AnnualReport2023_FINAL_2
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Excellent Service
Excellent Stewardship
Operations Division Annual Report - FY23
Athletics
CORKY OGLESBY
TRACK & FIELD
OFFICES
A new addition to the
Sports Performance Center
was constructed for the
Corky Oglesby Track &
Field offices. The space
includes coaches’ offices,
a conference room, large
break room with a custom
shuffleboard, storage and
restrooms. The new addition
has direct connection
to the existing Sports
Performance Center through
a new doorway and multiple
windows that allow the
coaches to view practice
from their offices and
break room.
JOHN WALKER
SOCCER FIELD
This project focused on
renovating the turf field and
consisted of removing the
existing synthetic turf and
underlying rock drainage
system. A new irrigation
system was installed, along
with approximately 100,000
square feet of earth fill
and mature sod. The work
also included installation
of synthetic turf covering a
concrete pad for the home
and visiting team benches
extending the length of the
grandstands on the west side
of the field. Congratulations to
the women’s soccer team for
their successful season.
26