- Page 1 and 2: 2011 Abbreviated Annual Report
- Page 3 and 4: Key figures (in €million, unless
- Page 5 and 6: Foreword Royal BAM Group nv hereby
- Page 7 and 8: Outlook Royal BAM Group started 201
- Page 9 and 10: Construction and mechanical and ele
- Page 11 and 12: Better results are generally accomp
- Page 13: 2. Optimum exploitation of strength
- Page 17 and 18: Dividend policy Dividend policy and
- Page 19 and 20: Report by the Supervisory Board to
- Page 21 and 22: Fotobijschrift: 19 2011
- Page 23 and 24: eported in each case on the state o
- Page 25 and 26: Multipurpose complex for care and s
- Page 27 and 28: and reported to the Supervisory Boa
- Page 29 and 30: 27 2011
- Page 31 and 32: to the financial objectives (maximu
- Page 33 and 34: The variable remuneration actually
- Page 35 and 36: The graduated scale shown below app
- Page 37 and 38: The company has no other remunerati
- Page 39 and 40: C.M.C. Mahieu (1959) Ms Mahieu grad
- Page 41 and 42: Financial results Report by the Exe
- Page 43 and 44: Result per ordinary share The numbe
- Page 45 and 46: Oman Botanical Garden, Muscat. BAM
- Page 47 and 48: of €16 million and a super divide
- Page 49 and 50: financial year and the subsequent f
- Page 51 and 52: manner with regard to the other mem
- Page 53 and 54: Sporen in Arnhem: modernisation and
- Page 55 and 56: Approximately 130 metres-high ‘De
- Page 57 and 58: Netherlands with a remaining term m
- Page 59 and 60: N218 Hartel canal cycle bridge (600
- Page 61 and 62: On the one hand, the operating comp
- Page 63 and 64: ensure that it consistently and eff
- Page 65 and 66:
carrying out this project but was n
- Page 67 and 68:
Corporate Social Responsibility Pol
- Page 69 and 70:
Green walls and roofs of the BSH In
- Page 71 and 72:
Worker participation European Works
- Page 73 and 74:
y 7.7 percent in 2012. On the other
- Page 75 and 76:
Royal BAM Group is active in the co
- Page 77 and 78:
18 homes in the Elzenhagen neighbou
- Page 79 and 80:
The company continued to perform st
- Page 81 and 82:
Four school buildings for Alfons Ke
- Page 83 and 84:
Royal BAM Group operates in the Dut
- Page 85 and 86:
Underground high-voltage link for t
- Page 87 and 88:
Design of quay wall and mooring jet
- Page 89 and 90:
Renovation and expansion of Tottenh
- Page 91 and 92:
Silberberg Railway Tunnel (7.4 kilo
- Page 93 and 94:
Laela-Sumbawanga road improvement p
- Page 95 and 96:
The Dutch property activities recor
- Page 97 and 98:
Redevelopment of a former domestic
- Page 99 and 100:
97 2011
- Page 101 and 102:
BAM PPP is responsible for Royal BA
- Page 103 and 104:
Tebodin Consultants & Engineers is
- Page 105 and 106:
Financial statements 2011 104 Conso
- Page 107 and 108:
Consolidated income statement (x
- Page 109 and 110:
Consolidated statement of equity (x
- Page 111 and 112:
Company balance sheet at 31 Decembe
- Page 113 and 114:
The Supervisory Board shall determi
- Page 115 and 116:
113 2011
- Page 117 and 118:
Royal BAM Group nv Royal BAM Group
- Page 119 and 120:
2006 2005 2004 2003 1 2002 IFRS IFR
- Page 121 and 122:
119 2011
- Page 124:
Royal BAM Group nv Runnenburg 9 398