27.12.2012 Views

BAM Abbreviated Annual Report 2011 - Siteseeing in the world of ...

BAM Abbreviated Annual Report 2011 - Siteseeing in the world of ...

BAM Abbreviated Annual Report 2011 - Siteseeing in the world of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Four school build<strong>in</strong>gs for Alfons Kern<br />

School, Pforzheim, Germany.<br />

<strong>BAM</strong> Deutschland.<br />

IsarBelle high-rise apartment<br />

build<strong>in</strong>g, Munich.<br />

<strong>BAM</strong> Deutschland.<br />

<strong>of</strong> cutt<strong>in</strong>g-edge communications/telecommunications<br />

and Internet technologies.<br />

<strong>BAM</strong> Techniek built a highly susta<strong>in</strong>able <strong>of</strong>fice build<strong>in</strong>g <strong>in</strong><br />

Hengelo for Tebod<strong>in</strong> and Lucassen Constructies <strong>in</strong> close<br />

collaboration with <strong>BAM</strong> Utiliteitsbouw and <strong>the</strong> architect.<br />

Susta<strong>in</strong>able options were selected for all <strong>of</strong> <strong>the</strong><br />

components <strong>in</strong> <strong>the</strong> electrical and mechanical equipment<br />

and thanks to a fully <strong>in</strong>tegrated structural, electrical and<br />

mechanical design, it was possible to construct an <strong>of</strong>fice<br />

build<strong>in</strong>g with energy label A+ with<strong>in</strong> a very competitive<br />

budget.<br />

<strong>2011</strong> also saw <strong>BAM</strong> Techniek complete <strong>the</strong> new and<br />

renovated parts <strong>of</strong> <strong>the</strong> Friesland prov<strong>in</strong>cial government<br />

build<strong>in</strong>g <strong>in</strong> Leeuwarden, <strong>the</strong> new Medimall <strong>in</strong> Rotterdam<br />

and <strong>the</strong> new central <strong>of</strong>fice <strong>of</strong> Hollands Noorderkwartier<br />

Higher Water Board <strong>in</strong> Heerhugowaard. <strong>BAM</strong> Techniek<br />

also worked on <strong>the</strong> new <strong>in</strong>fectious diseases laboratory <strong>in</strong><br />

Gron<strong>in</strong>gen and <strong>the</strong> <strong>in</strong>stallation <strong>of</strong> electrical and<br />

mechanical equipment – <strong>in</strong>clud<strong>in</strong>g heat and cold storage<br />

– at <strong>the</strong> University <strong>of</strong> Leiden. Comb<strong>in</strong>ed <strong>of</strong>fice and<br />

laboratory space was created for Unilever by <strong>BAM</strong><br />

Techniek <strong>in</strong> collaboration with <strong>BAM</strong> Gebouwservices.<br />

<strong>2011</strong> saw <strong>BAM</strong> Techniek and <strong>BAM</strong> Utiliteitsbouw w<strong>in</strong> <strong>the</strong><br />

first BREEAM Excellent Certificate <strong>in</strong> <strong>the</strong> Ne<strong>the</strong>rlands for<br />

<strong>the</strong> design phase <strong>of</strong> <strong>the</strong> De Monarch <strong>of</strong>fice block<br />

redevelopment project <strong>in</strong> The Hague. <strong>BAM</strong> Techniek also<br />

worked closely with <strong>BAM</strong> Utiliteitsbouw dur<strong>in</strong>g <strong>the</strong> year<br />

under review to build a laboratory and warehouse for<br />

Synthon <strong>in</strong> Nijmegen us<strong>in</strong>g <strong>the</strong> fast-track method <strong>of</strong> lean<br />

construction <strong>in</strong> a very short space <strong>of</strong> time.<br />

A large number <strong>of</strong> medium-voltage projects were<br />

delivered <strong>in</strong> <strong>the</strong> <strong>in</strong>dustrial market, <strong>in</strong>clud<strong>in</strong>g at Cabot <strong>in</strong><br />

Rotterdam and Hekema <strong>in</strong> Amstelveen.<br />

A technical management contract was signed <strong>in</strong> <strong>2011</strong> for<br />

<strong>the</strong> ma<strong>in</strong>tenance <strong>of</strong> all structural, electrical and<br />

mechanical build<strong>in</strong>g components at FrieslandCamp<strong>in</strong>a.<br />

Ma<strong>in</strong>tenance and management contracts for build<strong>in</strong>g<br />

equipment were also signed with Ricoh Europe <strong>in</strong> Bergen<br />

op Zoom and with property company Cushman &<br />

Wakefield.<br />

Industrial ma<strong>in</strong>tenance contracts were signed with<br />

He<strong>in</strong>eken, Cabot, Vopak and L<strong>in</strong>de Gas and <strong>BAM</strong><br />

Gebouwbeheer signed a long-term ma<strong>in</strong>tenance contract<br />

with Aalsmeer-based FloraHolland.<br />

The Energy Systems division was especially active <strong>in</strong> <strong>the</strong><br />

area <strong>of</strong> energy management <strong>in</strong> <strong>2011</strong>. Customers such as<br />

DTZ Zadelh<strong>of</strong>f and <strong>the</strong> Amsterdam ArenA were given an<br />

<strong>in</strong>sight <strong>in</strong>to <strong>the</strong> breakdown <strong>of</strong> <strong>the</strong>ir energy costs as well as<br />

advice about how to successfully manage and reduce <strong>the</strong>ir<br />

energy consumption.<br />

<strong>BAM</strong> Techniek-ICT delivered <strong>the</strong> first part <strong>of</strong> a new IP<br />

network along <strong>the</strong> A12 motorway for controll<strong>in</strong>g and<br />

check<strong>in</strong>g traffic signs and signals <strong>in</strong> <strong>2011</strong>. This delivery was<br />

<strong>the</strong> first <strong>in</strong> an extensive network <strong>in</strong>frastructure along this<br />

route which <strong>BAM</strong> (Poort van Bunnik) is widen<strong>in</strong>g.<br />

The <strong>BAM</strong> Techniek division Interflow built and <strong>in</strong>stalled a<br />

cleanroom at <strong>the</strong> Amsterdam Medical Centre for IVF<br />

patients dur<strong>in</strong>g <strong>the</strong> year under review. The cleanroom that<br />

was ultimately delivered is considered to be <strong>the</strong> new<br />

standard for IVF laboratories. Interflow also signed<br />

long-term contracts to validate and take measurements<br />

for a number <strong>of</strong> customers, <strong>in</strong>clud<strong>in</strong>g <strong>the</strong> Franciscus<br />

Hospital <strong>in</strong> Roosendaal, Merck Sharp & Dohme <strong>in</strong> Oss and<br />

<strong>the</strong> Re<strong>in</strong>ier de Graaf Group <strong>in</strong> Delft.<br />

<strong>BAM</strong> Gebouwbeheer <strong>in</strong>troduced <strong>the</strong> ‘Liv<strong>in</strong>gFacility’<br />

concept dur<strong>in</strong>g <strong>2011</strong>. The Liv<strong>in</strong>gFacility concept consists <strong>of</strong><br />

fully <strong>in</strong>tegrated management <strong>of</strong> technical and facilities<br />

processes and is an add-on to <strong>the</strong> current package <strong>of</strong><br />

services.<br />

Tempo Scan high-rise <strong>of</strong>fice block, Jakarta.<br />

<strong>BAM</strong> Decorient Indonesia.<br />

79<br />

<strong>2011</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!