31.12.2012 Views

Biogas support for Tanzania „BiogaST“ - Ingenieure ohne Grenzen

Biogas support for Tanzania „BiogaST“ - Ingenieure ohne Grenzen

Biogas support for Tanzania „BiogaST“ - Ingenieure ohne Grenzen

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Course of the project<br />

<strong>Ingenieure</strong> <strong>ohne</strong> <strong>Grenzen</strong> e.V. • <strong>Biogas</strong> <strong>support</strong> <strong>for</strong> <strong>Tanzania</strong> <strong>„BiogaST“</strong><br />

PROJECT HANDOUT<br />

Phase 5 - Further development of plant technology and construction<br />

of new digesters in <strong>Tanzania</strong> (phase in progress)<br />

The ongoing phase 5 (11/2011 - 12/2012) compasses following goals:<br />

• Education of an expert <strong>for</strong> the biogas lab and the plant operation<br />

• Enhancement of the plant technology<br />

• Optimisation of the heating system<br />

• Construction of 14 new digesters <strong>for</strong> rural households<br />

• Qualification of the consisting construction team<br />

• Education of new construction teams<br />

• Training of the residents<br />

• Establishing a maintenance system <strong>for</strong> the digesters<br />

Phase 4 - Evaluating and optimising phase in <strong>Tanzania</strong> (terminated)<br />

An evaluation of the new pilot digester at MAVUNO Project site was<br />

carried out in phase 4 (03/2011 - 04/2011). Subsequently, the plant<br />

design was optimised in order to improve the plant operation prior to<br />

the construction of further digesters within the region.<br />

Phase 3 - Implementation in <strong>Tanzania</strong> (terminated)<br />

Phase 3 (08/2010 - 11/2010) covered the construction of the pilot<br />

digester at the MAVUNO Project site in <strong>Tanzania</strong>. Additionally, the<br />

training and education concept was initiated covering the following<br />

aspects:<br />

• Basics of the biogas technology<br />

• Construction of digester<br />

• Commissioning of the digester and the plant operation<br />

• <strong>Biogas</strong> usage<br />

• Repair and maintenance<br />

Experiences and findings of the first two phases were trans<strong>for</strong>med<br />

into the real plant design. An intensive communication with the local<br />

partner MAVUNO Project was valuable to adapt the plant design to<br />

the local needs and habits.<br />

<strong>Ingenieure</strong> <strong>ohne</strong> <strong>Grenzen</strong> e.V. Donations Account Office Management<br />

Headquarter Subject: BiogaST Greifswalder Str. 4<br />

Grüner Weg 11 IBAN DE89533500001030333337 D-10405 Berlin<br />

D-35041 Marburg Bank: Sparkasse Marburg Biedenkopf Fon: 0049 (0)30 - 32 52 98 65<br />

info@ingenieure-<strong>ohne</strong>-grenzen.org SWIFT HELADEF1MAR Fax: 0049 (0)30 - 32 53 28 55<br />

www.ingenieure-<strong>ohne</strong>-grenzen.org • www.biogast.org 3/5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!