Renovation and expansion <strong>of</strong> Tottenham<br />

Court Road underground station, London.<br />

<strong>BAM</strong> Nuttall.<br />

Substantial progress was also made at <strong>the</strong> follow<strong>in</strong>g<br />

major construction sites (as part <strong>of</strong> a consortium): <strong>the</strong><br />

new permanent NATO headquarters <strong>in</strong> Brussels, <strong>the</strong><br />

Ernotte, Bervoets and Bruyn-West residential projects<br />

and <strong>the</strong> renovation <strong>of</strong> <strong>the</strong> Cross<strong>in</strong>g Schaarbeek football<br />

stadium. The construction projects carried out by CEI-De<br />

Meyer for subsidiary Immo <strong>BAM</strong> proceeded as expected,<br />

<strong>the</strong> Bara-De Lijn residential complex <strong>in</strong> Anderlecht, <strong>the</strong><br />

Remy II <strong>of</strong>fice complex <strong>in</strong> Leuven and <strong>the</strong> HanzePark<br />

residential project be<strong>in</strong>g particular highlights. A large<br />

part <strong>of</strong> <strong>the</strong> Kantienberg PPP project was delivered earlier<br />

than planned <strong>in</strong> <strong>the</strong> second half <strong>of</strong> <strong>the</strong> year – to <strong>the</strong> great<br />

satisfaction <strong>of</strong> <strong>the</strong> University <strong>of</strong> Ghent.<br />

Rebuild<strong>in</strong>g <strong>of</strong> Lizard Lifeboat Station,<br />

Kilcobben Cove, United K<strong>in</strong>gdom.<br />

<strong>BAM</strong> Nuttall.<br />

<strong>2011</strong> saw > <strong>BAM</strong> Nuttall achieve ano<strong>the</strong>r year <strong>of</strong> record<br />

revenues. Dur<strong>in</strong>g <strong>the</strong> year under review, a number <strong>of</strong><br />

prestigious contracts were <strong>in</strong> progress, such as <strong>the</strong><br />

remediation <strong>of</strong> <strong>the</strong> Olympic Park at Stratford (<strong>in</strong>clud<strong>in</strong>g<br />

<strong>the</strong> <strong>in</strong>frastructure, <strong>the</strong> green areas and <strong>the</strong> bridges), <strong>the</strong><br />

upgrade <strong>of</strong> Blackpool’s historic tram system (with<br />

<strong>in</strong>volvement from <strong>BAM</strong> Rail), <strong>the</strong> upgrade <strong>of</strong> Tottenham<br />

Court Road and Victoria tube stations <strong>in</strong> Central London,<br />

<strong>the</strong> refurbishment <strong>of</strong> <strong>the</strong> northbound bore <strong>of</strong> <strong>the</strong><br />

Blackwall road tunnel <strong>in</strong> London, <strong>the</strong> Luton to Dunstable<br />

Guided Busway, <strong>the</strong> Evergreen 3 rail improvement<br />

scheme between London Marylebone and Birm<strong>in</strong>gham<br />

and <strong>the</strong> Managed Motorways Framework.<br />

Major contracts secured by <strong>BAM</strong> Nuttall <strong>in</strong>clude <strong>the</strong><br />

construction <strong>of</strong> <strong>the</strong> new station at Farr<strong>in</strong>gdon and <strong>the</strong><br />

removal <strong>of</strong> surplus material across all schemes <strong>in</strong> <strong>the</strong><br />

build<strong>in</strong>g <strong>of</strong> <strong>the</strong> Crossrail Tunnel. Two contracts were<br />

awarded for legacy work on <strong>the</strong> Olympic Park.<br />

Confirmation has been received as preferred contractor<br />

<strong>in</strong> a consortium for <strong>the</strong> earthworks contract for <strong>the</strong> new<br />

H<strong>in</strong>kley Po<strong>in</strong>t C nuclear power station.<br />

Despite <strong>the</strong> current recession, <strong>the</strong> forward order book<br />

position rema<strong>in</strong>s fairly healthy. Opportunities to tender<br />

for projects rema<strong>in</strong> solid although work w<strong>in</strong>n<strong>in</strong>g activity<br />

is now conf<strong>in</strong>ed to small geographical pockets. The<br />

Beyond Zero ethos cont<strong>in</strong>ues to be embedded<br />

throughout <strong>the</strong> entire workforce with <strong>the</strong> aim <strong>of</strong><br />

chang<strong>in</strong>g behaviour and challeng<strong>in</strong>g current safety<br />

standards.<br />