</strong>ts. O<strong>the</strong>r projects are be<strong>in</strong>g<br />

carried out for Cabot, Knauf Gypsum, and Huntsman.


F<strong>in</strong>ancial statements <strong>2011</strong><br />

104 Consolidated balance sheet as at 31 December<br />

105 Consolidated <strong>in</strong>come statement<br />

106 Consolidated statement <strong>of</strong> comprehensive <strong>in</strong>come<br />

107 Consolidated statement <strong>of</strong> equity<br />

108 Consolidated cash flow statement<br />

109 Company balance sheet at 31 December<br />

109 Company <strong>in</strong>come statement<br />

110 O<strong>the</strong>r <strong>in</strong>formation<br />

114 Overview <strong>of</strong> pr<strong>in</strong>cipal subsidiaries and associates<br />

115 Royal <strong>BAM</strong> Group nv executive <strong>of</strong>ficers<br />

116 Ten year key figures<br />

118 Key f<strong>in</strong>ancial dates<br />

Disclosure<br />

In this abbreviated annual report <strong>the</strong> consolidated balance sheet as at 31 December <strong>2011</strong>,<br />

<strong>the</strong> consolidated <strong>in</strong>come statement, <strong>the</strong> consolidated comprehensive <strong>in</strong>come statement,<br />

<strong>the</strong> consolidated statement <strong>of</strong> equity and <strong>the</strong> consolidated cash flow statement for <strong>the</strong> year<br />

<strong>the</strong>n ended, <strong>the</strong> company balance sheet as at 31 December <strong>2011</strong> and <strong>the</strong> company <strong>in</strong>come<br />

statement for <strong>the</strong> year <strong>the</strong>n ended (hereafter: <strong>the</strong> primary statements) are presented,<br />

accompanied by this disclosure.<br />

These primary statements are an <strong>in</strong>tegral part <strong>of</strong> and are consistent with <strong>the</strong> f<strong>in</strong>ancial<br />

statements <strong>of</strong> Royal <strong>BAM</strong> Group nv. It was decided to disclose <strong>the</strong> annual report and <strong>the</strong> primary<br />

statements <strong>in</strong> an abbreviated annual report, that serves <strong>the</strong> purpose <strong>of</strong> giv<strong>in</strong>g readers an<br />

impression <strong>of</strong> <strong>the</strong> full version <strong>of</strong> <strong>the</strong> (audited) annual report.<br />

The external report<strong>in</strong>g (IFRS) and account<strong>in</strong>g pr<strong>in</strong>ciples used <strong>in</strong> <strong>the</strong>se primary statements are<br />

consistent with <strong>the</strong> consolidated f<strong>in</strong>ancial statements <strong>of</strong> Royal <strong>BAM</strong> Group nv. Here<strong>in</strong>, amongst<br />

o<strong>the</strong>rs, <strong>the</strong> valuation <strong>of</strong> <strong>in</strong>ventory, <strong>in</strong>cluded <strong>in</strong> which are land and build<strong>in</strong>g rights and property<br />

development, is set out, be<strong>in</strong>g <strong>the</strong> lower <strong>of</strong> cost and net realisable value. Construction contracts<br />

are stated at cost <strong>in</strong>curred and allocated result <strong>in</strong> l<strong>in</strong>e with <strong>the</strong> progress <strong>of</strong> <strong>the</strong> construction, less<br />

identifiable losses and <strong>in</strong>voiced <strong>in</strong>stalments.<br />

For more <strong>in</strong>formation on <strong>the</strong> account<strong>in</strong>g pr<strong>in</strong>ciples and <strong>the</strong> f<strong>in</strong>ancial statements as a whole we<br />

refer to our website www.bam.eu where you can download <strong>the</strong> f<strong>in</strong>ancial statements.<br />

103<br />

<strong>2011</strong>


104<br />

<strong>2011</strong><br />

Consolidated balance sheet as at 31 December<br />

(x € 1,000)<br />

The notes on pages 109 to 176 are an <strong>in</strong>tegral part <strong>of</strong> <strong>the</strong>se consolidated f<strong>in</strong>ancial statements.<br />

<strong>2011</strong> 2010<br />

8 Property, plant and equipment 373,634 409,064<br />

9 Intangible assets 734,480 850,156<br />

10 PPP receivables 743,284 753,313<br />

11 Associates 19,198 210,781<br />

12 O<strong>the</strong>r f<strong>in</strong>ancial assets 70,861 48,463<br />

20 Derivative f<strong>in</strong>ancial <strong>in</strong>struments 802 1,702<br />

21 Pension plan assets 137,585 111,966<br />

23 Deferred tax assets 149,410 174,063<br />

Non-current assets 2,229,254 2,559,508<br />

13 Inventories 1,514,458 1,564,208<br />

14 Trade and o<strong>the</strong>r receivables 2,116,904 2,085,888<br />

Income tax receivable 36,539 8,672<br />

20 Derivative f<strong>in</strong>ancial <strong>in</strong>struments 5,071 1,684<br />

15 Cash and cash equivalents 1,012,610 913,792<br />

35 Assets held for sale 303,242 95<br />

Current assets 4,988,824 4,574,339<br />

Total assets 7,218,078 7,133,847<br />

16 Share capital 714,694 709,466<br />

17 Reserves (258,539) (196,916)<br />

Reta<strong>in</strong>ed earn<strong>in</strong>gs 706,253 587,391<br />

Equity attributable to <strong>the</strong> Company’s shareholders 1,162,408 1,099,941<br />

Non-controll<strong>in</strong>g <strong>in</strong>terest 735 1,692<br />

Group equity 1,163,143 1,101,633<br />

19 Borrow<strong>in</strong>gs 1,951,024 1,904,021<br />

20 Derivative f<strong>in</strong>ancial <strong>in</strong>struments 249,500 149,305<br />

21 Employee benefit obligations 100,935 120,902<br />

22 Provisions 82,529 75,464<br />

23 Deferred tax liabilities 76,080 66,363<br />

Non-current liabilities 2,460,068 2,316,055<br />

19 Borrow<strong>in</strong>gs 240,101 366,984<br />

24 Trade and o<strong>the</strong>r payables 3,047,808 3,267,605<br />

20 Derivative f<strong>in</strong>ancial <strong>in</strong>struments 1,988 4,022<br />

22 Provisions 54,330 54,999<br />

Income tax payable 17,509 22,549<br />

35 Liabilities held for sale 233,131 -<br />

Current liabilities 3,594,867 3,716,159<br />

Total equity and liabilities 7,218,078 7,133,847<br />

18 Capital base 1,362,408 1,301,512


Consolidated <strong>in</strong>come statement<br />

(x € 1,000)<br />

Cont<strong>in</strong>u<strong>in</strong>g<br />

operations<br />

<strong>2011</strong> 2010<br />

Discont<strong>in</strong>ued<br />

operations<br />

Total<br />

The notes on pages 109 to 176 are an <strong>in</strong>tegral part <strong>of</strong> <strong>the</strong>se consolidated f<strong>in</strong>ancial statements.<br />

Cont<strong>in</strong>u<strong>in</strong>g<br />

operations<br />

Discont<strong>in</strong>ued<br />

operations<br />

6 Revenue 7,697,427 222,681 7,920,108 7,400,809 209,933 7,610,742<br />

Raw materials and consumables (1,383,578) (12,696) (1,396,274) (1,256,279) (20,362) (1,276,641)<br />

Subcontracted work and o<strong>the</strong>r<br />

external charges (4,342,601) (25,119) (4,367,720) (4,244,896) (16,714) (4,261,610)<br />

25 Personnel expenses (1,420,712) (127,994) (1,548,706) (1,393,472) (119,305) (1,512,777)<br />

8, 9 Amortisation and depreciation (103,338) (2,678) (106,016) (105,589) (2,682) (108,271)<br />

