27.12.2012 Views

1 BY ORDER OF THE AFI11-2HC-130JV3 CL-2 SECRETARY OF ...

1 BY ORDER OF THE AFI11-2HC-130JV3 CL-2 SECRETARY OF ...

1 BY ORDER OF THE AFI11-2HC-130JV3 CL-2 SECRETARY OF ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SEARCH AND RESCUE CHECKLIST<br />

PRE-SEARCH/PRE-DEPLOYMENT CHECKLIST<br />

CHECKLIST<br />

1. “PRE-SEARCH/PRE-DEPLOYMENT CHECKLIST” – PF<br />

a. The PF will call this step as “Pre-search Checklist” or “Predeployment<br />

Checklist” as appropriate for the operation being<br />

conducted<br />

2. “ACKNOWLEDGED” - LM<br />

3. Helmet and Oxygen Mask (if reqd) - “On” - PM, PF, CSO, LM<br />

W<br />

N(3)<br />

4. Cabin Altitude Checks (if reqd) - “Complete” - PM, PF, CSO, LM<br />

a. Mask – On and connected<br />

b. Oxygen regulators – On<br />

c. Mask hose connection – Checked<br />

d. Regulator flow indicator – Checked<br />

e. Parachutist/Personnel Oxygen – Checked<br />

5. Cabin - Prepared<br />

a. Emergency Equipment – As required<br />

b. Loose Equipment – Stowed/secured<br />

c. LPUs – On (as required)<br />

d. MA-1 Kits – Positioned/Secured<br />

6. –Aft Anchor Cable Supports Lowered<br />

(Paratroop Door Exit Only)<br />

7. Anchor Cables - Attached to Center Anchor Cable Supports<br />

(Paratroop Door Exit Only)<br />

8. Anchor Cable Stops - Positioned and Secured<br />

9. Static Line Retriever Cable - Safety Tied and Checked (as reqd)<br />

10. Retrieval Sling Assembly - Attached and Safety Tied (As reqd)<br />

11. Retrieval Assist Strap (Roller Assembly) - Positioned &<br />

Secured (As reqd)<br />

12. ADS Latch Handles - Checked<br />

a. LOCK, UNRESRICTED ramp travel light – <strong>OF</strong>F<br />

N<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!