BAM Abbreviated Annual Report 2011 - Siteseeing in the world of ...
BAM Abbreviated Annual Report 2011 - Siteseeing in the world of ...
BAM Abbreviated Annual Report 2011 - Siteseeing in the world of ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
82<br />
<strong>2011</strong><br />
<strong>BAM</strong> Won<strong>in</strong>gbouw hoge<br />
kantoortoren, Palais Thurn und Taxis,<br />
maakt Neste Oil deel biodiesel uit van plant. het project Al<br />
Bidda, <strong>BAM</strong> Civiel, Qatar. <strong>BAM</strong> Techniek.<br />
<strong>BAM</strong> Vastgoed De 134 meter<br />
hoge kantoortoren, Palais Thurn und<br />
Nijmegen Taxis, maakt municipal deel uit bridge. van het project<br />
<strong>BAM</strong> Al Hidmi, Civiel. Qatar.<br />
> <strong>BAM</strong> Civiel concentrates on specialist concrete<br />
construction projects <strong>in</strong> <strong>the</strong> civil eng<strong>in</strong>eer<strong>in</strong>g, park<strong>in</strong>g,<br />
hydraulic eng<strong>in</strong>eer<strong>in</strong>g, <strong>in</strong>dustry and energy markets.<br />
The work varies from concept development, design and<br />
construction to management and ma<strong>in</strong>tenance.<br />
<strong>BAM</strong> Civiel’s ma<strong>in</strong> <strong>of</strong>fice is situated <strong>in</strong> Gouda. <strong>BAM</strong> Civiel<br />
has four regional branches and three specialist divisions:<br />
<strong>BAM</strong> Speciale Technieken, <strong>BAM</strong> Civiel Prefab Beton and<br />
<strong>BAM</strong> Civiel Bekist<strong>in</strong>gfabriek. <strong>BAM</strong> Civiel has around 750<br />
employees.<br />
<strong>BAM</strong> Civiel launched a development programme <strong>in</strong> <strong>2011</strong><br />
to <strong>in</strong>crease <strong>the</strong> added value <strong>of</strong> <strong>the</strong> organisation for<br />
customers and reduce costs. Lean methodology is a<br />
major part <strong>of</strong> this programme, which wiIl cont<strong>in</strong>ue <strong>in</strong><br />
2012. The collaboration between <strong>BAM</strong> Civiel and <strong>the</strong><br />
o<strong>the</strong>r <strong>BAM</strong> civil eng<strong>in</strong>eer<strong>in</strong>g companies also <strong>in</strong>creased <strong>in</strong><br />
order to improve <strong>the</strong> acquisition and implementation <strong>of</strong><br />
<strong>in</strong>tegrated, multidiscipl<strong>in</strong>ary projects.<br />
The civil eng<strong>in</strong>eer<strong>in</strong>g projects completed dur<strong>in</strong>g <strong>the</strong> year<br />
<strong>in</strong>clude <strong>the</strong> Hartel Cycle Bridge <strong>in</strong> <strong>the</strong> Botlek area <strong>of</strong><br />
Rotterdam, <strong>the</strong> tram depot for <strong>the</strong> RET transport<br />
company <strong>in</strong> <strong>the</strong> Rotterdam neighbourhood <strong>of</strong><br />
Beverwaard and <strong>the</strong> renovation <strong>of</strong> <strong>the</strong> IJ Tunnel <strong>in</strong><br />
Amsterdam. Work <strong>in</strong> progress <strong>in</strong>cludes <strong>the</strong> Burgerveen<br />
to Leiden South section <strong>of</strong> <strong>the</strong> A4 motorway, <strong>the</strong><br />
‘Stadsbrug’ bridge <strong>in</strong> Nijmegen, <strong>the</strong> ‘OV SAAL’ project<br />
(expansion <strong>of</strong> rail capacity on <strong>the</strong> Schiphol-Amsterdam-<br />
Almere-Lelystad l<strong>in</strong>e), <strong>the</strong> widen<strong>in</strong>g <strong>of</strong> <strong>the</strong> Utrecht<br />
Lunetten to Veenendaal stretch <strong>of</strong> <strong>the</strong> A12 motorway, <strong>the</strong><br />