26 Impairments - - - (128,196) - (128,196)<br />

O<strong>the</strong>r operat<strong>in</strong>g expenses (309,944) (38,959) (348,903) (319,051) (37,077) (356,128)<br />

Exchange rate differences (1,854) 25 (1,829) 2,714 (129) 2,585<br />

Total operat<strong>in</strong>g expense (7,562,027) (207,421) (7,769,448) (7,444,769) (196,269) (7,641,038)<br />

Operat<strong>in</strong>g result 135,400 15,260 150,660 (43,960) 13,664 (30,296)<br />

28 F<strong>in</strong>ance <strong>in</strong>come 72,738 63 72,801 87,106 49 87,155<br />

28 F<strong>in</strong>ance expense (98,996) (148) (99,144) (64,467) (156) (64,623)<br />

11 Result from associates 34,376 - 34,376 33,719 - 33,719<br />

Result before tax 143,518 15,175 158,693 12,398 13,557 25,955<br />

29 Income tax (28,050) (2,916) (30,966) (3,475) (4,114) (7,589)<br />

Net result for <strong>the</strong> year 115,468 12,259 127,727 8,923 9,443 18,366<br />

Attributable to:<br />

Shareholders <strong>of</strong> <strong>the</strong> company 113,850 12,145 125,995 5,863 9,463 15,326<br />

Non-controll<strong>in</strong>g <strong>in</strong>terest 1,618 114 1,732 3,060 (20) 3,040<br />

115,468 12,259 127,727 8,923 9,443 18,366<br />

Earn<strong>in</strong>gs per share for net result attributable to shareholders <strong>of</strong> <strong>the</strong> Company<br />

(<strong>in</strong> € per share)<br />

Cont<strong>in</strong>u<strong>in</strong>g<br />

operations<br />

<strong>2011</strong> 2010<br />

Discont<strong>in</strong>ued<br />

Cont<strong>in</strong>u<strong>in</strong>g Discont<strong>in</strong>ued<br />

operations<br />

Total operations operations<br />

30 Basic 0.49 0.05 0.54 0.03 0.05 0.08<br />

30 Fully diluted 0.49 0.05 0.54 0.03 0.05 0.08<br />

Total<br />

Total<br />

105<br />

<strong>2011</strong>


106<br />

<strong>2011</strong><br />

Consolidated statement <strong>of</strong> comprehensive <strong>in</strong>come<br />

(x € 1,000)<br />

The notes on pages 109 to 176 are an <strong>in</strong>tegral part <strong>of</strong> <strong>the</strong>se consolidated f<strong>in</strong>ancial statements.<br />

<strong>2011</strong> 2010<br />

Net result for <strong>the</strong> year 127,727 18,366<br />

20 Fair value cash flow hedges ¹ (73,113) (38,916)<br />

Currency translation differences ¹<br />

- Subsidiaries 11,047 22,153<br />

- Associates (81) 1,094<br />

O<strong>the</strong>r comprehensive <strong>in</strong>come (62,147) (15,669)<br />

Total comprehensive <strong>in</strong>come 65,580 2,697<br />

Attributable to:<br />

Non-controll<strong>in</strong>g <strong>in</strong>terest 64,372 (194)<br />

Shareholders <strong>of</strong> <strong>the</strong> company 1,208 2,891<br />

65,580 2,697<br />

Attributable to sharholders <strong>of</strong> <strong>the</strong> company arises from:<br />

Cont<strong>in</strong>u<strong>in</strong>g operations 52,540 (11,124)<br />

Discont<strong>in</strong>ued operations 11,832 10,930<br />

¹ After tax.<br />

64,372 (194)


Consolidated statement <strong>of</strong> equity<br />

(x € 1,000)<br />

Share<br />

capital Reserves<br />

Equity attributable to<br />

<strong>the</strong> Company’s shareholders<br />

Reta<strong>in</strong>ed<br />

earn<strong>in</strong>gs Total<br />

The notes on pages 109 to 176 are an <strong>in</strong>tegral part <strong>of</strong> <strong>the</strong>se consolidated f<strong>in</strong>ancial statements.<br />

Non-controll<strong>in</strong>g<br />

<strong>in</strong>terest<br />

At 1 January 2010 469,379 (181,396) 587,059 875,042 6,172 881,214<br />

20 Fair value cash flow hedges - (38,758) - (38,758) (158) (38,916)<br />

Currency translation differences<br />

- Subsidiaries - 22,144 - 22,144 9 22,153<br />

11 - Associates<br />

Net result recognised directly<br />

- 1, 094 - 1,094 - 1,094<br />

<strong>in</strong> equity - (15,520) - (15,520) (149) (15,669)<br />

Net result for <strong>the</strong> year - - 15,326 15,326 3,040 18,366<br />

Total comprehensive <strong>in</strong>come - (15,520) 15,326 (194) 2,891 2,697<br />

16 Issue <strong>of</strong> shares 240,087 - - 240,087 - 240,087<br />

31 Dividend paid - - (13,520) (13,520) (344) (13,864)<br />

Acquisition <strong>of</strong> non controll<strong>in</strong>g <strong>in</strong>terest - - (1,474) (1,474) (4,541) (6,015)<br />

O<strong>the</strong>r movements - - - - (2,486) (2,486)<br />

240,087 - (14,994) 225,093 (7,371) 217,722<br />

At 31 December 2010 709,466 (196,916) 587,391 1,099,941 1,692 1,101,633<br />

20 Fair value cash flow hedges<br />

Currency translation differences<br />

- (72,691) - (72,691) (422) (73,113)<br />

- Subsidiaries - 11,149 - 11,149 (102) 11,047<br />

11 - Associates<br />

Net result recognised directly<br />

- (81) - (81) - (81)<br />

<strong>in</strong> equity - (61,623) - (61,623) (524) (62,147)<br />

Net result for <strong>the</strong> year - - 125,995 125,995 1,732 127,727<br />

Total comprehensive <strong>in</strong>come - (61,623) 125,995 64,372 1,208 65,580<br />

16 Preference shares conversion 1,407 - - 1,407 - 1,407<br />

31 Dividend paid 3,821 - (7,133) (3,312) (2,015) (5,327)<br />

O<strong>the</strong>r movements - - - - (150) (150)<br />

5,228 - (7,133) (1,905) (2,165) (4,070)<br />

At 31 December <strong>2011</strong> 714,694 (258,539) 706,253 1,162,408 735 1,163,143<br />

Group<br />

equity<br />

107<br />

<strong>2011</strong>


108<br />

<strong>2011</strong><br />

Consolidated cash flow statement<br />

(x € 1,000)<br />

The notes on pages 109 to 176 are an <strong>in</strong>tegral part <strong>of</strong> <strong>the</strong>se consolidated f<strong>in</strong>ancial statements.<br />

<strong>2011</strong> 2010<br />

Net result for <strong>the</strong> year 127,727 18,366<br />

Adjustments for:<br />

29 - Taxation 30,966 7,589<br />

8,26 - Depreciation <strong>of</strong> property, plant and equipment 94,920 97,324<br />

9 - Amortisation <strong>of</strong> <strong>in</strong>tangible assets 11,096 10,947<br />

8,26 - Impairment <strong>of</strong> property, plant and equipment - 884<br />

11,12,26- Impairment <strong>of</strong> o<strong>the</strong>r fixed assets - 5,112<br />

35 - Result on sale PPP projects (11,669) -<br />

- Result on sale <strong>of</strong> property, plant and equipment (4,325) (2,573)<br />

28 - F<strong>in</strong>ance <strong>in</strong>come (72,801) (87,155)<br />

28 - F<strong>in</strong>ance expense 99,144 64,623<br />

11 - Result from associates (34,376) (33,719)<br />

21,22 Changes <strong>in</strong> provisions (40,242) (69,159)<br />

Changes <strong>in</strong> work<strong>in</strong>g capital (exclud<strong>in</strong>g net liquidities) (90,927) 137,042<br />

