1 BY ORDER OF THE AFI11-2HC-130JV3 CL-2 SECRETARY OF ...
1 BY ORDER OF THE AFI11-2HC-130JV3 CL-2 SECRETARY OF ...
1 BY ORDER OF THE AFI11-2HC-130JV3 CL-2 SECRETARY OF ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
W<br />
22. CNI-MU POD CTRL page 2/3 Set<br />
CSO/PO<br />
a. “Pod Pump – <strong>OF</strong>F” (If required)<br />
23. Refuel Control Panel Set<br />
CSO/PO<br />
a. “Pod Supply Valve Switch(s) – MAN/<strong>CL</strong>SD”<br />
b. Interconnect Switch(es) – <strong>CL</strong>SD<br />
24. CNI-MU POD CTRL page 1/3 (If required) Set<br />
CSO/PO<br />
a. Pod Status Indication – STWD LKD Status Highlighted<br />
b. Hydraulic Power LSK – <strong>OF</strong>F<br />
c. Master Power LSK - <strong>OF</strong>F<br />
N<br />
25. Fuel Management Panel “Set”<br />
CSO/PO<br />
a. FUEL TRANSFER Switches – <strong>CL</strong>SD/<strong>OF</strong>F<br />
b. CROSS SHIP Switch – <strong>CL</strong>OSED<br />
c. SPR Valve – DRAIN<br />
d. Tank Select Switches – <strong>OF</strong>F (If used)<br />
N<br />
26. External Drain Pump Control Valves<br />
Positioned for defuel HRS<br />
27. External Drain Pump ON<br />
HRS<br />
28. Leak Check<br />
Complete HRS<br />
N<br />
21