‘Green Port Lane’ road-build<strong>in</strong>g project (N295) near<br />
Venlo, <strong>the</strong> ‘Hovenr<strong>in</strong>g’ crossroads <strong>in</strong> E<strong>in</strong>dhoven, <strong>the</strong><br />
‘Poortvrije Passages’ (shopp<strong>in</strong>g arcades) at Amsterdam<br />
Central Station and <strong>the</strong> renovation <strong>of</strong> <strong>the</strong> Vollenhover<br />
Bridge which l<strong>in</strong>ks <strong>the</strong> prov<strong>in</strong>ces <strong>of</strong> Overijssel and<br />
Flevoland. Construction <strong>of</strong> Europapark Station <strong>in</strong><br />
Gron<strong>in</strong>gen <strong>of</strong>ficially started.<br />
The underground civil eng<strong>in</strong>eer<strong>in</strong>g works for <strong>the</strong> New<br />
Rijksmuseum <strong>in</strong> Amsterdam (lot 1) are now complete <strong>in</strong> a<br />
project that won <strong>the</strong> Schreuder Award <strong>in</strong> <strong>2011</strong> for<br />
<strong>in</strong>novative and socially responsible use <strong>of</strong> underground<br />
space. The deepen<strong>in</strong>g <strong>of</strong> <strong>the</strong> basement for Ardagh Glass<br />
<strong>in</strong> Dongen was completed. Work is <strong>in</strong> progress on<br />
underground car parks <strong>in</strong> Apeldoorn, Nijmegen and<br />
Rotterdam.<br />
<strong>2011</strong> saw <strong>BAM</strong> Civiel <strong>in</strong>troduce ‘<strong>BAM</strong> GO-Park’, an<br />
<strong>in</strong>tegrated approach to build<strong>in</strong>g underground car parks<br />
that <strong>in</strong>cludes <strong>the</strong> entire process from <strong>in</strong>itiation and<br />
design<strong>in</strong>g <strong>the</strong> underground car park through calculation<br />
<strong>of</strong> <strong>the</strong> costs, construction and exploitation.<br />
In <strong>the</strong> hydraulic eng<strong>in</strong>eer<strong>in</strong>g segment, construction <strong>of</strong><br />
<strong>the</strong> quay walls is at an advanced stage <strong>in</strong> Maasvlakte 2<br />
and <strong>in</strong> <strong>the</strong> Wilhelm<strong>in</strong>ahaven part <strong>of</strong> <strong>the</strong> Eemshaven<br />
harbour area. Build<strong>in</strong>g work started on <strong>the</strong> Sluiskil Tunnel<br />
under <strong>the</strong> Ghent-to-Terneuzen canal.<br />
The projects delivered <strong>in</strong> <strong>the</strong> <strong>in</strong>dustry and energy<br />
segments <strong>in</strong>cluded <strong>the</strong> concrete and steel work for a<br />
comb<strong>in</strong>ed-cycle gas turb<strong>in</strong>e (CCGT) for Essent <strong>in</strong><br />
Moerdijk. The SITA ReEnergy waste energy plant <strong>in</strong><br />
Roosendaal was <strong>of</strong>ficially opened <strong>in</strong> October. BritNed’s<br />
convertor stations – <strong>the</strong> electricity l<strong>in</strong>k between <strong>the</strong><br />
Ne<strong>the</strong>rlands and England – were completed by <strong>BAM</strong><br />
Civiel and <strong>BAM</strong> Nuttall. The cool<strong>in</strong>g water station at <strong>the</strong><br />
EnecoGEN power plant also came on l<strong>in</strong>e <strong>in</strong> <strong>2011</strong>.<br />
<strong>BAM</strong> Civiel has been certified at <strong>the</strong> highest level <strong>of</strong><br />
ProRail’s CO performance ladder s<strong>in</strong>ce 2010 and is now<br />
2<br />
certified under version 2.0 as well. <strong>BAM</strong> Civiel was also<br />
awarded <strong>the</strong> ISO 14001 Environmental Management<br />
Certificate <strong>in</strong> <strong>2011</strong>.