Cashflow from operations 109,513 149,281<br />

Interest paid (130,007) (101,342)<br />

Income tax paid (13,458) (3,452)<br />

Net cashflow from ord<strong>in</strong>ary activities (33,952) 44,487<br />

10 Change <strong>in</strong> PPP receivables (419,002) (250,080)<br />

Net cash flow from operat<strong>in</strong>g activities (452,954) (205,593)<br />

Acquisition <strong>of</strong> subsidiaries (3,000) (4,628)<br />

8 Investments <strong>in</strong> property, plant and equipment (70,171) (80,538)<br />

9 Investments <strong>in</strong> <strong>in</strong>tangible assets (2,838) (35,939)<br />

12 Investments <strong>in</strong> non-current receivables (26,654) (10,664)<br />

11,12 Investments <strong>in</strong> o<strong>the</strong>r f<strong>in</strong>ancial fixed assets (218) (3,538)<br />

35 Divestments <strong>of</strong> PPP projects 25,429 -<br />

8 Divestments <strong>in</strong> property, plant and equipment 17,251 14,615<br />

9 Divestments <strong>in</strong> <strong>in</strong>tangible assets 154 11<br />

10,11,12Divestments <strong>in</strong> f<strong>in</strong>ancial assets 218,550 35,323<br />

O<strong>the</strong>r movements <strong>in</strong> m<strong>in</strong>ority <strong>in</strong>terest - (2,570)<br />

Interest received 72,903 86,761<br />

11 Dividend received 41,788 16,291<br />

Net cash flow from <strong>in</strong>vest<strong>in</strong>g activities 273,194 15,124<br />

16 Net proceeds from issue new shares - 240,087<br />

19 New non current borrow<strong>in</strong>gs 637,673 503,287<br />

19 Repayment <strong>of</strong> non current borrow<strong>in</strong>gs (346,511) (353,550)<br />

31 Dividend paid (3,312) (13,520)<br />

Dividend paid to non-controll<strong>in</strong>g <strong>in</strong>terests (2,015) (344)<br />

Purchase f<strong>in</strong>ance preference shares (314) -<br />

Net cash flow from f<strong>in</strong>anc<strong>in</strong>g activities 285,521 375,960<br />

Increase/decrease <strong>in</strong> net cash position 105,761 185,491<br />

15 Net cash position at beg<strong>in</strong>n<strong>in</strong>g <strong>of</strong> <strong>the</strong> year 912,870 715,152<br />

35 Movement net liquidities assets and liabilities held for sale (17,165) -<br />

Exchange rate difference on net cash position 6,539 12,227<br />

15 Net cash position at end <strong>of</strong> <strong>the</strong> year 1,008,005 912,870


Company balance sheet at 31 December<br />

(before pr<strong>of</strong>it appropriation x €1,000)<br />

Company <strong>in</strong>come statement<br />

(x €1,000)<br />

<strong>2011</strong> 2010<br />

2 Tangible assets 21,879 23,485<br />

3 Intangible assets 576,500 461,765<br />

4 F<strong>in</strong>ancial assets 1,819,398 2,102,911<br />

5 Deferred tax assets 101,943 68,559<br />

Non-current assets 2,519,720 2,656,720<br />

6 Receivables 23,149 15,940<br />

7 Cash and cash equivalents 397,352 208,158<br />

Current assets 420,501 224,098<br />

Total assets 2,940,221 2,880,818<br />

Issued and paid up capital 23,294 23,177<br />

Share premium reserve 691,400 686,242<br />

Reserve pursuant to Articles <strong>of</strong> Association - 47<br />

Exchange rate differences / Hedg<strong>in</strong>g reserve (258,539) (196,916)<br />

O<strong>the</strong>r legal reserves - 94,185<br />

O<strong>the</strong>r reserves 580,258 477,880<br />

Net result for <strong>the</strong> year 125,995 15,326<br />

8 Shareholders equity 1,162,408 1,099,941<br />

Employee benefit obligations 5,930 3,896<br />

Provisions 15,000 -<br />

9 Provisions 20,930 3,896<br />

Borrow<strong>in</strong>gs 569,320 569,197<br />

10 Non-current liabilities 569,320 569,197<br />

Borrow<strong>in</strong>gs 5,412 2,735<br />

O<strong>the</strong>r current liabilities 1,182,151 1,205,049<br />

11 Current liabilities 1,187,563 1,207,784<br />

Total equity and liabilities 2,940,221 2,880,818<br />

<strong>2011</strong> 2010<br />

Result <strong>of</strong> participat<strong>in</strong>g <strong>in</strong>terests after tax 159,358 33,851<br />

O<strong>the</strong>r <strong>in</strong>come and expense after tax (33,363) (18,525)<br />

Net result for <strong>the</strong> year 125,995 15,326<br />

109<br />

<strong>2011</strong>


110<br />

<strong>2011</strong><br />

O<strong>the</strong>r <strong>in</strong>formation<br />

Proposed appropriation <strong>of</strong> pr<strong>of</strong>it for <strong>2011</strong><br />

The net result for <strong>2011</strong>, <strong>in</strong> <strong>the</strong> amount <strong>of</strong> €126.0 million, has been accounted for <strong>in</strong> shareholders’ equity.<br />

The company proposes to declare a dividend for <strong>the</strong> f<strong>in</strong>ancial year <strong>2011</strong> at, at <strong>the</strong> option <strong>of</strong> shareholders, €0.16 <strong>in</strong> cash<br />

(2010: €0.03) per ord<strong>in</strong>ary share or a dividend <strong>in</strong> ord<strong>in</strong>ary shares. In case <strong>of</strong> dividend <strong>in</strong> shares, <strong>the</strong> company will calculate<br />

<strong>the</strong> number <strong>of</strong> dividend rights required to obta<strong>in</strong> one new share <strong>in</strong> such a manner that <strong>the</strong> dividend <strong>in</strong> shares will exceed<br />

<strong>the</strong> dividend <strong>in</strong> cash by approximately 5 percent. The proposal for <strong>the</strong> cash dividend corresponds with a pay-out<br />

percentage <strong>of</strong> approximately 30 based on <strong>the</strong> net result for <strong>2011</strong> <strong>of</strong> €126.0 million. Based on <strong>the</strong> number <strong>of</strong> ord<strong>in</strong>ary<br />

shares outstand<strong>in</strong>g at year-end <strong>2011</strong>, a maximum <strong>of</strong> €37.3 million will be distributed as dividend on <strong>the</strong> ord<strong>in</strong>ary shares.<br />

As yet, <strong>the</strong> dividend proposal has not been deducted from reta<strong>in</strong>ed earn<strong>in</strong>gs under equity.<br />

Provisions <strong>of</strong> <strong>the</strong> Articles <strong>of</strong> Association concern<strong>in</strong>g pr<strong>of</strong>it appropriation<br />

(Summary <strong>of</strong> Article 32 <strong>of</strong> <strong>the</strong> Articles <strong>of</strong> Association)<br />

From <strong>the</strong> pr<strong>of</strong>it realised <strong>in</strong> any f<strong>in</strong>ancial year, an amount will first be distributed, where possible, on <strong>the</strong> class B cumulative<br />

preference shares, calculated by apply<strong>in</strong>g <strong>the</strong> percentage stated below to <strong>the</strong> mandatory amount paid up on those shares<br />

as at <strong>the</strong> start <strong>of</strong> <strong>the</strong> f<strong>in</strong>ancial year for which <strong>the</strong> distribution is made. The percentage referred to above will be equal to<br />

<strong>the</strong> average <strong>of</strong> <strong>the</strong> EURIBOR rates for money market loans with a maturity <strong>of</strong> twelve months – weighted accord<strong>in</strong>g to <strong>the</strong><br />

number <strong>of</strong> days for which <strong>the</strong>se rates prevailed – dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial year for which <strong>the</strong> distribution is made, plus one<br />

percentage po<strong>in</strong>t. EURIBOR refers to <strong>the</strong> Euro Interbank Offered Rate as determ<strong>in</strong>ed and published by <strong>the</strong> European<br />

