27.12.2012 Views

1 BY ORDER OF THE AFI11-2HC-130JV3 CL-2 SECRETARY OF ...

1 BY ORDER OF THE AFI11-2HC-130JV3 CL-2 SECRETARY OF ...

1 BY ORDER OF THE AFI11-2HC-130JV3 CL-2 SECRETARY OF ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

W<br />

22. CNI-MU POD CTRL page 2/3 Set<br />

CSO/PO<br />

a. “Pod Pump – <strong>OF</strong>F” (If required)<br />

23. Refuel Control Panel Set<br />

CSO/PO<br />

a. “Pod Supply Valve Switch(s) – MAN/<strong>CL</strong>SD”<br />

b. Interconnect Switch(es) – <strong>CL</strong>SD<br />

24. CNI-MU POD CTRL page 1/3 (If required) Set<br />

CSO/PO<br />

a. Pod Status Indication – STWD LKD Status Highlighted<br />

b. Hydraulic Power LSK – <strong>OF</strong>F<br />

c. Master Power LSK - <strong>OF</strong>F<br />

N<br />

25. Fuel Management Panel “Set”<br />

CSO/PO<br />

a. FUEL TRANSFER Switches – <strong>CL</strong>SD/<strong>OF</strong>F<br />

b. CROSS SHIP Switch – <strong>CL</strong>OSED<br />

c. SPR Valve – DRAIN<br />

d. Tank Select Switches – <strong>OF</strong>F (If used)<br />

N<br />

26. External Drain Pump Control Valves<br />

Positioned for defuel HRS<br />

27. External Drain Pump ON<br />

HRS<br />

28. Leak Check<br />

Complete HRS<br />

N<br />

21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!