Central Bank.<br />

Subsequently, if possible, a dividend will be distributed on each f<strong>in</strong>anc<strong>in</strong>g preference share <strong>of</strong> a certa<strong>in</strong> series and subseries,<br />

with due consideration <strong>of</strong> <strong>the</strong> provisions <strong>of</strong> Article 32(6) <strong>of</strong> <strong>the</strong> Articles <strong>of</strong> Association, equal to an amount<br />

calculated by apply<strong>in</strong>g a percentage to <strong>the</strong> nom<strong>in</strong>al amount <strong>of</strong> <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g preference share concerned at <strong>the</strong> start <strong>of</strong><br />

that f<strong>in</strong>ancial year, plus <strong>the</strong> amount <strong>of</strong> share premium paid up on <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g preference share issued <strong>in</strong> <strong>the</strong> series and<br />

sub-series concerned at <strong>the</strong> time <strong>of</strong> <strong>in</strong>itial issue <strong>of</strong> <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g preference shares <strong>of</strong> that series and sub-series, less <strong>the</strong><br />

amount paid out on each f<strong>in</strong>anc<strong>in</strong>g preference share concerned and charged to <strong>the</strong> share premium reserve formed at <strong>the</strong><br />

time <strong>of</strong> issue <strong>of</strong> <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g preference shares <strong>of</strong> that series and sub-series prior to that f<strong>in</strong>ancial year.<br />

If and to <strong>the</strong> extent that a distribution has been made on <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g preference shares concerned <strong>in</strong> <strong>the</strong> course <strong>of</strong> <strong>the</strong><br />

year and charged to <strong>the</strong> share premium reserve formed at <strong>the</strong> time <strong>of</strong> issue <strong>of</strong> <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g preference shares <strong>of</strong> <strong>the</strong><br />

series and sub-series concerned, or partial repayment has been made on such shares, <strong>the</strong> amount <strong>of</strong> <strong>the</strong> distribution will<br />

be reduced pro rata over <strong>the</strong> period concerned accord<strong>in</strong>g to <strong>the</strong> amount <strong>of</strong> <strong>the</strong> distribution charged to <strong>the</strong> share<br />

premium reserve and/or <strong>the</strong> repayment with respect to <strong>the</strong> amount referred to <strong>in</strong> <strong>the</strong> preced<strong>in</strong>g sentence. The<br />

calculation <strong>of</strong> <strong>the</strong> dividend percentage for <strong>the</strong> f<strong>in</strong>anc<strong>in</strong>g preference shares <strong>of</strong> a certa<strong>in</strong> series will be made for each <strong>of</strong> <strong>the</strong><br />

series <strong>of</strong> f<strong>in</strong>anc<strong>in</strong>g preference shares referred to below, <strong>in</strong> <strong>the</strong> manner set forth for <strong>the</strong> series concerned.<br />

Series FP1-FP4:<br />

The dividend percentage will be calculated by tak<strong>in</strong>g <strong>the</strong> arithmetical mean <strong>of</strong> <strong>the</strong> yield to maturity on euro government<br />

loans issued by <strong>the</strong> K<strong>in</strong>gdom <strong>of</strong> <strong>the</strong> Ne<strong>the</strong>rlands with a rema<strong>in</strong><strong>in</strong>g term match<strong>in</strong>g as closely as possible <strong>the</strong> term <strong>of</strong> <strong>the</strong><br />

series concerned, as published <strong>in</strong> <strong>the</strong> Official Price List <strong>of</strong> Euronext Amsterdam, plus two percentage po<strong>in</strong>ts.<br />

Series FP5-FP8:<br />

The dividend percentage will be equal to <strong>the</strong> average <strong>of</strong> <strong>the</strong> EURIBOR rates for money market loans with a maturity <strong>of</strong><br />

12 months – weighted accord<strong>in</strong>g to <strong>the</strong> number <strong>of</strong> days for which <strong>the</strong>se rates prevailed – dur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial year for<br />

which <strong>the</strong> distribution is made, plus two percentage po<strong>in</strong>ts.<br />

The above percentages may be <strong>in</strong>creased or reduced by an amount <strong>of</strong> no more than three hundred basis po<strong>in</strong>ts.<br />

The above percentages apply for <strong>the</strong> follow<strong>in</strong>g periods: series FP1 and FP5: five years; series FP2 and FP6: six years; series<br />

FP3 and FP7: seven years and series FP4 and FP8: eight years. After a period expires, <strong>the</strong> percentage will be modified <strong>in</strong><br />

accordance with <strong>the</strong> rules laid down <strong>in</strong> Article 32 paragraph 6(c) <strong>of</strong> <strong>the</strong> Articles <strong>of</strong> Association.


The Supervisory Board shall determ<strong>in</strong>e, on <strong>the</strong> basis <strong>of</strong> a proposal by <strong>the</strong> Executive Board, what part <strong>of</strong> <strong>the</strong> pr<strong>of</strong>it<br />

rema<strong>in</strong><strong>in</strong>g after application <strong>of</strong> <strong>the</strong> above provisions will be added to <strong>the</strong> reserves. The part <strong>of</strong> <strong>the</strong> pr<strong>of</strong>it that rema<strong>in</strong>s<br />

<strong>the</strong>reafter is at <strong>the</strong> disposal <strong>of</strong> <strong>the</strong> General Meet<strong>in</strong>g, subject to <strong>the</strong> provision that no fur<strong>the</strong>r dividends will be distributed<br />

on <strong>the</strong> preference shares and with due consideration <strong>of</strong> <strong>the</strong> o<strong>the</strong>r provisions <strong>of</strong> Article 32 <strong>of</strong> <strong>the</strong> Articles <strong>of</strong> Association.<br />

Anti-takeover measures<br />

The company has taken <strong>the</strong> follow<strong>in</strong>g measures to protect itself aga<strong>in</strong>st any undesired developments that might have an<br />

impact on <strong>the</strong> <strong>in</strong>dependence, cont<strong>in</strong>uity and/or identity <strong>of</strong> <strong>the</strong> Group.<br />

Pursuant to a resolution passed by <strong>the</strong> General Meet<strong>in</strong>g held on 12 June 1972, <strong>the</strong> Articles <strong>of</strong> Association <strong>in</strong>clude <strong>the</strong><br />

possibility <strong>of</strong> issu<strong>in</strong>g preference shares. Sticht<strong>in</strong>g Aandelenbeheer <strong>BAM</strong> Groep (hereafter referred to as “<strong>the</strong> Foundation”)<br />

was founded with a view to this possibility <strong>in</strong> 1978.<br />

The object <strong>of</strong> <strong>the</strong> Foundation is to look after <strong>the</strong> <strong>in</strong>terests <strong>of</strong> <strong>the</strong> Company and <strong>the</strong> companies that are held by <strong>the</strong><br />

Company and <strong>the</strong> group <strong>of</strong> companies associated with <strong>the</strong> Company. Specifically, <strong>the</strong> Foundation seeks to ensure that<br />

<strong>the</strong> <strong>in</strong>terests <strong>of</strong> <strong>the</strong> Company and <strong>of</strong> those companies and all <strong>the</strong>ir stakeholders are safeguarded as well as possible and<br />

that <strong>in</strong>fluences which could underm<strong>in</strong>e <strong>the</strong> <strong>in</strong>dependence and/or cont<strong>in</strong>uity and/or identity <strong>of</strong> <strong>the</strong> Company and those<br />

companies and which are <strong>in</strong> conflict with those <strong>in</strong>terests are averted to <strong>the</strong> best <strong>of</strong> <strong>the</strong> Foundation’s ability. The<br />

Foundation attempts to achieve its objective by acquir<strong>in</strong>g – whe<strong>the</strong>r or not by exercis<strong>in</strong>g <strong>the</strong> option referred to above –<br />

and hold<strong>in</strong>g class B cumulative preference shares <strong>in</strong> <strong>the</strong> Company’s capital, by exercis<strong>in</strong>g <strong>the</strong> rights connected with those<br />

shares and/or by us<strong>in</strong>g its right <strong>of</strong> enquiry.<br />

As announced at <strong>the</strong> General Meet<strong>in</strong>g held on 4 June 1992 and considered at <strong>the</strong> General Meet<strong>in</strong>g on 8 June 1993, <strong>the</strong><br />

Company granted <strong>the</strong> Foundation an option to acquire class B cumulative preference shares <strong>in</strong> <strong>the</strong> Company’s capital on<br />

17 May 1993. This option was granted up to such an amount as <strong>the</strong> Foundation might require, subject to a maximum <strong>of</strong> a<br />

nom<strong>in</strong>al amount that would result <strong>in</strong> <strong>the</strong> total nom<strong>in</strong>al amount <strong>of</strong> class B cumulative preference shares <strong>in</strong> issue and not<br />

held by <strong>the</strong> Company equall<strong>in</strong>g no more than n<strong>in</strong>ety-n<strong>in</strong>e po<strong>in</strong>t n<strong>in</strong>e percent (99.9 percent) <strong>of</strong> <strong>the</strong> nom<strong>in</strong>al amount <strong>of</strong> <strong>the</strong><br />

issued share capital <strong>in</strong> <strong>the</strong> form <strong>of</strong> shares o<strong>the</strong>r than class B cumulative preference shares and not held by <strong>the</strong> Company at<br />

<strong>the</strong> time <strong>of</strong> exercis<strong>in</strong>g <strong>of</strong> <strong>the</strong> right referred to above. The Executive Committee <strong>of</strong> <strong>the</strong> Foundation has <strong>the</strong> exclusive right<br />

to determ<strong>in</strong>e whe<strong>the</strong>r or not to exercise this right to acquire class B cumulative preference shares.<br />

On 6 October 2008, <strong>the</strong> Company granted <strong>the</strong> Foundation <strong>the</strong> right, under Article 2:346(c) <strong>of</strong> <strong>the</strong> Dutch Civil Code, to<br />

submit a petition as referred to <strong>in</strong> Article 2:345 <strong>of</strong> <strong>the</strong> Dutch Civil Code (right <strong>of</strong> enquiry).<br />

The Foundation’s Executive Committee consists <strong>of</strong> three members, namely a Category A director and two Category B<br />

directors. The Category A director is appo<strong>in</strong>ted by <strong>the</strong> company’s Executive Board, subject to approval by <strong>the</strong> Supervisory<br />

Board. The Category A director may not be a member <strong>of</strong> <strong>the</strong> Executive Board or Supervisory Board <strong>of</strong> <strong>the</strong> Company or any<br />

<strong>of</strong> its subsidiaries.<br />

The Category B directors are appo<strong>in</strong>ted by <strong>the</strong> Foundation’s Executive Committee, subject to <strong>the</strong> approval <strong>of</strong> <strong>the</strong><br />

Executive Board, for which <strong>the</strong> latter <strong>in</strong> turn requires <strong>the</strong> approval <strong>of</strong> <strong>the</strong> Supervisory Board. A Category B director may<br />

not be a person affiliated to <strong>the</strong> Company as referred to <strong>in</strong> <strong>the</strong> now lapsed Appendix X to <strong>the</strong> General Regulations <strong>of</strong><br />

Euronext Amsterdam Stock Market, Rule Book II (Algemeen Reglement Euronext Amsterdam Stockmarket, Rulebook II).<br />

The current composition <strong>of</strong> <strong>the</strong> Executive Committee is:<br />

J. Kleiterp, Chairman (A)<br />

R. de Jong (B)<br />

R. Pieterse (B)<br />

The Chairman <strong>of</strong> <strong>the</strong> Foundation’s Executive Committee receives an annual fee <strong>of</strong> €6,000 from <strong>the</strong> Foundation.<br />

The Foundation pays an annual fee <strong>of</strong> €5,000 to each <strong>of</strong> <strong>the</strong> o<strong>the</strong>r members <strong>of</strong> its Executive Committee.<br />

111<br />

<strong>2011</strong>


112<br />

<strong>2011</strong><br />

The particulars <strong>of</strong> <strong>the</strong> Executive Committee members are:<br />

J. Kleiterp (1933), Chairman<br />

Member <strong>of</strong> <strong>the</strong> Foundation’s Executive Committee s<strong>in</strong>ce 2004 and Chairman s<strong>in</strong>ce 2005. Dutch national. Former<br />

Chairman <strong>of</strong> <strong>the</strong> Executive Board <strong>of</strong> MeesPierson.<br />

R. de Jong (1948)<br />

Member <strong>of</strong> <strong>the</strong> Foundation’s Executive Committee s<strong>in</strong>ce 2009. Dutch national. Former member <strong>of</strong> <strong>the</strong> Executive Board <strong>of</strong><br />

Essent and Chief F<strong>in</strong>ancial Officer. Mr De Jong is a member <strong>of</strong> <strong>the</strong> Supervisory Board and a member <strong>of</strong> <strong>the</strong> Audit<br />

Committee <strong>of</strong> APX-Endex (Amsterdam Power Exchange-European Energy Derivates Exchange), Chairman <strong>of</strong> <strong>the</strong><br />

Supervisory Board <strong>of</strong> Bakeplus Hold<strong>in</strong>g, Chairman <strong>of</strong> <strong>the</strong> Supervisory Board <strong>of</strong> EAH Hold<strong>in</strong>g (Thialf ice r<strong>in</strong>k), member <strong>of</strong><br />

<strong>the</strong> Supervisory Board and Chairman <strong>of</strong> <strong>the</strong> Audit Committee <strong>of</strong> Enexis Hold<strong>in</strong>g and member <strong>of</strong> <strong>the</strong> Supervisory Board<br />

and Chairman <strong>of</strong> <strong>the</strong> Audit Committee <strong>of</strong> USG People. Mr De Jong is also a member <strong>of</strong> <strong>the</strong> Supervisory Board <strong>of</strong><br />

Waarborgfonds voor de Zorgsector.<br />

R. Pieterse (1942)<br />

Member <strong>of</strong> <strong>the</strong> Foundation’s Executive Committee s<strong>in</strong>ce 2009. Dutch national. Former Chairman <strong>of</strong> <strong>the</strong> Executive Board<br />

<strong>of</strong> Wolters Kluwer. Mr Pieterse is Chairman <strong>of</strong> <strong>the</strong> Supervisory Board <strong>of</strong> Royal Grolsch and Non-Executive Director at<br />

SABMiller, Chairman <strong>of</strong> <strong>the</strong> Supervisory Board and member <strong>of</strong> <strong>the</strong> Audit Committee <strong>of</strong> Mercurius Group Wormerveer,<br />

member <strong>of</strong> <strong>the</strong> Supervisory Board and Chairman <strong>of</strong> <strong>the</strong> Audit Committee <strong>of</strong> CSM, Chairman <strong>of</strong> <strong>the</strong> Board <strong>of</strong> Sticht<strong>in</strong>g<br />

Bescherm<strong>in</strong>g TNT and Chairman <strong>of</strong> <strong>the</strong> Board <strong>of</strong> Sticht<strong>in</strong>g Preferente Aandelen USG People.<br />

In 2003, Mr Pieterse was a member <strong>of</strong> <strong>the</strong> committee that drew up <strong>the</strong> first Dutch Corporate Governance Code.<br />

No class B cumulative preference shares have been issued at this time.<br />

The Supervisory Board and <strong>the</strong> Executive Board reserve <strong>the</strong> right, <strong>in</strong> <strong>the</strong> <strong>in</strong>terests <strong>of</strong> <strong>the</strong> Company and its associated<br />

companies, to resolve to take measures o<strong>the</strong>r than <strong>the</strong> issue <strong>of</strong> class B preference shares <strong>in</strong> order to protect <strong>the</strong> Company<br />

aga<strong>in</strong>st <strong>in</strong>fluences that might be regarded by <strong>the</strong> Supervisory Board and <strong>the</strong> Executive Board, after balanc<strong>in</strong>g <strong>the</strong> <strong>in</strong>terests<br />

<strong>of</strong> <strong>the</strong> Company and all <strong>of</strong> <strong>the</strong> stakeholders <strong>in</strong> <strong>the</strong> Group, as be<strong>in</strong>g potentially damag<strong>in</strong>g to <strong>the</strong> <strong>in</strong>dependence, cont<strong>in</strong>uity<br />

and/or identity <strong>of</strong> <strong>the</strong> Group.


113<br />

<strong>2011</strong>


114<br />

<strong>2011</strong><br />

Overview <strong>of</strong> pr<strong>in</strong>cipal subsidiaries and associates<br />

Construction and mechanical and electrical services %<br />

• <strong>BAM</strong> Utiliteitsbouw bv*, Bunnik (Ne<strong>the</strong>rlands) 100<br />

• <strong>BAM</strong> Won<strong>in</strong>gbouw bv*, Bunnik (Ne<strong>the</strong>rlands) 100<br />

• Heilijgers bv*, Amersfoort (Ne<strong>the</strong>rlands) 100<br />

• Bouwbedrijf Penn<strong>in</strong>gs bv*, Rosmalen (Ne<strong>the</strong>rlands) 100<br />

• <strong>BAM</strong> Materieel bv*, Lelystad (Ne<strong>the</strong>rlands) 100<br />

• <strong>BAM</strong> Techniek bv*, Bunnik (Ne<strong>the</strong>rlands) 100<br />

• Interbuild nv, Wilrijk-Antwerp (Belgium) 100<br />

• <strong>BAM</strong> Construct UK Ltd, Hemel Hempstead (United K<strong>in</strong>gdom) 100<br />

• <strong>BAM</strong> Deutschland AG, Stuttgart (Germany) 100<br />

Civil eng<strong>in</strong>eer<strong>in</strong>g<br />

• <strong>BAM</strong> Civiel bv*, Gouda (Ne<strong>the</strong>rlands) 100<br />

• <strong>BAM</strong> Infratechniek bv*, Culemborg (Ne<strong>the</strong>rlands) 100<br />

• <strong>BAM</strong> Rail bv*, Breda (Ne<strong>the</strong>rlands) 100<br />

• <strong>BAM</strong> Wegen bv*, Utrecht (Ne<strong>the</strong>rlands) 100<br />

• <strong>BAM</strong> Infraconsult bv*, Gouda (Ne<strong>the</strong>rlands) 100<br />

• <strong>BAM</strong> International bv*, Gouda (Ne<strong>the</strong>rlands) 100<br />

• <strong>BAM</strong> Wallonie sa, Liège (Belgium) 100<br />

• Betonac nv, S<strong>in</strong>t-Truiden (Belgium) 100<br />

• CEI-De Meyer nv, Brussels (Belgium) 100<br />

• <strong>BAM</strong> Nuttall Ltd, Camberley, Surrey (United K<strong>in</strong>gdom) 100<br />

• <strong>BAM</strong> Contractors Ltd, Kill, County Kildare (Ireland) 100<br />

• Wayss & Freytag Ingenieurbau AG, Frankfurt am Ma<strong>in</strong> (Germany) 100<br />

Property<br />

• AM bv*, Nieuwege<strong>in</strong> (Ne<strong>the</strong>rlands) 100<br />

• AM Real Estate Development*, Utrecht (Ne<strong>the</strong>rlands) 100<br />

• Kaïros nv, Wilrijk-Antwerp (Belgium) 100<br />

Public-Private Partnerships (PPP)<br />

• <strong>BAM</strong> PPP bv, Bunnik (Ne<strong>the</strong>rlands) 100<br />

Consultancy and eng<strong>in</strong>eer<strong>in</strong>g<br />

• Tebod<strong>in</strong> bv, The Hague (Ne<strong>the</strong>rlands) 100<br />

Associates<br />

• Infraspeed (Hold<strong>in</strong>gs) bv, Haarlem (Ne<strong>the</strong>rlands) 10.5<br />

• Railpro bv, Hilversum (Ne<strong>the</strong>rlands) 10<br />

• Just<strong>in</strong>vest nv, Wilrijk-Antwerp (Belgium) 33.3<br />

• Rabot Invest nv, Wilrijk-Antwerp (Belgium) 25<br />

A list <strong>of</strong> associates as referred to <strong>in</strong> Sections 379 and 414, Book 2, <strong>of</strong> <strong>the</strong> Ne<strong>the</strong>rlands Civil Code has been<br />

deposited at <strong>the</strong> Office <strong>of</strong> <strong>the</strong> Trade Register <strong>in</strong> Utrecht.<br />

* In respect <strong>of</strong> <strong>the</strong>se subsidiaries, Royal <strong>BAM</strong> Group nv has deposited a declaration <strong>of</strong> jo<strong>in</strong>t and several liability<br />

pursuant to Section 403, Part 9, Book 2 <strong>of</strong> <strong>the</strong> Ne<strong>the</strong>rlands Civil Code.


Royal <strong>BAM</strong> Group nv<br />

Royal <strong>BAM</strong> Group nv executive <strong>of</strong>ficers<br />

(as at 1 April 2012)<br />

Bunnik (Ne<strong>the</strong>rlands) N.J. de Vries, Chairman<br />

M.J. Rogers<br />

J. Ruis, CFO<br />

R.P. van W<strong>in</strong>gerden<br />

Construction and mechanical and<br />

electrical services<br />

Ne<strong>the</strong>rlands<br />

<strong>BAM</strong> Utiliteitsbouw, Bunnik H.W.J. Bol<br />

J.J. Kempkens<br />

M.J.E. de Vreede<br />

<strong>BAM</strong> Won<strong>in</strong>gbouw, Bunnik P.M.L. Born<br />

T.M. Krouwels<br />

J.G. Nelis<br />

Heilijgers, Amersfoort R.J. Jansen<br />

<strong>BAM</strong> Techniek, Bunnik J.F.M. Al<br />

J.A. Hazeleger<br />

R.A.C. van Zijl<br />

Belgium<br />

Interbuild, Wilrijk-Antwerp W. Tahon<br />

M. Coppens<br />

United K<strong>in</strong>gdom<br />

<strong>BAM</strong> Construct UK, London G. Cash<br />

R. Bailey<br />

J.R. Burke<br />

Germany<br />

<strong>BAM</strong> Deutschland, Stuttgart A. Naujoks<br />

A. Häberle<br />

M. Hager<br />

M. Koch<br />

Civil eng<strong>in</strong>eer<strong>in</strong>g<br />

Ne<strong>the</strong>rlands<br />

<strong>BAM</strong> Civiel, Gouda B.J. Wierenga<br />

H.M.E. te Duits<br />

W.R. Remmelts<br />

<strong>BAM</strong> Infratechniek, M. de Rooij<br />

Culemborg H.G. Kuipers<br />

B. Schultze<br />

<strong>BAM</strong> Rail, Breda S.H. van Royen<br />

M.A. van Raaij<br />

B.H. Regtuijt<br />

<strong>BAM</strong> Wegen, Utrecht W. Kon<strong>in</strong>gs<br />

R.L.M. van Hulst<br />

T. W<strong>in</strong>ter<br />

W.J. van Niekerk, Corporate Social<br />

Responsibility<br />

H. Bree, Property Investments<br />

M. von Devivere, Bus<strong>in</strong>ess Development<br />

Civil<br />

P.F. Jaeger, Legal Affairs and<br />

Company Secretary<br />

T.W. Munt<strong>in</strong>ga, F<strong>in</strong>ance<br />

P.J.J. Leliefeld, Human Resources<br />

Pr<strong>of</strong>. G.J. Maas, Strategy<br />

A.C. Pronk, Public Relations<br />

A. Sundermeijer, ICT<br />

Belgium<br />

Betonac, S<strong>in</strong>t-Truiden M. Peeters<br />

G. De Cock<br />

L. Luyten<br />

CEI-De Meyer, Brussels M. Peeters<br />

G. De Cock<br />

P. Depreter<br />

<strong>BAM</strong> Wallonie, P. Goblet<br />

Chaudfonta<strong>in</strong>e V. Pissart<br />

S. Rizzo<br />

United K<strong>in</strong>gdom<br />

<strong>BAM</strong> Nuttall, S.C. Fox<br />

Camberley D.K. Belsham<br />

R. Treadgold<br />

G. Renshaw<br />

Ireland<br />

<strong>BAM</strong> Contractors, T.M. Cull<strong>in</strong>ane<br />

Kill L.F. Harmon<br />

Germany<br />

Wayss & Freytag S. Currle<br />

Ingenieurbau, M. Blaschko<br />

Frankfurt am Ma<strong>in</strong><br />

Worldwide<br />

<strong>BAM</strong> International, Gouda G.K. Mazloumian<br />

M.R. Bellamy<br />

Property<br />

Ne<strong>the</strong>rlands<br />

AM, Nieuwege<strong>in</strong> R. Vollebregt<br />

M.J.S. Broos<br />

H. de Pater<br />

AM Real Estate Development, M. Verwoert<br />

Utrecht B.C. Kuil<br />

F.P. Trip<br />

Belgium<br />

Kaïros, Wilrijk-Antwerp B. De Landsheer<br />

Public-Private Partnerships (PPP)<br />

<strong>BAM</strong> PPP, Bunnik, Glasgow R. Fielder<br />

A.J. Kroezen<br />

K. Meade<br />

115<br />

<strong>2011</strong>


116<br />

<strong>2011</strong><br />

Ten-year key figures<br />

(<strong>in</strong> € million, unless o<strong>the</strong>rwise <strong>in</strong>dicated)<br />

<strong>2011</strong> 2010 2009 6 2008 2007<br />

IFRS IFRS IFRS IFRS IFRS<br />

Revenue 7,920 7,611 8,324 8,835 8,954<br />

Operat<strong>in</strong>g result exclud<strong>in</strong>g f<strong>in</strong>es 150.7 (30.3) (68.5) 233.4 340.7<br />

Operat<strong>in</strong>g result 150.7 (30.3) (68.5) 233.4 340.7<br />

Result before tax 158.7 26.0 (52.8) 252.5 428.1<br />

Net result attributable to shareholders 126.0 15.3 31.3 161.9 349.0<br />

Net result attributable to holders <strong>of</strong> ord<strong>in</strong>ary shares 126.0 15.3 31.3 161.9 349.0<br />

Revenue from cont<strong>in</strong>u<strong>in</strong>g operations 7,697 7,611 8,324 8,835 8,539<br />

Operat<strong>in</strong>g result from cont<strong>in</strong>u<strong>in</strong>g operations 135.4 (30.3) (68.5) 233.4 327.2<br />

Result from cont<strong>in</strong>u<strong>in</strong>g operations before tax<br />

Net result from cont<strong>in</strong>u<strong>in</strong>g operations before tax<br />

143.5 26.0 (52.8) 252.5 341.8<br />

attributable to shareholders 113.9 15.3 31.3 161.9 268.3<br />

Earn<strong>in</strong>g per ord<strong>in</strong>ary share (<strong>in</strong> € 1) 7 0.54 0.08 0.18 1.21 2.80<br />

Fully diluted result per ord<strong>in</strong>ary share (<strong>in</strong> € 1) 7 0.54 0.08 0.18 1.20 2.60<br />

Dividend per ord<strong>in</strong>ary share (<strong>in</strong> € 1) ² 0.16 0.03 0.10 0.50 0.90<br />

Equity attributable to shareholders 1,162.4 1,099.9 875.0 847.4 993.5<br />

Subord<strong>in</strong>ated loans ³ 200.0 199.9 200.0 200.0 200.0<br />

Preference shares - 1.7 1.7 1.8 23.3<br />

Third-party shareholders AM - - - 49.0 49.0<br />

Convertible subord<strong>in</strong>ated bond loan 3 - - - - -<br />

Capital base 1,362.4 1,301.5 1,076.7 1,098.2 1,265.8<br />

Net additions to property, plant and equipment<br />

Depreciation/amortisation/impairment <strong>of</strong>:<br />

57.2 68.5 83.3 89.7 131.7<br />

- Property, plant and equipment 94.9 97.3 93.0 86.0 93.6<br />

- Intangible assets 11.1 10.9 51.3 109.5 7.7<br />

- O<strong>the</strong>r impairments - 127.3 92.7 - -<br />

Cash flow before dividend 232.0 250.9 268.3 357.3 450.3<br />

Total impairments - 128.2 134.3 100.0 (1.0)<br />

Order book 4 10,400 12,100 11,100 13,100 13,800<br />

Average number <strong>of</strong> fte 26,639 26,840 28,464 28,544 28,007<br />

Number <strong>of</strong> fte at year-end 27,007 26,088 27,212 29,050 27,578<br />

Ratios (<strong>in</strong> %)<br />

Result before tax, impairments and f<strong>in</strong>es as % <strong>of</strong> revenu 5 2.0 2.0 1.0 4.0 4.8<br />

Result before tax and impairment <strong>of</strong> goodwill as % <strong>of</strong> revenu 5 Result from cont<strong>in</strong>u<strong>in</strong>g operations before tax and impairment<br />

2.0 2.0 (0.2) 4.0 4.8<br />

<strong>of</strong> goodwill as % <strong>of</strong> revenue 1.9 0.3 (0.2) 4.0 4.0<br />

Net result as % <strong>of</strong> revenue 1.6 0.2 0.4 1.8 3.9<br />

Net result as % average equity 11.1 1.6 3.6 17.6 41.4<br />

Capital ratios:<br />

- Equity attributable to shareholders as % <strong>of</strong> total assets 16.1 15.4 12.9 12.6 14.2<br />

- Capital base as % <strong>of</strong> total assets 18.9 18.2 15.8 16.3 18.1<br />

Current ratio 1.39 1.23 1.21 1.28 1.28<br />

¹ With effect from 2003, <strong>in</strong>terest on property development has been capittalised; previous year figures are not restated.<br />

² Dividend proposal <strong>2011</strong>.<br />

³ Includ<strong>in</strong>g <strong>the</strong> current part.


2006 2005 2004 2003 1 2002<br />

IFRS IFRS IFRS NL GAAP NL GAAP<br />

8,646 7,425 7,493 7,770 3,579 Revenue<br />

262.6 235.3 232.7 172.6 75.7 Operat<strong>in</strong>g result exclud<strong>in</strong>g f<strong>in</strong>es<br />

255.2 235.3 192.7 145.2 75.7 Operat<strong>in</strong>g result<br />

228.4 229.9 172.3 112.6 70.2 Result before tax<br />

137.0 153.3 106.4 56.0 46.7 Net result attributable to shareholders<br />

137.0 153.3 91.1 38.2 45.9 Net result attributable to holders <strong>of</strong> ord<strong>in</strong>ary shares<br />

8,150 7,425 7,493 7,770 3,579 Revenue from cont<strong>in</strong>u<strong>in</strong>g operations<br />

237.2 235.3 192.7 145.2 75.7 Operat<strong>in</strong>g result from cont<strong>in</strong>u<strong>in</strong>g operations<br />

209.8 229.9 172.3 112.6 70.2 Result from cont<strong>in</strong>u<strong>in</strong>g operations before tax<br />

Net result from cont<strong>in</strong>u<strong>in</strong>g operations before tax<br />

124.8 153.3 106.4 56.0 46.7 attributable to shareholders<br />

1.11 1.46 1.06 0.52 0.87 Earn<strong>in</strong>g per ord<strong>in</strong>ary share (<strong>in</strong> € 1) 7<br />

1.04 1.28 0.87 0.45 0.74 Fully diluted result per ord<strong>in</strong>ary share (<strong>in</strong> € 1) 7<br />

0.45 0.40 0.31 0.31 0.31 Dividend per ord<strong>in</strong>ary share (<strong>in</strong> € 1) ²<br />

692.6 581.7 435.1 441.1 404.1 Equity attributable to shareholders<br />

150.0 155.1 121.3 125.9 30.5 Subord<strong>in</strong>ated loans ³<br />

48.2 53.6 - - - Preference shares<br />

49.0 - - - - Third-party shareholders AM<br />

- - - 17.4 33.2 Convertible subord<strong>in</strong>ated bond loan 3<br />

939.8 790.4 556.4 584.4 467.8 Capital base<br />

119.2 101.0 92.9 86.0 54.3 Net additions to property, plant and equipment<br />

Depreciation/amortisation/impairment <strong>of</strong>:<br />

96.5 97.6 92.5 134.1 43.5 - Property, plant and equipment<br />

3.4 8.0 2.7 35.4 8.7 - Intangible assets<br />

- 1.0 - - - - O<strong>the</strong>r impairments<br />

230.9 259.9 201.6 225.4 98.8 Cash flow before dividend<br />

1.0 16.0 4.0 2.9 - Total impairments<br />

13,100 10,400 8,900 9,100 10,200 Order book 4<br />

28,330 26,914 26,801 29,551 14,972 Average number <strong>of</strong> fte<br />

30,338 27,190 26,651 26,837 30,588 Number <strong>of</strong> fte at year-end<br />

2.7 3.3 2.9 2.3 2.2<br />

Ratios (<strong>in</strong> %)<br />

Result before tax, impairments and f<strong>in</strong>es as % <strong>of</strong> revenu 5<br />

2.6 3.1 2.3 1.9 2.2 Result before tax and impairment <strong>of</strong> goodwill as % <strong>of</strong> revenu 5<br />

Result from cont<strong>in</strong>u<strong>in</strong>g operations before tax and impairment<br />

2.6 3.1 2.3 1.9 2.2 <strong>of</strong> goodwill as % <strong>of</strong> revenue<br />

1.6 2.1 1.4 0.7 1.3 Net result as % <strong>of</strong> revenue<br />

21.5 37.8 28.2 13.2 29.2 Net result as % average equity<br />

10.7 11.7 9.2 14.1 10.5<br />

Capital ratios:<br />

- Equity attributable to shareholders as % <strong>of</strong> total assets<br />

14.5 15.9 11.7 18.7 12.1 - Capital base as % <strong>of</strong> total assets<br />

1.16 1.09 0.99 0.92 0.77 Current ratio<br />

4 The orderbook comprises both signed contracts and verbally agreed upon orders.<br />

5 Includ<strong>in</strong>g goodwill amortisation <strong>in</strong> <strong>the</strong> years 2002 and 2003.<br />

6 In 2009 revenu, operat<strong>in</strong>g result and order book are adjusted due to IFRIC 12.<br />

7 2009 adjusted for rights issue.<br />

117<br />

<strong>2011</strong>


118<br />

<strong>2011</strong><br />

Key f<strong>in</strong>ancial dates<br />

25 April 2012 General Meet<strong>in</strong>g <strong>of</strong> Shareholders<br />

27 April 2012 Ex-dividend list<strong>in</strong>g<br />

2 May 2012 Record date for dividend rights<br />

3 May 2012 Start <strong>of</strong> dividend option period<br />

16 May 2012 End <strong>of</strong> dividend option period; adoption and publication<br />

<strong>of</strong> stock dividend conversion ratio (after hours)<br />

21 May 2012 Declaration <strong>of</strong> dividend<br />

10 May 2012 Publication <strong>of</strong> first quarter results<br />

23 August 2012 Publication <strong>of</strong> half-year results<br />

15 November 2012 Publication <strong>of</strong> third quarter results<br />

7 March 2013 Publication <strong>of</strong> annual results for 2012<br />

24 April 2013 General Meet<strong>in</strong>g <strong>of</strong> Shareholders<br />

16 May 2013 Publication <strong>of</strong> first quarter results<br />

22 August 2013 Publication <strong>of</strong> half-year results<br />

14 November 2013 Publication <strong>of</strong> third quarter results<br />

The General Meet<strong>in</strong>g <strong>of</strong> Shareholders will be held on Wednesday 25 April 2012, start<strong>in</strong>g at 3 p.m., <strong>in</strong> <strong>the</strong> Koepelzaal <strong>of</strong> <strong>the</strong><br />

Renaissance Amsterdam Hotel, Kattengat 1, 1012 SZ Amsterdam.<br />

The adoption <strong>of</strong> <strong>the</strong> stock dividend conversion ratio will be based on <strong>the</strong> volume-weighted average price <strong>of</strong> <strong>the</strong> Royal<br />

<strong>BAM</strong> Group nv shares traded on <strong>the</strong> Euronext Amsterdam stock exchange on 14, 15 and 16 May, such that <strong>the</strong> gross value<br />

<strong>of</strong> <strong>the</strong> dividend distributed <strong>in</strong> shares is approximately 5 percent more than <strong>the</strong> gross value <strong>of</strong> <strong>the</strong> cash dividend.<br />

Acknowledgements<br />

Layout:<br />

Boulogne Jonkers Vormgev<strong>in</strong>g, Zoetermeer, <strong>the</strong> Ne<strong>the</strong>rlands<br />

Pr<strong>in</strong>t<strong>in</strong>g:<br />

RotoSmeets GrafiServices, Utrecht, <strong>the</strong> Ne<strong>the</strong>rlands<br />

Illustrations:<br />

African M<strong>in</strong>erals, McAteer Photograph, Arge TSB, De Beeldredaktie, Michael Boulogne, Mark van de Br<strong>in</strong>k, Mike Chivers,<br />

Hans van Cooten, Imre Csany, Jean-Luc Deru/daylight sprl-photo-daylight.com, Graeme Duncan, Sylvia Geurts,<br />

Tom D’Haenens, Femke van den Heuvel, Thea van den Heuvel, Hufton+Crow, Henk Huisman, I.M.S. Fotografie/Ge Duits,<br />

Chris Klok, Greg K<strong>in</strong>g, Marti Hold<strong>in</strong>g AG, Peter Morgan (Lightworks), Peter van Mulken, Neste Oil, Lisette van de Pavoordt,<br />

Tim Pestridge, Jane van Raaphorst, Rijkswaterstaat, Mario Rodrigues, nv De Scheepvaart, Sebastian Schuler, Jamie Sharp,<br />

Sasja van Vechgel (heart4photography.com), Snow-white luchtfotografie/Moniek Mulder, John Voermans,<br />

Eresh Weerasuriya, Ad Wittens.<br />

Pr<strong>in</strong>ted on Revive 50:50 / 9Lives <strong>of</strong> BührmannUbbens, Zutphen, <strong>the</strong> Ne<strong>the</strong>rlands.<br />

This FSC ® -certified paper is made from 55 percent recycled fibres.<br />

13.03.2012


119<br />

<strong>2011</strong>


120<br />

<strong>2011</strong>


Royal <strong>BAM</strong> Group nv<br />

Runnenburg 9<br />

3981 AZ Bunnik<br />

P.O. Box 20<br />

3980 CA Bunnik<br />

The Ne<strong>the</strong>rlands<br />

Telephone +31 (0)30 659 89 88<br />

<strong>in</strong>fo@bam.nl<br />

www.bam.eu<br />

Established at Bunnik.<br />

Trade Register Utrecht Number 30058019.<br />

This is an English translation <strong>of</strong> <strong>the</strong> orig<strong>in</strong>al Dutch-language report.<br />

Should different <strong>in</strong>terpretations arise, <strong>the</strong> Dutch version prevails.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!